<iati-activities version="2.03" generated-datetime="2026-10-25T20:58:48"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P176419</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Enhancing Connectivity in the Northern and Central Agricultural Production Areas of Senegal Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to enhance resilient road connectivity in selected agricultural areas of Senegal and to support road safety institutional capacity development in Senegal.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Enhancing Connectivity in the Northern and Central Agricultural Production Areas of Senegal Project for Senegal is to enhance safe and resilient road connectivity in selected agricultural areas of Senegal. The project comprises of four components. The first component, enhancement of safe and resilient transport connectivity in the selected areas aims to improve connectivity in high agricultural production areas in the north (Ferlo, Delta and Senegal River valley) and center (groundnut basin), to significantly reduce road transport costs and to improve road safety. The second component, support for access to economic opportunities and small community infrastructure will finance small community infrastructure and or income generating activities for the rural population living in the project's area of influence, especially those benefitting women and other groups in a situation of vulnerability. The third component, project management and institutional support to the transport sector consists of following sub-components: (i) project management and implementation support; and (ii) institutional support to the transport sector. The fourth component, contingent emergency response component (CERC) is designed to provide a swift response in the event of an eligible crisis or emergency, by enabling the government to request the World Bank to reallocate project funds to support emergency response and reconstruction.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0048865"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0048864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-03-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hatem Chahbani</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hchahbani@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244181" />
            <name><narrative>Velingara Department</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.986 -13.813</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244290" />
            <name><narrative>Touba Saloum</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.28333 -15.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244388" />
            <name><narrative>Tivaouane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08519 -16.71058</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245297" />
            <name><narrative>Sintiou Vanar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.88333 -15.63333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246548" />
            <name><narrative>Ribo Escale</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.36667 -14.68333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246737" />
            <name><narrative>Payar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.45 -14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246832" />
            <name><narrative>Pambal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.96667 -16.9</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248512" />
            <name><narrative>Mbos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.36667 -15.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248515" />
            <name><narrative>Mboro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.14051 -16.88682</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248975" />
            <name><narrative>Maka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.8481 -15.9503</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249076" />
            <name><narrative>Mabo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.91667 -15.68333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249084" />
            <name><narrative>Lour-Escale</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.21667 -14.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249158" />
            <name><narrative>Loumbel Lana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.2653 -14.7287</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249554" />
            <name><narrative>Koungheul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.98333 -14.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250982" />
            <name><narrative>Kahone</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.15 -16.03333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251230" />
            <name><narrative>Guinguineo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.26667 -15.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251459" />
            <name><narrative>Goui Madi Bouri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.86667 -15.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251576" />
            <name><narrative>Gnibi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.43333 -15.65</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251892" />
            <name><narrative>Ferlo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252468" />
            <name><narrative>Diogo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.3002 -16.8196</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253228" />
            <name><narrative>Darou Alfa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.95 -17</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595222" />
            <name><narrative>Sali</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.44111 -17.01944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010778870" />
            <name><narrative>Birkelane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.0685 -15.69036</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010778872" />
            <name><narrative>Koungheul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.23612 -14.84476</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="74020" percentage="51" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="49" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="94.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="47" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="20" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="95" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="20" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="95" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="95" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="95" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="49" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="11" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="11" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="51" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="100" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="95" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="100" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000726" percentage="95" xml:lang="en"><narrative>Geospatial Services</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2090000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1070000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">2770000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">3470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1890000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1960000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2080000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">3940000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1910000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">4040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2080000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">3100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">3100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">5910000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2780000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">5420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">5410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2710000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">5420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">5470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2740000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2760000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">5530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2770000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2780000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2780000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">6190000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1480965.98</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">4062147.61</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">150000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">117000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">1480966</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">4062148</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">16376962</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">5441999</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">6572516</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">12869594</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">22624970</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">14816868</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">25583048</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">9067987</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">4822906</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">3012380</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">24779063</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1745145</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">6592214</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">10541478</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">22332911</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1633201</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1405853</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">535348</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">2254158</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">20957471</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-6539</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-606211</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-218</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-182317</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-25914</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-226221</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-179844</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-206108</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-254215</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1018237</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-9288</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-248928</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-144545</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1718443</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-154396</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-269811</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1493906</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1617</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-266844</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-463316</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1970386</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48864"><narrative>Road Works and Management Agency (Agence des Travaux et de Gestion des Routes, AGEROUTE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176419"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P176419?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176419"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National laboratory asphalt mix composition level
</narrative></title>
<baseline year="2023" iso-date="2023-04-27" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-27" />
<period-end iso-date="2027-01-15" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RN1 with enhanced road safety infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="40.00">
<comment><narrative>
Ongoing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety audit prepared
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Shops/mini-storage facilities  leased out to female entrepreneurs in improved markets
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="55">
<comment><narrative>
This indicator will measure the proportion of newly constructed shops/storage facilities that are leased to female entrepreneurs.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of multifunctional platforms build or rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="10">
<comment><narrative>
Number of multifunctional platforms build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mobile speed cameras operational
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="50.00">
<comment><narrative>
Ongoing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of GBV complaints treated and referred to service providers
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="100.00">
<comment><narrative>
Ratio number of GVB related complaints treated and referred and total number of GBV complaints reported.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2027-12-07" />
<target value="20,0000">
<comment><narrative>
Cancelled indicators?
</narrative></comment>
</target>
<actual value="31,4990">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Shops/mini-storage facilities  leased out to female entrepreneurs in improved markets
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="55">
<comment><narrative>
This indicator will measure the proportion of newly constructed shops/storage facilities that are leased to female entrepreneurs.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety audit prepared
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the quality of roads in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="85.00">
<comment><narrative>
Share of  of beneficiary that feel project investments reflected their needs along the selected roads
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RN1 with enhanced road safety infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="40.00">
<comment><narrative>
Ongoing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="31,499"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="207,000">
<comment><narrative>
This indicator was added to reflect new climate corporate guidance.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="31,499"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="207,000">
<comment><narrative>
This indicator was added to reflect new climate corporate guidance.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets build or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="5.00">
<comment><narrative>
Number of markets build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vehicles inspected yearly by the new center and the three mobile units
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2030-12-15" />
<target value="430,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of multifunctional platforms build or rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="10">
<comment><narrative>
Number of multifunctional platforms build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Action Plan available
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
A Gender Action Plan will be developed for the project including analysis of the barriers and facilitators that women face in the sector, and the recommendations or activities to address these barriers.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="20,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mobile speed cameras operational
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="50.00">
<comment><narrative>
Ongoing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sustainable mobility plans in two secondary cities
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="2.00">
<comment><narrative>
Two plans in two selected cities for sustainable urban mobility are realized
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the socio-economic infrastructure built in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85.00">
<comment><narrative>
Share of beneficiary that feel project socio-economic infrastructure investments reflected their needs
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of GBV complaints treated and referred to service providers
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="100.00">
<comment><narrative>
Ratio number of GVB related complaints treated and referred and total number of GBV complaints reported.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Budget for Road Maintenance increased
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="10.00">
<comment><narrative>
FERA's budget increased by 10 percent over the life of the project
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff (PIU and Ministry of Transport) trained in climate resilience
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="50.00">
<comment><narrative>
Training on green and resilient management of road projects is given to the staff of AGEROUTE and other entities
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of GBV complaints treated and referred to service providers
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="100.00">
<comment><narrative>
Ratio number of GVB related complaints treated and referred and total number of GBV complaints reported.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Female
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="10,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="20,0000">

</target>
<actual value="296,990">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of multifunctional platforms build or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="7.00">
<comment><narrative>
Number of multifunctional platforms build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="314,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New National Road safety agency is operational
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National laboratory asphalt mix composition level
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Action Plan available
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
A Gender Action Plan will be developed for the project including analysis of the barriers and facilitators that women face in the sector, and the recommendations or activities to address these barriers.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Budget for Road Maintenance increased
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="10.00">
<comment><narrative>
FERA's budget increased by 10 percent over the life of the project
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="296 990">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers build or rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="6">
<comment><narrative>
Number of health care centers build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of paved roads rehabilitated, integrating climate resilience measures
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="414.00">
<comment><narrative>
Length of road receiving rehabilitation which incorporates climate-resilient measures, as described in Annex 7.
</narrative></comment>
</target>
<actual value="212">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Transport strategy prepared
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2025-01-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff (PIU and Ministry of Transport) trained in climate resilience
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="50.00">
<comment><narrative>
Training on green and resilient management of road projects is given to the staff of AGEROUTE and other entities
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vehicles inspected yearly by the new center and the three mobile units
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="430,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of feeder roads rehabilitated, integrating climate resilience measures
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="167.00">
<comment><narrative>
Length of feeder roads constructed which incorporates climate-resilient measures, as described in Annex 7.
</narrative></comment>
</target>
<actual value="83.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Driving license centers built and equipped with computers and operational
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="15.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="20,7000">
<comment><narrative>
This indicator was added to reflect new CRI with updated an increased target and end date extended.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints addressed within the stipulated GRM timeframe
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="100.00">
<comment><narrative>
Percentage of all grievances received through the project level GRM and addressed within the stipulated in the GRM timeframe.

&amp;nbsp;

Currently 455 complaints were received, of which 100 have been addressed&amp;nbsp;
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="25.00">
<comment><narrative>
Target achieved already
</narrative></comment>
</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of feeder roads rehabilitated, integrating climate resilience measures
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="271">
<comment><narrative>
Length of feeder roads constructed which incorporates climate-resilient measures, as described in Annex 7.
</narrative></comment>
</target>
<actual value="83.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of paved roads rehabilitated, integrating climate resilience measures
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="585">
<comment><narrative>
Length of road receiving rehabilitation which incorporates climate-resilient measures, as described in Annex 7.
</narrative></comment>
</target>
<actual value="212">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-26" />
<period-end iso-date="2027-01-15" />
<target value="25.00">

</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="314,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Female
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="10,0000">

</target>
<actual value="145,525">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in project target areas provided with improved access to socio-economic services (schools, health care centers, markets)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570000">
<comment><narrative>
Population of the local communities within 5 km of the improved roads that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="314000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of persons in project target areas provided with improved access to socio-economic services (schools, health care centers, markets) (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="30.00">
<comment><narrative>
Share of population of the local communities benefiting from access road improvements that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets build or rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="10">
<comment><narrative>
Number of markets build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="20,0000">

</target>
<actual value="314990">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented (Yes/No)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
This indicator measures the compliance with safety measures identified during detailed studies and included to Biding documents.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers build or rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="6">
<comment><narrative>
Number of health care centers build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RN1 with enhanced road safety infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="40.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools build or rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="15">
<comment><narrative>
Number of schools build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of paved roads rehabilitated, integrating climate resilience measures
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="414.00">
<comment><narrative>
Length of road receiving rehabilitation which incorporates climate-resilient measures, as described in Annex 7.
</narrative></comment>
</target>
<actual value="183">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented (Yes/No)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
This indicator measures the compliance with safety measures identified during detailed studies and included to Biding documents.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed in road rehabilitation/construction
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="5.00">
<comment><narrative>
This indicator will measure the percentage of women employed in road rehabilitation/construction from the total of the project employees in civil works.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Transport strategy prepared
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction workers that have signed the code of conduct
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="100.00">
<comment><narrative>
Ratio of cumulative number of construction workers that have signed the code of conduct and the total number of construction workers recruited by the contractors
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Transport strategy prepared
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2025-01-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of multifunctional platforms build or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="7.00">
<comment><narrative>
Number of multifunctional platforms build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff (PIU and Ministry of Transport) trained in climate resilience
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="50.00">
<comment><narrative>
Training on green and resilient management of road projects is given to the staff of AGEROUTE and other entities
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers build or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="7.00">
<comment><narrative>
Number of health care centers build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety audit prepared
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="Yes">

</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="30.00">
<comment><narrative>
Ongoing assessment
</narrative></comment>
</target>
<actual value="---">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="30.00">
<comment><narrative>
Ongoing implementation of the RN1 Road Safety measures
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="30.00">
<comment><narrative>
Ongoing implementation of the RN1 Road Safety measures
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of persons in project target areas provided with improved access to socio-economic services (schools, health care centers, markets) (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="30.00">
<comment><narrative>
Share of population of the local communities benefiting from access road improvements that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of persons in project target areas provided with improved access to socio-economic services (schools, health care centers, markets) (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="30.00">
<comment><narrative>
Share of population of the local communities benefiting from access road improvements that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in project target areas provided with improved access to socio-economic services (schools, health care centers, markets)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570000">
<comment><narrative>
Population of the local communities within 5 km of the improved roads that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="314000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in project target areas provided with improved access to socio-economic services (schools, health care centers, markets)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570000">
<comment><narrative>
Population of the local communities within 5 km of the improved roads that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="314000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to/from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to/from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented (Yes/No)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
This indicator measures the compliance with safety measures identified during detailed studies and included to Biding documents.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented (Yes/No)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
This indicator measures the compliance with safety measures identified during detailed studies and included to Biding documents.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary satisfaction with the road infrastructure built under the project
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85">

</target>
<actual value="46">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiary population's satisfaction with the road infrastructure built by the project
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85">

</target>
<actual value="46">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570,000">

</target>
<actual value="31,4000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570,000">

</target>
<actual value="31,4000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New National Road safety agency is operational
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="31,499"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="207,000">
<comment><narrative>
This indicator was added to reflect new climate corporate guidance.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="31,499"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="207,000">
<comment><narrative>
This indicator was added to reflect new climate corporate guidance.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools build or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="10.00">
<comment><narrative>
Number of schools build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="20,7000">
<comment><narrative>
This indicator was added to reflect new CRI with updated an increased target and end date extended.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="20,7000">
<comment><narrative>
This indicator was added to reflect new CRI with updated an increased target and end date extended.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Driving license centers built and equipped with computers and operational
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="15.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-26" />
<period-end iso-date="2027-01-15" />
<target value="25.00">

</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in project target areas provided with improved access to socio-economic services (schools, health care centers, markets)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570000">
<comment><narrative>
Population of the local communities within 5 km of the improved roads that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="314000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sustainable mobility plans in two secondary cities
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="2.00">
<comment><narrative>
Two plans in two selected cities for sustainable urban mobility are realized
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction workers that have signed the code of conduct
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="100.00">
<comment><narrative>
Ratio of cumulative number of construction workers that have signed the code of conduct and the total number of construction workers recruited by the contractors
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="25.00">
<comment><narrative>
Target achieved already
</narrative></comment>
</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Youth
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="5,0000">
<comment><narrative>
Not Available
</narrative></comment>
</target>
<actual value="9,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to/from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary satisfaction with the road infrastructure built under the project
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85">

</target>
<actual value="46">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Youth
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="5,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of feeder roads rehabilitated, integrating climate resilience measures
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="167.00">
<comment><narrative>
Length of feeder roads constructed which incorporates climate-resilient measures, as described in Annex 7.
</narrative></comment>
</target>
<actual value="17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Action Plan available
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
A Gender Action Plan will be developed for the project including analysis of the barriers and facilitators that women face in the sector, and the recommendations or activities to address these barriers.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sustainable mobility plans in two secondary cities
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="2.00">
<comment><narrative>
Two plans in two selected cities for sustainable urban mobility are realized
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff (PIU and Ministry of Transport) trained in climate resilience
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="50.00">
<comment><narrative>
Training on green and resilient management of road projects is given to the staff of AGEROUTE and other entities
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="20,7000">
<comment><narrative>
This indicator was added to reflect new CRI with updated an increased target and end date extended.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Youth
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="5,0000">

</target>
<actual value="9,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the quality of roads in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="85.00">
<comment><narrative>
Share of  of beneficiary that feel project investments reflected their needs along the selected roads
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the quality of roads in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="85.00">
<comment><narrative>
Share of  of beneficiary that feel project investments reflected their needs along the selected roads
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the socio-economic infrastructure built in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85.00">
<comment><narrative>
Share of beneficiary that feel project socio-economic infrastructure investments reflected their needs
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the socio-economic infrastructure built in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85.00">
<comment><narrative>
Share of beneficiary that feel project socio-economic infrastructure investments reflected their needs
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="314,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mobile speed cameras operational
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="296 990">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="314,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="314,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-26" />
<period-end iso-date="2027-01-15" />
<target value="25.00">

</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-26" />
<period-end iso-date="2027-01-15" />
<target value="25.00">

</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="25.00">
<comment><narrative>
Target achieved already
</narrative></comment>
</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="25.00">
<comment><narrative>
Target achieved already
</narrative></comment>
</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="30.00">
<comment><narrative>
Ongoing assessment
</narrative></comment>
</target>
<actual value="---">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets build or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="5.00">
<comment><narrative>
Number of markets build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="30.00">
<comment><narrative>
Ongoing implementation of the RN1 Road Safety measures
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="30.00">
<comment><narrative>
Ongoing implementation of the RN1 Road Safety measures
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of persons in project target areas provided with improved access to socio-economic services (schools, health care centers, markets) (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="30.00">
<comment><narrative>
Share of population of the local communities benefiting from access road improvements that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of persons in project target areas provided with improved access to socio-economic services (schools, health care centers, markets) (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="30.00">
<comment><narrative>
Share of population of the local communities benefiting from access road improvements that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in project target areas provided with improved access to socio-economic services (schools, health care centers, markets)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570000">
<comment><narrative>
Population of the local communities within 5 km of the improved roads that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="314000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in project target areas provided with improved access to socio-economic services (schools, health care centers, markets)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570000">
<comment><narrative>
Population of the local communities within 5 km of the improved roads that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="314000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed in road rehabilitation/construction
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="5.00">
<comment><narrative>
This indicator will measure the percentage of women employed in road rehabilitation/construction from the total of the project employees in civil works.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to/from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to/from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to/from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented (Yes/No)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
This indicator measures the compliance with safety measures identified during detailed studies and included to Biding documents.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented (Yes/No)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
This indicator measures the compliance with safety measures identified during detailed studies and included to Biding documents.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary satisfaction with the road infrastructure built under the project
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85">

</target>
<actual value="46">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiary population's satisfaction with the road infrastructure built by the project
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85">

</target>
<actual value="46">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570,000">

</target>
<actual value="31,4000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570,000">

</target>
<actual value="31,4000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="31,499"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="207,000">
<comment><narrative>
This indicator was added to reflect new climate corporate guidance.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="31,499"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="207,000">
<comment><narrative>
This indicator was added to reflect new climate corporate guidance.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="20,7000">
<comment><narrative>
This indicator was added to reflect new CRI with updated an increased target and end date extended.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community Consultations held with beneficiary feedback integrated into investment decisions
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="60">
<comment><narrative>
This indicator measures the number of consultation engaging the beneficiaries, how the feedback is integrated and the extent to which investment decisions are transparent and participatory.
</narrative></comment>
</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="20,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="20,7000">
<comment><narrative>
This indicator was added to reflect new CRI with updated an increased target and end date extended.
</narrative></comment>
</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed in road rehabilitation/construction
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="5.00">
<comment><narrative>
This indicator will measure the percentage of women employed in road rehabilitation/construction from the total of the project employees in civil works.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570,000">

</target>
<actual value="31,4000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Driving license centers built and equipped with computers and operational
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="15.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers build or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="7.00">
<comment><narrative>
Number of health care centers build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools build or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="10.00">
<comment><narrative>
Number of schools build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of paved roads rehabilitated, integrating climate resilience measures
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="585">
<comment><narrative>
Length of road receiving rehabilitation which incorporates climate-resilient measures, as described in Annex 7.
</narrative></comment>
</target>
<actual value="212">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National laboratory asphalt mix composition level
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2027-12-07" />
<target value="20,0000">

</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiary population's satisfaction with the road infrastructure built by the project
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85">

</target>
<actual value="46">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Transport strategy prepared
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community Consultations held with beneficiary feedback integrated into investment decisions
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="60">
<comment><narrative>
This indicator measures the number of consultation engaging the beneficiaries, how the feedback is integrated and the extent to which investment decisions are transparent and participatory.
</narrative></comment>
</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Youth
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="5,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="30.00">
<comment><narrative>
Ongoing assessment
</narrative></comment>
</target>
<actual value="---">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Budget for Road Maintenance increased
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="10.00">
<comment><narrative>
FERA's budget increased by 10 percent over the life of the project
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community Consultations held with beneficiary feedback integrated into investment decisions
</narrative></title>
<baseline year="2023" iso-date="2023-04-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-27" />
<period-end iso-date="2027-01-15" />
<target value="40.00">

</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mobile speed cameras operational
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="50.00">
<comment><narrative>
Ongoing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New National Road safety agency is operational
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction workers that have signed the code of conduct
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="100.00">
<comment><narrative>
Ratio of cumulative number of construction workers that have signed the code of conduct and the total number of construction workers recruited by the contractors
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints addressed within the stipulated GRM timeframe
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="100.00">
<comment><narrative>
Percentage of all grievances received through the project level GRM and addressed within the stipulated in the GRM timeframe.

&amp;nbsp;

Currently 455 complaints were received, of which 100 have been addressed&amp;nbsp;
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2027-12-07" />
<target value="20,0000">

</target>
<actual value="20,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Shops/mini-storage facilities  leased out to female entrepreneurs in improved markets
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="25.00">
<comment><narrative>
This indicator will measure the proportion of newly constructed shops/storage facilities that are leased to female entrepreneurs.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="30.00">
<comment><narrative>
Ongoing implementation of the RN1 Road Safety measures
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community Consultations held with beneficiary feedback integrated into investment decisions
</narrative></title>
<baseline year="2023" iso-date="2023-04-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-27" />
<period-end iso-date="2027-01-15" />
<target value="40.00">

</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of GBV complaints treated and referred to service providers
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="100.00">
<comment><narrative>
Ratio number of GVB related complaints treated and referred and total number of GBV complaints reported.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the quality of roads in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="85.00">
<comment><narrative>
Share of  of beneficiary that feel project investments reflected their needs along the selected roads
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Budget for Road Maintenance increased
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="10.00">
<comment><narrative>
FERA's budget increased by 10 percent over the life of the project
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="570,000">

</target>
<actual value="31,4000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Shops/mini-storage facilities  leased out to female entrepreneurs in improved markets
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="25.00">
<comment><narrative>
This indicator will measure the proportion of newly constructed shops/storage facilities that are leased to female entrepreneurs.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools build or rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="15">
<comment><narrative>
Number of schools build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Female
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="10,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Action Plan available
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
A Gender Action Plan will be developed for the project including analysis of the barriers and facilitators that women face in the sector, and the recommendations or activities to address these barriers.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National laboratory asphalt mix composition level
</narrative></title>
<baseline year="2023" iso-date="2023-04-27" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-27" />
<period-end iso-date="2027-01-15" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction workers that have signed the code of conduct
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="100.00">
<comment><narrative>
Ratio of cumulative number of construction workers that have signed the code of conduct and the total number of construction workers recruited by the contractors
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets build or rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="10">
<comment><narrative>
Number of markets build or rehabilitated in the selected areas
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety audit prepared
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Changes in annual road crash fatalities along the pilot section of the RN1 road
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="30.00">
<comment><narrative>
Ongoing implementation of the RN1 Road Safety measures
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of persons in project target areas provided with improved access to socio-economic services (schools, health care centers, markets) (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="30.00">
<comment><narrative>
Share of population of the local communities benefiting from access road improvements that is able to access to social infrastructure by motorized transport within 30 minutes.
</narrative></comment>
</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RN1 with enhanced road safety infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="40.00">
<comment><narrative>
Ongoing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2027-12-07" />
<target value="20,0000">

</target>
<actual value="12,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints addressed within the stipulated GRM timeframe
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="100.00">
<comment><narrative>
Percentage of all grievances received through the project level GRM and addressed within the stipulated in the GRM timeframe.

&amp;nbsp;

Currently 455 complaints were received, of which 100 have been addressed&amp;nbsp;
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Female
</narrative></title>
<baseline year="2023" iso-date="2023-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-08" />
<period-end iso-date="2027-12-06" />
<target value="10,0000">

</target>
<actual value="14,8045">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along key connection axes to from selected areas of agricultural production to market areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="70.00">
<comment><narrative>
Average travel time for vehicles between on each road segment
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of feeder roads rehabilitated, integrating climate resilience measures
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="271">
<comment><narrative>
Length of feeder roads constructed which incorporates climate-resilient measures, as described in Annex 7.
</narrative></comment>
</target>
<actual value="83.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints addressed within the stipulated GRM timeframe
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="100.00">
<comment><narrative>
Percentage of all grievances received through the project level GRM and addressed within the stipulated in the GRM timeframe.

&amp;nbsp;

Currently 455 complaints were received, of which 100 have been addressed&amp;nbsp;
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vehicles inspected yearly by the new center and the three mobile units
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2030-12-15" />
<target value="430,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New National Road safety agency is operational
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Driving license centers built and equipped with computers and operational
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="15.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="314,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sustainable mobility plans in two secondary cities
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="2.00">
<comment><narrative>
Two plans in two selected cities for sustainable urban mobility are realized
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the socio-economic infrastructure built in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85.00">
<comment><narrative>
Share of beneficiary that feel project socio-economic infrastructure investments reflected their needs
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vehicles inspected yearly by the new center and the three mobile units
</narrative></title>
<baseline year="2023" iso-date="2023-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-05" />
<period-end iso-date="2027-01-15" />
<target value="430,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the quality of roads in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="85.00">
<comment><narrative>
Share of  of beneficiary that feel project investments reflected their needs along the selected roads
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the quality of roads in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="85.00">
<comment><narrative>
Share of  of beneficiary that feel project investments reflected their needs along the selected roads
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the socio-economic infrastructure built in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85.00">
<comment><narrative>
Share of beneficiary that feel project socio-economic infrastructure investments reflected their needs
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population expressing satisfaction with the socio-economic infrastructure built in their area (Disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="85.00">
<comment><narrative>
Share of beneficiary that feel project socio-economic infrastructure investments reflected their needs
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="314,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="296 990">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="314,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons living within 5 km of an all-weather road in the selected areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="350,000.00">
<comment><narrative>
Number of populations living within 5 km of targeted road sections that have improved access to road that has been constructed or rehabilitated under the project
</narrative></comment>
</target>
<actual value="314,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-26" />
<period-end iso-date="2027-01-15" />
<target value="25.00">

</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-26" />
<period-end iso-date="2027-01-15" />
<target value="25.00">

</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="25.00">
<comment><narrative>
Target achieved already
</narrative></comment>
</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Experts trained on conducting road safety audits
</narrative></title>
<baseline year="2023" iso-date="2023-04-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-15" />
<period-end iso-date="2030-12-15" />
<target value="25.00">
<comment><narrative>
Target achieved already
</narrative></comment>
</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project roads completed with road safety measures implemented
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="Yes">
<comment><narrative>
Measure the compliance with safety measures identified during detailed studies and included to Biding documents
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed in road rehabilitation/construction
</narrative></title>
<baseline year="2022" iso-date="2022-01-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-07" />
<period-end iso-date="2027-01-15" />
<target value="5.00">
<comment><narrative>
This indicator will measure the percentage of women employed in road rehabilitation/construction from the total of the project employees in civil works.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P087304</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Dakar Diamniadio Toll Highway</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Objective of the project is to : (i) improve mobility between Dakar and Diamniadio; and (ii) provide communities affected by the construction of the highway access to basic social and economic services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Dakar Diamniadio Toll Highway (DDTH) Project for Senegal are to: (i) improve mobility between Dakar and Diamniadio; and (ii) provide communities affected by the construction of the highway access to basic social and economic services. There are four components to the project, the first component being road infrastructure. The Government of Senegal (GoS) has been keen to attract private sector involvement in the project via a Public Private Partnership (PPP) arrangement as a way of: (1) mobilizing private sector investment in the road sector; and (2) ensuring that it will be built, operated, and maintained to the largest extent possible by the private sector. The second component is the right of way clearing, urban development of the Tivaouane Peulh resettlement site, and implementation of the Mbao forest management plan. The third component is the urban restructuring of Pikine Irrigulier Sud. The main objectives of this component will thus be to: (a) provide incentive and framework for securing land ownership titles for current residents; and (b) improve the livelihoods of the population through better access to basic services such as land titles, health care, education, and commercial facilities. Finally, the fourth component is the program implementation. This component will include all activities related to the coordination and supervision of the program activities as performed by the Investment Promotion and Large Projects Agency (APIX, s.a.), including the monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0000615"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0000615"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0000614"><narrative>APIX</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2005-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-06-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-01-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-01-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Eric R. Lancelot</narrative></person-name><telephone>+1-202-473-1000</telephone><email>elancelot@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246678" />
            <name><narrative>Pikine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76457 -17.390711</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252753" />
            <name><narrative>Diamniadio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.06667 -16.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>Region de Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.283331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.444059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595714" />
            <name><narrative>Patte d'Oie</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.74363 -17.43347</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="16011" percentage="14" xml:lang="en"/><sector vocabulary="1" code="21012" percentage="59" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="27" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="13" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="1" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="23" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="23" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="13" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="1" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="41" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="41" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="23" xml:lang="en"><narrative>Jobs</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">791111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">8400492.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">8400492.55</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">105000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-5427233</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-5134484</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">1556977</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">5065826</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">17279722</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">2487465</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">1872409</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">5552043</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">4242397</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">547976</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">212290</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">1906855</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">2382191</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">291416</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">1732749</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">879715</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">428997</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">934840</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">416074</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">812334</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">162887</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">184224</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">2312666</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">169743</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">181866</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">842293</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">978741</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">478488</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">2651686</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">1156972</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">1379909</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">699968</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">1994839</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">416439</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">236133</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">3091267</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1105819</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">166130</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">305963</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">2911596</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1101981</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">507299</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">203148</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">308855</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">1348867</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">450806</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">272302</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">502704</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">191972</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">416046</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">86399</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">3117457</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">218287</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">377325</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">1731138</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">327009</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">169814</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">155369</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">1035934</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">2215394</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">102254</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">1497933</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">1682531</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">736182</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">871356</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">1110975</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">1269411</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">1901005</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">572731</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">419737</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">166756</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">797055</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">1541879</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-282366</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-555943</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-18181</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-116755</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-157374</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-175140</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-181552</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-208222</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-232248</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-237923</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-231469</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-272862</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-270570</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-283778</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-296633</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-323347</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-342932</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-340318</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-330425</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-321024</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-336315</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-332046</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-321777</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-336789</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-289908</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-309502</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-293423</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-267433</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-315992</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-292332</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-287894</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-289800</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-285590</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-875802</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-878985</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-903527</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-911078</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-909497</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-879731</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-821557</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-849059</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-841074</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-849289</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-860578</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-862395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-875290</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3765</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-871360</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-614"><narrative>APIX</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P087304"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P087304?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P087304"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Keur Massar - Diamniadio
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="13.00">
<comment><narrative>
Fully achieved. This is a breakdown of the roads constructed, non rural indicator and represents section 4 of Phase 3.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PIS Restructuring
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="4.20">
<comment><narrative>
Target not achieved. This indicator should be &quot;Kilometers of roads constructed in PIS&quot; instead of &quot;PIS restructuring&quot; and is supposed to measure the length of local roads in PIS as part of the urban restructuring. The construction of the roads in PIS could not be completed as planned because the right of way in some sections was not cleared. The lack of funds for compensations affected the copletion of these works.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Malick Sy- Patte d'Oie
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="7.00">
<comment><narrative>
Fully achieved. This is a breakdown of the roads constructed, non rural indicator and represents phase 1.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads constructed, non-rural
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="32.00">
<comment><narrative>
Fully achieved. Phase 1: Malick Sy – Patte d’Oie : 7 km financed by GoS; Phase 2: Patte d’Oie – Pikine: 5 km financed by GoS but toll system included under this project; Phase 3: Pikine – Diamniadio: 20 km built under this project with toll systems. The baseline already included the first section of the highway from Malick Sy to Patte d'Oie.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population displaced satisfied with relocation services (%)
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="100.00">
<comment><narrative>
Target fully achieved. Overall at project completion and based on the surveys performed by the implementing agency, 100% of the population displaced were satisfied with the relocation services against of target of 90% thanks to the wide range of benefits offered to PAPs as part of the resettlement package.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New socioeconomic services constructed
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="203.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="219.00">
<comment><narrative>
Target exceeded at 102%. An additional 16 facilities was constructed compared to the 11 originally planned in PIS.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pikine - Keur Massar
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2017-01-31" />
<target value="7.00">
<comment><narrative>
Fully achieved. This is a breakdown of the roads constructed, non rural indicator and represents section 3 of Phase 3.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Patte d'Oie -Pikine
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2016-11-30" />
<target value="5.00">
<comment><narrative>
Fully achieved. This is a breakdown of the roads constructed, non rural indicator and represents Phase 2.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Unresolved PAPs after one year of lodging complaint (Percentage)
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="0.00">
<comment><narrative>
Fully Achieved. All complaints received were resolved within a year.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Displaced children sent to school in PIS and Resettlement Zone
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="58.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="85.00">
<comment><narrative>
Target exceeded at 106%
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Housing units constructed
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="215.00">
<comment><narrative>
Target not achieved. Originally this indicator was supposed to compute the number of houses built by the project in TP. During project implementation, it was agreed that the beneficiaries would build their own houses and thus this indicator should have been revised accordingly. Not all 2000 lots were allocated as originally planned. Out of 1662 lots allocated, 215 houses are constructed and occupied and 602 are under construction by PAPs.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of traffic on toll highway
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="25000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="60000.00">
<comment><narrative>
Target exceeded at 133%. In July 2015, the volume had already reached 45,000 and by May 2018, the volume of traffic reached  73,000. This indicator measured the volume of traffic on Phases 2 and 3 which have toll systems financed by the project.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of drainage canals constructed (meters)
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="4780.00">
<comment><narrative>
Target exceeded at 131%. The length of drainage canal increased thanks to complementary drainage works completed.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roundtrips between Dakar and Rufisque on weekdays per public transpot mini-bus (Number)
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="4.00">
<comment><narrative>
Fully achieved. The first buses to operate earlier morning can even go up to 5 round trips/day. Rufisque is a suburb of Dakar (13 kms from Dakar centre) with a large number of commuters using public transport services to reach the city centre for work, school or economic activities. The number of round trips between Dakar and Rufisque is a very good indicator to measure the improvement of urban mobility in Dakar.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Surface area in PIS liable to flooding (hectares)
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="210"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="142">
<comment><narrative>
Indicator partially achieved. After project,142 ha remain liable to flooding against a target of 119. The RF includes the corrected baseline and target established during implementation. At appraisal, the baseline for the indicator ‘Surface area in PIS liable tolooding (hectares)’ was 90 ha and the target was set at 15 ha. However, in 2009, a study conducted by APIX concluded that the surface in PIS liable to flooding was 210 ha (30 percent of the total surface of PIS - 700 ha) instead of 90 ha, and the objective of the project was to decrease that area to 119 ha.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People within 150 meters of an asphalted all year round road in PIS
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="109000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="199226.00">
<comment><narrative>
Partially achieved (80%). The target of 250,000 people was not fully achieved as the project only financed the construction of 4.2 kms of roads compared to an initial target of 28 km due to the slow clearing of the right of way in PIS that affected the construction of the local roads.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Dakar and Diamniadio
</narrative></title>
<baseline year="2009" iso-date="2009-05-06" value="90.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-06" />
<period-end iso-date="2018-01-31" />
<target value="25.00">
<comment><narrative>
Target exceeded  at 115%. This indicator measured the travel time on the highway including Phases 1, 2 and 3
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P178673</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal: Integrated Water Security and Sanitation Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to promote water security in selected areas of Senegal.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Integrated Water Security and Sanitation Program Multiphase Programmatic Approach (MPA) Including Phase 1 Credit for the Integrated Water Security and Sanitation Project for Senegal is to improve access to safe water supply and sanitation, and to increase resilience to flood and drought risks. There are four components to the project, the first component being water resources management and protection. This component will promote water security and resilience to climate change-exacerbated droughts and floods through the restoration of depleted or polluted sources and improved management. This component includes three subcomponents: Restoring strategic water resources of Lac de Guiers, Improving Diass and Littoral Nord groundwater recharge and management, and Strengthening WRM governance and developing new water sources in the Niayes area and in the Groundnut Basin. The second component is the Improving sanitation in a circular economy. This component includes three subcomponents: Improving access to urban sanitation, strengthening Irrigation Systems, and Improving access to rural sanitation. The third component is the improving water supply services. This component includes two subcomponents: Improving urban water supply services and improving rural water supply services. Finally, the fourth component is the Sectors reforms, strengthening citizen engagement, and project management. This component includes two subcomponents: sector reforms, and citizen engagement and project management.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0051911"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-00006493"><narrative>DGPRE</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-06-21"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-06-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Thierry Davy</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tdavy@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<contact-info type="2">
<mailing-address><narrative>
CitE TP SOM n°4 Hann, Dakar, Senegal, (+221) 33 859 35 35, onas@onas.sn

</narrative></mailing-address></contact-info>

<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="67" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="67" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="16" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="16" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="15" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="15" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="2" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="0" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="0" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="0" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="0" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000716" percentage="0" xml:lang="en"><narrative>Urban Water and Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="0" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="0" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000724" percentage="0" xml:lang="en"><narrative>Rural Water and Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="0" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="0" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">8583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">8583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">8583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">8583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">8583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">8583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">8583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">8583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">8583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">8583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">8583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">8583344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2916677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">599999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">599999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">600002.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1333344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">2500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">8583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">8583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">8583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">8583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">8583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">8583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">8583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">8583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">8583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">8583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">8583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">8583344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2916677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1166677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">599999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">599999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">600002.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">185300196.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">185300196.99</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-51909"><narrative>Cellule de Planification MHA; DGPRE; OLAC; ONAS; SONES</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">856422</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-51909"><narrative>Cellule de Planification MHA; DGPRE; OLAC; ONAS; SONES</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">5985065</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-51909"><narrative>Cellule de Planification MHA; DGPRE; OLAC; ONAS; SONES</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">7858315</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-51909"><narrative>Cellule de Planification MHA; DGPRE; OLAC; ONAS; SONES</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-205837</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-51909"><narrative>Cellule de Planification MHA; DGPRE; OLAC; ONAS; SONES</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-535612</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-51909"><narrative>Cellule de Planification MHA; DGPRE; OLAC; ONAS; SONES</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-39</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-51909"><narrative>Cellule de Planification MHA; DGPRE; OLAC; ONAS; SONES</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-334755</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-51909"><narrative>Cellule de Planification MHA; DGPRE; OLAC; ONAS; SONES</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-428032</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-51909"><narrative>Cellule de Planification MHA; DGPRE; OLAC; ONAS; SONES</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178673"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178673?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178673"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water supply PPP project bid out as a result of project-financed technical assistance.
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">
<comment><narrative>
Activities have not yet begun.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Groundwater salinity at Panthior dam
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="5,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="800">
<comment><narrative>
The technical and financial report for the rehabilitation of Panthior has been reviewed and will be finalized once the dam safety study becomes available. A consultant was recruited to conduct this study and has submitted the report, which will be shared with the Bank in the near future. Construction activities planned in 2026.
</narrative></comment>
</target>
<actual value="5000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of wastewater treated daily
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="39,000">
<comment><narrative>
The advisory mandate between IFC, ONAS, and the Ministry was signed on October 7, 2025. IFC has begun recruiting the consultants who will structure the transaction. The bidding process is expected to be launched in September 2026, and the recruitment of the private partner is expected to be completed by May 2027
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SDAGE committees supported by the Project
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="6">
<comment><narrative>
Technical assistance for the design of SDAGE committees at water basin and sub-basin levels has started. The consultant has submitted the report on the presentation of the planned actions and the ongoing IWRM activities in the three priority water basin.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Circular economy strategy developed and under implementation
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
Terms of reference are being developed based on going work with the OECD and are expected in early 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction of beneficiaries with project activities as demonstrated through beneficiary survey
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-05-30" />
<target value="75">
<comment><narrative>
This indicator measures the roll out and application of a beneficiary survey to be carried out at midterm, and the use of survey results to inform project activities for the rest of the implementation period.
</narrative></comment>
</target>
<actual value="Not yet available">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers provided with irrigation services from treated wastewater reuse
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="3,000">
<comment><narrative>
The achievement of targets is conditioned to the implementation of the sanitation system (see above). Engineering studies ongoing for the irrigation system. Construction activities expected to start in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks (includes flood and drought risks) (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="603,000">
<comment><narrative>
Achievements of targets will be linked to the delivery of sewerage services and irrigation services from treated wastewater
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Circular economy strategy developed and under implementation
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
Terms of reference are being developed based on going work with the OECD and are expected in early 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household sewerage connections constructed
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="21,000">
<comment><narrative>
Tenders for construction activities planned to start shortly.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with irrigation services from treated wastewater reuse
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="600">
<comment><narrative>
The achievement of targets is conditioned to the implementation of the sanitation system (see above). Engineering studies ongoing for the irrigation system. Construction activities expected to start in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual power generation from biogas
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="7,400">
<comment><narrative>
The advisory mandate between IFC, ONAS, and the Ministry was signed on October 7, 2025. IFC has begun recruiting the consultants who will structure the transaction. The bidding process is expected to be launched in September 2026, and the recruitment of the private partner is expected to be completed by May 2027
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women in decision-making positions within SDAGE committees (Percentage)
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="30">
<comment><narrative>
See above
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks (includes flood and drought risks) (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="603,000">
<comment><narrative>
Achievements of targets will be linked to the delivery of sewerage services and irrigation services from treated wastewater
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers provided with irrigation services from treated wastewater reuse
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="3,000">
<comment><narrative>
The achievement of targets is conditioned to the implementation of the sanitation system (see above). Engineering studies ongoing for the irrigation system. Construction activities expected to start in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Groundwater salinity at Panthior dam
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="5,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="800">
<comment><narrative>
The technical and financial report for the rehabilitation of Panthior has been reviewed and will be finalized once the dam safety study becomes available. A consultant was recruited to conduct this study and has submitted the report, which will be shared with the Bank in the near future. Construction activities planned in 2026.
</narrative></comment>
</target>
<actual value="5000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women in decision-making positions within SDAGE committees (Percentage)
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="30">
<comment><narrative>
See above
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with irrigation services from treated wastewater reuse
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="600">
<comment><narrative>
The achievement of targets is conditioned to the implementation of the sanitation system (see above). Engineering studies ongoing for the irrigation system. Construction activities expected to start in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers trained with climate-resilient agriculture and irrigation techniques
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="2,000">
<comment><narrative>
Training will start in 2026
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of treated wastewater delivered daily for reuse in irrigation in areas that are vulnerable to droughts and saltwater intrusion
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="35,000">
<comment><narrative>
Construction activities for the sewerage and irrigation systems are expected to start in 2026, and to be completed in 2028. Preparatory engineering activities are ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Private capital mobilized by ONAS, leveraging World Bank financing under the project
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
This indicator monitor the formalization of PPP arrangements for the wastewater treatment plant. Expected in 2027
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of wastewater treated daily
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="39,000">
<comment><narrative>
The advisory mandate between IFC, ONAS, and the Ministry was signed on October 7, 2025. IFC has begun recruiting the consultants who will structure the transaction. The bidding process is expected to be launched in September 2026, and the recruitment of the private partner is expected to be completed by May 2027
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of sewerage network constructed
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="400">
<comment><narrative>
Tenders for construction activities planned to start shortly.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed sanitation services (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="600,000">
<comment><narrative>
Construction activities for the sewerage system are expected to start in 2026 and to be completed in 2028. Engineering design work has been finalized, and the tender documents are about to be issued.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water supply network macro sectorization effective in Dakar 2 service area
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">
<comment><narrative>
For the large-scale and detailed sectorization study under the DMT, Mission 3 is underway, but the progress is hindered by the pending key data requested from SEN’EAU since September 30, 2025. The delay in the project is mainly due to the necessary harmonization between SEN’EAU's GIS (December 2024 version) and the hydraulic model from the updated Dakar–ThiEs–Petite Côte master plan study.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers trained with climate-resilient agriculture and irrigation techniques
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="2,000">
<comment><narrative>
Training will start in 2026
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Private capital mobilized by ONAS, leveraging World Bank financing under the project
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
This indicator monitor the formalization of PPP arrangements for the wastewater treatment plant. Expected in 2027
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of treated wastewater delivered daily for reuse in irrigation in areas that are vulnerable to droughts and saltwater intrusion
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="35,000">
<comment><narrative>
Construction activities for the sewerage and irrigation systems are expected to start in 2026, and to be completed in 2028. Preparatory engineering activities are ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed sanitation services (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="600,000">
<comment><narrative>
Construction activities for the sewerage system are expected to start in 2026 and to be completed in 2028. Engineering design work has been finalized, and the tender documents are about to be issued.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of sewerage network constructed
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="400">
<comment><narrative>
Tenders for construction activities planned to start shortly.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction of beneficiaries with project activities as demonstrated through beneficiary survey
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-05-30" />
<target value="75">
<comment><narrative>
This indicator measures the roll out and application of a beneficiary survey to be carried out at midterm, and the use of survey results to inform project activities for the rest of the implementation period.
</narrative></comment>
</target>
<actual value="Not yet available">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual power generation from biogas
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="7,400">
<comment><narrative>
The advisory mandate between IFC, ONAS, and the Ministry was signed on October 7, 2025. IFC has begun recruiting the consultants who will structure the transaction. The bidding process is expected to be launched in September 2026, and the recruitment of the private partner is expected to be completed by May 2027
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed sanitation services (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="600,000">
<comment><narrative>
Construction activities for the sewerage system are expected to start in 2026 and to be completed in 2028. Engineering design work has been finalized, and the tender documents are about to be issued.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed sanitation services (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="600,000">
<comment><narrative>
Construction activities for the sewerage system are expected to start in 2026 and to be completed in 2028. Engineering design work has been finalized, and the tender documents are about to be issued.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks (includes flood and drought risks) (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="603,000">
<comment><narrative>
Achievements of targets will be linked to the delivery of sewerage services and irrigation services from treated wastewater
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks (includes flood and drought risks) (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="603,000">
<comment><narrative>
Achievements of targets will be linked to the delivery of sewerage services and irrigation services from treated wastewater
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Population living in water resources management basins/sub-basins whose management committees are operational, and where water resources data is available in real time to the general public
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="7,150,000">
<comment><narrative>
This indicator estimates the population living in WRM basins and sub/basins where local WRM committees including water users representatives are operational, and for which DGPRE publishes at least on a monthly basis water resources bulletins. Technical assistance for the operationalization of WRM committees has started.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Population living in water resources management basins/sub-basins whose management committees are operational, and where water resources data is available in real time to the general public
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="7,150,000">
<comment><narrative>
This indicator estimates the population living in WRM basins and sub/basins where local WRM committees including water users representatives are operational, and for which DGPRE publishes at least on a monthly basis water resources bulletins. Technical assistance for the operationalization of WRM committees has started.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of treated wastewater delivered daily for reuse in irrigation in areas that are vulnerable to droughts and saltwater intrusion
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="35,000">
<comment><narrative>
Construction activities for the sewerage and irrigation systems are expected to start in 2026, and to be completed in 2028. Preparatory engineering activities are ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of treated wastewater delivered daily for reuse in irrigation in areas that are vulnerable to droughts and saltwater intrusion
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="35,000">
<comment><narrative>
Construction activities for the sewerage and irrigation systems are expected to start in 2026, and to be completed in 2028. Preparatory engineering activities are ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water supply network macro sectorization effective in Dakar 2 service area
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">
<comment><narrative>
For the large-scale and detailed sectorization study under the DMT, Mission 3 is underway, but the progress is hindered by the pending key data requested from SEN’EAU since September 30, 2025. The delay in the project is mainly due to the necessary harmonization between SEN’EAU's GIS (December 2024 version) and the hydraulic model from the updated Dakar–ThiEs–Petite Côte master plan study.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Population living in water resources management basins/sub-basins whose management committees are operational, and where water resources data is available in real time to the general public
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="7,150,000">
<comment><narrative>
This indicator estimates the population living in WRM basins and sub/basins where local WRM committees including water users representatives are operational, and for which DGPRE publishes at least on a monthly basis water resources bulletins. Technical assistance for the operationalization of WRM committees has started.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Population living in water resources management basins/sub-basins whose management committees are operational, and where water resources data is available in real time to the general public
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="7,150,000">
<comment><narrative>
This indicator estimates the population living in WRM basins and sub/basins where local WRM committees including water users representatives are operational, and for which DGPRE publishes at least on a monthly basis water resources bulletins. Technical assistance for the operationalization of WRM committees has started.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed sanitation services (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="600,000">
<comment><narrative>
Construction activities for the sewerage system are expected to start in 2026 and to be completed in 2028. Engineering design work has been finalized, and the tender documents are about to be issued.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed sanitation services (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="600,000">
<comment><narrative>
Construction activities for the sewerage system are expected to start in 2026 and to be completed in 2028. Engineering design work has been finalized, and the tender documents are about to be issued.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks (includes flood and drought risks) (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="603,000">
<comment><narrative>
Achievements of targets will be linked to the delivery of sewerage services and irrigation services from treated wastewater
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks (includes flood and drought risks) (MPA indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="603,000">
<comment><narrative>
Achievements of targets will be linked to the delivery of sewerage services and irrigation services from treated wastewater
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Population living in water resources management basins/sub-basins whose management committees are operational, and where water resources data is available in real time to the general public
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="7,150,000">
<comment><narrative>
This indicator estimates the population living in WRM basins and sub/basins where local WRM committees including water users representatives are operational, and for which DGPRE publishes at least on a monthly basis water resources bulletins. Technical assistance for the operationalization of WRM committees has started.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Population living in water resources management basins/sub-basins whose management committees are operational, and where water resources data is available in real time to the general public
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="7,150,000">
<comment><narrative>
This indicator estimates the population living in WRM basins and sub/basins where local WRM committees including water users representatives are operational, and for which DGPRE publishes at least on a monthly basis water resources bulletins. Technical assistance for the operationalization of WRM committees has started.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of treated wastewater delivered daily for reuse in irrigation in areas that are vulnerable to droughts and saltwater intrusion
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="35,000">
<comment><narrative>
Construction activities for the sewerage and irrigation systems are expected to start in 2026, and to be completed in 2028. Preparatory engineering activities are ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of treated wastewater delivered daily for reuse in irrigation in areas that are vulnerable to droughts and saltwater intrusion
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="35,000">
<comment><narrative>
Construction activities for the sewerage and irrigation systems are expected to start in 2026, and to be completed in 2028. Preparatory engineering activities are ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household sewerage connections constructed
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="21,000">
<comment><narrative>
Tenders for construction activities planned to start shortly.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SDAGE committees supported by the Project
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-06-01" />
<target value="6">
<comment><narrative>
Technical assistance for the design of SDAGE committees at water basin and sub-basin levels has started. The consultant has submitted the report on the presentation of the planned actions and the ongoing IWRM activities in the three priority water basin.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water supply PPP project bid out as a result of project-financed technical assistance.
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">
<comment><narrative>
Activities have not yet begun.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P172723</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>First Equitable and Resilient Recovery in Senegal DPF</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective of this programmatic DPO is to enable equitable growth and sustainably increase resilience of households, firms and fiscal accounts.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the First Equitable and Resilient Recovery Development Policy Financing in Senegal support structural reforms for equitable and resilient growth post COVID-19. It is the first in a series of two programmatic development policy operations (DPO). The development objective is to enable equitable growth and sustainably increase the resilience of households (Pillar 1), firms and fiscal accounts (Pillar 2). The program consists of policy reforms to: (a) boost the resilience and productivity of human capital by sustainably and equitably broadening access to healthcare, social assistance, and economic opportunities for women on the labor market (Pillar 1); and (b) boost macro-fiscal resilience and private sector participation for productive jobs by improving debt management and equitable tax revenue mobilization, while boosting the growth potential of the private sector, focusing on access to finance, and competitive private sector participation economy-wide and in the digital and energy sectors (Pillar 2).]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0043909"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0043910"><narrative>Ministry of Finance and Budget, Republic of Senegal</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-10-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-06-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Markus Kitzmuller</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mkitzmuller@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15126" percentage="25" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="16" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="13" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="13" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="12" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="12" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="9" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FK" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Capital Markets</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="12.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="13" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="13" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="13" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="13" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="10" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="13" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="13" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="13" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="10" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="13" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="13" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="3" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="13" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="13" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="13" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="13" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="13" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="13" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="3" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="25" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="9" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="13" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="13" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="3" xml:lang="en"><narrative>Adaptation</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">300000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">300000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">19173825.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">19173825.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">300000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43910"><narrative>Ministry of Finance and Budget, Republic of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">280826175</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43910"><narrative>Ministry of Finance and Budget, Republic of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-2372101</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43910"><narrative>Ministry of Finance and Budget, Republic of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-1816116</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43910"><narrative>Ministry of Finance and Budget, Republic of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1803409</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43910"><narrative>Ministry of Finance and Budget, Republic of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1828712</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43910"><narrative>Ministry of Finance and Budget, Republic of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1792638</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43910"><narrative>Ministry of Finance and Budget, Republic of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1941021</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43910"><narrative>Ministry of Finance and Budget, Republic of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1912743</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43910"><narrative>Ministry of Finance and Budget, Republic of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172723"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P172723?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172723"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P172524</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Digital Economy Acceleration Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Expand access to affordable and climate resilient broadband connectivity and improve adoption of online government services and electronic medical records.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Digital Economy Acceleration Project for Senegal is to expand access to affordable and climate resilient broadband connectivity and improve adoption of online government services and electronic medical records. The project comprises of six components. The first component, strengthening climate-informed legal, regulatory, and institutional environment for digital economy will finance technical assistance (TA) activities to strengthen analog foundations to underpin a vibrant, safe, and inclusive digital economy by supporting key sectoral reforms. It consists of following sub-components: (i) improving telecom and broadband market competition; and (ii) strengthening enabling environment for digital economy. The second component, expanding digital broadband connectivity and digital inclusion will expand the national fiber optic backbone and the last-mile connectivity in selected areas. It consists of following sub-components: (i) expanding national fiber optic backbone; and (ii) expanding last-mile connectivity in Casamance and groundnut basin. The third component, supporting digital adoption aims to accelerate broadband uptake and increase the participation of the population in the digital economy by addressing key demand-side barriers: the provision of useful local content through digital public services and the enhancement of digital literacy and skills. It consists of following sub-components: (i) enhancing e-government technical foundations and services; and (ii) strengthening basic and intermediary digital skills. The fourth component, digitalizing selected health and social action systems and services will aim to support Ministry of Health and Social Action (MSAS) in leveraging digital technologies to strengthen the accessibility, quality, and security of healthcare services and health information in line with the strategic orientations of health system digitization program (PDSS). It consists of following sub-components: (i) infrastructure, connectivity, and equipment; (ii) governance, policy, and capacity reinforcement; and (iii) digital health platforms and services. The fifth component, project management will provide support for the management and implementation of project associated activities. The sixth component, contingent emergency response component is added to the project structure to provide support to the Government of Senegal (GoS) to swiftly respond to an eligible crisis, including climate or natural disasters and public health emergencies.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0043652"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0043652"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-00012469"><narrative>Ministry of Finance and Budget</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2020-12-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-02-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Eric Raoul Philippe Dunand</narrative></person-name><telephone>+1-202-473-1000</telephone><email>edunand@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.497401 -14.452362</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.28333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253435" />
            <name><narrative>Casamance</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.75 -15.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="22011" percentage="79" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="21" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="64.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="31.0000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="26" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="31" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="44" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="18" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000262" percentage="75" xml:lang="en"><narrative>ICT Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="26" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="44" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="44" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="6" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="44" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="33" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="100" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="44" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="44" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">3791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">3791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">3791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">3791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">3791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">3791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">3791666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">125000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">125000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">125000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">125000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">125000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">125000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">125000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">140080796.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">140080796.18</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">150000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">637039</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">2971929</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">65073</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">106666</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">177141</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">1128203</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">530683</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">252058</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">94676</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">89042</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">201088</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">286695</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">366585</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">680093</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">938712</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">855794</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">537725</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-388622</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-387136</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-275982</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-279554</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-316</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-316695</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-334382</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43653"><narrative>Ministry of Communication, Telecommunications, and Digital (MCTN); Ministry of Finance and Budget; Ministry of Health and Public Hygiene</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172524"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P172524?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172524"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People with disabilities having access to electronic equal opportunity cards
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="8.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="50.00">
<comment><narrative>
Percentage of people with disabilities for whom an electronic equal opportunity card is available (through the digitization of the people with disabilities record)
</narrative></comment>
</target>
<actual value="8.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Patients, for whom an electronic medical record is available
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="1,500,000.00">
<comment><narrative>
Total cumulative number of primary care patients, for whom an electronic medical record (EMR) is available (through the implementation of a platform for the management of patients' EMR).
</narrative></comment>
</target>
<actual value="200,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Geo-referenced map of healthcare facilities available online
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="Yes">
<comment><narrative>
This indicator will track the implementation of the online Geo-referenced map of healthcare facilities available on MSAS website.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Geo-referenced map of healthcare facilities available online
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="Yes">
<comment><narrative>
This indicator will track the implementation of the online Geo-referenced map of healthcare facilities available on MSAS website.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of MNOs, ISPs, and wholesale operators buying capacity from the infrastructure deployed
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="4.00">
<comment><narrative>
Number of mobile network operators, Internet service providers, and wholesale operators that buy bandwidth capacity from the infrastructure deployed under the project (fiber optic backbone or access infrastructure). This indicator is to capture the impact of the project on competition, which is expected to translate into a higher number of service providers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eligible women, for whom electronic maternal records are available
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="25.00">
<comment><narrative>
This indicator will track the share of eligible women, for whom electronic maternal records are available (through the digitization of the mother and child health record)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public healthcare facilities connected to internet
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="30.00">
<comment><narrative>
Share of public healthcare facilities (including hospitals and non-hospital public health establishments, health centers, and health posts) benefitting from new or enhanced (through internal network cabling and IT equipment) broadband connectivity services under the project.
The baseline is represented by the 51 health structures connected through the governmental intranet (out of a total of 1600 structures at the national level).
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Government enterprise architecture developed
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="Yes">
<comment><narrative>
Based on the national e-Government strategy and roadmap, the GoS established a comprehensive government enterprise architecture in order to leverage digital resources as a driver of organizational transformation.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial viability model for digital health interventions developed
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="Yes">
<comment><narrative>
The indicator will track whether the government has developed sustainable digital health financing mechanisms to ensure that costs on personnel and digital systems to be supported by the project will be integrated into the national health financing after the project closure.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have completed digital skills training (obtained a certificate) under the project
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="5,000.00">
<comment><narrative>
Total cumulative number of individuals that complete trainings (i.e., obtain a certificate) in digital skills (including digital literacy, digital financial literacy, usage of digital government services, intermediate digital skills) either in-person, virtually, or under a hybrid approach.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2028-05-15" />
<target value="250,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Government enterprise architecture developed
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="Yes">
<comment><narrative>
Based on the national e-Government strategy and roadmap, the GoS established a comprehensive government enterprise architecture in order to leverage digital resources as a driver of organizational transformation.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial viability model for digital health interventions developed
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="Yes">
<comment><narrative>
The indicator will track whether the government has developed sustainable digital health financing mechanisms to ensure that costs on personnel and digital systems to be supported by the project will be integrated into the national health financing after the project closure.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People completing a transaction for an online government service as a percentage of the total number of internet users
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="35.00">
<comment><narrative>
Share of people completing a transaction for an online government service either through a mobile phone or stationary computer as a percentage of the total number of internet users. The objective is to track digital service uptake by users as a result of new/ re-ngineered digital service deployment activities supported through the project to increase availability and access to user-friendly and citizen-centric digital public services. Baseline data to be collected at the start of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly built or upgraded digital infrastructure that is resilient to climate related shocks
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="100.00">
<comment><narrative>
The newly built and upgraded infrastructure under the project (Component 2) subject to quality standards, including compliance with requirements for disaster response and climate change mitigation (to be elaborated in bidding documents).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New/reengineered transactional public services digitized and available to citizens and businesses
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="15.00">
<comment><narrative>
A cumulative number of new / reengineered transactional services have been digitized and are available to citizens and businesses, as a result of the project interventions. The objective is to increase availability and access to user-friendly, citizen-centric digital public services to stimulate user uptake. The services would be required to meet the standards for level 3 and above, as defined by the UN four-stage maturity model of e-government.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CE Indicator: Grievances registered related to delivery of project benefits addressed within the stipulated service standards for response times
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="100.00">
<comment><narrative>
Percentage of grievances responded to and/or resolved within the stipulated service standards for response time.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consultations provided through a telemedicine platform
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="2,000.00">
<comment><narrative>
Total cumulative number of patients using teleconsultation platform (online consultations and expertise) based on the telemedicine pilot supported by the project that would provide kits to selected health facilities.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly price of a 1-GB internet subscription
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="1.17"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="0.53">
<comment><narrative>
Retail price of mobile broadband sub-basket, prepaid handset-based, 1 GB (3G and above), in US$.
</narrative></comment>
</target>
<actual value="1.17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CE Indicator: User satisfaction with the new public digital services hosted on the senegalservices.sn portal supported through the project
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="85.00">
<comment><narrative>
This indicator will track the percentage of people accessing new digital governments services hosted in the senegalservices.sn portal supported through the project and reporting satisfaction. The survey will be designed during project implementation with the baseline data to be collected at year one after project effectiveness. The results will be used to inform and enhance the design and delivery mechanisms of the newly introduced and additional digital public services.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Audit of the State's public fiber optic infrastructure completed
</narrative></title>
<baseline year="2022" iso-date="2022-10-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MFD Indicator: Value of private sector investment leveraged under the project
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="30,000,000.00">
<comment><narrative>
Private sector investment in digital infrastructure and services leveraged in response to project supported activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National household and enterprises survey on the availability and quality of digital infrastructure and the usage of digital services designed and conducted
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="Yes">
<comment><narrative>
National household and enterprises survey on the availability and quality of digital infrastructure and the usage of digital services across the country (with gender-disaggregated indicators) conducted with the final report published on MCTEN website.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National household and enterprises survey on the availability and quality of digital infrastructure and the usage of digital services designed and conducted
</narrative></title>
<baseline year="2022" iso-date="2022-10-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consultations provided through a telemedicine platform
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="2,000.00">
<comment><narrative>
Total cumulative number of patients using teleconsultation platform (online consultations and expertise) based on the telemedicine pilot supported by the project that would provide kits to selected health facilities.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Government interoperability platform implemented
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="Yes">
<comment><narrative>
This indicator measures the Government's achievement in streamlining the interoperability framework and its adoption. The achievement is met when the interoperability standards are endorsed by the Project Steering Committee and disseminated by MCTEN to the MDAs and the interoperability platform deployed.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or enhanced access to broadband internet
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="5,000,000.00">
<comment><narrative>
The data include both people who have gained new access to Internet service and people who have benefitted from improved Internet service (e.g., affordability, quality) during the project implementation period. The data are collected at a national level. Internet use can be through fixed or mobile networks, and can be at any location of Internet access (e.g., home, work, school, Internet cafE, public places). Cumulative data should be reported in the ISR.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eligible women, for whom electronic maternal records are available
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="25.00">
<comment><narrative>
This indicator will track the share of eligible women, for whom electronic maternal records are available (through the digitization of the mother and child health record)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women mobilized as digital ambassadors to deliver digital literacy programs
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="50.00">
<comment><narrative>
This indicator will track the share of women who are trained as digital ambassadors to deliver digital literacy programs under the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mobile broadband penetration
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="50.00">
<comment><narrative>
“Unique” mobile-broadband subscriptions per 100 inhabitants (3G and above, using GSMA definition)
</narrative></comment>
</target>
<actual value="36.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MFD Indicator: Value of private sector investment leveraged under the project
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="30,000,000.00">
<comment><narrative>
Private sector investment in digital infrastructure and services leveraged in response to project supported activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IFMIS Accounting Module Operationalized
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mobile broadband penetration
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="50.00">
<comment><narrative>
“Unique” mobile-broadband subscriptions per 100 inhabitants (3G and above, using GSMA definition)
</narrative></comment>
</target>
<actual value="36.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly price of a 1-GB internet subscription
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="1.17"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="0.53">
<comment><narrative>
Retail price of mobile broadband sub-basket, prepaid handset-based, 1 GB (3G and above), in US$.
</narrative></comment>
</target>
<actual value="1.17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Patients, for whom an electronic medical record is available
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="1,500,000.00">
<comment><narrative>
Total cumulative number of primary care patients, for whom an electronic medical record (EMR) is available (through the implementation of a platform for the management of patients' EMR).
</narrative></comment>
</target>
<actual value="200,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or enhanced access to broadband internet
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="5,000,000.00">
<comment><narrative>
The data include both people who have gained new access to Internet service and people who have benefitted from improved Internet service (e.g., affordability, quality) during the project implementation period. The data are collected at a national level. Internet use can be through fixed or mobile networks, and can be at any location of Internet access (e.g., home, work, school, Internet cafE, public places). Cumulative data should be reported in the ISR.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People completing a transaction for an online government service as a percentage of the total number of internet users
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="35.00">
<comment><narrative>
Share of people completing a transaction for an online government service either through a mobile phone or stationary computer as a percentage of the total number of internet users. The objective is to track digital service uptake by users as a result of new/ re-ngineered digital service deployment activities supported through the project to increase availability and access to user-friendly and citizen-centric digital public services. Baseline data to be collected at the start of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2028-05-15" />
<target value="250,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly price of a 1-GB internet subscription
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="1.17"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="0.53">
<comment><narrative>
Retail price of mobile broadband sub-basket, prepaid handset-based, 1 GB (3G and above), in US$.
</narrative></comment>
</target>
<actual value="1.17">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly price of a 1-GB internet subscription
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="1.17"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="0.53">
<comment><narrative>
Retail price of mobile broadband sub-basket, prepaid handset-based, 1 GB (3G and above), in US$.
</narrative></comment>
</target>
<actual value="1.17">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health centers using electronic medical records
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="20.00">
<comment><narrative>
“Health center” refers to the 102 “centres de sante” at the district level. Electronic Medical Record (EMR) contains basic patient demographic data, data on visits, diagnoses, treatments, prescribed medication and referrals. The health center will be considered as using the EMR if at least 30% of consultations are recorded electronically.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health centers using electronic medical records
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="20.00">
<comment><narrative>
“Health center” refers to the 102 “centres de sante” at the district level. Electronic Medical Record (EMR) contains basic patient demographic data, data on visits, diagnoses, treatments, prescribed medication and referrals. The health center will be considered as using the EMR if at least 30% of consultations are recorded electronically.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly built or upgraded digital infrastructure that is resilient to climate related shocks
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="100.00">
<comment><narrative>
The newly built and upgraded infrastructure under the project (Component 2) subject to quality standards, including compliance with requirements for disaster response and climate change mitigation (to be elaborated in bidding documents).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly built or upgraded digital infrastructure that is resilient to climate related shocks
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="100.00">
<comment><narrative>
The newly built and upgraded infrastructure under the project (Component 2) subject to quality standards, including compliance with requirements for disaster response and climate change mitigation (to be elaborated in bidding documents).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People completing a transaction for an online government service as a percentage of the total number of internet users
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="35.00">
<comment><narrative>
Share of people completing a transaction for an online government service either through a mobile phone or stationary computer as a percentage of the total number of internet users. The objective is to track digital service uptake by users as a result of new/ re-ngineered digital service deployment activities supported through the project to increase availability and access to user-friendly and citizen-centric digital public services. Baseline data to be collected at the start of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People completing a transaction for an online government service as a percentage of the total number of internet users
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="35.00">
<comment><narrative>
Share of people completing a transaction for an online government service either through a mobile phone or stationary computer as a percentage of the total number of internet users. The objective is to track digital service uptake by users as a result of new/ re-ngineered digital service deployment activities supported through the project to increase availability and access to user-friendly and citizen-centric digital public services. Baseline data to be collected at the start of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or enhanced access to broadband internet
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="5,000,000.00">
<comment><narrative>
The data include both people who have gained new access to Internet service and people who have benefitted from improved Internet service (e.g., affordability, quality) during the project implementation period. The data are collected at a national level. Internet use can be through fixed or mobile networks, and can be at any location of Internet access (e.g., home, work, school, Internet cafE, public places). Cumulative data should be reported in the ISR.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or enhanced access to broadband internet
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="5,000,000.00">
<comment><narrative>
The data include both people who have gained new access to Internet service and people who have benefitted from improved Internet service (e.g., affordability, quality) during the project implementation period. The data are collected at a national level. Internet use can be through fixed or mobile networks, and can be at any location of Internet access (e.g., home, work, school, Internet cafE, public places). Cumulative data should be reported in the ISR.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Government interoperability platform implemented
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="Yes">
<comment><narrative>
This indicator measures the Government's achievement in streamlining the interoperability framework and its adoption. The achievement is met when the interoperability standards are endorsed by the Project Steering Committee and disseminated by MCTEN to the MDAs and the interoperability platform deployed.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Audit of the State's public fiber optic infrastructure completed
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="Yes">
<comment><narrative>
Completion of the audit of the State's public fiber optic assets through the publication of the final audit report by MCTEN.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CE Indicator: Grievances registered related to delivery of project benefits addressed within the stipulated service standards for response times
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="100.00">
<comment><narrative>
Percentage of grievances responded to and/or resolved within the stipulated service standards for response time.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CE Indicator: User satisfaction with the new public digital services hosted on the senegalservices.sn portal supported through the project
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="85.00">
<comment><narrative>
This indicator will track the percentage of people accessing new digital governments services hosted in the senegalservices.sn portal supported through the project and reporting satisfaction. The survey will be designed during project implementation with the baseline data to be collected at year one after project effectiveness. The results will be used to inform and enhance the design and delivery mechanisms of the newly introduced and additional digital public services.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New/reengineered transactional public services digitized and available to citizens and businesses
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="15.00">
<comment><narrative>
A cumulative number of new / reengineered transactional services have been digitized and are available to citizens and businesses, as a result of the project interventions. The objective is to increase availability and access to user-friendly, citizen-centric digital public services to stimulate user uptake. The services would be required to meet the standards for level 3 and above, as defined by the UN four-stage maturity model of e-government.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health centers using electronic medical records
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="20.00">
<comment><narrative>
“Health center” refers to the 102 “centres de sante” at the district level. Electronic Medical Record (EMR) contains basic patient demographic data, data on visits, diagnoses, treatments, prescribed medication and referrals. The health center will be considered as using the EMR if at least 30% of consultations are recorded electronically.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public healthcare facilities connected to internet
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="30.00">
<comment><narrative>
Share of public healthcare facilities (including hospitals and non-hospital public health establishments, health centers, and health posts) benefitting from new or enhanced (through internal network cabling and IT equipment) broadband connectivity services under the project.
The baseline is represented by the 51 health structures connected through the governmental intranet (out of a total of 1600 structures at the national level).
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly price of a 1-GB internet subscription
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="1.17"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="0.53">
<comment><narrative>
Retail price of mobile broadband sub-basket, prepaid handset-based, 1 GB (3G and above), in US$.
</narrative></comment>
</target>
<actual value="1.17">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly price of a 1-GB internet subscription
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="1.17"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="0.53">
<comment><narrative>
Retail price of mobile broadband sub-basket, prepaid handset-based, 1 GB (3G and above), in US$.
</narrative></comment>
</target>
<actual value="1.17">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health centers using electronic medical records
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="20.00">
<comment><narrative>
“Health center” refers to the 102 “centres de sante” at the district level. Electronic Medical Record (EMR) contains basic patient demographic data, data on visits, diagnoses, treatments, prescribed medication and referrals. The health center will be considered as using the EMR if at least 30% of consultations are recorded electronically.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health centers using electronic medical records
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="20.00">
<comment><narrative>
“Health center” refers to the 102 “centres de sante” at the district level. Electronic Medical Record (EMR) contains basic patient demographic data, data on visits, diagnoses, treatments, prescribed medication and referrals. The health center will be considered as using the EMR if at least 30% of consultations are recorded electronically.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly built or upgraded digital infrastructure that is resilient to climate related shocks
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="100.00">
<comment><narrative>
The newly built and upgraded infrastructure under the project (Component 2) subject to quality standards, including compliance with requirements for disaster response and climate change mitigation (to be elaborated in bidding documents).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly built or upgraded digital infrastructure that is resilient to climate related shocks
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="100.00">
<comment><narrative>
The newly built and upgraded infrastructure under the project (Component 2) subject to quality standards, including compliance with requirements for disaster response and climate change mitigation (to be elaborated in bidding documents).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People completing a transaction for an online government service as a percentage of the total number of internet users
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="35.00">
<comment><narrative>
Share of people completing a transaction for an online government service either through a mobile phone or stationary computer as a percentage of the total number of internet users. The objective is to track digital service uptake by users as a result of new/ re-ngineered digital service deployment activities supported through the project to increase availability and access to user-friendly and citizen-centric digital public services. Baseline data to be collected at the start of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People completing a transaction for an online government service as a percentage of the total number of internet users
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="35.00">
<comment><narrative>
Share of people completing a transaction for an online government service either through a mobile phone or stationary computer as a percentage of the total number of internet users. The objective is to track digital service uptake by users as a result of new/ re-ngineered digital service deployment activities supported through the project to increase availability and access to user-friendly and citizen-centric digital public services. Baseline data to be collected at the start of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or enhanced access to broadband internet
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="5,000,000.00">
<comment><narrative>
The data include both people who have gained new access to Internet service and people who have benefitted from improved Internet service (e.g., affordability, quality) during the project implementation period. The data are collected at a national level. Internet use can be through fixed or mobile networks, and can be at any location of Internet access (e.g., home, work, school, Internet cafE, public places). Cumulative data should be reported in the ISR.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or enhanced access to broadband internet
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="5,000,000.00">
<comment><narrative>
The data include both people who have gained new access to Internet service and people who have benefitted from improved Internet service (e.g., affordability, quality) during the project implementation period. The data are collected at a national level. Internet use can be through fixed or mobile networks, and can be at any location of Internet access (e.g., home, work, school, Internet cafE, public places). Cumulative data should be reported in the ISR.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2028-05-15" />
<target value="50,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2028-05-15" />
<target value="25,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2028-05-15" />
<target value="500,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health centers using electronic medical records
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="20.00">
<comment><narrative>
“Health center” refers to the 102 “centres de sante” at the district level. Electronic Medical Record (EMR) contains basic patient demographic data, data on visits, diagnoses, treatments, prescribed medication and referrals. The health center will be considered as using the EMR if at least 30% of consultations are recorded electronically.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly built or upgraded digital infrastructure that is resilient to climate related shocks
</narrative></title>
<baseline year="2022" iso-date="2022-10-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-03" />
<period-end iso-date="2028-05-31" />
<target value="100.00">
<comment><narrative>
The newly built and upgraded infrastructure under the project (Component 2) subject to quality standards, including compliance with requirements for disaster response and climate change mitigation (to be elaborated in bidding documents).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P175915</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal: Natural Resources Management Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to improve the management of fish and forest resources and access to related economic opportunities in target areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project seeks to enhance the sustainability of growth in Senegal for productivity, livelihood, and resilience.  It is comprised of three technical components, which aim on the one hand, to strengthen the management of environmental and social impacts, and on the other hand, to address the erosion of Senegal's natural capital (focusing on two natural resources of primary importance for thecountry, its fish and forest resources).Component 1 - Institutional framework for managing environmental and social risks and intersectoral collaboration. This component seeks to strengthen institutional capacity for managing the environmental and social (E&amp;S) risks of projects and programs as well as intersectoral coordination for the management of shared or complementary natural resources. Key activities include : (i) Capacity building and provision of equipment for the management of E&amp;S risks (Strengthening the E&amp;S regulatory and coordination framework and Building the technical and operational capacity on E&amp;S management); (ii) Streamlining the management of marine, coastal and forest resources (Strategic analysis of community-led fisheries initiatives, marine and coastal natural resources management / zoning, and Strengthening resilience and sustainability of the smoked seafood value chain); and (iii) Citizen engagement and communication (Preparation and implementation of a communication strategy and action plan, relevant both for the sector and project activities and results, with outreach including youth and community engagement as well as training of journalists and media).Component 2 - Resilience and productivity of the fisheries and aquaculture sectors. This component will consolidate the achievement of the West Africa Regional Fisheries Program in Senegal (WARFP), with support to: (i) Strengthening fisheries management and community-based fisheries management initiatives (fisheries management plans; fishing permits and licenses management system; monitoring, control, and surveillance system; fisheries information system for transparency; strategic studies; and scale up community-led fisheries management initiatives); (ii) Strengthening the value chains of selected fisheries (construction of landing, preservation, and processing infrastructures for fishery products; technical assistance to strengthen the technical and commercial aspects of the related value chains; monitoring and control operations to improve the sanitary quality of  targeted fishery product value chains); and (iii) Development of aquaculture (enabling framework for the attractiveness of the sector; strengthen the technical skills of stakeholders; develop or rehabilitate key aquaculture infrastructures).Component 3 - Sustainable management of forests and ecosystems. This component will consolidate the achievements of the various programs and projects relating to the sustainable management of forests, including the two phases of the Sustainable and Participatory Energy Management Project (PROGEDE I &amp; II). Activities include: (i) Strengthening the institutional framework for forest management and monitoring (capacity building program on the new forest code and good forestry practices; strengthening knowledge on forests and monitoring capacity; support to regional cooperation and coordination initiative on illegal timber trade); (ii) Strengthening community-based forest management, domestic energy sources, and sustainable use of fuelwood (community forest management and diversification of domestic energy sources); (iii) Valorization of natural forest capital (support to the management and development of sustainable nature-based tourism in selected protected areas, planning and support to community management of critical ecosystem and key biodiversity areas, support for the MEDD'sfield interventions for the maintenance of natural capital).Component 4 – Project management. This component will support the operating costs of the two PIUs, at the MEDD and at the MPEM, responsible for overall project management and oversight, and related bodies (e.g., National Steering Committee, Technical Committees, etc.).  Support will be provided for implementation planning, coordination, and support, technical expertise, fiduciary management, supervision of compliance under the Environmental and Social Framework (ESF), including operationalization of the Grievance Redress Mechanism, as well as monitoring, evaluation, and project reporting. ]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0048204"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0048202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-03-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-07-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Arame Tall</narrative></person-name><telephone>+1-202-473-1000</telephone><email>atall2@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244991" />
            <name><narrative>Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.77073 -13.66734</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246691" />
            <name><narrative>Petite Cote</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -17</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247179" />
            <name><narrative>Parc National du Niokolo-Koba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.00769 -12.91459</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248477" />
            <name><narrative>Mbour</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.42196 -16.96375</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251002" />
            <name><narrative>Kafountine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.92528 -16.73889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251933" />
            <name><narrative>Fas Boye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.2701 -16.8379</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007302183" />
            <name><narrative>Cap Skirring</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.35011 -16.71707</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303936" />
            <name><narrative>Region de Kedougou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.55146 -12.17586</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303937" />
            <name><narrative>Region de Sedhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70683 -15.55801</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008133376" />
            <name><narrative>Ouakam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72389 -17.48917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="31310" percentage="48" xml:lang="en"/><sector vocabulary="1" code="31210" percentage="34" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="14" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AF" percentage="47.0000000" xml:lang="en"><narrative>FY17 - Fisheries</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="42" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="8" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="24" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="21" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="87" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000831" percentage="42" xml:lang="en"><narrative>Forests Policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="24" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="24" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="19" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000833" percentage="10" xml:lang="en"><narrative>Oceans</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="14" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="24" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000836" percentage="8" xml:lang="en"><narrative>Coastal Zone Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="17" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="21" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="24" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000832" percentage="55" xml:lang="en"><narrative>Fisheries Policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="19" xml:lang="en"><narrative>Air quality management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">373333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1112500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1452500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1980833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1980833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1980833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1980833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1980833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1980833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1980833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1980833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1980833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1980833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1980833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1980833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">373333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1112500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1452500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1980833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1980833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1980833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1980833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1980833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1980833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1980833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1980833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1980833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1980833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1980833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1980833.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">73509214.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">73509214.57</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">1679669</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">3277349</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">3358147</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">142253</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">344683</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">380142</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">335471</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">1785244</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">146627</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">595517</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">1557301</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">401315</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1537468</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1482876</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">238925</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">209695</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">355029</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">57027</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">2028256</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">1012126</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">1794533</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1763451</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">1831285</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">176397</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-30769</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-67378</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-70147</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-81226</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-99777</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-142762</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-168766</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48202"><narrative>Ministry of Environment, Sustainable Development, and Ecological Transition; Ministry of Fisheries and Maritime Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175915"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175915?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175915"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO3. Income generating activity program implemented in targeted forest areas
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="60.00">
<comment><narrative>
Monitoring the number of targeted forest areas benefiting from the IGA program
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3d. Improved cookstoves distributed
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="836,253.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="1,086,000.00">
<comment><narrative>
Monitoring the dissemination of the use of improved stoves
</narrative></comment>
</target>
<actual value="836,253.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2b. Reliable key fisheries management data published online regularly
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="5.00">
<comment><narrative>
Monitoring the transparency of the fisheries sector with publication of selected data on MPEM website. In 2025, only the amounts of infringement settlements are not published.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR3a. Forest monitoring system operational
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="Yes">
<comment><narrative>
Monitoring the development and operationalization of a national forest monitoring system.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IR1b. Share of annual requests/complaints addressed by citizen to the environmental emergency management center handled with satisfaction
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="70.00">
<comment><narrative>
This indicator is monitored through an annual analysis of the CGUE database, the share of annual requests/complaints sent by citizens to the Environmental Emergency Management Center treated with satisfaction was 40% at the beginning of the project.
</narrative></comment>
</target>
<actual value="58">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3b. Forest areas under active community-based management that include at least one women in leadership positions including President, Secretary General or Treasurer
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="29.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="42.00">
<comment><narrative>
Monitoring involvement of women in community-based forest management for fuelwood production. The existing participatory management bodies of terroir forests for the production of wood energy have been maintained, including the representation of women in management positions in 29 committees.
</narrative></comment>
</target>
<actual value="29.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3f. Management effectiveness of the Niokolo-Koba national park (IMET)
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="334.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2028-07-31" />
<target value="410.00">
<comment><narrative>
Monitoring the management effectiveness of the Niokolo-Koba through the Integrated Management Effectiveness Tool (details in annex 5)
IMET
Baseline : 334.5
2022 September : 339.1 
The level of management efficiency of the NKNP remains high in 2025 (323.8) and has notably made it possible to remove the park from the list of World Heritage sites in danger.
</narrative></comment>
</target>
<actual value="323.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IR2c. Representation of all relevant local stakeholders groups in community-based fisheries management planning processes
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Monitoring citizen and stakeholders engagement in the local planning of fisheries management.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO4. Share of fisheries products landed and transformed according to improved practices at project-supported sites
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Monitoring the  improvement in the quality of fisheries landings and transformation of seafood products (details in annex 5)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2d. New marine areas under active community-based management that include at least one women in leadership positions including President, Secretary General or Treasurer
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="10.00">
<comment><narrative>
This indicator tracks the inclusion of women in leadership positions in local community management planning. In the 4 current development plans, women are represented. The percentage of women in management bodies is already 19%.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3c. Jobs created in new community-based managed forests for fuelwood production
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="2,457.00">
<comment><narrative>
Monitoring jobs created in new community-based managed forest for fuelwood production
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Terrestrial and aquatic areas under enhanced conservation and management
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-07-15" />
<target value="0">
<comment><narrative>
This CRI has been included as part of the retrofitting exercise and will be updated once the retrofitting process has been concluded.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO2. Targeted artisanal fishing areas brought under territorial use right regimes for fishing monitored by geolocation system
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="10.00">
<comment><narrative>
This indicator relates to the development and implementation of local community management plans, including (a) updating and extending existing local management plans; b) developing four new local management plans (Fass-Boye, Mbour, Cap-Skirring and Kafountine), and c) developing two management plans for artificial reef areas in Hann and Yoff.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IR1a. Proportion of  projects with an ESIA  registered in the national database having a valid ESMP and annual monitoring
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
This indicator is tracked through an annual analysis of the EIA database, the proportion of ESIA-backed development projects registered in the national database with a valid ESMP and annual monitoring was 40% at the beginning of the project. A significant strengthening of environmental monitoring from 40% to 58.3% of development projects with an ESIA and an ESMP registered in the national database and subject to annual monitoring.
</narrative></comment>
</target>
<actual value="58.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2e. Jobs created in the aquaculture sector
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="1,854.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="6,854.00">
<comment><narrative>
Monitoring the number of direct and indirect jobs in the aquaculture sector
2022: 2,271 jobs
2023: 2612 jobs.
The number of jobs created in the aquaculture sector is increasing from 1,854 jobs in 2022 to 2,612 in 2023 and 3,045 in 2024.
</narrative></comment>
</target>
<actual value="3045">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2d. New marine areas under active community-based management that include at least one women in leadership positions including President, Secretary General or Treasurer
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="10.00">
<comment><narrative>
This indicator tracks the inclusion of women in leadership positions in local community management planning. In the 4 current development plans, women are represented. The percentage of women in management bodies is already 19%.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3f. Management effectiveness of the Niokolo-Koba national park (IMET)
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="334.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2028-07-31" />
<target value="410.00">
<comment><narrative>
Monitoring the management effectiveness of the Niokolo-Koba through the Integrated Management Effectiveness Tool (details in annex 5)
IMET
Baseline : 334.5
2022 September : 339.1 
The level of management efficiency of the NKNP remains high in 2025 (323.8) and has notably made it possible to remove the park from the list of World Heritage sites in danger.
</narrative></comment>
</target>
<actual value="323.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IR2c. Representation of all relevant local stakeholders groups in community-based fisheries management planning processes
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Monitoring citizen and stakeholders engagement in the local planning of fisheries management.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2b. Reliable key fisheries management data published online regularly
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="5.00">
<comment><narrative>
Monitoring the transparency of the fisheries sector with publication of selected data on MPEM website. In 2025, only the amounts of infringement settlements are not published.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3e. Annual man/days of forest surveillance and control missions carried out in the target sites
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="22,320.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="66,960.00">
<comment><narrative>
Monitoring the effectiveness of surveillance missions in the field for the protection of forests and protected areas
</narrative></comment>
</target>
<actual value="29 872">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3d. Improved cookstoves distributed
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="836,253.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="1,086,000.00">
<comment><narrative>
Monitoring the dissemination of the use of improved stoves
</narrative></comment>
</target>
<actual value="847,985.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR1c. Air quality monitoring stations operational
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="10.00">
<comment><narrative>
Monitoring air quality monitoring stations network efficiency. This indicator is tracked through a review of the AQGC's annual reports.
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3b. Forest areas under active community-based management that include at least one women in leadership positions including President, Secretary General or Treasurer
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="29.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="42.00">
<comment><narrative>
Monitoring involvement of women in community-based forest management for fuelwood production. The existing participatory management bodies of terroir forests for the production of wood energy have been maintained, including the representation of women in management positions in 29 committees.
</narrative></comment>
</target>
<actual value="29.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3c. Jobs created in new community-based managed forests for fuelwood production
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="2,457.00">
<comment><narrative>
Monitoring jobs created in new community-based managed forest for fuelwood production
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2a. Modernization of licencing/permit, registration, monitoring and control systems
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="24.00">
<comment><narrative>
Monitoring of the modernization of licencing/permit, registration, monitoring and control systems in fisheries sectors
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IR1b. Share of annual requests/complaints addressed by citizen to the environmental emergency management center handled with satisfaction
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="70.00">
<comment><narrative>
This indicator is monitored through an annual analysis of the CGUE database, the share of annual requests/complaints sent by citizens to the Environmental Emergency Management Center treated with satisfaction was 40% at the beginning of the project.
</narrative></comment>
</target>
<actual value="79">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IR1a. Proportion of  projects with an ESIA  registered in the national database having a valid ESMP and annual monitoring
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
This indicator is tracked through an annual analysis of the EIA database, the proportion of ESIA-backed development projects registered in the national database with a valid ESMP and annual monitoring was 40% at the beginning of the project. A significant strengthening of environmental monitoring from 40% to 58.3% of development projects with an ESIA and an ESMP registered in the national database and subject to annual monitoring.
</narrative></comment>
</target>
<actual value="48.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR3a. Forest monitoring system operational
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="Yes">
<comment><narrative>
Monitoring the development and operationalization of a national forest monitoring system.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO5. Aquaculture production
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="1,374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="5,374.00">
<comment><narrative>
National aquaculture production is steadily increasing from 1374 to 2374 tons/year between 2022 and 2024 due to the strengthening of the investment framework but does not yet benefit from the contribution of the aquaculture clusters which should allow a significant increase.
</narrative></comment>
</target>
<actual value="2074">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO5. Aquaculture production
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="1,374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="5,374.00">
<comment><narrative>
National aquaculture production is steadily increasing from 1374 to 2374 tons/year between 2022 and 2024 due to the strengthening of the investment framework but does not yet benefit from the contribution of the aquaculture clusters which should allow a significant increase.
</narrative></comment>
</target>
<actual value="2074">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO4. Share of fisheries products landed and transformed according to improved practices at project-supported sites
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Monitoring the  improvement in the quality of fisheries landings and transformation of seafood products (details in annex 5)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO4. Share of fisheries products landed and transformed according to improved practices at project-supported sites
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Monitoring the  improvement in the quality of fisheries landings and transformation of seafood products (details in annex 5)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO2. Targeted artisanal fishing areas brought under territorial use right regimes for fishing monitored by geolocation system
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="10.00">
<comment><narrative>
This indicator relates to the development and implementation of local community management plans, including (a) updating and extending existing local management plans; b) developing four new local management plans (Fass-Boye, Mbour, Cap-Skirring and Kafountine), and c) developing two management plans for artificial reef areas in Hann and Yoff.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO2. Targeted artisanal fishing areas brought under territorial use right regimes for fishing monitored by geolocation system
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="10.00">
<comment><narrative>
This indicator relates to the development and implementation of local community management plans, including (a) updating and extending existing local management plans; b) developing four new local management plans (Fass-Boye, Mbour, Cap-Skirring and Kafountine), and c) developing two management plans for artificial reef areas in Hann and Yoff.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area brought under management plans
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="2243831.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="3476306.00">
<comment><narrative>
The baseline was reassessed during the mid-term review. There has been no significant change in this indicator as only some existing management plans have been updated, but no new plans have been developed during the first period of Project implementation.
</narrative></comment>
</target>
<actual value="1 673 442">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area brought under management plans
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="2243831.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="3476306.00">
<comment><narrative>
The baseline was reassessed during the mid-term review. There has been no significant change in this indicator as only some existing management plans have been updated, but no new plans have been developed during the first period of Project implementation.
</narrative></comment>
</target>
<actual value="1 673 442">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO3. Income generating activity program implemented in targeted forest areas
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="60.00">
<comment><narrative>
Monitoring the number of targeted forest areas benefiting from the IGA program
</narrative></comment>
</target>
<actual value="29.23">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO3. Income generating activity program implemented in targeted forest areas
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="60.00">
<comment><narrative>
Monitoring the number of targeted forest areas benefiting from the IGA program
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Terrestrial and aquatic areas under enhanced conservation and management
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-07-15" />
<target value="0">
<comment><narrative>
This CRI has been included as part of the retrofitting exercise and will be processed via a level-2 project restructuring .
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2e. Jobs created in the aquaculture sector
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="1,854.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="6,854.00">
<comment><narrative>
Monitoring the number of direct and indirect jobs in the aquaculture sector
2022: 2,271 jobs
2023: 2612 jobs.
The number of jobs created in the aquaculture sector is increasing from 1,854 jobs in 2022 to 2,612 in 2023 and 3,045 in 2024.
</narrative></comment>
</target>
<actual value="3045">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO5. Aquaculture production
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="1,374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="5,374.00">
<comment><narrative>
National aquaculture production is steadily increasing from 1374 to 2374 tons/year between 2022 and 2024 due to the strengthening of the investment framework but does not yet benefit from the contribution of the aquaculture clusters which should allow a significant increase.
</narrative></comment>
</target>
<actual value="2074">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO5. Aquaculture production
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="1,374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="5,374.00">
<comment><narrative>
National aquaculture production is steadily increasing from 1374 to 2374 tons/year between 2022 and 2024 due to the strengthening of the investment framework but does not yet benefit from the contribution of the aquaculture clusters which should allow a significant increase.
</narrative></comment>
</target>
<actual value="2074">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO4. Share of fisheries products landed and transformed according to improved practices at project-supported sites
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Monitoring the  improvement in the quality of fisheries landings and transformation of seafood products (details in annex 5)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO4. Share of fisheries products landed and transformed according to improved practices at project-supported sites
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Monitoring the  improvement in the quality of fisheries landings and transformation of seafood products (details in annex 5)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO2. Targeted artisanal fishing areas brought under territorial use right regimes for fishing monitored by geolocation system
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="10.00">
<comment><narrative>
This indicator relates to the development and implementation of local community management plans, including (a) updating and extending existing local management plans; b) developing four new local management plans (Fass-Boye, Mbour, Cap-Skirring and Kafountine), and c) developing two management plans for artificial reef areas in Hann and Yoff.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO2. Targeted artisanal fishing areas brought under territorial use right regimes for fishing monitored by geolocation system
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="10.00">
<comment><narrative>
This indicator relates to the development and implementation of local community management plans, including (a) updating and extending existing local management plans; b) developing four new local management plans (Fass-Boye, Mbour, Cap-Skirring and Kafountine), and c) developing two management plans for artificial reef areas in Hann and Yoff.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area brought under management plans
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="2243831.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="3476306.00">
<comment><narrative>
The baseline was reassessed during the mid-term review. There has been no significant change in this indicator as only some existing management plans have been updated, but no new plans have been developed during the first period of Project implementation.
</narrative></comment>
</target>
<actual value="1 673 442">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area brought under management plans
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="2243831.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="3476306.00">
<comment><narrative>
The baseline was reassessed during the mid-term review. There has been no significant change in this indicator as only some existing management plans have been updated, but no new plans have been developed during the first period of Project implementation.
</narrative></comment>
</target>
<actual value="1 673 442">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO3. Income generating activity program implemented in targeted forest areas
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="60.00">
<comment><narrative>
Monitoring the number of targeted forest areas benefiting from the IGA program
</narrative></comment>
</target>
<actual value="29.23">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO3. Income generating activity program implemented in targeted forest areas
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="60.00">
<comment><narrative>
Monitoring the number of targeted forest areas benefiting from the IGA program
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area brought under management plans
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="2243831.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="3476306.00">
<comment><narrative>
The baseline was reassessed during the mid-term review. There has been no significant change in this indicator as only some existing management plans have been updated, but no new plans have been developed during the first period of Project implementation.
</narrative></comment>
</target>
<actual value="1 673 442">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3e. Annual man/days of forest surveillance and control missions carried out in the target sites
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="22,320.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="66,960.00">
<comment><narrative>
Monitoring the effectiveness of surveillance missions in the field for the protection of forests and protected areas
</narrative></comment>
</target>
<actual value="27 688">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR1c. Air quality monitoring stations operational
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="10.00">
<comment><narrative>
Monitoring air quality monitoring stations network efficiency. This indicator is tracked through a review of the AQGC's annual reports.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2a. Modernization of licencing/permit, registration, monitoring and control systems
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="24.00">
<comment><narrative>
Monitoring of the modernization of licencing/permit, registration, monitoring and control systems in fisheries sectors
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO5. Aquaculture production
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="1,374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-07-31" />
<target value="5,374.00">
<comment><narrative>
National aquaculture production is steadily increasing from 1374 to 2374 tons/year between 2022 and 2024 due to the strengthening of the investment framework but does not yet benefit from the contribution of the aquaculture clusters which should allow a significant increase.
</narrative></comment>
</target>
<actual value="2074">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P105881</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sustainable Management of Fish Resources</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The combined development objective/global objective of the project is to empower communities to reduce fishing pressure on the fish stocks supporting the central coastal fisheries of Senegal (from the Cap Vert Peninsula to the Saloum River Delta), by (i) promoting co-management of the coastal fisheries, (ii) contributing to the rehabilitation of the essential ecosystems for the coastal fisheries, and (iii) supporting alternative livelihoods and accompanying poverty reduction measures in targeted poor fishing communities.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Sustainable Management of Fish Resources Project is to empower communities to reduce fishing pressure on the fish stocks supporting the central coastal fisheries of Senegal. There are four components to the project. The first component is the co-management of coastal fisheries. The objective of this component is to implement co-management systems to improve the governance of the coastal fisheries for a more sustainable use of the resources. The second component is the rehabilitation of ecosystems essential for coastal fisheries. The objective of this component is to contribute to the rehabilitation of ecosystems essential to the coastal fisheries, by establishing Protected Fishing Zones (ZPPs) in association with artificial reefs, in order to help regenerate the natural resources, and by creating market mechanisms to encourage sustainable management of the ecosystems. The third component is the poverty alleviation measures for fishing communities and alternative livelihoods for fishers, fish processors, and fish transporters. The objective of this component is to offset any negative socio-economic impacts for targeted fishing communities resulting from co-management initiatives or management plans (including the introduction of instruments such as ZPPs, artificial reefs, eco-labels, etc.). Finally, the fourth component is the institutional strengthening for fisheries management, project management, and monitoring and evaluation. The objective of this component is to support the ministry of maritime economy to manage and implement the project in the context of the letter of sector policy, and to monitor and evaluate results.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2007-07-03"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-12-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2012-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2012-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>John Virdin</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jvirdin@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243991" />
            <name><narrative>Yene Tode</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.64828 -17.183769</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244800" />
            <name><narrative>Region de Thies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -16.866671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246412" />
            <name><narrative>Saloum</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.83333 -16.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246648" />
            <name><narrative>Pointe-Sarene</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.28333 -16.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247246" />
            <name><narrative>Nianing</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.34485 -16.92676</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247507" />
            <name><narrative>Ngaparou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.46419 -17.05619</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248529" />
            <name><narrative>Mbodiene</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.25 -16.866671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251791" />
            <name><narrative>Foundiougne</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.13333 -16.466669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251972" />
            <name><narrative>Residence de Fann</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.69004 -17.471769</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>Region de Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.283331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253436" />
            <name><narrative>Presqu'ile du Cap Vert</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.73886 -17.4638</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253926" />
            <name><narrative>Betanti</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.69056 -16.626671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254154" />
            <name><narrative>Bargny</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.69707 -17.23015</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002593136" />
            <name><narrative>Fambine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.99917 -16.603331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007670895" />
            <name><narrative>Mballing</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.37911 -16.947821</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="16011" percentage="25" xml:lang="en"/><sector vocabulary="1" code="31310" percentage="25" xml:lang="en"/><sector vocabulary="1" code="31320" percentage="25" xml:lang="en"/><sector vocabulary="1" code="41030" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="33" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="33" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="33" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="33" xml:lang="en"><narrative>Soil Pollution</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">83333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">83333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">83333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">83333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">83333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">83333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">83333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">83333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">2743976.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">2743976.64</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P105881"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P105881?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P105881"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 2: Feasibility study and consensus on a sustainable financing mechanism for recurrent costs of ZPPs.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="No study conducted"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="Study completed and consensus on mechanism.">

</target>
<actual value="">
<comment><narrative>
Delays due to slow recruitment of firm for component 2.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 2: At least 2 artificial reefs are expanded/submerged and co-managed with the local communities by end of project.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="2 artificial reefs identified."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="2 artificial reefs under co-management.">

</target>
<actual value="0">
<comment><narrative>
2 artificial reefs identified but not yet under co-management, due to delays in recruitment of firm for component 2. As with aboveindicator, this has now been addressed so progress should be seen soon.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 2:All small-scale fishing and transport vessels (central coastal region) are registered by the National Registration Program within the first 6 months of project implem
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="&lt;5%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="100%">

</target>
<actual value="100%">
<comment><narrative>
This target has been met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 3: % of women in participating communities that are benefitting from micro-credit to develop activities outside the fisheriessector.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="20">

</target>
<actual value="0">
<comment><narrative>
Delays in recruitment of technical assistance firm for alternative livelihoods fund have delayed implementation here. The firm hasjust been selected.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 2: 2 protected fisheries zones (ZPPs) are created and legally established and their management plans prepared.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="2 ZPPs identified but not established"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="2 ZPPs legally established and actively managed.">

</target>
<actual value="">
<comment><narrative>
Delays due to slow recruitment of firm for Component 2. This has now been addressed, so progress should be measurable soon.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 4: Annual M&amp;E reports with all data on results indicators and M&amp;E plan completed.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="N.A."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2009-03-31" />
<target value="Report received annually.">

</target>
<actual value="Report received quarterly and annually but not with M&amp;E plan completed">
<comment><narrative>
Reports are sufficient, and continuing to improve.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members surveyed in participating communities are satisfied with project activities (Coastal Ecosystems)
</narrative></title>
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-11" />
<period-end iso-date="2012-03-31" />
<target value="70.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of fishing effort for targeted species in co-management sites (reduction)
</narrative></title>
<baseline year="2010" iso-date="2010-03-01" value="0.00"><comment><narrative>The value is not 0. However,  values are given for a number of sites, thus it is not possible to list all here or to summarize.Thebaseline values are listed in the attached document.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-01" />
<period-end iso-date="2012-03-31" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 2: 2 protected fisheries zones (ZPPs) are created and legally established and their management plans prepared.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="2 ZPPs identified but not established"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="2 ZPPs legally established and actively managed.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 3: % of targeted fishing communities receiving micro-finance and number of families entering new commercial markets.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="80%, 200 new families">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 1: 4 consolidated local fisheries management plans are approved by the relevant Local Artisanal Fishers'Councils within first24 months of implementation
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="4 plans implemented">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of fishing effort for targeted species in co-management sites (reduction)
</narrative></title>
<baseline year="2010" iso-date="2010-03-01" value="0.00"><comment><narrative>The value is not 0. However,  values are given for a number of sites, thus it is not possible to list all here or to summarize.Thebaseline values are listed in the attached document.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-01" />
<period-end iso-date="2012-03-31" />
<target value="10.00">

</target>
<actual value="0.00">
<comment><narrative>
Baseline values are included in the attached document, and updated values to be provided by September 2011
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to system of micro-credit in targeted community (Livelihoods)
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="8.00">

</target>
<actual value="0.00">
<comment><narrative>
Delays in recruitment of technical assistance firm for alternative livelihoods fund have delayed implementation here.  However,thefirm has now been recruited, so this value should change soon.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Refer to PDO - Increase in the average size of fish caught for targeted species in co-management sites
</narrative></title>
<baseline year="2009" iso-date="2009-11-11" value="see above."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-11" />
<period-end iso-date="2012-03-31" />
<target value="% increase above baseline">

</target>
<actual value="see above.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp.2: At least 1 fishery is eligible for eco-certification (criteria of the Marine Stewardship Council) by end of project.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0 fisheries eligible"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="Full evaluation conducted. eligibility of at least 1 fishery.">

</target>
<actual value="">
<comment><narrative>
Target due by end of project, and work is currently underway.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 2: Access rights are defined, legally recognized and introduced in 2 of fisheries under co-management.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0 fisheries have access rights."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="Access rights allocated to fishers in 2 fisheries.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average size of fish caught for targeted species in co-management sites (increase)
</narrative></title>
<baseline year="2010" iso-date="2010-03-01" value="0.00"><comment><narrative>The value is not 0. However,  values are given for a number of sites, thus it is not possible to list all here or to summarize.Thebaseline values are listed in the attached document.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-01" />
<period-end iso-date="2012-03-31" />
<target value="10.00">

</target>
<actual value="0.00">
<comment><narrative>
Baseline values are included in the attached document, and updated values to be provided by September 2011
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp.2: At least 1 fishery is eligible for eco-certification (criteria of the Marine Stewardship Council) by end of project.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0 fisheries eligible"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="Full evaluation conducted. eligibility of at least 1 fishery.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 2: Access rights are defined, legally recognized and introduced in 2 of fisheries under co-management.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0 fisheries have access rights."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="Access rights allocated to fishers in 2 fisheries.">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 4: Annual M&amp;E reports with all data on results indicators and M&amp;E plan completed.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="N.A."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2009-03-31" />
<target value="Report received annually.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to system of micro-credit in targeted community (Livelihoods)
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="8.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Co-management sub-projects proposals are approved through legal agreements with the Gov. &amp; successfully implemented (Coastal Fisheries)
</narrative></title>
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-11" />
<period-end iso-date="2012-03-31" />
<target value="8.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average size of fish caught for targeted species in co-management sites (increase)
</narrative></title>
<baseline year="2010" iso-date="2010-03-01" value="0.00"><comment><narrative>The value is not 0. However,  values are given for a number of sites, thus it is not possible to list all here or to summarize.Thebaseline values are listed in the attached document.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-01" />
<period-end iso-date="2012-03-31" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 4: Participating communities receive information on key indicators in a timely manner.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="N.A."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2009-03-31" />
<target value="Report received.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 2: At least 2 artificial reefs are expanded/submerged and co-managed with the local communities by end of project.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="2 artificial reefs identified."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="2 artificial reefs under co-management.">

</target>
<actual value="">
<comment><narrative>
2 artificial reefs identified but not yet under co-management, due to delays in recruitment of firm for component 2. As with aboveindicator, this has now been addressed so progress should be seen soon.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project-supported poverty reduction measures in initial pilot sites (Livelihoods)
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="4.00">

</target>
<actual value="4.00">
<comment><narrative>
Poverty-reduction measures have been supported in the four initial pilot sites - these are currently under implementation inconjunction with the co-management proposals already prepared and implemented in these sites via GIRMaC finance.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Co-management sub-projects proposals are approved through legal agreements with the Gov. &amp; successfully implemented (Coastal Fisheries)
</narrative></title>
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-11" />
<period-end iso-date="2012-03-31" />
<target value="8.00">

</target>
<actual value="0.00">
<comment><narrative>
8 new co-management sub-project proposals have been prepared as drafts, and are currently being validated by the communities andGovernment.  These proposals could be approved through legal agreements with the Government as early as September 2011, thusmeeting the target ahead of time.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 2:All small-scale fishing and transport vessels (central coastal region) are registered by the National Registration Program within the first 6 months of project implem
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="&lt;5%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="100%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 2: At least 2 artificial reefs are expanded/submerged and co-managed with the local communities by end of project.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="2 artificial reefs identified."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="2 artificial reefs under co-management.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members surveyed in participating communities are satisfied with project activities (Coastal Ecosystems)
</narrative></title>
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-11" />
<period-end iso-date="2012-03-31" />
<target value="70.00">

</target>
<actual value="78.00">
<comment><narrative>
78 % of community members in participating communities are satisfied with solutions proposed by the project, but not yet projectactivities.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Refer to PDO - Increase in the average size of fish caught for targeted species in co-management sites
</narrative></title>
<baseline year="2009" iso-date="2009-11-11" value="see above."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-11" />
<period-end iso-date="2012-03-31" />
<target value="% increase above baseline">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 4: Annual audit opinion has been unqualified.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="N.A."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2009-03-31" />
<target value="Audit unqualified.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp.2: At least 1 fishery is eligible for eco-certification (criteria of the Marine Stewardship Council) by end of project.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0 fisheries eligible"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="Full evaluation conducted. eligibility of at least 1 fishery.">

</target>
<actual value="0 fisheries eligible">
<comment><narrative>
Target due by end of project, and work is currently underway.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Co-management sub-projects proposals are approved through legal agreements with the Gov. &amp; successfully implemented (Coastal Fisheries)
</narrative></title>
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-11" />
<period-end iso-date="2012-03-31" />
<target value="8.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 3: % of sustained reconversion achieved amongst fishers receiving micro finance access and small enterprise training.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="40">

</target>
<actual value="0">
<comment><narrative>
Target due at end of project.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 3: % of women in participating communities that are benefitting from micro-credit to develop activities outside the fisheriessector.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="20">

</target>
<actual value="">
<comment><narrative>
Delays in recruitment of technical assistance firm for alternative livelihoods fund have delayed implementation here. The firm hasjust been selected.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 2:All small-scale fishing and transport vessels (central coastal region) are registered by the National Registration Program within the first 6 months of project implem
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="&lt;5%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="100%">

</target>
<actual value="">
<comment><narrative>
This target has been met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 1: 8 new CLPS (local fishers committees) legally established in central coastal region within the first 18 months of implementation
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="4 CLPs in initial pilot sites"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="8 new CLPS established">

</target>
<actual value="8 new CLPs legally established in central coastal region, in addition to the 4 initial pilot sites">
<comment><narrative>
Target has been met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project-supported poverty reduction measures in initial pilot sites (Livelihoods)
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 1: 8 new CLPS (local fishers committees) legally established in central coastal region within the first 18 months of implementation
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="4 CLPs in initial pilot sites"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="8 new CLPS established">

</target>
<actual value="">
<comment><narrative>
Target has been met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 3: % of sustained reconversion achieved amongst fishers receiving micro finance access and small enterprise training.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="40">

</target>
<actual value="">
<comment><narrative>
Target due at end of project.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to system of micro-credit in targeted community (Livelihoods)
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="8.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 3: % of targeted fishing communities receiving micro-finance and number of families entering new commercial markets.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="80%, 200 new families">

</target>
<actual value="0">
<comment><narrative>
Delays in recruitment of technical assistance firm for alternative livelihoods fund have delayed implementation here. The firm hasjust been selected.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 2: Access rights are defined, legally recognized and introduced in 2 of fisheries under co-management.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0 fisheries have access rights."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="Access rights allocated to fishers in 2 fisheries.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members surveyed in participating communities are satisfied with project activities (Coastal Ecosystems)
</narrative></title>
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-11" />
<period-end iso-date="2012-03-31" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 4: Annual audit opinion has been unqualified.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="N.A."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2009-03-31" />
<target value="Audit unqualified.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 2: 2 protected fisheries zones (ZPPs) are created and legally established and their management plans prepared.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="2 ZPPs identified but not established"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="2 ZPPs legally established and actively managed.">

</target>
<actual value="2 ZPPs identified by not yet established">
<comment><narrative>
Delays due to slow recruitment of firm for Component 2. This has now been addressed, so progress should be measurable soon.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 2: Feasibility study and consensus on a sustainable financing mechanism for recurrent costs of ZPPs.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="No study conducted"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="Study completed and consensus on mechanism.">

</target>
<actual value="No study conducted yet">
<comment><narrative>
Delays due to slow recruitment of firm for component 2.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 4: Participating communities receive information on key indicators in a timely manner.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="N.A."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2009-03-31" />
<target value="Report received.">

</target>
<actual value="Communities receive information on project, but not yet on updated indicators.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 1: 8 new CLPS (local fishers committees) legally established in central coastal region within the first 18 months of implementation
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="4 CLPs in initial pilot sites"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="8 new CLPS established">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 1: 4 consolidated local fisheries management plans are approved by the relevant Local Artisanal Fishers'Councils within first24 months of implementation
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="4 plans implemented">

</target>
<actual value="0">
<comment><narrative>
Local Fishers' Management Councils expected to be fully operational shortly.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 3: % of targeted fishing communities receiving micro-finance and number of families entering new commercial markets.
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="80%, 200 new families">

</target>
<actual value="">
<comment><narrative>
Delays in recruitment of technical assistance firm for alternative livelihoods fund have delayed implementation here. The firm hasjust been selected.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp. 1: 4 consolidated local fisheries management plans are approved by the relevant Local Artisanal Fishers'Councils within first24 months of implementation
</narrative></title>
<baseline year="2009" iso-date="2009-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-11" />
<period-end iso-date="2012-03-31" />
<target value="4 plans implemented">

</target>
<actual value="">
<comment><narrative>
Local Fishers' Management Councils expected to be fully operational shortly.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P157097</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Municipal and Agglomerations Support Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program and Project Development Objectives (PDO) are to: (i) improve local government financing; and (ii) enhance the performance of participating urban local governments in managing public investments.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Municipal and Agglomerations Support Program are to: (i) improve local government financing; and (ii) enhance the performance of participating urban local governments in managing public investments. The proposed Operation is fully aligned with the existing Country Partnership Strategy (CPS) for Senegal (2013-2017). In line with the World Bank's updated Governance and Accountability (GAC) agenda, the CPS recommends that interventions focus on strengthening governance systems and processes to enhance the predictability, credibility and accountability of the Government. The proposed operation aligns with key outcomes under Pillar one is accelerating inclusive growth and creating employment; and Pillar two is improving service delivery. The Operation also addresses several binding constraints identified in the Systematic Country Diagnostic (SCD) for Senegal, which is under preparation and which will inform the preparation of a CPF in FY18. The SCD identifies the spatial challenges involved in creating productivity-enhancing urban spaces, including secondary cities, to promote transformational growth and job creation, while bridging the urban and rural divide by securing basic service provision across the territory. It also highlights the importance of shifting the prevailing centralized and low level governance equilibrium by promoting local level contestation and citizen engagement. The bulk of the proposed Operation will be financed through the PforR Instrument - a financing modality that is particularly well-suited to managing conditional grants to sub-national governments and to supporting sustainable structural incentives to strengthen local government capacity to deliver front-line infrastructure and services. Though the Government of Senegal does not have prior experience with the PforR instrument, the selection of the financing modality has been welcomed by the authorities. The government's commitment to the instrument is underscored by extensive efforts during preparation to sensitize the authorities to the implications of a PforR.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0026615"><narrative>GOVERNMENT OF SENEGAL</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0026615"><narrative>GOVERNMENT OF SENEGAL</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0026614"><narrative>Municipal Development Agency</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2017-02-09"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-01-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jonas Ingemann Parby</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jparby@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15129" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="100.000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="20" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="40" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="40" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000115" percentage="20" xml:lang="en"><narrative>Subnational Fiscal Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="6" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="34" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000115" percentage="20" xml:lang="en"><narrative>Subnational Fiscal Policies</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">2433333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1958333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1791666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">83333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">16530548.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">2272803.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">722376.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">8038053.93</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">8035612.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">403001.93</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">12726494.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">-12664979.77</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">15267020.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">5610548.77</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">323611.49</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">5584615.82</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">7899765.58</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">3529323.39</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">53950.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">3054765.94</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2139009.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">7155266.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">208206.77</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">286960.05</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">6251486.39</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">6251486.39</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">7000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">103000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">14846413</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">1684136</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">2272803</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">722377</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">8038054</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">8035612</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">403002</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">12726494</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-12664980</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">15267020</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">5610549</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">323611</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">5584616</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">7899766</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">3529323</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">53950</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">300119</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">2754647</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">2139009</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">226375</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">6928891</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">208207</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">286960</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">3582663</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">474417</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">264224</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">802609</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">8261347</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">718228</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">481993</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">1373447</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">612632</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-2300</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-6201</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-77986</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-8373</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-61814</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-66287</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-9345</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-122456</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-9541</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-136573</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-10378</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-178995</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-9963</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-183078</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-9937</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-252942</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-11575</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-269577</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-11782</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-14207</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-297638</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-304458</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-15097</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-16285</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-317901</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-320094</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-19340</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-74223</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-316364</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-20330</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-100575</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1460014</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-101241</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1469676</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-105820</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1536158</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1573040</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-107714</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1584063</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-108900</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-26614"><narrative>Municipal Development Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P157097"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P157097?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P157097"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (amount in billion of FCFA)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="98.00">
<comment><narrative>
Amounts allocated to the FECT and FDD reach or exceed the annual target in billion FCFA.
Restructuring changes: DLI is scalable based on a disbursement formula as per FA.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.2: Proportion of Urban LGs that received at least 80 percent of the Territorial Coaching support identified in their Annual Capacity Building Plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="95.00">

</target>
<actual value="86.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.1: Functional review of the Intergovernmental Transfer System
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No review of intergovernmental transfer system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Roll-out of Strategy for the sustainability of the resource allocation system, based on the review of intergovernmental transfer system">

</target>
<actual value="Strategy for the consolidation of intergovernmental transfer systems in Senega not developed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3: Reduction in time taken for payment of investment expenditures from the Program Special Account
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="2.00">
<comment><narrative>
achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Principal Urban Center LGs that have executed their annual investment plans (AIPs) on schedule in terms of expenditures
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="50.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX financial implementation reports on the status of PAI im
</narrative></comment>
</target>
<actual value="15.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="No LG standards on implementation of Senegal's NDC at LG level"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="DLR?8.8a: 30% of 124 PACASEN LGs have adopted a climate action plan (CAP) in line with the LGs NDC standards specified?in interministerial arrêtE.DLR?8.8.b: 50% of 124 PACASEN LGs have validated a climate risk vulnerability study (CRVS) in line with the LGs NDC standards specified in interministerial arrêtE.">
<comment><narrative>
This indicator will be measured in 2025 when it is expected that the standards will be completed.
</narrative></comment>
</target>
<actual value="Interministerial decree (MUCTAT &amp; METE) signed and adopted for the guide for local development climate plans">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.4 Women at national level in leadership position developing the LG standards to deploy the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="33.00">
<comment><narrative>
This indicator will be measured in 2025 (new indicator under the AF). Expected to be measured later in 2025/early 2026.
</narrative></comment>
</target>
<actual value="Not yet meaured. due later in 2025.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/ FDD to LGs for investment/ recurrent spending &amp; repartition of LVATF reformed and applied in timely resource transfer to LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="Modalities for repartition of State transfers to LGs for recurrent as well as investment spending &amp; for repartition of LVATF reformed and applied in timely transfer of resources to LGs not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="DLR 1.8a: Decree reforming the FECT Special window, integrating a mechanism to finance?projects to combat CC effects DLR 1.8b: Allocations from FECT and FDD according to current decrees transmitted on time.">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs, to the satisfaction of IDA
Restructuring changes: Change in DLI name from “allocation” to ‘transfer” to capture the actual and timely transfer from central to local governments, Year 2 and 3 target “conformity with the FECT decree” and year 4 and 5 target “conformity with the regulatory framework” is defined as including all 4 FECT windows, as specified by the FECT decree. Introduction of proportional disbursement in year 3, 4, 5, as per FA. Change in calendar with dates included in the FA. Inclusion of the DLI verification criteria in the FA.
</narrative></comment>
</target>
<actual value="DLR 1.7a Timely transfer before March 31 of said year of FDD resources to LGs in conformity with the FECT decree was not achievedDLR 1.7b Timely transfer before March 31 of said year of FECT resources to LGs in conformity with the FECT decree was not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.5 Urban LGs that received a minimum of coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage)
</narrative></title>
<baseline year="2024" iso-date="2024-04-04" value="No climate change capacity building for LGs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-04" />
<period-end iso-date="2026-12-31" />
<target value="DLR 10.8.a: 90% of 124 PACASEN CTs have received at least 100% of their coaching which includes two-thirds coaching interventions relating to CCDLR 10.8.b: 70% of 124 PACASEN CTs have benefited from capacity building on the development of CRVS and CAP.">
<comment><narrative>
This new indicator under the AF will be measured in late 2025/early 2026
</narrative></comment>
</target>
<actual value="Climate change training activities will be rolled out April-July 2025.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3: Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="70.00">
<comment><narrative>
Years 2 to 5: This DLI will be measured by the percentage of Principal Urban Center LGs that have met all MMCs and have achieved a performance score above the agreed satisfactory performance score in the given year (provided in Operations Manual), as confirmed through the annual LG performance assessment. 
Restructuring changes: Reformulate DLI to reduce complexity by removing FECT transfer from central government to LGs, which is now included in reformulated DLI 1. Change in calendar (not included in the FA). Decrease DLI 5 envelop from USD 4 million to USD 3 million by reallocating USD 1 million to DLI 4 envelop. This Indicator will be updated when the evaluation has been completed for 2024.
</narrative></comment>
</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.5 Urban LGs that received a minimum of coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage)
</narrative></title>
<baseline year="2024" iso-date="2024-04-04" value="No climate change capacity building for LGs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-04" />
<period-end iso-date="2026-12-31" />
<target value="DLR 10.8.a: 90% of 124 PACASEN CTs have received at least 100% of their coaching which includes two-thirds coaching interventions relating to CCDLR 10.8.b: 70% of 124 PACASEN CTs have benefited from capacity building on the development of CRVS and CAP.">
<comment><narrative>
This new indicator under the AF will be measured in late 2025/early 2026
</narrative></comment>
</target>
<actual value="Climate change training activities will be rolled out April-July 2025.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.5 Urban LGs that received a minimum of coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage)
</narrative></title>
<baseline year="2024" iso-date="2024-04-04" value="No climate change capacity building for LGs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-04" />
<period-end iso-date="2026-12-31" />
<target value="DLR 10.8.a: 90% of 124 PACASEN CTs have received at least 100% of their coaching which includes two-thirds coaching interventions relating to CCDLR 10.8.b: 70% of 124 PACASEN CTs have benefited from capacity building on the development of CRVS and CAP.">
<comment><narrative>
This new indicator under the AF will be measured in late 2025/early 2026
</narrative></comment>
</target>
<actual value="Climate change training activities will be rolled out April-July 2025.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.5 Urban LGs that received a minimum of coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage)
</narrative></title>
<baseline year="2024" iso-date="2024-04-04" value="No climate change capacity building for LGs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-04" />
<period-end iso-date="2026-12-31" />
<target value="DLR 10.8.a: 90% of 124 PACASEN CTs have received at least 100% of their coaching which includes two-thirds coaching interventions relating to CCDLR 10.8.b: 70% of 124 PACASEN CTs have benefited from capacity building on the development of CRVS and CAP.">
<comment><narrative>
This new indicator under the AF will be measured in late 2025/early 2026
</narrative></comment>
</target>
<actual value="Climate change training activities will be rolled out April-July 2025.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.2 Local property tax assessments in the Principal Urban Center LGs
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="49.00">

</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.2 Local property tax assessments in the Principal Urban Center LGs
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="49.00">
<comment><narrative>
This indicator will be updated in mid 2025 when the fiscal year 2024 is completed. There are indications that the target (44) will be achieved.
</narrative></comment>
</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.2 Local property tax assessments in the Principal Urban Center LGs
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="49.00">
<comment><narrative>
This indicator will be updated in mid 2025 when the fiscal year 2024 is completed. There are indications that the target (44) will be achieved.
</narrative></comment>
</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="No LG standards on implementation of Senegal's NDC at LG level"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="DLR?8.8a: 30% of 124 PACASEN LGs have adopted a climate action plan (CAP) in line with the LGs NDC standards specified?in interministerial arrêtE.DLR?8.8.b: 50% of 124 PACASEN LGs have validated a climate risk vulnerability study (CRVS) in line with the LGs NDC standards specified in interministerial arrêtE.">
<comment><narrative>
This indicator will be measured in 2025 when it is expected that the standards will be completed.
</narrative></comment>
</target>
<actual value="Interministerial decree (MUCTAT &amp; METE) signed and adopted for the guide for local development climate plans">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="No LG standards on implementation of Senegal's NDC at LG level"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="DLR?8.8a: 30% of 124 PACASEN LGs have adopted a climate action plan (CAP) in line with the LGs NDC standards specified?in interministerial arrêtE.DLR?8.8.b: 50% of 124 PACASEN LGs have validated a climate risk vulnerability study (CRVS) in line with the LGs NDC standards specified in interministerial arrêtE.">
<comment><narrative>
This indicator will be measured in 2025 when it is expected that the standards will be completed.
</narrative></comment>
</target>
<actual value="Interministerial decree (MUCTAT &amp; METE) signed and adopted for the guide for local development climate plans">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="No LG standards on implementation of Senegal's NDC at LG level"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="DLR?8.8a: 30% of 124 PACASEN LGs have adopted a climate action plan (CAP) in line with the LGs NDC standards specified?in interministerial arrêtE.DLR?8.8.b: 50% of 124 PACASEN LGs have validated a climate risk vulnerability study (CRVS) in line with the LGs NDC standards specified in interministerial arrêtE.">
<comment><narrative>
This indicator will be measured in 2025 when it is expected that the standards will be completed.
</narrative></comment>
</target>
<actual value="Interministerial decree (MUCTAT &amp; METE) signed and adopted for the guide for local development climate plans">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.4 Women at national level in leadership position developing the LG standards to deploy the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="33.00">
<comment><narrative>
This indicator will be measured in 2025 (new indicator under the AF). Expected to be measured later in 2025/early 2026.
</narrative></comment>
</target>
<actual value="Not yet meaured. due later in 2025.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.4 Women at national level in leadership position developing the LG standards to deploy the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="33.00">
<comment><narrative>
This indicator will be measured in 2025 (new indicator under the AF). Expected to be measured later in 2025/early 2026.
</narrative></comment>
</target>
<actual value="Not yet meaured. due later in 2025.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.4 Women at national level in leadership position developing the LG standards to deploy the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="33.00">
<comment><narrative>
This indicator will be measured in 2025 (new indicator under the AF). Expected to be measured later in 2025/early 2026.
</narrative></comment>
</target>
<actual value="Not yet meaured. due later in 2025.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3: Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="70.00">
<comment><narrative>
Years 2 to 5: This DLI will be measured by the percentage of Principal Urban Center LGs that have met all MMCs and have achieved a performance score above the agreed satisfactory performance score in the given year (provided in Operations Manual), as confirmed through the annual LG performance assessment. 
Restructuring changes: Reformulate DLI to reduce complexity by removing FECT transfer from central government to LGs, which is now included in reformulated DLI 1. Change in calendar (not included in the FA). Decrease DLI 5 envelop from USD 4 million to USD 3 million by reallocating USD 1 million to DLI 4 envelop. This Indicator will be updated when the evaluation has been completed for 2024.
</narrative></comment>
</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3: Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="70.00">
<comment><narrative>
Years 2 to 5: This DLI will be measured by the percentage of Principal Urban Center LGs that have met all MMCs and have achieved a performance score above the agreed satisfactory performance score in the given year (provided in Operations Manual), as confirmed through the annual LG performance assessment. 
Restructuring changes: Reformulate DLI to reduce complexity by removing FECT transfer from central government to LGs, which is now included in reformulated DLI 1. Change in calendar (not included in the FA). Decrease DLI 5 envelop from USD 4 million to USD 3 million by reallocating USD 1 million to DLI 4 envelop. This Indicator will be updated when the evaluation has been completed for 2024.
</narrative></comment>
</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3: Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="70.00">
<comment><narrative>
Years 2 to 5: This DLI will be measured by the percentage of Principal Urban Center LGs that have met all MMCs and have achieved a performance score above the agreed satisfactory performance score in the given year (provided in Operations Manual), as confirmed through the annual LG performance assessment. 
Restructuring changes: Reformulate DLI to reduce complexity by removing FECT transfer from central government to LGs, which is now included in reformulated DLI 1. Change in calendar (not included in the FA). Decrease DLI 5 envelop from USD 4 million to USD 3 million by reallocating USD 1 million to DLI 4 envelop. This Indicator will be updated when the evaluation has been completed for 2024.
</narrative></comment>
</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.2: Information on fiscal transfers and LG performance in year N-1 is publicly accessible by March 31 in year N
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Yes">
<comment><narrative>
This has not been achieved this year due to delay in approval of fiscal transfers
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.2: Information on fiscal transfers and LG performance in year N-1 is publicly accessible by March 31 in year N
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Yes">
<comment><narrative>
This has not been achieved this year due to delay in approval of fiscal transfers
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.2: Information on fiscal transfers and LG performance in year N-1 is publicly accessible by March 31 in year N
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Yes">
<comment><narrative>
This has not been achieved this year due to delay in approval of fiscal transfers
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3: Reduction in time taken for payment of investment expenditures from the Program Special Account
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="2.00">
<comment><narrative>
Achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3: Reduction in time taken for payment of investment expenditures from the Program Special Account
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="2.00">
<comment><narrative>
achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3: Reduction in time taken for payment of investment expenditures from the Program Special Account
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="2.00">
<comment><narrative>
achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.2: Proportion of Urban LGs that received at least 80 percent of the Territorial Coaching support identified in their Annual Capacity Building Plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="95.00">

</target>
<actual value="86.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.2: Proportion of Urban LGs that received at least 80 percent of the Territorial Coaching support identified in their Annual Capacity Building Plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="95.00">

</target>
<actual value="86.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2: Urban LGs with a functioning Local Fiscal Commission
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="115.00">
<comment><narrative>
Indicator achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="107.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2: Urban LGs with a functioning Local Fiscal Commission
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="115.00">
<comment><narrative>
Indicator achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="107.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2: Urban LGs with a functioning Local Fiscal Commission
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="115.00">
<comment><narrative>
Indicator achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="107.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.2: Proportion of Urban LGs that received at least 80 percent of the Territorial Coaching support identified in their Annual Capacity Building Plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="95.00">

</target>
<actual value="86.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 Urban LGs having received at least 3 training modules (including 1 CC module) identified in their annual capacity development plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="100.00">
<comment><narrative>
This indicator will be updated after completion of the trainings in 2025
</narrative></comment>
</target>
<actual value="74.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 Urban LGs having received at least 3 training modules (including 1 CC module) identified in their annual capacity development plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="100.00">
<comment><narrative>
This indicator will be updated after completion of the trainings in 2025
</narrative></comment>
</target>
<actual value="74.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 Urban LGs having received at least 3 training modules (including 1 CC module) identified in their annual capacity development plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="100.00">
<comment><narrative>
This indicator will be updated after completion of the trainings in 2025
</narrative></comment>
</target>
<actual value="74.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.1: Functional review of the Intergovernmental Transfer System
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No review of intergovernmental transfer system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Roll-out of Strategy for the sustainability of the resource allocation system, based on the review of intergovernmental transfer system">

</target>
<actual value="Strategy for the consolidation of intergovernmental transfer systems in Senega not developed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.1: Functional review of the Intergovernmental Transfer System
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No review of intergovernmental transfer system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Roll-out of Strategy for the sustainability of the resource allocation system, based on the review of intergovernmental transfer system">

</target>
<actual value="Strategy for the consolidation of intergovernmental transfer systems in Senega not developed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.1: Functional review of the Intergovernmental Transfer System
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No review of intergovernmental transfer system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Roll-out of Strategy for the sustainability of the resource allocation system, based on the review of intergovernmental transfer system">

</target>
<actual value="Strategy for the consolidation of intergovernmental transfer systems in Senega not developed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Principal Urban Center LGs that have executed their annual investment plans (AIPs) on schedule in terms of expenditures
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="50.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX financial implementation reports on the status of PAI im
</narrative></comment>
</target>
<actual value="15.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Principal Urban Center LGs that have executed their annual investment plans (AIPs) on schedule in terms of expenditures
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="50.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX financial implementation reports on the status of PAI im
</narrative></comment>
</target>
<actual value="15.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Principal Urban Center LGs that have executed their annual investment plans (AIPs) on schedule in terms of expenditures
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="50.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX financial implementation reports on the status of PAI im
</narrative></comment>
</target>
<actual value="15.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Urban LGs that satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="80.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX fin implementation reports on the status of PAI implemen
</narrative></comment>
</target>
<actual value="94.35">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Urban LGs that satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="80.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX fin implementation reports on the status of PAI implemen
</narrative></comment>
</target>
<actual value="94.35">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Urban LGs that satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="80.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX fin implementation reports on the status of PAI implemen
</narrative></comment>
</target>
<actual value="94.35">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (amount in billion of FCFA)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="98.00">
<comment><narrative>
Amounts allocated to the FECT and FDD reach or exceed the annual target in billion FCFA.
Restructuring changes: DLI is scalable based on a disbursement formula as per FA.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (amount in billion of FCFA)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="98.00">
<comment><narrative>
Amounts allocated to the FECT and FDD reach or exceed the annual target in billion FCFA.
Restructuring changes: DLI is scalable based on a disbursement formula as per FA.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in local taxation revenues in the Principle Urban Center LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="40.00">
<comment><narrative>
This indicator has been dropped.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in local taxation revenues in the Principle Urban Center LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="40.00">
<comment><narrative>
This indicator has been dropped.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in local taxation revenues in the Principle Urban Center LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="40.00">
<comment><narrative>
This indicator has been dropped.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/ FDD to LGs for investment/ recurrent spending &amp; repartition of LVATF reformed and applied in timely resource transfer to LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="Modalities for repartition of State transfers to LGs for recurrent as well as investment spending &amp; for repartition of LVATF reformed and applied in timely transfer of resources to LGs not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="DLR 1.8a: Decree reforming the FECT Special window, integrating a mechanism to finance?projects to combat CC effects DLR 1.8b: Allocations from FECT and FDD according to current decrees transmitted on time.">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs, to the satisfaction of IDA
Restructuring changes: Change in DLI name from “allocation” to ‘transfer” to capture the actual and timely transfer from central to local governments, Year 2 and 3 target “conformity with the FECT decree” and year 4 and 5 target “conformity with the regulatory framework” is defined as including all 4 FECT windows, as specified by the FECT decree. Introduction of proportional disbursement in year 3, 4, 5, as per FA. Change in calendar with dates included in the FA. Inclusion of the DLI verification criteria in the FA.
</narrative></comment>
</target>
<actual value="DLR 1.7a Timely transfer before March 31 of said year of FDD resources to LGs in conformity with the FECT decree was not achievedDLR 1.7b Timely transfer before March 31 of said year of FECT resources to LGs in conformity with the FECT decree was not achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (amount in billion of FCFA)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="98.00">
<comment><narrative>
Amounts allocated to the FECT and FDD reach or exceed the annual target in billion FCFA.
Restructuring changes: DLI is scalable based on a disbursement formula as per FA.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/ FDD to LGs for investment/ recurrent spending &amp; repartition of LVATF reformed and applied in timely resource transfer to LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="Modalities for repartition of State transfers to LGs for recurrent as well as investment spending &amp; for repartition of LVATF reformed and applied in timely transfer of resources to LGs not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="DLR 1.8a: Decree reforming the FECT Special window, integrating a mechanism to finance?projects to combat CC effects DLR 1.8b: Allocations from FECT and FDD according to current decrees transmitted on time.">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs, to the satisfaction of IDA
Restructuring changes: Change in DLI name from “allocation” to ‘transfer” to capture the actual and timely transfer from central to local governments, Year 2 and 3 target “conformity with the FECT decree” and year 4 and 5 target “conformity with the regulatory framework” is defined as including all 4 FECT windows, as specified by the FECT decree. Introduction of proportional disbursement in year 3, 4, 5, as per FA. Change in calendar with dates included in the FA. Inclusion of the DLI verification criteria in the FA.
</narrative></comment>
</target>
<actual value="DLR 1.7a Timely transfer before March 31 of said year of FDD resources to LGs in conformity with the FECT decree was not achievedDLR 1.7b Timely transfer before March 31 of said year of FECT resources to LGs in conformity with the FECT decree was not achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/ FDD to LGs for investment/ recurrent spending &amp; repartition of LVATF reformed and applied in timely resource transfer to LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="Modalities for repartition of State transfers to LGs for recurrent as well as investment spending &amp; for repartition of LVATF reformed and applied in timely transfer of resources to LGs not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="DLR 1.8a: Decree reforming the FECT Special window, integrating a mechanism to finance?projects to combat CC effects DLR 1.8b: Allocations from FECT and FDD according to current decrees transmitted on time.">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs, to the satisfaction of IDA
Restructuring changes: Change in DLI name from “allocation” to ‘transfer” to capture the actual and timely transfer from central to local governments, Year 2 and 3 target “conformity with the FECT decree” and year 4 and 5 target “conformity with the regulatory framework” is defined as including all 4 FECT windows, as specified by the FECT decree. Introduction of proportional disbursement in year 3, 4, 5, as per FA. Change in calendar with dates included in the FA. Inclusion of the DLI verification criteria in the FA.
</narrative></comment>
</target>
<actual value="DLR 1.7a Timely transfer before March 31 of said year of FDD resources to LGs in conformity with the FECT decree was not achievedDLR 1.7b Timely transfer before March 31 of said year of FECT resources to LGs in conformity with the FECT decree was not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.2: Information on fiscal transfers and LG performance in year N-1 is publicly accessible by March 31 in year N
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Yes">
<comment><narrative>
This has not been achieved this year due to delay in approval of fiscal transfers
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in local taxation revenues in the Principle Urban Center LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="40.00">
<comment><narrative>
This indicator has been dropped.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.5 Urban LGs that received a minimum of coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage)
</narrative></title>
<baseline year="2024" iso-date="2024-04-04" value="No climate change capacity building for LGs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-04" />
<period-end iso-date="2026-12-31" />
<target value="DLR 10.8.a: 90% of 124 PACASEN CTs have received at least 100% of their coaching which includes two-thirds coaching interventions relating to CCDLR 10.8.b: 70% of 124 PACASEN CTs have benefited from capacity building on the development of CRVS and CAP.">
<comment><narrative>
This new indicator under the AF will be measured in late 2025/early 2026
</narrative></comment>
</target>
<actual value="Climate change training activities will be rolled out April-July 2025.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.5 Urban LGs that received a minimum of coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage)
</narrative></title>
<baseline year="2024" iso-date="2024-04-04" value="No climate change capacity building for LGs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-04" />
<period-end iso-date="2026-12-31" />
<target value="DLR 10.8.a: 90% of 124 PACASEN CTs have received at least 100% of their coaching which includes two-thirds coaching interventions relating to CCDLR 10.8.b: 70% of 124 PACASEN CTs have benefited from capacity building on the development of CRVS and CAP.">
<comment><narrative>
This new indicator under the AF will be measured in late 2025/early 2026
</narrative></comment>
</target>
<actual value="Climate change training activities will be rolled out April-July 2025.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.5 Urban LGs that received a minimum of coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage)
</narrative></title>
<baseline year="2024" iso-date="2024-04-04" value="No climate change capacity building for LGs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-04" />
<period-end iso-date="2026-12-31" />
<target value="DLR 10.8.a: 90% of 124 PACASEN CTs have received at least 100% of their coaching which includes two-thirds coaching interventions relating to CCDLR 10.8.b: 70% of 124 PACASEN CTs have benefited from capacity building on the development of CRVS and CAP.">
<comment><narrative>
This new indicator under the AF will be measured in late 2025/early 2026
</narrative></comment>
</target>
<actual value="Climate change training activities will be rolled out April-July 2025.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban LGs that received a minimum of coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No climate change capacity building for LGs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Urban LGs that received a minimum of Coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage).&amp;nbsp;Measured at the level of Urban LGs. This is DLI 10.

&amp;nbsp;
</narrative></comment>
</target>
<actual value="51">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban LGs that received a minimum of coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No climate change capacity building for LGs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Urban LGs that received a minimum of Coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage).&amp;nbsp;Measured at the level of Urban LGs. This is DLI 10.

&amp;nbsp;
</narrative></comment>
</target>
<actual value="No climate change capacity building for LGs">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban LGs that received a minimum of coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No climate change capacity building for LGs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Urban LGs that received a minimum of Coaching, incl on climate change, identified in their Annual Capacity Building Plans (Percentage).&amp;nbsp;Measured at the level of Urban LGs. This is DLI 10.

&amp;nbsp;
</narrative></comment>
</target>
<actual value="No climate change capacity building for LGs">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Local property tax assessments in the Principal Urban Center LGs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Annual increase of 5% in local property tax assessments in the Principal Urban Center LGs  (distinguished into built/ unbuilt and commercial/ domestic), starting at the baseline of 39% in 2024 (total increase over AF period: 10%)
</narrative></comment>
</target>
<actual value="44">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Local property tax assessments in the Principal Urban Center LGs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Annual increase of 5% in local property tax assessments in the Principal Urban Center LGs  (distinguished into built/ unbuilt and commercial/ domestic), starting at the baseline of 39% in 2024 (total increase over AF period: 10%)
</narrative></comment>
</target>
<actual value="39.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Local property tax assessments in the Principal Urban Center LGs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Annual increase of 5% in local property tax assessments in the Principal Urban Center LGs  (distinguished into built/ unbuilt and commercial/ domestic), starting at the baseline of 39% in 2024 (total increase over AF period: 10%)
</narrative></comment>
</target>
<actual value="39.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No LG standards on implementation of Senegal's NDC at LG level"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level. This is the new DLI 8.
</narrative></comment>
</target>
<actual value="Interministerial decree signed for trhe new Local Climate plan standards">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No LG standards on implementation of Senegal's NDC at LG level"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level. This is the new DLI 8.
</narrative></comment>
</target>
<actual value="No LG standards on NDC implementation - Interministerial decree on local climate development plans has been signed and adopted">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No LG standards on implementation of Senegal's NDC at LG level"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level. This is the new DLI 8.
</narrative></comment>
</target>
<actual value="No LG standards on NDC implementation - Interministerial decree on local climate development plans has been signed and adopted">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.2 Local property tax assessments in the Principal Urban Center LGs
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="49.00">

</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.2 Local property tax assessments in the Principal Urban Center LGs
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="49.00">
<comment><narrative>
This indicator will be updated in mid 2025 when the fiscal year 2024 is completed. There are indications that the target (44) will be achieved.
</narrative></comment>
</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.2 Local property tax assessments in the Principal Urban Center LGs
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="49.00">
<comment><narrative>
This indicator will be updated in mid 2025 when the fiscal year 2024 is completed. There are indications that the target (44) will be achieved.
</narrative></comment>
</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="No LG standards on implementation of Senegal's NDC at LG level"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="DLR?8.8a: 30% of 124 PACASEN LGs have adopted a climate action plan (CAP) in line with the LGs NDC standards specified?in interministerial arrêtE.DLR?8.8.b: 50% of 124 PACASEN LGs have validated a climate risk vulnerability study (CRVS) in line with the LGs NDC standards specified in interministerial arrêtE.">
<comment><narrative>
This indicator will be measured in 2025 when it is expected that the standards will be completed.
</narrative></comment>
</target>
<actual value="Interministerial decree (MUCTAT &amp; METE) signed and adopted for the guide for local development climate plans">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="No LG standards on implementation of Senegal's NDC at LG level"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="DLR?8.8a: 30% of 124 PACASEN LGs have adopted a climate action plan (CAP) in line with the LGs NDC standards specified?in interministerial arrêtE.DLR?8.8.b: 50% of 124 PACASEN LGs have validated a climate risk vulnerability study (CRVS) in line with the LGs NDC standards specified in interministerial arrêtE.">
<comment><narrative>
This indicator will be measured in 2025 when it is expected that the standards will be completed.
</narrative></comment>
</target>
<actual value="Interministerial decree (MUCTAT &amp; METE) signed and adopted for the guide for local development climate plans">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deployment of the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="No LG standards on implementation of Senegal's NDC at LG level"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="DLR?8.8a: 30% of 124 PACASEN LGs have adopted a climate action plan (CAP) in line with the LGs NDC standards specified?in interministerial arrêtE.DLR?8.8.b: 50% of 124 PACASEN LGs have validated a climate risk vulnerability study (CRVS) in line with the LGs NDC standards specified in interministerial arrêtE.">
<comment><narrative>
This indicator will be measured in 2025 when it is expected that the standards will be completed.
</narrative></comment>
</target>
<actual value="Interministerial decree (MUCTAT &amp; METE) signed and adopted for the guide for local development climate plans">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.4 Women at national level in leadership position developing the LG standards to deploy the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="33.00">
<comment><narrative>
This indicator will be measured in 2025 (new indicator under the AF). Expected to be measured later in 2025/early 2026.
</narrative></comment>
</target>
<actual value="Not yet meaured. due later in 2025.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.4 Women at national level in leadership position developing the LG standards to deploy the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="33.00">
<comment><narrative>
This indicator will be measured in 2025 (new indicator under the AF). Expected to be measured later in 2025/early 2026.
</narrative></comment>
</target>
<actual value="Not yet meaured. due later in 2025.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.4 Women at national level in leadership position developing the LG standards to deploy the National Determined Contribution (NDC) at the LG level
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="33.00">
<comment><narrative>
This indicator will be measured in 2025 (new indicator under the AF). Expected to be measured later in 2025/early 2026.
</narrative></comment>
</target>
<actual value="Not yet meaured. due later in 2025.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/ FDD to LGs for investment/recurrent spending &amp; repartition of LVATF reformed and applied in timely resource transfer to LGs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT&amp;nbsp;and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs.
</narrative></comment>
</target>
<actual value="DLR 7.1a: Promulgated decree on allocation criteria for FDD by Dec 31, 2025 DLR 7.1b: Allocations from FECT and FDD according to current decrees transmitted on time. DLR 8.2a: Decree reforming the FECT Special window, integrating a mechanism to finance projects to combat climate change effectsDLR 8.b: Allocations from FECT and FDD according to current decrees transmitted on time.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/ FDD to LGs for investment/recurrent spending &amp; repartition of LVATF reformed and applied in timely resource transfer to LGs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT&amp;nbsp;and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs.
</narrative></comment>
</target>
<actual value="DLR 7.1a: Promulgated decree on allocation criteria for FDD by Dec 31, 2025 DLR 7.1b: Allocations from FECT and FDD according to current decrees transmitted on time. DLR 8.2a: Decree reforming the FECT Special window, integrating a mechanism to finance projects to combat climate change effectsDLR 8.b: Allocations from FECT and FDD according to current decrees transmitted on time.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/ FDD to LGs for investment/recurrent spending &amp; repartition of LVATF reformed and applied in timely resource transfer to LGs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT&amp;nbsp;and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs.
</narrative></comment>
</target>
<actual value="DLR 7.1a: Promulgated decree on allocation criteria for FDD by Dec 31, 2025 DLR 7.1b: Allocations from FECT and FDD according to current decrees transmitted on time. DLR 8.2a: Decree reforming the FECT Special window, integrating a mechanism to finance projects to combat climate change effectsDLR 8.b: Allocations from FECT and FDD according to current decrees transmitted on time.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 5: Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs).&amp;nbsp;This indicator is DLI 5.&amp;nbsp;
</narrative></comment>
</target>
<actual value="73">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 5: Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs).&amp;nbsp;This indicator is DLI 5.&amp;nbsp;
</narrative></comment>
</target>
<actual value="73">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 5: Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs).&amp;nbsp;This indicator is DLI 5.&amp;nbsp;
</narrative></comment>
</target>
<actual value="73">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 6: Principal Urban Center LGs that have executed their annual investment plans (AIPs) on schedule in terms of expenditures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Principal Urban Center LGs that have executed their Annual Investment Plans on schedule in terms of expenditures
</narrative></comment>
</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 6: Principal Urban Center LGs that have executed their annual investment plans (AIPs) on schedule in terms of expenditures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Principal Urban Center LGs that have executed their Annual Investment Plans on schedule in terms of expenditures
</narrative></comment>
</target>
<actual value="15.79">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 6: Principal Urban Center LGs that have executed their annual investment plans (AIPs) on schedule in terms of expenditures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Principal Urban Center LGs that have executed their Annual Investment Plans on schedule in terms of expenditures
</narrative></comment>
</target>
<actual value="15.79">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 4:Urban LGs which satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Urban LGs which satisfied the annual Minimum Mandatory Conditions (MMC).&amp;nbsp;Measured at the level of Urban LGs
</narrative></comment>
</target>
<actual value="95">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 4:Urban LGs which satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Urban LGs which satisfied the annual Minimum Mandatory Conditions (MMC).&amp;nbsp;Measured at the level of Urban LGs
</narrative></comment>
</target>
<actual value="82.26">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 4:Urban LGs which satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Urban LGs which satisfied the annual Minimum Mandatory Conditions (MMC).&amp;nbsp;Measured at the level of Urban LGs
</narrative></comment>
</target>
<actual value="82.26">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
DLI 2: State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (in billion FCFA)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the national level. Amounts allocated to the FECT&amp;nbsp;and FDD&amp;nbsp;reach or exceed the annual target in billions FCFA.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
DLI 2: State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (in billion FCFA)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the national level. Amounts allocated to the FECT&amp;nbsp;and FDD&amp;nbsp;reach or exceed the annual target in billions FCFA.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
DLI 2: State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (in billion FCFA)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the national level. Amounts allocated to the FECT&amp;nbsp;and FDD&amp;nbsp;reach or exceed the annual target in billions FCFA.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 7: Proportion of Urban LGs that received at least 80 percent of the Territorial Coaching support identified in their Annual Capacity Building Plans
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Urban LGs
Year 1: At least 95% of Urban LGs produce an Annual Capacity Building Plan.
Year 2: At least 80 percent of Urban LGs have prepared and received at least 80 percent of the coaching missions specified in their Annual Capacity Build Plan. 
Year 3: At least 90 percent of Urban LGs have prepared and received at least 80 percent of the coaching missions specified in their Annual Capacity Build Plan.
Years 4 and 5: 95 percent of Urban LGs have prepared and received at least 80 percent of the coaching missions specified in their Annual Capacity Build Plan
</narrative></comment>
</target>
<actual value="86.29">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 7: Proportion of Urban LGs that received at least 80 percent of the Territorial Coaching support identified in their Annual Capacity Building Plans
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Urban LGs
Year 1: At least 95% of Urban LGs produce an Annual Capacity Building Plan.
Year 2: At least 80 percent of Urban LGs have prepared and received at least 80 percent of the coaching missions specified in their Annual Capacity Build Plan. 
Year 3: At least 90 percent of Urban LGs have prepared and received at least 80 percent of the coaching missions specified in their Annual Capacity Build Plan.
Years 4 and 5: 95 percent of Urban LGs have prepared and received at least 80 percent of the coaching missions specified in their Annual Capacity Build Plan
</narrative></comment>
</target>
<actual value="86.29">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 7: Proportion of Urban LGs that received at least 80 percent of the Territorial Coaching support identified in their Annual Capacity Building Plans
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Urban LGs
Year 1: At least 95% of Urban LGs produce an Annual Capacity Building Plan.
Year 2: At least 80 percent of Urban LGs have prepared and received at least 80 percent of the coaching missions specified in their Annual Capacity Build Plan. 
Year 3: At least 90 percent of Urban LGs have prepared and received at least 80 percent of the coaching missions specified in their Annual Capacity Build Plan.
Years 4 and 5: 95 percent of Urban LGs have prepared and received at least 80 percent of the coaching missions specified in their Annual Capacity Build Plan
</narrative></comment>
</target>
<actual value="86.29">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 6: Proportion of Principle Urban Center LGs that have executed their Annual Investment Plans on schedule in terms of expenditures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Principle Urban Center LGs Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan. The annual target levels are:

Y1: 10% of LGs.

Y2:&amp;nbsp;40% of LGs have financially executed 25% of their annual investment plans (AIPs);

Y3: 50% of LGs have financially executed 30% of their AIPs;

Y4: 60% of LGs have financially executed 40% of their&amp;nbsp;AIPs;

Y5: 70% of LGs have financially executed 50% of their AIPs.
</narrative></comment>
</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 6: Proportion of Principle Urban Center LGs that have executed their Annual Investment Plans on schedule in terms of expenditures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Principle Urban Center LGs Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan. The annual target levels are:

Y1: 10% of LGs.

Y2:&amp;nbsp;40% of LGs have financially executed 25% of their annual investment plans (AIPs);

Y3: 50% of LGs have financially executed 30% of their AIPs;

Y4: 60% of LGs have financially executed 40% of their&amp;nbsp;AIPs;

Y5: 70% of LGs have financially executed 50% of their AIPs.
</narrative></comment>
</target>
<actual value="10.52">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 6: Proportion of Principle Urban Center LGs that have executed their Annual Investment Plans on schedule in terms of expenditures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Principle Urban Center LGs Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan. The annual target levels are:

Y1: 10% of LGs.

Y2:&amp;nbsp;40% of LGs have financially executed 25% of their annual investment plans (AIPs);

Y3: 50% of LGs have financially executed 30% of their AIPs;

Y4: 60% of LGs have financially executed 40% of their&amp;nbsp;AIPs;

Y5: 70% of LGs have financially executed 50% of their AIPs.
</narrative></comment>
</target>
<actual value="10.52">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 5: Proportion of Principle Urban Center LGs who satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Principle Urban Center LGs.

Y1: Baselines for all PIS are established for all Principle Urban Centre LGs and Performance Assessment Procedural Manual produced by the MGT to the satisfaction of the World Bank.

Y&amp;nbsp;2 to 5: This DLI will be measured by the percentage of Principal Urban Center LGs that have met all MMCs and have achieved a performance score above the agreed satisfactory performance score in the given year, as confirmed through the annual performance assessment carried out by a recruited firm for year 2, and by the court of auditors, or another designated entity, acceptable to IDA, for years 3 to 5. The agreed satisfactory performance score is provided in the Operations Manual and any change is subject to IDA&amp;rsquo;s prior approval
</narrative></comment>
</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 5: Proportion of Principle Urban Center LGs who satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Principle Urban Center LGs.

Y1: Baselines for all PIS are established for all Principle Urban Centre LGs and Performance Assessment Procedural Manual produced by the MGT to the satisfaction of the World Bank.

Y&amp;nbsp;2 to 5: This DLI will be measured by the percentage of Principal Urban Center LGs that have met all MMCs and have achieved a performance score above the agreed satisfactory performance score in the given year, as confirmed through the annual performance assessment carried out by a recruited firm for year 2, and by the court of auditors, or another designated entity, acceptable to IDA, for years 3 to 5. The agreed satisfactory performance score is provided in the Operations Manual and any change is subject to IDA&amp;rsquo;s prior approval
</narrative></comment>
</target>
<actual value="57.89">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 5: Proportion of Principle Urban Center LGs who satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Principle Urban Center LGs.

Y1: Baselines for all PIS are established for all Principle Urban Centre LGs and Performance Assessment Procedural Manual produced by the MGT to the satisfaction of the World Bank.

Y&amp;nbsp;2 to 5: This DLI will be measured by the percentage of Principal Urban Center LGs that have met all MMCs and have achieved a performance score above the agreed satisfactory performance score in the given year, as confirmed through the annual performance assessment carried out by a recruited firm for year 2, and by the court of auditors, or another designated entity, acceptable to IDA, for years 3 to 5. The agreed satisfactory performance score is provided in the Operations Manual and any change is subject to IDA&amp;rsquo;s prior approval
</narrative></comment>
</target>
<actual value="57.89">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 4: Proportion of Urban LGs which satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Urban LGs
By April 30 Year 1: Baselines for all MMCs are established for all Urban LGs and Performance Assessment Procedural Manual produced by the MGT to the satisfaction of the World Bank. 
Year 2: at least 50% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March. 
Year 3: at least 60% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March.
Year 4: at least 70% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March.
Year 5: at least 80% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March.
</narrative></comment>
</target>
<actual value="95">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 4: Proportion of Urban LGs which satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Urban LGs
By April 30 Year 1: Baselines for all MMCs are established for all Urban LGs and Performance Assessment Procedural Manual produced by the MGT to the satisfaction of the World Bank. 
Year 2: at least 50% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March. 
Year 3: at least 60% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March.
Year 4: at least 70% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March.
Year 5: at least 80% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DLI 4: Proportion of Urban LGs which satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Urban LGs
By April 30 Year 1: Baselines for all MMCs are established for all Urban LGs and Performance Assessment Procedural Manual produced by the MGT to the satisfaction of the World Bank. 
Year 2: at least 50% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March. 
Year 3: at least 60% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March.
Year 4: at least 70% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March.
Year 5: at least 80% of LGs achieve the applicable MMCs for that year and are notified of their first-tier conditional grant allocations by Inter-Ministerial Order no later than 31 March.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
DLI 3: Urban LGs with a functioning Local Fiscal Commission
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Urban LGs. Functioning local fiscal commissions are those that (i) are created by a formal written decision issued by the Head of the relevant Fiscal Services Centre (DGID); (ii) meet at least once a year as reflected in the minutes of meetings; and (iii) prepare an annual report to track progress against the performance agreement signed between the members of the Committee
</narrative></comment>
</target>
<actual value="107.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
DLI 3: Urban LGs with a functioning Local Fiscal Commission
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Urban LGs. Functioning local fiscal commissions are those that (i) are created by a formal written decision issued by the Head of the relevant Fiscal Services Centre (DGID); (ii) meet at least once a year as reflected in the minutes of meetings; and (iii) prepare an annual report to track progress against the performance agreement signed between the members of the Committee
</narrative></comment>
</target>
<actual value="107.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
DLI 3: Urban LGs with a functioning Local Fiscal Commission
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the level of Urban LGs. Functioning local fiscal commissions are those that (i) are created by a formal written decision issued by the Head of the relevant Fiscal Services Centre (DGID); (ii) meet at least once a year as reflected in the minutes of meetings; and (iii) prepare an annual report to track progress against the performance agreement signed between the members of the Committee
</narrative></comment>
</target>
<actual value="107.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
DLI 2: Increase in State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (in billion FCFA)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the national level. Amounts allocated to the FECT&amp;nbsp;and FDD&amp;nbsp;reach or exceed the annual target in billions FCFA.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
DLI 2: Increase in State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (in billion FCFA)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the national level. Amounts allocated to the FECT&amp;nbsp;and FDD&amp;nbsp;reach or exceed the annual target in billions FCFA.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
DLI 2: Increase in State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (in billion FCFA)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measured at the national level. Amounts allocated to the FECT&amp;nbsp;and FDD&amp;nbsp;reach or exceed the annual target in billions FCFA.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/FDD to LGs for recurrent &amp; investment spending &amp; repartition of LVATF reformed and applied in timely transfer of resources to LGs to IDA satisfaction
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT&amp;nbsp;and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs, to the satisfaction of the Association
</narrative></comment>
</target>
<actual value="b. Timely transfer before March 31 of said year of FECT resources to LGs in conformity with the FECT decree; c. Promulgated decrees on the allocation criteria for LVATF">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/FDD to LGs for recurrent &amp; investment spending &amp; repartition of LVATF reformed and applied in timely transfer of resources to LGs to IDA satisfaction
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT&amp;nbsp;and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs, to the satisfaction of the Association
</narrative></comment>
</target>
<actual value="b. Timely transfer before March 31 of said year of FECT resources to LGs in conformity with the FECT decree; c. Promulgated decrees on the allocation criteria for LVATF">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/FDD to LGs for recurrent &amp; investment spending &amp; repartition of LVATF reformed and applied in timely transfer of resources to LGs to IDA satisfaction
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT&amp;nbsp;and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs, to the satisfaction of the Association
</narrative></comment>
</target>
<actual value="b. Timely transfer before March 31 of said year of FECT resources to LGs in conformity with the FECT decree; c. Promulgated decrees on the allocation criteria for LVATF">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3: Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="70.00">
<comment><narrative>
Years 2 to 5: This DLI will be measured by the percentage of Principal Urban Center LGs that have met all MMCs and have achieved a performance score above the agreed satisfactory performance score in the given year (provided in Operations Manual), as confirmed through the annual LG performance assessment. 
Restructuring changes: Reformulate DLI to reduce complexity by removing FECT transfer from central government to LGs, which is now included in reformulated DLI 1. Change in calendar (not included in the FA). Decrease DLI 5 envelop from USD 4 million to USD 3 million by reallocating USD 1 million to DLI 4 envelop. This Indicator will be updated when the evaluation has been completed for 2024.
</narrative></comment>
</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3: Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="70.00">
<comment><narrative>
Years 2 to 5: This DLI will be measured by the percentage of Principal Urban Center LGs that have met all MMCs and have achieved a performance score above the agreed satisfactory performance score in the given year (provided in Operations Manual), as confirmed through the annual LG performance assessment. 
Restructuring changes: Reformulate DLI to reduce complexity by removing FECT transfer from central government to LGs, which is now included in reformulated DLI 1. Change in calendar (not included in the FA). Decrease DLI 5 envelop from USD 4 million to USD 3 million by reallocating USD 1 million to DLI 4 envelop. This Indicator will be updated when the evaluation has been completed for 2024.
</narrative></comment>
</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3: Principal Urban Center LGs that satisfied the annual Performance Indicators (PIs)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="70.00">
<comment><narrative>
Years 2 to 5: This DLI will be measured by the percentage of Principal Urban Center LGs that have met all MMCs and have achieved a performance score above the agreed satisfactory performance score in the given year (provided in Operations Manual), as confirmed through the annual LG performance assessment. 
Restructuring changes: Reformulate DLI to reduce complexity by removing FECT transfer from central government to LGs, which is now included in reformulated DLI 1. Change in calendar (not included in the FA). Decrease DLI 5 envelop from USD 4 million to USD 3 million by reallocating USD 1 million to DLI 4 envelop. This Indicator will be updated when the evaluation has been completed for 2024.
</narrative></comment>
</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.2: Information on fiscal transfers and LG performance in year N-1 is publicly accessible by March 31 in year N
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Yes">
<comment><narrative>
This has not been achieved this year due to delay in approval of fiscal transfers
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.2: Information on fiscal transfers and LG performance in year N-1 is publicly accessible by March 31 in year N
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Yes">
<comment><narrative>
This has not been achieved this year due to delay in approval of fiscal transfers
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.2: Information on fiscal transfers and LG performance in year N-1 is publicly accessible by March 31 in year N
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Yes">
<comment><narrative>
This has not been achieved this year due to delay in approval of fiscal transfers
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3: Reduction in time taken for payment of investment expenditures from the Program Special Account
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="2.00">
<comment><narrative>
Achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3: Reduction in time taken for payment of investment expenditures from the Program Special Account
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="2.00">
<comment><narrative>
achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3: Reduction in time taken for payment of investment expenditures from the Program Special Account
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="2.00">
<comment><narrative>
achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.2: Proportion of Urban LGs that received at least 80 percent of the Territorial Coaching support identified in their Annual Capacity Building Plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="95.00">

</target>
<actual value="86.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.2: Proportion of Urban LGs that received at least 80 percent of the Territorial Coaching support identified in their Annual Capacity Building Plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="95.00">

</target>
<actual value="86.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2: Urban LGs with a functioning Local Fiscal Commission
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="115.00">
<comment><narrative>
Indicator achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="107.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2: Urban LGs with a functioning Local Fiscal Commission
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="115.00">
<comment><narrative>
Indicator achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="107.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2: Urban LGs with a functioning Local Fiscal Commission
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="115.00">
<comment><narrative>
Indicator achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="107.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.2: Proportion of Urban LGs that received at least 80 percent of the Territorial Coaching support identified in their Annual Capacity Building Plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="95.00">

</target>
<actual value="86.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 Urban LGs having received at least 3 training modules (including 1 CC module) identified in their annual capacity development plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="100.00">
<comment><narrative>
This indicator will be updated after completion of the trainings in 2025
</narrative></comment>
</target>
<actual value="74.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 Urban LGs having received at least 3 training modules (including 1 CC module) identified in their annual capacity development plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="100.00">
<comment><narrative>
This indicator will be updated after completion of the trainings in 2025
</narrative></comment>
</target>
<actual value="74.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 Urban LGs having received at least 3 training modules (including 1 CC module) identified in their annual capacity development plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="100.00">
<comment><narrative>
This indicator will be updated after completion of the trainings in 2025
</narrative></comment>
</target>
<actual value="74.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.1: Functional review of the Intergovernmental Transfer System
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No review of intergovernmental transfer system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Roll-out of Strategy for the sustainability of the resource allocation system, based on the review of intergovernmental transfer system">

</target>
<actual value="Strategy for the consolidation of intergovernmental transfer systems in Senega not developed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.1: Functional review of the Intergovernmental Transfer System
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No review of intergovernmental transfer system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Roll-out of Strategy for the sustainability of the resource allocation system, based on the review of intergovernmental transfer system">

</target>
<actual value="Strategy for the consolidation of intergovernmental transfer systems in Senega not developed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.1: Functional review of the Intergovernmental Transfer System
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="No review of intergovernmental transfer system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="Roll-out of Strategy for the sustainability of the resource allocation system, based on the review of intergovernmental transfer system">

</target>
<actual value="Strategy for the consolidation of intergovernmental transfer systems in Senega not developed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Principal Urban Center LGs that have executed their annual investment plans (AIPs) on schedule in terms of expenditures
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="50.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX financial implementation reports on the status of PAI im
</narrative></comment>
</target>
<actual value="15.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Principal Urban Center LGs that have executed their annual investment plans (AIPs) on schedule in terms of expenditures
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="50.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX financial implementation reports on the status of PAI im
</narrative></comment>
</target>
<actual value="15.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Principal Urban Center LGs that have executed their annual investment plans (AIPs) on schedule in terms of expenditures
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="50.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX financial implementation reports on the status of PAI im
</narrative></comment>
</target>
<actual value="15.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Urban LGs that satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="80.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX fin implementation reports on the status of PAI implemen
</narrative></comment>
</target>
<actual value="94.35">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Urban LGs that satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="80.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX fin implementation reports on the status of PAI implemen
</narrative></comment>
</target>
<actual value="94.35">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Urban LGs that satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="80.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX fin implementation reports on the status of PAI implemen
</narrative></comment>
</target>
<actual value="94.35">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (amount in billion of FCFA)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="98.00">
<comment><narrative>
Amounts allocated to the FECT and FDD reach or exceed the annual target in billion FCFA.
Restructuring changes: DLI is scalable based on a disbursement formula as per FA.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (amount in billion of FCFA)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="98.00">
<comment><narrative>
Amounts allocated to the FECT and FDD reach or exceed the annual target in billion FCFA.
Restructuring changes: DLI is scalable based on a disbursement formula as per FA.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in local taxation revenues in the Principle Urban Center LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="40.00">
<comment><narrative>
This indicator has been dropped.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in local taxation revenues in the Principle Urban Center LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="40.00">
<comment><narrative>
This indicator has been dropped.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in local taxation revenues in the Principle Urban Center LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="40.00">
<comment><narrative>
This indicator has been dropped.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/ FDD to LGs for investment/ recurrent spending &amp; repartition of LVATF reformed and applied in timely resource transfer to LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="Modalities for repartition of State transfers to LGs for recurrent as well as investment spending &amp; for repartition of LVATF reformed and applied in timely transfer of resources to LGs not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="DLR 1.8a: Decree reforming the FECT Special window, integrating a mechanism to finance?projects to combat CC effects DLR 1.8b: Allocations from FECT and FDD according to current decrees transmitted on time.">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs, to the satisfaction of IDA
Restructuring changes: Change in DLI name from “allocation” to ‘transfer” to capture the actual and timely transfer from central to local governments, Year 2 and 3 target “conformity with the FECT decree” and year 4 and 5 target “conformity with the regulatory framework” is defined as including all 4 FECT windows, as specified by the FECT decree. Introduction of proportional disbursement in year 3, 4, 5, as per FA. Change in calendar with dates included in the FA. Inclusion of the DLI verification criteria in the FA.
</narrative></comment>
</target>
<actual value="DLR 1.7a Timely transfer before March 31 of said year of FDD resources to LGs in conformity with the FECT decree was not achievedDLR 1.7b Timely transfer before March 31 of said year of FECT resources to LGs in conformity with the FECT decree was not achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State-financed intergovernmental capital and recurrent grants (FECT and FDD) to LGs (amount in billion of FCFA)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="98.00">
<comment><narrative>
Amounts allocated to the FECT and FDD reach or exceed the annual target in billion FCFA.
Restructuring changes: DLI is scalable based on a disbursement formula as per FA.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/ FDD to LGs for investment/ recurrent spending &amp; repartition of LVATF reformed and applied in timely resource transfer to LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="Modalities for repartition of State transfers to LGs for recurrent as well as investment spending &amp; for repartition of LVATF reformed and applied in timely transfer of resources to LGs not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="DLR 1.8a: Decree reforming the FECT Special window, integrating a mechanism to finance?projects to combat CC effects DLR 1.8b: Allocations from FECT and FDD according to current decrees transmitted on time.">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs, to the satisfaction of IDA
Restructuring changes: Change in DLI name from “allocation” to ‘transfer” to capture the actual and timely transfer from central to local governments, Year 2 and 3 target “conformity with the FECT decree” and year 4 and 5 target “conformity with the regulatory framework” is defined as including all 4 FECT windows, as specified by the FECT decree. Introduction of proportional disbursement in year 3, 4, 5, as per FA. Change in calendar with dates included in the FA. Inclusion of the DLI verification criteria in the FA.
</narrative></comment>
</target>
<actual value="DLR 1.7a Timely transfer before March 31 of said year of FDD resources to LGs in conformity with the FECT decree was not achievedDLR 1.7b Timely transfer before March 31 of said year of FECT resources to LGs in conformity with the FECT decree was not achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modalities for repartition of State transfers FECT/ FDD to LGs for investment/ recurrent spending &amp; repartition of LVATF reformed and applied in timely resource transfer to LGs
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="Modalities for repartition of State transfers to LGs for recurrent as well as investment spending &amp; for repartition of LVATF reformed and applied in timely transfer of resources to LGs not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="DLR 1.8a: Decree reforming the FECT Special window, integrating a mechanism to finance?projects to combat CC effects DLR 1.8b: Allocations from FECT and FDD according to current decrees transmitted on time.">
<comment><narrative>
Modalities for the repartition of State transfers to LGs for recurrent and investment spending (FECT and FDD) and for the repartition of the LVATF reformed and applied in the timely transfer of resources to LGs, to the satisfaction of IDA
Restructuring changes: Change in DLI name from “allocation” to ‘transfer” to capture the actual and timely transfer from central to local governments, Year 2 and 3 target “conformity with the FECT decree” and year 4 and 5 target “conformity with the regulatory framework” is defined as including all 4 FECT windows, as specified by the FECT decree. Introduction of proportional disbursement in year 3, 4, 5, as per FA. Change in calendar with dates included in the FA. Inclusion of the DLI verification criteria in the FA.
</narrative></comment>
</target>
<actual value="DLR 1.7a Timely transfer before March 31 of said year of FDD resources to LGs in conformity with the FECT decree was not achievedDLR 1.7b Timely transfer before March 31 of said year of FECT resources to LGs in conformity with the FECT decree was not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2: Urban LGs with a functioning Local Fiscal Commission
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2024-06-30" />
<target value="115.00">
<comment><narrative>
Indicator achieved and hence no longer tracked.
</narrative></comment>
</target>
<actual value="107.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Urban LGs that satisfied the annual Minimum Mandatory Conditions (MMC)
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="80.00">
<comment><narrative>
Measured at the level of Principle Urban Center LGs: Percentage of LGs which have executed at least the minimum annual target levels of expenditures as compared to their annual investment plan.  
Restructuring changes: Reduction of annual and final targets to address some COVID-19 related negative impacts on LG's ability to execute public investments. Clarification of minimum threshold, triggering disbursement, as per FA. 
Annual target levels are: 
Y1: 10% of LGs. 
Y2:?40% of LGs have financially executed 25% of their annual investment plans (AIPs); 
Y3: 50% of LGs have financially executed 30% of their AIPs; 
Y4: 60% of LGs have financially executed 40% o their?AIPs; 
Y5: 70% of LGs have financially executed 50% of their?AIPs. 

Y6: no target 

Y7: 30% of LGs have financially executed 30% of their AIPs. For target 2025, Pending verification early 2025 with transmission of 2024 achievement reports of LGs and reports on the SITEX fin implementation reports on the status of PAI implemen
</narrative></comment>
</target>
<actual value="94.35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 Urban LGs having received at least 3 training modules (including 1 CC module) identified in their annual capacity development plans
</narrative></title>
<baseline year="2018" iso-date="2018-01-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-08" />
<period-end iso-date="2026-12-31" />
<target value="100.00">
<comment><narrative>
This indicator will be updated after completion of the trainings in 2025
</narrative></comment>
</target>
<actual value="74.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.2 Local property tax assessments in the Principal Urban Center LGs
</narrative></title>
<baseline year="2024" iso-date="2024-04-05" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-05" />
<period-end iso-date="2026-12-31" />
<target value="49.00">
<comment><narrative>
This indicator will be updated in mid 2025 when the fiscal year 2024 is completed. There are indications that the target (44) will be achieved.
</narrative></comment>
</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P156186</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Dakar Bus Rapid Transit Pilot Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to enhance urban mobility between Dakar and Guediawaye through the development of a Bus Rapid Transit (BRT) corridor.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Dakar Bus Rapid Transit Pilot (BRT) Project for Senegal is to enhance urban mobility between Dakar and GuEdiawaye through the development of a Bus Rapid Transit (BRT) corridor. This project has four components. 1) The first component, BRT Infrastructure, Fleet, and Systems, aims to finance goods, works, and services for detailed design, construction, and supervision of the BRT core infrastructure including the road infrastructure and its drainage system, landscaping, depot, terminals, stations, intersections, corridor traffic management systems, pedestrian crosswalks, sidewalks, and some bike lanes along the corridor. 2) The second component, Public transport network restructuring and road works, aims to finance goods, works, and services for road works along feeder routes, road works on vicinal roads to support diverted traffic due to suppressing of left turn movement as well as reduction of the ROW, and provision of urban furniture for public transport along feeder routes. 3) The third component, Capacity building and project management, aims to finance provision of technical assistance, operational costs, and capacity building in project implementation as well as in sustainable monitoring and supervising of BRT operations (including a mirror system), fiduciary and safeguard activities, monitoring and evaluation (M and E), and financial audits. 4) The fourth component, Road safety, aims to finance provision of road safety technical assistances, education and sensitization campaigns of local communities to the BRT operations, and training and equipment.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0025623"><narrative>Ministry of Finance and Budget</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0025624"><narrative>CETUD</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2018-03-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-05-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Asuka Tsuboike</narrative></person-name><telephone>+1-202-473-1000</telephone><email>atsuboike@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248443" />
            <name><narrative>Medina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.68263 -17.44908</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251274" />
            <name><narrative>Gueule Tapee</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.68122 -17.45837</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251337" />
            <name><narrative>Grand Medine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.74795 -17.44715</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251339" />
            <name><narrative>Grand Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71331 -17.45472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252008" />
            <name><narrative>Fadia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.66667 -14.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253011" />
            <name><narrative>Derkle</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72517 -17.45109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.44406</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253441" />
            <name><narrative>Camberene</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76594 -17.43017</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595695" />
            <name><narrative>Dial Diop</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66 -17.44028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595714" />
            <name><narrative>Patte d'Oie</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.74363 -17.43347</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595734" />
            <name><narrative>S.I.C.A.P. Dieupeul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71962 -17.4536</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595744" />
            <name><narrative>S.I.C.A.P. Mermoz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.70564 -17.47369</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595778" />
            <name><narrative>Guediawaye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.77446 -17.40212</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008521732" />
            <name><narrative>Parcelles Assainies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.757 -17.435</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011101612" />
            <name><narrative>Golf sud</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.77036 -17.4185</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011205570" />
            <name><narrative>Grand Yoff</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.73361 -17.44944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21023" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="96.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="4" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="99" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="5" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="7" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="91" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="99" xml:lang="en"><narrative>Public Transport</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">4166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">6666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">5833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">4166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">2450046.26</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1657175.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">1542046.32</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">8676635.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">56715.24</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">2572232.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">22877717.80</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">5354257.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1012097.73</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">3376234.08</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">6953720.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2345066.05</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">3080042.23</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">4185101.12</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1608078.04</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">5661387.06</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">8348201.14</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2654315.09</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">12773788.18</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1049944.15</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">5927822.23</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">722639.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">8444819.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">2628535.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">794332.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">5200205.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">17568520.92</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">444975.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">559605.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">556865.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">324789.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">3762705.60</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">7986247.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">3134155.87</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">270000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">70000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">2450046</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">1657175</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">1542046</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">8676636</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">56715</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">2572232</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">22877718</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">5354258</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">1012098</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">3376234</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">6953720</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">2345066</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">3080042</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">4185101</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">1608078</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">5661387</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">8348201</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">2654315</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">12773788</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">1049944</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">5927822</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">722640</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">8444820</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">2628535</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">794332</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">5200206</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">17568521</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">444976</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">559606</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">556865</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">324789</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">3762706</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">7986247</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">3134156</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">1029362</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">9078113</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">18362554</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">2774151</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">7511944</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">12706972</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">546936</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">25204727</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">7319031</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">14525766</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">943377</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1139081</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">697296</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">14626400</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">16514047</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">763389</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">4937492</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">11327745</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">3293534</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">1480425</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">2803046</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">19947815</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1228371</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">2630253</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1937935</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-777644</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-475823</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-405479</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-393051</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-453871</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-704146</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-957281</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-1105444</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-1358701</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-1400151</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-1493491</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1775481</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1909493</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-2429750</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-263018</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-90450</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-33129</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-2795648</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-188956</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2851809</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-112897</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-203541</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-102623</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2824163</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-418</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-431913</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2774113</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-101945</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-6152520</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-6988972</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-6647376</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-6780096</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-6840768</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1425724</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-7133700</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-495592</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-7260732</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-504417</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-7356164</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-510652</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-25624"><narrative>CETUD</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156186"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P156186?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156186"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual disclosure by CETUD of the audited annual financial statements and the operational results of the Dakar GuEdiawaye BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of serious injuries and deaths involving a BRT bus
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="0">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A concession agreement with a private company to invest and operate in the BRT operations between Dakar and GuEdiawaye is signed
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of operational BRT buses
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="121">

</target>
<actual value="121">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of feeder lines operational
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="14">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of the Dakar GuEdiawaye BRT infrastructure constructed
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100.00">

</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of the Dakar GuEdiawaye BRT infrastructure constructed
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100.00">

</target>
<actual value="99.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of serious injuries and deaths involving a BRT bus
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="0">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A road safety management plan is in place within the BRT operator
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily passenger ridership in the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women staff in the BRT operator
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="25">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A concession agreement with a private company to invest and operate in the BRT operations between Dakar and GuEdiawaye is signed
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time by public transport from Guediawaye Prefecture  to  Petersen Bus Station in Dakar Plateau
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="45.00">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual net savings of GHG emission (ton CO2)
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="13,884.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time by public transport from Guediawaye Prefecture  to  Petersen Bus Station in Dakar Plateau
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="45.00">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers serviced by the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="18000">

</target>
<actual value="12300">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A mirror system to monitor the fare collection system is in use at CETUD
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
There is currently a temporary full-access scheme in place, but a real-time full mirror system has not yet been established.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="80.00">
<comment><narrative>
To be confirmed.
</narrative></comment>
</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A revised public transport licensing system is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A GRM (Grievance Redress Mechanism) for the BRT operation is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of serious injuries and deaths involving a BRT bus
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="0">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population of Greater Dakar Area residents with access to the city center (Medina) within 60 minutes commuting period using the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="69.00">

</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual net savings of GHG emission (ton CO2)
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="13,884.00">
<comment><narrative>
To be confirmed
</narrative></comment>
</target>
<actual value="13087">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers serviced by the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="18000">

</target>
<actual value="14053">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A revised public transport licensing system is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of the Dakar GuEdiawaye BRT infrastructure constructed
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100.00">

</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A system for mapping road accidents along the BRT corridor is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population of Greater Dakar Area residents with access to the city center (Medina) within 60 minutes commuting period using the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="69.00">
<comment><narrative>
To be confirmed.
</narrative></comment>
</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population of Greater Dakar Area residents with access to the city center (Medina) within 60 minutes commuting period using the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="69.00">

</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily passenger ridership in the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100">

</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A GRM (Grievance Redress Mechanism) is in use during construction
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="80.00">

</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety assessment carried out on the BRT corridor with focus on pedestrians
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual disclosure by CETUD of the audited annual financial statements and the operational results of the Dakar GuEdiawaye BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A revised public transport licensing system is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of operational BRT buses
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="121">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="80.00">

</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily passenger ridership in the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100">

</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A road safety management plan is in place within the BRT operator
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual net savings of GHG emission (ton CO2)
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="13,884.00">

</target>
<actual value="13087">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time by public transport from Guediawaye Prefecture  to  Petersen Bus Station in Dakar Plateau
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="45.00">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A system for mapping road accidents along the BRT corridor is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety assessment carried out on the BRT corridor with focus on pedestrians
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A GRM (Grievance Redress Mechanism) for the BRT operation is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of operational BRT buses
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="121">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-06-15" />
<target value="100,000">

</target>
<actual value="4,3000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A mirror system to monitor the fare collection system is in use at CETUD
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
There is currently a temporary full-access scheme in place, but a real-time full mirror system has not yet been established.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A GRM (Grievance Redress Mechanism) is in use during construction
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A GRM (Grievance Redress Mechanism) for the BRT operation is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A road safety management plan is in place within the BRT operator
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual net savings of GHG emission (ton CO2)
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="13,884.00">
<comment><narrative>
The indicator will be reported by the BRT concessionaire and is expected to be available before October 31, 2026.
</narrative></comment>
</target>
<actual value="13087">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women staff in the BRT operator
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="25">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A system for mapping road accidents along the BRT corridor is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A GRM (Grievance Redress Mechanism) is in use during construction
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A mirror system to monitor the fare collection system is in use at CETUD
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="Yes">

</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A road safety management plan is in place within the BRT operator
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A revised public transport licensing system is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of operational BRT buses
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="121">

</target>
<actual value="121">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety assessment carried out on the BRT corridor with focus on pedestrians
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of feeder lines operational
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="14">
<comment><narrative>
22 alternative feeder lines are planned by July 15, 2026, through rerouting of existing services.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of the Dakar GuEdiawaye BRT infrastructure constructed
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="100.00">

</target>
<actual value="99.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of serious injuries and deaths involving a BRT bus
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="0">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual disclosure by CETUD of the audited annual financial statements and the operational results of the Dakar GuEdiawaye BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="Yes">

</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A concession agreement with a private company to invest and operate in the BRT operations between Dakar and GuEdiawaye is signed
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A GRM (Grievance Redress Mechanism) is in use during construction
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="80.00">
<comment><narrative>
To be confirmed.
</narrative></comment>
</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="80.00">

</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="80.00">
<comment><narrative>
The indicator will be assessed based on mobility survey results expected by June 30, 2026.
</narrative></comment>
</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="80.00">

</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers serviced by the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="18000">

</target>
<actual value="14053">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers serviced by the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="18000">

</target>
<actual value="12300">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers serviced by the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="18000">

</target>
<actual value="14053">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers serviced by the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="18000">

</target>
<actual value="12300">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population of Greater Dakar Area residents with access to the city center (Medina) within 60 minutes commuting period using the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="69.00">
<comment><narrative>
To be confirmed.
</narrative></comment>
</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population of Greater Dakar Area residents with access to the city center (Medina) within 60 minutes commuting period using the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="69.00">

</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population of Greater Dakar Area residents with access to the city center (Medina) within 60 minutes commuting period using the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="69.00">

</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population of Greater Dakar Area residents with access to the city center (Medina) within 60 minutes commuting period using the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="69.00">

</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time by public transport from Guediawaye Prefecture  to  Petersen Bus Station in Dakar Plateau
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="45.00">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time by public transport from Guediawaye Prefecture  to  Petersen Bus Station in Dakar Plateau
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="45.00">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time by public transport from Guediawaye Prefecture  to  Petersen Bus Station in Dakar Plateau
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="45.00">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time by public transport from Guediawaye Prefecture  to  Petersen Bus Station in Dakar Plateau
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="45.00">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily passenger ridership in the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100">

</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily passenger ridership in the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily passenger ridership in the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily passenger ridership in the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100">

</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-12-15" />
<target value="100,000">

</target>
<actual value="7,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of feeder lines operational
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="14">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women staff in the BRT operator
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="25">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women staff in the BRT operator
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="25">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A mirror system to monitor the fare collection system is in use at CETUD
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A concession agreement with a private company to invest and operate in the BRT operations between Dakar and GuEdiawaye is signed
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers serviced by the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="18000">

</target>
<actual value="12300">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of feeder lines operational
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="14">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-06-15" />
<target value="100,000">

</target>
<actual value="6,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety assessment carried out on the BRT corridor with focus on pedestrians
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="80.00">
<comment><narrative>
To be confirmed.
</narrative></comment>
</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="80.00">

</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="80.00">
<comment><narrative>
The indicator will be assessed based on mobility survey results expected by June 30, 2026.
</narrative></comment>
</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="80.00">

</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers serviced by the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="18000">

</target>
<actual value="14053">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers serviced by the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="18000">

</target>
<actual value="12300">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers serviced by the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="18000">

</target>
<actual value="14053">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers serviced by the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="18000">

</target>
<actual value="12300">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population of Greater Dakar Area residents with access to the city center (Medina) within 60 minutes commuting period using the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="69.00">
<comment><narrative>
To be confirmed.
</narrative></comment>
</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population of Greater Dakar Area residents with access to the city center (Medina) within 60 minutes commuting period using the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="69.00">

</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population of Greater Dakar Area residents with access to the city center (Medina) within 60 minutes commuting period using the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="69.00">

</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population of Greater Dakar Area residents with access to the city center (Medina) within 60 minutes commuting period using the BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="69.00">

</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time by public transport from Guediawaye Prefecture  to  Petersen Bus Station in Dakar Plateau
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="45.00">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-06-15" />
<target value="100,000">
<comment><narrative>
To be confirmed
</narrative></comment>
</target>
<actual value="7,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time by public transport from Guediawaye Prefecture  to  Petersen Bus Station in Dakar Plateau
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="45.00">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time by public transport from Guediawaye Prefecture  to  Petersen Bus Station in Dakar Plateau
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="45.00">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time by public transport from Guediawaye Prefecture  to  Petersen Bus Station in Dakar Plateau
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="45.00">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily passenger ridership in the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100">

</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily passenger ridership in the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily passenger ridership in the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily passenger ridership in the BRT buses per weekday
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="100">

</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A system for mapping road accidents along the BRT corridor is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual disclosure by CETUD of the audited annual financial statements and the operational results of the Dakar GuEdiawaye BRT
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A GRM (Grievance Redress Mechanism) for the BRT operation is in use
</narrative></title>
<baseline year="2017" iso-date="2017-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P101415</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SENEGAL: TRANSPORT &amp; URBAN MOBILITY PROJECT</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[-]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the Transport and Urban Mobility Project are: (i) to improve effective road management and maintenance, both at national level and in urban areas; and (ii) to improve public urban transport in the Greater Dakar Area (GDA). There are three components to the project. The first component of the project is support to interurban road infrastructure development. This component will finance targeted technical assistance, awareness campaign and training, as well as computers and other equipment for the key sector agencies, created under the Second Transport Sector Project (PST2) with Bank support. Investments include works for rural and interurban road upgrading in the Grandes Niayes region selected. The geographical area was selected on the basis of its role in the national economic framework and its support towards national growth. The second component of the project is capacity building for the development of public transport services in the GDA. This component will finance targeted technical assistance, awareness campaign and training, as well as computers and other equipment for the key sector agencies, created under the Urban Mobility Improvement Project (UMIP) with Bank support. Support to the development of the existing leasing scheme. This component is aimed at ensuring the renewal of about 900 additional minibuses on a sustainable basis, affecting about 55 percent of the total minibus fleet (2,500 minibuses) and aiming to raise the level of service and safety, improve productivity and lower the rate of vehicle emissions. The third component of the project is support to implementation, monitoring and evaluation. This component will finance: (a) equipment and operating costs, as well as training, for the two agencies in charge of project implementation: National Road Management Agency and Dakar urban transport authority; (b) technical and financial audits; (c) support to monitoring and evaluation, including surveys and beneficiary assessments; and (d) information, education and communication (IEC) for the project.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0001445"><narrative>Ministere des Finances et du Budget</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0001445"><narrative>Ministere des Finances et du Budget</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0001443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-03-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-06-01"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ndeye Anna Ba</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nba@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244419" />
            <name><narrative>Tioukougne Peul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.44168 -16.727289</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244800" />
            <name><narrative>Region de Thies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -16.866671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246512" />
            <name><narrative>Rufisque</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72503 -17.27088</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247211" />
            <name><narrative>Niayes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.41667 -16.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249248" />
            <name><narrative>Lompoul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.428 -16.7199</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250677" />
            <name><narrative>Kayar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91893 -17.11978</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251933" />
            <name><narrative>Fas Boye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.2701 -16.8379</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253193" />
            <name><narrative>Darou Khoudos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.107 -16.836901</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>Region de Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.283331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253352" />
            <name><narrative>Port of Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.68417 -17.428329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.444059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254154" />
            <name><narrative>Bargny</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.69707 -17.23015</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595640" />
            <name><narrative>Diam Niadia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72051 -17.181601</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21012" percentage="22" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="78" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="68.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TW" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Railways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="7" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="28" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="28" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="36" xml:lang="en"><narrative>Regional Integration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="28" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="7" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="36" xml:lang="en"><narrative>Regional Integration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="28" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="28" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="28" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="7" xml:lang="en"><narrative>Jobs</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">554166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">554166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">554166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">554166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">554166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">554166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">554166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">554166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">554166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">554166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">554166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">554166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">796400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">970750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">968333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">968333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">968333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">968333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">968333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">968333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">968333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">968333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">968333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">968333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">968333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">968333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">383333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">383333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">383333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">383333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">55000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-129804</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-1211634</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">615036</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">4101641</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">79877</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-80802</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">224958</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">255693</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">59309</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">170787</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">65484</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">206572</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">51654</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">275395</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">328017</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">174577</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">64058</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">995463</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">152555</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">264498</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">200559</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">4433263</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">1444193</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">2620279</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">1398693</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">1727257</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">1149950</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">2736467</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2359377</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">2106924</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">882750</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">1100776</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">1066651</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">992691</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">1295733</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">2136169</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">2397873</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">1549848</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">347561</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">968890</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">821119</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">3069705</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">1001637</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">5188516</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">1412571</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">825011</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">22782</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">55866</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">57745</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">45972</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">41738</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">649964</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">94791</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">87594</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">2170129</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">401289</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">2355029</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">480750</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">153594</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">2347736</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">1061761</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">434840</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">464802</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">537244</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">766895</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">556103</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">1334075</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">798776</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">554682</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">3891198</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">280676</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">314606</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">2218947</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">1249113</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-42807</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">2221758</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">3756042</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">936830</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">971415</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">4721265</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">1881262</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">5961120</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">1523421</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">2281049</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">621794</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">1395783</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-1181112</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-1263</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-21994</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-20393</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-22084</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-22906</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-32018</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-72107</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-95000</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-104867</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-136974</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-148525</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-18602</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-165192</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-165502</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-19398</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-179332</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-46884</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-194631</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-60285</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-190531</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-90610</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-186228</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-106653</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-186197</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-150662</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-174265</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-186710</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-186507</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-186550</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-186378</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-185865</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-186751</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-183878</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-157568</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-187973</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-161631</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-172213</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-183192</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-183238</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-157530</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-143797</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-179868</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-176702</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-168957</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-148718</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-167074</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-171090</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-166971</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-152086</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-27189</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-132038</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-150965</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-510728</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-512937</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-511148</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-741678</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-499815</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-463425</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-692881</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-735268</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-487088</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-476135</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-711021</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-715152</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-477058</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-488992</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-721755</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-5768</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-483717</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-733943</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-42019</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-493804</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-693593</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-497006</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-742552</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-1443"><narrative>Agence des Travaux et de Gestion des Routes (AGEROUTE Senegal); Conseil ExEcutif des Transports Urbains de Dakar (CETUD); Coordination du PATMUR</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P101415"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P101415?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P101415"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional beneficiaries of improved access
</narrative></title>
<baseline year="2015" iso-date="2015-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-08-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;At the project closing, 680,203 beneficiaries were reached against a target of 650,000 for the AF.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="680203.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Passengers in urban transport services (DDD, AFTU and PTB) (in millions)
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="135.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&amp;nbsp;The objective of 208 million passengers was reached by 2015.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="208.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban paved roads
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="2019-12-31" />
<target value="30.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced Travel  time on selected itineraries inside the Grandes Niayes areas (mn): Road section Rufisque-Bayak-Notto-Diogo-Lompoul
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="211.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="153.00">

</target>
<actual value="150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of youth benefiting from training during the road works
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="2019-12-31" />
<target value="600.00">

</target>
<actual value="607.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional arrangement for the pilot BRT defined and adopted
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="2019-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced Travel time on selected itineraries inside the Grandes Niayes areas (mn): Road section Lompoul-Gandiol
</narrative></title>
<baseline year="2015" iso-date="2015-08-31" value="202.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-08-31" />
<period-end iso-date="2019-12-31" />
<target value="100.00">

</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Passengers in urban transport services (DDD, AFTU and PTB) (in millions)
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="135.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="202.00">

</target>
<actual value="208.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GDA Urban Mobility Policy Letter defined and adopted
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="Adopted">

</target>
<actual value="Already adopted">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Wages paid during implementation of HILM works (US$million)
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="2019-12-31" />
<target value="0.40">

</target>
<actual value="0.06">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GDA Urban Mobility Policy Letter defined and adopted
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The&amp;nbsp;outcome indicator target (GDA Urban Mobility Policy Letter defined and adopted) was achieved.&amp;nbsp;The letter was approved on July 27, 2015, by the Ministers in charge of Land Transport Infrastructure and Connectivity and of the Economy, Finance, and Planning.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Already adopted">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the road maintenance budget coming from TSPP
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="80.00">

</target>
<actual value="62.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of youth benefiting from training during the road works
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This activity represents a solid basis for employment generation. 607 young people, of which 23 percent are women, have been trained against an initial target of 600&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="607.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target for Classified Roads in good and fair condition was 60 percent. By completion, Classified Roads in good and fair condition were at 71.3 percent.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="71.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional arrangement for the pilot BRT defined and adopted
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="2019-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the road maintenance budget coming from TSPP
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Jobs created through HIMO  (person months)
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="2019-12-31" />
<target value="2600.00">

</target>
<actual value="6653.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="60.00">

</target>
<actual value="71.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Jobs created through HIMO  (person months)
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;6,653 jobs (person-months) were created versus an initial target of 2,600.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6653.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced Travel time on selected itineraries inside the Grandes Niayes areas (mn): Road section Lompoul-Gandiol
</narrative></title>
<baseline year="2015" iso-date="2015-08-31" value="202.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-08-31" />
<period-end iso-date="2019-12-31" />
<target value="100.00">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced Travel  time on selected itineraries inside the Grandes Niayes areas (mn): Road section Rufisque-Bayak-Notto-Diogo-Lompoul
</narrative></title>
<baseline year="2015" iso-date="2015-08-31" value="211.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-08-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target is achieved. The objective of travel time reduction was to make the trip (from Rufisque to Lompoul) in 153 minutes, the surveys carried out show that the travel time is 150 minutes after the completion of the activities.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road maintenance budget (FERA) (in CFAF billion)
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="32.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;At project closing, the target was XOF 65 billion and the real budget was only 11. The allocated budget was generally aligned with the project target, but the mobilized amount was always lower. Because of the state treasury problems, budget cuts are systematically made from the Road Fund.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reimbursement rate for the leasing mechanism
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="99.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The reimbursement rate for the leasing mechanism reached the objective of 98 percent.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the road maintenance budget coming from TSPP
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;At project closing, the special tax on petroleum products was 49 percent and has never exceeded 54 percent of the overall maintenance budget during project implementation, whereas the target of the project was 80 percent.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of rural population with access to an all-season road
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="30.00">

</target>
<actual value="62.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional arrangement for the pilot BRT defined and adopted
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="1900-01-01"/>
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Institutional arrangement for the pilot BRT defined and adopted. The BRT project is under implementation, at project closing.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Wages paid during implementation of HILM works (US$million)
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="2019-12-31" />
<target value="0.20">

</target>
<actual value="0.17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reimbursement rate for the leasing mechanism
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="99.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="98.00">

</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2019-12-31" />
<target value="162.00">

</target>
<actual value="173.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced Travel  time on selected itineraries inside the Grandes Niayes areas (mn): Road section Rufisque-Bayak-Notto-Diogo-Lompoul
</narrative></title>
<baseline year="2015" iso-date="2015-08-31" value="211.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-08-31" />
<period-end iso-date="2019-12-31" />
<target value="153.00">

</target>
<actual value="150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Wages paid during implementation of HILM works (US$million)
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Wages paid to the youth during the implementation of the HILM program reached US$600,000, exceeding the initial target of US$400,000.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GDA Urban Mobility Policy Letter defined and adopted
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="Adopted">

</target>
<actual value="Already adopted">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;A total of 173 km of roads were rehabilitated under the project, 11 km more than the 162 km originally planned.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="173.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional beneficiaries of improved access
</narrative></title>
<baseline year="2015" iso-date="2015-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-08-31" />
<period-end iso-date="2019-12-31" />
<target value="650000.00">

</target>
<actual value="680203.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of minibuses entered in the fleet renewal operation
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="505.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;By appraisal, 505 new buses were leased to operators and under this activity, an additional 900 buses were provided to operators exceeding the target set by the project by 8 percent (from 1,307 to 1,405 buses).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1405.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban paved roads
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="2019-12-31" />
<target value="26.70">

</target>
<actual value="24.90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="60.00">

</target>
<actual value="71.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Jobs created through HIMO  (person months)
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="2019-12-31" />
<target value="1000.00">

</target>
<actual value="1310.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road maintenance budget (FERA) (in CFAF billion)
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="32.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2019-12-31" />
<target value="65.00">

</target>
<actual value="46.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of rural population with access to an all-season road
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of youth benefiting from training during the road works
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="2019-12-31" />
<target value="600.00">

</target>
<actual value="575.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2019-12-31" />
<target value="162.00">

</target>
<actual value="164.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional beneficiaries of improved access
</narrative></title>
<baseline year="2015" iso-date="2015-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-08-31" />
<period-end iso-date="2019-12-31" />
<target value="650000.00">

</target>
<actual value="680203.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban paved roads
</narrative></title>
<baseline year="2015" iso-date="2015-07-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-07-27" />
<period-end iso-date="2019-10-17" />
<target value="26.70">
<comment><narrative>
&lt;p&amp;gt;The initial target of&amp;nbsp;paved roads was reduced during the third restructuring, from 30 km&amp;nbsp;to 26.7 km, which was achieved by the end of the project.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="26.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced Travel time on selected itineraries inside the Grandes Niayes areas (mn): Road section Lompoul-Gandiol
</narrative></title>
<baseline year="2015" iso-date="2015-08-31" value="202.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-08-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;On the Lompoul-Gandiole section, travel time was reduced from 202 minutes (2015) to 80 minutes (2019) against a target of 100 minutes.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of minibuses entered in the fleet renewal operation
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="505.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="1307.00">

</target>
<actual value="1307.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Passengers in urban transport services (DDD, AFTU and PTB) (in millions)
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="135.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="202.00">

</target>
<actual value="208.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;At the project closing, 900,607 beneficiaries were reached against a target of 726,000, a 24 percent increase. With 50.4 percent of women instead of 50 percent.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="900607.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road maintenance budget (FERA) (in CFAF billion)
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="32.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2019-12-31" />
<target value="65.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of minibuses entered in the fleet renewal operation
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="505.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="1307.00">

</target>
<actual value="1307.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of rural population with access to an all-season road
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target of 30 percent for &amp;quot;share of rural population with access to an all-season road&amp;quot; was achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reimbursement rate for the leasing mechanism
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="99.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2019-12-31" />
<target value="98.00">

</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" humanitarian="1"  hierarchy="1"><iati-identifier>44000-P166538</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal - Saint-Louis Emergency Recovery and Resilience Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to reduce the vulnerability of populations to coastal hazards along the Langue de Barbarie and strengthen urban and coastal resilience planning of the city of Saint-Louis.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the  Saint-Louis Emergency Recovery and Resilience Project for Senegal is to reduce the vulnerability of populations to coastal hazards along the Langue de Barbarie and strengthen urban and coastal resilience planning of the city of Saint-Louis. It has five component. First component, Meeting immediate needs of the disaster affected population is to support the GOS to provide temporary accommodation and  related services for households currently displaced by the disaster, and urgently improve their living condition  n line with global standard practice. The component will finance: (i) the provision of rental subsidies; and (ii)  good, services and civil works required to erect temporary dwellings and provide related essential services on  the permanent relocation site (electricity, water supply, sanitation), to be situated in an area not prone to  flooding; Second component, Planned relocation of populations living in the highest risk zones in the Langue de Barbari will finance the planned relocation of households affected by coastal erosion, and living in the extremely high-risk zone along the Langue de Barbarie. The activities under this component will be financed through four sub-components: (i) design and implementation of the citizen engagement and social support strategy; (ii) development of the relocation site; (iii) construction of permanent dwellings for the population affected by coastal erosion; and (iv) livelihood restoration for the displaced populations; Third component, Strengthening urban and coastal resilience planning will consist of (i) the recruitment of a consultant to conceptualize  design a site development plan for the liberated area, including participatory input form the local community; and (ii) site development works to reclaim the area. Land rights will be transferred to the Government so that they can exercise effective control of new occupation, and reclaim and maintain the at-risk area; Fourth component, contingent emergency response will draw from the uncommitted credit resources under the project from other project components to cover emergency response.; Fifth component, project management,monitoring and evaluation will support project management and coordination and monitoring and evaluation for the project. It will finance the administrative management of the Project by the Project Coordinating Unit (ADM)  and implementing partners, including: (i) recruitment of specialists in financial management, procurement, and  monitoring and evaluation; (ii) carrying out the fiduciary aspects of the Project including audits; (iii) technical and  safeguard audits, including beneficiary surveys; (iv) design and operationalization of the Grievance Redress  Mechanism (GRM); (v) the provision of training and workshops; (vi) communication; (vii) the financing of the  necessary goods, equipment, and operating costs; and (viii) costs associated with convening and reporting to the  Project Technical Committee (PTC) and Project Steering Committee (PSC). It will also support the design and  implementation of a detailed monitoring and evaluation plan.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0036296"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0036297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2018-05-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-06-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Lorenzo Carrera</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lcarrera@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246452" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.01793 -16.48962</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254163" />
            <name><narrative>Langue de Barbarie</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.98547 -16.51331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="73010" percentage="80" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="20" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="100.000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="12" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="97" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="12" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="86" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="22" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000836" percentage="22" xml:lang="en"><narrative>Coastal Zone Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="19" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="29" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="29" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="77" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">380000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">190000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">190000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">190000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">770000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1090000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1160000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1070000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1860000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">810000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1797948.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">2197432.59</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">512039.07</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1668559.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">25000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">25000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">1797948</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">2197433</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">512039</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">1668559</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">423027</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">2788502</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">1901227</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">1503310</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">909837</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">549979</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">407798</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">210854</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">830974</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">2252554</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-7435</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">430406</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">352177</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">3360140</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">650231</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">2781856</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">363199</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">1009061</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">67936</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">2845601</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">648591</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">360132</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">456034</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">274220</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">336695</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">2839214</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">2272067</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">1878797</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">524465</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">768352</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">2603386</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">1273440</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">604056</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">2189867</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">177447</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1806701</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">663896</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">848868</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">725060</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">667002</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">1965768</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">3075183</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">2091031</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">189816</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">1845078</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-4486</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-16872</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-20925</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-24141</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-26140</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-38610</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-50617</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-56372</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-81090</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-98375</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-97544</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-98406</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-101211</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-101508</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-19433</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-100928</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-411712</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-430336</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-438037</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-442860</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-36297"><narrative>Municipal Development Agency (Agence de dEveloppement municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166538"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P166538?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166538"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Terrestrial and aquatic areas under enhanced conservation and management
</narrative></title>
<baseline year="2018" iso-date="2018-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-14" />
<period-end iso-date="2025-06-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits addressed
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="95.00">

</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with temporary accommodation
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="1,800.00">
<comment><narrative>
The project successfully set up 360 mobile housing units at the temporary site in Djougop, capable of housing 2331 people who lost their homes. These victims are the one who opted to be relocated voluntarily to Djougop. Hence, the project's target can be considered achieved and the end target has been adjusted from 1800 to 2331.
</narrative></comment>
</target>
<actual value="2331">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-06-14" />
<target value="1,5000">
<comment><narrative>
This indicator cannot be assessed at this stage of the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits addressed
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="95.00">

</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-06-14" />
<target value="15,000">

</target>
<actual value="4500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene
</narrative></title>
<baseline year="2018" iso-date="2018-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-13" />
<period-end iso-date="2025-06-14" />
<target value="15,000">
<comment><narrative>
For the time being, disaster victims and some families initially living in the highest risk zone along the LdB have been relocated in Diougop. Water and sanitation are provided on the relocation site
</narrative></comment>
</target>
<actual value="4500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people reached by the citizen engagement and social support strategy
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="15,000.00">

</target>
<actual value="28 442">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="15,000.00">
<comment><narrative>
In February 2025, 4500 people were relocated to their permanent residences.
</narrative></comment>
</target>
<actual value="4500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct beneficiaries benefiting from new collective facilities (schools, health post, market, roads, community public spaces, etc.)
</narrative></title>
<baseline year="2019" iso-date="2019-06-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-28" />
<period-end iso-date="2025-06-30" />
<target value="15,000.00">
<comment><narrative>
The health post, schools and market are under construction. Contractors for other equipment (primary and middle schools, Mosque, socio-educative center etc.) have just been recruited.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Coastal Resilience Plan of Saint-Louis developed and adopted
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
This activity has been delayed but the firm responsible for carrying out the plan was recruited in September 2024 and the development of the plan is ongoing
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with reduced vulnerability to coastal hazards and planned relocation site
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="70.00">
<comment><narrative>
This indicator cannot be assessed at this stage of project implementation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Relocation site developed with adequate housing and social infrastructure and ready for occupation
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
As of February 2025 the development of the permanent relocation site is finalized at 95% and 171 houses are finalized.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Relocation site developed with adequate housing and social infrastructure and ready for occupation
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
As of February 2025 the development of the permanent relocation site is finalized at 95% and 171 houses are finalized.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct beneficiaries benefiting from new collective facilities (schools, health post, market, roads, community public spaces, etc.)
</narrative></title>
<baseline year="2019" iso-date="2019-06-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-28" />
<period-end iso-date="2025-06-30" />
<target value="15,000.00">
<comment><narrative>
The health post, schools and market are under construction. Contractors for other equipment (primary and middle schools, Mosque, socio-educative center etc.) have just been recruited.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-06-14" />
<target value="15,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people reached by the citizen engagement and social support strategy
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="15,000.00">

</target>
<actual value="28 442">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical studies and coastal risk management solution completed and validated for the long term coastal protection of the Langue de Barbarie
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
The contract for the hydrodynamic modeling of the Saint-Louis delta have been finalized and preliminary studies for the design of the sustainable protection of the Langue de Barbarie already submitted by the recruited firm. The next step will be the contracting and completion of the detailed design. The APS study of the sustainable protection solution for Saint-Louis is already finalized and will be followed by the APD, which will be launched by August 2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project coastline in the high risk zone of the Langue de Barbarie reclaimed and protected against future informal settlement
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="3.50">
<comment><narrative>
This indicator cannot be assessed at this stage of the project. The target will be measured once the 20 m strip has been freed up and requalified.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of detailed Urban Development Plans developed and adopted by the Urban Regional Committee
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="3.00">
<comment><narrative>
Recruitment of the firm to carry out the 3 Urban development plans has been completed. The mission started on August 26, 2024.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-06-14" />
<target value="1,5000">
<comment><narrative>
This indicator cannot be assessed at this stage of the project
</narrative></comment>
</target>
<actual value="45,00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participation of women in the participatory planning of the site design for the permanent relocation site
</narrative></title>
<baseline year="2020" iso-date="2020-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-23" />
<period-end iso-date="2025-06-30" />
<target value="45.00">

</target>
<actual value="51.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Coastal Resilience Plan of Saint-Louis developed and adopted
</narrative></title>
<baseline year="2018" iso-date="2018-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-15" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
the target of this indicator was met by December 2025 2025
</narrative></comment>
</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Coastal Resilience Plan of Saint-Louis developed and adopted
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
This activity has been delayed but the firm responsible for carrying out the plan was recruited in September 2024 and the development of the plan is ongoing
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Coastal Resilience Plan of Saint-Louis developed and adopted
</narrative></title>
<baseline year="2018" iso-date="2018-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-15" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
the target of this indicator was met by December 2025 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Coastal Resilience Plan of Saint-Louis developed and adopted
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
This activity has been delayed but the firm responsible for carrying out the plan was recruited in September 2024 and the development of the plan is ongoing
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000.00">
<comment><narrative>
5,774 people have been relocated, including 4,384 to the Diougop site and 1,390 PAP beneficiaries who have been compensated in cash and relocated off-site.
</narrative></comment>
</target>
<actual value="7164">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="15,000.00">

</target>
<actual value="4500">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000.00">
<comment><narrative>
5,774 people have been relocated, including 4,384 to the Diougop site and 1,390 PAP beneficiaries who have been compensated in cash and relocated off-site.
</narrative></comment>
</target>
<actual value="5774">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="15,000.00">
<comment><narrative>
In February 2025, 4500 people were relocated to their permanent residences.
</narrative></comment>
</target>
<actual value="4500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participation of women in the participatory planning of the site design for the permanent relocation site
</narrative></title>
<baseline year="2020" iso-date="2020-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-23" />
<period-end iso-date="2027-06-15" />
<target value="45.00">

</target>
<actual value="51.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Design of livelihood restoration activities based on thorough analysis that includes a focus on the particular needs of woman and men
</narrative></title>
<baseline year="2020" iso-date="2020-06-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-23" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
A livelihood restoration strategy and plan have been developed to comprehensively address the specific needs of women and men. All the activities identified within the PROSE (Socio-economic activities) framework will be those chosen by these populations.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Design of livelihood restoration activities based on thorough analysis that includes a focus on the particular needs of woman and men
</narrative></title>
<baseline year="2020" iso-date="2020-06-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-23" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
A livelihood restoration strategy and plan have been developed to comprehensively address the specific needs of women and men. All the activities identified within the PROSE (Socio-economic activities) framework will be those chosen by these populations.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct beneficiaries benefiting from new collective facilities (schools, health post, market, roads, community public spaces, etc.)
</narrative></title>
<baseline year="2019" iso-date="2019-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000.00">
<comment><narrative>
The health Center, and market are finalized. Other equipment (primary and middle schools, Mosque, socio-educative center etc.) are under construction.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participation of women in the participatory planning of the site design for the permanent relocation site
</narrative></title>
<baseline year="2020" iso-date="2020-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-23" />
<period-end iso-date="2027-06-15" />
<target value="45.00">

</target>
<actual value="51.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct beneficiaries benefiting from new collective facilities (schools, health post, market, roads, community public spaces, etc.)
</narrative></title>
<baseline year="2019" iso-date="2019-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000.00">
<comment><narrative>
The health Center, and market are finalized. Other equipment (primary and middle schools, Mosque, socio-educative center etc.) are under construction.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits addressed
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2027-06-15" />
<target value="95.00">

</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits addressed
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2027-06-15" />
<target value="95.00">

</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with reduced vulnerability to coastal hazards and planned relocation site
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="70.00">
<comment><narrative>
This indicator cannot be assessed at this stage of project implementation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with reduced vulnerability to coastal hazards and planned relocation site
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="70.00">
<comment><narrative>
This indicator cannot be assessed at this stage of project implementation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Displaced working beneficiaries that have benefited from livelihood restoration activities
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="80.00">

</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of detailed Urban Development Plans developed and adopted by the Urban Regional Committee
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="3.00">
<comment><narrative>
Recruitment of the firm to carry out the 3 Urban development plans has been completed. The mission started on August 26, 2024.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Displaced working beneficiaries that have benefited from livelihood restoration activities
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="80.00">

</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of detailed Urban Development Plans developed and adopted by the Urban Regional Committee
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="3.00">
<comment><narrative>
Three Urban Development Plans are currently being finalized
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of detailed Urban Development Plans developed and adopted by the Urban Regional Committee
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="3.00">
<comment><narrative>
Three Urban Development Plans are currently being finalized
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Relocation site developed with adequate housing and social infrastructure and ready for occupation
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
to date, 304 housing units have been completed out of the 436 planned (69%). The health clinic and the market are complete. The elementary school and middle school, the mosque, and the community center are nearing completion.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Relocation site developed with adequate housing and social infrastructure and ready for occupation
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
to date, 304 housing units have been completed out of the 436 planned (69%). The health clinic and the market are complete. The elementary school and middle school, the mosque, and the community center are nearing completion.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical studies and coastal risk management solution completed and validated for the long term coastal protection of the Langue de Barbarie
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
The preliminary design study for the sustainable protection solution has been completed. The process of selecting a firm to conduct the detailed design study is currently being finalized.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical studies and coastal risk management solution completed and validated for the long term coastal protection of the Langue de Barbarie
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
The preliminary design study for the sustainable protection solution has been completed. The process of selecting a firm to conduct the detailed design study is currently being finalized.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project coastline in the high risk zone of the Langue de Barbarie reclaimed and protected against future informal settlement
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="3.50">
<comment><narrative>
This indicator cannot be assessed at this stage of the project. The target will be measured once the 20 m strip has been freed up and requalified.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project coastline in the high risk zone of the Langue de Barbarie reclaimed and protected against future informal settlement
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="3.50">
<comment><narrative>
This indicator cannot be assessed at this stage of the project. The target will be measured once the 20 m strip has been freed up and requalified.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people reached by the citizen engagement and social support strategy
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000.00">
<comment><narrative>
A total of 41,249 people benefited from the awareness-raising and social support activities carried out primarily by the social facilitation mission on site and on the Langue de Barbarie
</narrative></comment>
</target>
<actual value="41,249">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people reached by the citizen engagement and social support strategy
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000.00">
<comment><narrative>
A total of 41,249 people benefited from the awareness-raising and social support activities carried out primarily by the social facilitation mission on site and on the Langue de Barbarie
</narrative></comment>
</target>
<actual value="41,249">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with temporary accommodation
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="1,800.00">
<comment><narrative>
The project successfully set up 360 mobile housing units at the temporary site in Djougop, capable of housing 2331 people who lost their homes. These victims are the one who opted to be relocated voluntarily to Djougop. Hence, the project's target can be considered achieved and the end target has been adjusted from 1800 to 2331.
</narrative></comment>
</target>
<actual value="2331">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with temporary accommodation
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="1,800.00">
<comment><narrative>
The project successfully set up 360 mobile housing units at the temporary site in Djougop, capable of housing 2331 people who lost their homes. These victims are the one who opted to be relocated voluntarily to Djougop. Hence, the project's target can be considered achieved and the end target has been adjusted from 1800 to 2331.
</narrative></comment>
</target>
<actual value="2331">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Coastal Resilience Plan of Saint-Louis developed and adopted
</narrative></title>
<baseline year="2018" iso-date="2018-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-15" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
the target of this indicator was met by December 2025 2025
</narrative></comment>
</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Coastal Resilience Plan of Saint-Louis developed and adopted
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
This activity has been delayed but the firm responsible for carrying out the plan was recruited in September 2024 and the development of the plan is ongoing
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Coastal Resilience Plan of Saint-Louis developed and adopted
</narrative></title>
<baseline year="2018" iso-date="2018-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-15" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
the target of this indicator was met by December 2025 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Coastal Resilience Plan of Saint-Louis developed and adopted
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
This activity has been delayed but the firm responsible for carrying out the plan was recruited in September 2024 and the development of the plan is ongoing
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000.00">
<comment><narrative>
5,774 people have been relocated, including 4,384 to the Diougop site and 1,390 PAP beneficiaries who have been compensated in cash and relocated off-site.
</narrative></comment>
</target>
<actual value="7164">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="15,000.00">

</target>
<actual value="4500">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000.00">
<comment><narrative>
5,774 people have been relocated, including 4,384 to the Diougop site and 1,390 PAP beneficiaries who have been compensated in cash and relocated off-site.
</narrative></comment>
</target>
<actual value="5774">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="15,000.00">
<comment><narrative>
In February 2025, 4500 people were relocated to their permanent residences.
</narrative></comment>
</target>
<actual value="4500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-06-15" />
<target value="1,5000">

</target>
<actual value="7,164">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-06-15" />
<target value="1,5000">

</target>
<actual value="5774">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000">

</target>
<actual value="7,164">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000">

</target>
<actual value="5774">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000">
<comment><narrative>
For the time being, disaster victims and some families initially living in the highest risk zone along the LdB have been relocated in Diougop. Water and sanitation are provided on the relocation site
</narrative></comment>
</target>
<actual value="7,164">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2027-06-15" />
<target value="15,000">
<comment><narrative>
For the time being, disaster victims and some families initially living in the highest risk zone along the LdB have been relocated in Diougop. Water and sanitation are provided on the relocation site
</narrative></comment>
</target>
<actual value="5774">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Terrestrial and aquatic areas under enhanced conservation and management
</narrative></title>
<baseline year="2018" iso-date="2018-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-14" />
<period-end iso-date="2027-06-15" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Terrestrial and aquatic areas under enhanced conservation and management
</narrative></title>
<baseline year="2018" iso-date="2018-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-14" />
<period-end iso-date="2027-06-15" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with temporary accommodation
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="1,800.00">
<comment><narrative>
The project successfully set up 360 mobile housing units at the temporary site in Djougop, capable of housing 2331 people who lost their homes. These victims are the one who opted to be relocated voluntarily to Djougop. Hence, the project's target can be considered achieved and the end target has been adjusted from 1800 to 2331.
</narrative></comment>
</target>
<actual value="2331">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Terrestrial and aquatic areas under enhanced conservation and management
</narrative></title>
<baseline year="2018" iso-date="2018-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-14" />
<period-end iso-date="2025-06-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Design of livelihood restoration activities based on thorough analysis that includes a focus on the particular needs of woman and men
</narrative></title>
<baseline year="2020" iso-date="2020-06-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-23" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
A livelihood restoration strategy and plan have been developed to comprehensively address the specific needs of women and men. All the activities identified within the PROSE (Socio-economic activities) framework will be those chosen by these populations.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project coastline in the high risk zone of the Langue de Barbarie reclaimed and protected against future informal settlement
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="3.50">
<comment><narrative>
This indicator cannot be assessed at this stage of the project. The target will be measured once the 20 m strip has been freed up and requalified.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical studies and coastal risk management solution completed and validated for the long term coastal protection of the Langue de Barbarie
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
The contract for the hydrodynamic modeling of the Saint-Louis delta have been finalized and preliminary studies for the design of the sustainable protection of the Langue de Barbarie already submitted by the recruited firm. The next step will be the contracting and completion of the detailed design. The APS study of the sustainable protection solution for Saint-Louis is already finalized and will be followed by the APD, which will be launched by August 2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Design of livelihood restoration activities based on thorough analysis that includes a focus on the particular needs of woman and men
</narrative></title>
<baseline year="2020" iso-date="2020-06-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-23" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
A livelihood restoration strategy and plan have been developed to comprehensively address the specific needs of women and men. All the activities identified within the PROSE (Socio-economic activities) framework will be those chosen by these populations.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Displaced working beneficiaries that have benefited from livelihood restoration activities
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="80.00">

</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="15,000.00">

</target>
<actual value="4500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene
</narrative></title>
<baseline year="2018" iso-date="2018-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-13" />
<period-end iso-date="2025-06-14" />
<target value="15,000">
<comment><narrative>
For the time being, disaster victims and some families initially living in the highest risk zone along the LdB have been relocated in Diougop. Water and sanitation are provided on the relocation site
</narrative></comment>
</target>
<actual value="4500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with reduced vulnerability to coastal hazards and planned relocation site
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="70.00">
<comment><narrative>
This indicator cannot be assessed at this stage of project implementation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Coastal Resilience Plan of Saint-Louis developed and adopted
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
This activity has been delayed but the firm responsible for carrying out the plan was recruited in September 2024 and the development of the plan is ongoing
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Displaced working beneficiaries that have benefited from livelihood restoration activities
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-06-30" />
<target value="80.00">

</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participation of women in the participatory planning of the site design for the permanent relocation site
</narrative></title>
<baseline year="2020" iso-date="2020-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-23" />
<period-end iso-date="2025-06-30" />
<target value="45.00">

</target>
<actual value="51.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P507844</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Dakar Sustainable Urban Mobility Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve urban mobility and accessibility and to enhance low-emission, safe public transport services in the Dakar metropolitan area.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed project represents the first phase of a Series of Operations (SOP), designed to support the implementation of Dakar's Sustainable Urban Mobility Plan (PMUD) by 2029 and to establish an integrated, efficient, inclusive, climate-resilient and safe urban mobility system. SOP1 will focus on 5 priority components aligned with the PMUD's strategic orientations: C1. Public Transport Network Restructuring (phase II): This component will support the second phase of Dakar's comprehensive public transport network restructuring, including the reorganization of bus routes, the development of a priority bus routes served by low emission vehicles, and the implementation of associated infrastructure and facilities' improvements such as road rehabilitation, bus stops, terminals and depots, and intersections. C2. Professionalization of paratransit bus operators: This component will facilitate the integration of paratransit transport operators into the ongoing fleet renewal program and support the strengthening their operational, human, and organizational capacities. C3. Traffic management and urban integration: This component will finance studies, infrastructure and equipment to address traffic congestion, improve parking management and promote urban development along key public transport routes in the metropolitan area. C4. Studies for the development of high capacity transit system and urban mobility: This component will finance various studies for improved mobility in the Dakar metropolitan area, including feasibility studies for the next Bus Rapid Transit (BRT) lines, thus laying the groundwork for scaling up Dakar's mass transit system, and support the development of sustainable mobility strategies for regional hubs. C5. Governance, institutional arrangements and project management: This component will focus on (i) enhancing both institutional capacity and financial sustainability through targeted studies on long-term sustainable financing strategy for the urban mobility sector and technical assistance to the local authorities; (ii) developing an integrated digital strategy for urban transport management to optimize resources and enhance governance; and (iii) establishing a project management unit, including monitoring, evaluation, and communication systems. This first phase of the SOP will be financed by a 100 Million USD contribution from the World Bank with CETUD currently exploring co-financing options. SOP 1 will be implemented over a five-year period from 2025 to 2030 and will establish the institutional and operational foundation for subsequent phases to further scale and improve urban transport systems in Dakar and regional hubs. ]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–00008953"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-00008955"><narrative>Conseil ExEcutif des Transports Urbains Durables</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-06-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-06-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Asuka Tsuboike</narrative></person-name><telephone>+1-202-473-1000</telephone><email>atsuboike@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Rue RenE Ndiaye x Avenue Carde, 4017 , Dakar

</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Route du Front de Terre, ex Imm. TP Som, Hann, Dakar 

</narrative></mailing-address></contact-info><recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21012" percentage="82" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="13" xml:lang="en"/><sector vocabulary="1" code="21030" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTF" percentage="10.0000000" xml:lang="en"><narrative>Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTW" percentage="1.00000000" xml:lang="en"><narrative>Railways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTC" percentage="89.0000000" xml:lang="en"><narrative>Urban Transport</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1250011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">100000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">100000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8955"><narrative>Conseil ExEcutif des Transports Urbains Durables</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P507844"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P507844?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P507844"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of a National Railway Master Plan for Senegal
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual net savings of GHG  emission
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="24501">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Study on ways to integrate gender aspects in urban mobility project
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tier 3 transport vehicles complying with safety and environmental standards in regional hubs outside Dakar
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="26">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved bus stations
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tier 3 transport vehicles complying with safety and environmental standards in Dakar
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="13">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction with public transport services, disaggregated by female and youth
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="65">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion of the feasibility study for the second BRT line
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Restructured public transport corridors rehabilitated
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Informal transport operators trained
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="251,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="867,000">

</target>
<actual value="25,1000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved intersection
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pedestrian and NMT infrastructure completed
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="120,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time on selected public transport route (from Keur Massar to Dakar Plateau) in morning peak hours on weekdays
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="120"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Traffic crashes involving public transport in selected corridors-in RTC financed by the project
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="42"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="29">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of an investment roadmap for urban mobility for Phase 2 of &quot;PAMUS&quot;
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Traffic crashes involving public transport in selected corridors-in RTC financed by the project
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="42"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="29">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Traffic crashes involving public transport in selected corridors-in RTC financed by the project
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="42"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="29">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of low emission vehicles in bus fleets
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="19">

</target>
<actual value="0.4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of low emission vehicles in bus fleets
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="19">

</target>
<actual value="0.4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction with public transport services, disaggregated by female and youth
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="65">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction with public transport services, disaggregated by female and youth
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="65">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="251,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="867,000">

</target>
<actual value="25,1000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="251,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="867,000">

</target>
<actual value="25,1000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="120,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="120,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time on selected public transport route (from Keur Massar to Dakar Plateau) in morning peak hours on weekdays
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="120"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time on selected public transport route (from Keur Massar to Dakar Plateau) in morning peak hours on weekdays
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="120"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of technical female staffs in transport operators
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pedestrian and NMT infrastructure completed
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Informal transport operators trained
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual net savings of GHG  emission
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="24501">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tier 3 transport vehicles complying with safety and environmental standards in regional hubs outside Dakar
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="26">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of a National Railway Master Plan for Senegal
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved bus stations
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of technical female staffs in transport operators
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Study on ways to integrate gender aspects in urban mobility project
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of an investment roadmap for urban mobility for Phase 2 of &quot;PAMUS&quot;
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion of the feasibility study for the second BRT line
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved intersection
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tier 3 transport vehicles complying with safety and environmental standards in Dakar
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="13">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Paratransit operators formally integrated into the structured formal operation - Tier 3
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="1250"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="1500">

</target>
<actual value="1250">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Restructured public transport corridors rehabilitated
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Traffic crashes involving public transport in selected corridors-in RTC financed by the project
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="42"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="29">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Traffic crashes involving public transport in selected corridors-in RTC financed by the project
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="42"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="29">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of low emission vehicles in bus fleets
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="19">

</target>
<actual value="0.4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of low emission vehicles in bus fleets
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="19">

</target>
<actual value="0.4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction with public transport services, disaggregated by female and youth
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="65">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction with public transport services, disaggregated by female and youth
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="65">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="251,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="867,000">

</target>
<actual value="25,1000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="251,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="867,000">

</target>
<actual value="25,1000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="120,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="120,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time on selected public transport route (from Keur Massar to Dakar Plateau) in morning peak hours on weekdays
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="120"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time on selected public transport route (from Keur Massar to Dakar Plateau) in morning peak hours on weekdays
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="120"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Paratransit operators formally integrated into the structured formal operation - Tier 3
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="1250"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="1500">

</target>
<actual value="1250">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of low emission vehicles in bus fleets
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-06-15" />
<target value="19">

</target>
<actual value="0.4">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P122841</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Stormwater Mgt. and Climate Change Adaptation Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To reduce flood risks in peri-urban areas of Dakar and improve capacity to plan and implement sustainable city management practices, including climate resilience, in selected urban areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Stormwater Management and Climate Change Adaptation Project for Senegal is to improve stormwater drainage and flood prevention in periurban areas of Dakar for the benefit of local residents. There are four components to the project, the first component being flood risk mainstreaming in the urban sector. The component will provide for: (i) consultant services and technical assistance; (ii) goods and small equipment, including GIS-equipment, computers, and office equipment; and (iii) carrying out training and capacity building activities including travel costs related to south-south exchanges. The second component is the drainage investment and management. The component will provide for consultant services (hydraulic, urban planning) and technical assistance in form of an Implementation Support Consultant (ISC) team assisting the Municipal Development Agency (MDA) and municipalities with implementation and detailed feasibility and technical studies. The third component is the community engagement in urban flood-risk reduction and adaptation to climate change. The component will provide for consultant services for the development of the information, education and communication (IEC) strategy and tools as well as technical assistance for carrying out the development, implementation and monitoring of the community investments (social facilitator). Finally, the fourth component is the project coordination, management, monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0004855"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0004855"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0004856"><narrative>Municipal Development Agency (MDA)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-12-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-05-10"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Isabelle Celine Kane</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ikane@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative> Region de Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.283331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="74020" percentage="90" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="4" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="3" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="2" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="66.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="98" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="50" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="13" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="50" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="98" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="50" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="98" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="13" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="13" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="39" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">55600000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">35000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-3268</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-28854</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">6887713</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">6664381</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">1688296</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">4476710</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">5410416</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">1570152</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">2094479</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">3802367</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">723938</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">938511</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">3218746</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">1894592</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">3381478</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">2315043</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">64075</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">440475</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">1108460</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">307877</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">58594</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">3204623</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">1723566</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">11697</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">3972467</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">261458</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">13961</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">81760</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">1022972</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">987134</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">385718</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">1939003</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">911335</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">117985</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1173844</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">231628</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">653368</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">967487</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">119860</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">1049934</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">1966258</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">521821</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">2685389</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">258868</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">1343325</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">738581</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">2944850</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">1559227</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">7951989</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">1539979</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-3260</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-838</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-241</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-15907</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-26340</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-61142</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-83160</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-119576</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-131122</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-151684</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-271</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-162889</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-185870</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-574</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-18252</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-196261</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-27716</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-185449</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-41288</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-186218</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-52766</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-185637</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-71017</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-181310</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-118393</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-193283</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-137093</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-193153</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-125212</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-188613</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-140652</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-191901</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-111981</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-165002</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-132754</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-190843</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-120858</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-175769</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-117224</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-172671</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-114479</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-173898</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-104545</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-169637</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-120989</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-173679</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-112514</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-162514</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-564933</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-558318</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-519221</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-473092</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-534727</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-480087</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-537146</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-478282</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-529825</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-476971</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-526340</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-480515</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-2838</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-516177</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-8152</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-467923</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-542472</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-491535</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-18931</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-526430</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-7876</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-481605</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4856"><narrative>Municipal Development Agency (MDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122841"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P122841?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122841"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AN O&amp;M stormwater drainage management system in Pikine and Guediawaye is functional.
</narrative></title>
<baseline year="2012" iso-date="2012-09-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-01" />
<period-end iso-date="2017-03-28" />
<target value="O&amp;M system functional">

</target>
<actual value="O&amp;M system functional but not funded">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Local flood management committees in Pikine and Guediawaye are engaged in stormwater management activities.
</narrative></title>
<baseline year="2012" iso-date="2012-09-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-01" />
<period-end iso-date="2017-03-28" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Tools related to urban resilience including climate change, adopted
</narrative></title>
<baseline year="2012" iso-date="2012-09-01" value="No Tools related to urban resilience including climate change, adopted"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-01" />
<period-end iso-date="2017-03-28" />
<target value="Tools related to urban resilience including climate change, adopted">

</target>
<actual value="A national strategy for integrated urban management and planning addressing, inter-alia, flood prevention and climate change impacts has been validated by the project technical committee and adopted by the National Urban Committee under the leadership of the Urban Ministry">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area in peri-urban Dakar protected against recurrent flooding through drainage works
</narrative></title>
<baseline year="2012" iso-date="2012-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-01" />
<period-end iso-date="2017-03-28" />
<target value="400.00">

</target>
<actual value="900.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached by IEC strategy at local and national level.
</narrative></title>
<baseline year="2012" iso-date="2012-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-01" />
<period-end iso-date="2017-03-28" />
<target value="60000.00">

</target>
<actual value="84366.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Primary drainage system in Pikine and Guediawaye put it place.
</narrative></title>
<baseline year="2012" iso-date="2012-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-01" />
<period-end iso-date="2017-03-28" />
<target value="15828.00">

</target>
<actual value="29317.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Eligible flood risk reduction community investments completed.
</narrative></title>
<baseline year="2012" iso-date="2012-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-01" />
<period-end iso-date="2017-03-28" />
<target value="30.00">

</target>
<actual value="68.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Drainage channels cleaned at least once per year before rainy season in project area
</narrative></title>
<baseline year="2012" iso-date="2012-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-01" />
<period-end iso-date="2017-03-28" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Experience in &quot;inter-municipal sustainable city&quot; practices, through concerted territorial development (CTD), improved
</narrative></title>
<baseline year="2012" iso-date="2012-09-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-01" />
<period-end iso-date="2017-03-28" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Key stakeholders (persons) trained in flood risk management, urban climate change resilience and territorial planning
</narrative></title>
<baseline year="2012" iso-date="2012-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-01" />
<period-end iso-date="2017-03-28" />
<target value="400">

</target>
<actual value="591">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2012" iso-date="2012-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-01" />
<period-end iso-date="2017-03-28" />
<target value="132000.00">

</target>
<actual value="167000.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P084022</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Local Authorities Development Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The program's development objectives are to: (a) strengthen the capacity of urban municipalities to improve resource mobilization, and municipal and urban management; and (b) increase access to and quality of public infrastructure and services in urban areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Local Authorities Development Program Project for Senegal aims to: (a) strengthen the capacity of urban municipalities to improve resource mobilization, and municipal and urban management; and (b) increase access to and quality of public infrastructure and services in urban areas. There are three project components. Component A, Institutional Development and Capacity Building, (will be carried out along two tracks: (a) implementation of the Municipal Adjustment Program for the local authorities (67 urban municipalities, urban community of Dakar (CADAK), and the urban community of Rufisque (CAR)) - the content of these programs will be detailed in each Municipal Contract as well as within the two specific contracts for CADAK and CAR; and (b) cross-cutting measures and support for the Government agencies, selected ministries, and the Municipal Development Agency (MDA). Component B, Municipal and Inter-communal Physical Investments, will be carried out along two tracks: (a) municipal contracts for the implementation of priority investment programs and priority maintenance programs; and (b) larger inter-communal projects for the Dakar metropolitan area. This amount includes the fees to be paid to the Contract Management Agency. Component C, Support to Project Implementation, and Monitoring and Evaluation will provide project implementation financing, including staff, operating costs, monitoring and evaluation, and cost of audits.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2004-12-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-07-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-12-16"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-12-16"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Salim Rouhana</narrative></person-name><telephone>+1-202-473-1000</telephone><email>srouhana@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244786" />
            <name><narrative>Tiadiaye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.41667 -16.700001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244797" />
            <name><narrative>Thilogne</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.92389 -13.65778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244802" />
            <name><narrative>Thies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.83417 -17.10611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244991" />
            <name><narrative>Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.77073 -13.66734</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246452" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.017929 -16.48962</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246901" />
            <name><narrative>Oussouye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.485 -16.54694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246922" />
            <name><narrative>Ouro Sogui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.60588 -13.3223</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247044" />
            <name><narrative>Waounde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.26367 -12.86821</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247161" />
            <name><narrative>Nioro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.5 -15.05</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248698" />
            <name><narrative>Mbake</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.79032 -15.90803</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248752" />
            <name><narrative>Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.65587 -13.25544</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249222" />
            <name><narrative>Louga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.61867 -16.22436</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249281" />
            <name><narrative>Linguere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.3953 -15.1193</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250805" />
            <name><narrative>Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.1825 -16.25333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250849" />
            <name><narrative>Kanel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.4916 -13.17627</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251911" />
            <name><narrative>Fatick</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.35806 -16.585831</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252309" />
            <name><narrative>Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.64792 -16.243629</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253277" />
            <name><narrative>Dara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.34844 -15.47993</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.444059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253375" />
            <name><narrative>Dagana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.476669 -15.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254441" />
            <name><narrative>Bakel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.90238 -12.45935</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007670740" />
            <name><narrative>Bambey</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.70074 -16.45911</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250982" />
            <name><narrative>Kahone</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.15 -16.033331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244177" />
            <name><narrative>Velingara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.15 -14.11667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244386" />
            <name><narrative>Tivaouane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.97444 -16.93972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254154" />
            <name><narrative>Bargny</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.69707 -17.23015</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245709" />
            <name><narrative>Sebikhoutane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.74521 -17.137831</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245704" />
            <name><narrative>Sedhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70806 -15.55694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253901" />
            <name><narrative>Bignona</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.81028 -16.226391</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252753" />
            <name><narrative>Diamniadio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.06667 -16.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252606" />
            <name><narrative>Diawara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.02196 -12.54374</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252473" />
            <name><narrative>Diofior</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.18333 -16.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250677" />
            <name><narrative>Kayar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91893 -17.11978</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250659" />
            <name><narrative>Kebemer</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.365 -16.433901</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250645" />
            <name><narrative>Kedougou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.5579 -12.1743</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249901" />
            <name><narrative>Khombole</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -16.700001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249782" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.88333 -14.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249554" />
            <name><narrative>Koungheul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.98333 -14.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248515" />
            <name><narrative>Mboro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.14051 -16.88682</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248477" />
            <name><narrative>Mbour</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.42196 -16.963751</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248409" />
            <name><narrative>Mekhe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.1097 -16.621799</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246780" />
            <name><narrative>Passi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.98333 -16.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246678" />
            <name><narrative>Pikine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76457 -17.390711</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246606" />
            <name><narrative>Pout</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.77099 -17.061069</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246585" />
            <name><narrative>Ranerou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.3 -13.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246544" />
            <name><narrative>Richard-Toll</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.4625 -15.70083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246522" />
            <name><narrative>Rosso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.42028 -15.79834</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246512" />
            <name><narrative>Rufisque</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72503 -17.27088</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245666" />
            <name><narrative>Seme</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.19422 -12.94482</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245241" />
            <name><narrative>Sokone</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.88333 -16.366671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243940" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.58333 -16.27194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247684" />
            <name><narrative>Ndioum</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.51293 -14.64706</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595778" />
            <name><narrative>Guediawaye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.77446 -17.402121</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251007" />
            <name><narrative>Kaffrine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.10594 -15.5508</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251084" />
            <name><narrative>Joal-Fadiout</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.16667 -16.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251230" />
            <name><narrative>Guinguineo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.26667 -15.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251470" />
            <name><narrative>Goudomp</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.57778 -15.87222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251544" />
            <name><narrative>Golere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.255751 -14.10165</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251791" />
            <name><narrative>Foundiougne</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.13333 -16.466669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247274" />
            <name><narrative>Niandane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.588869 -14.9953</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247381" />
            <name><narrative>Nguekokh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.51255 -17.004471</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="14020" percentage="10" xml:lang="en"/><sector vocabulary="1" code="14030" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="20" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="20" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="40" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="72" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000715" percentage="29" xml:lang="en"><narrative>Municipal Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="28" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="24" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">784583.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">784583.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">784583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">784583.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">784583.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">784583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">896666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">896666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">896666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">896666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">896666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">896666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">896666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">896666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">896666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">672500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">672500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">672500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">672500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">672500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">672500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">784583.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">784583.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">784583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">896666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">896666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">896666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2013-12-16"/>
<value currency="USD" value-date="2013-12-16">3894165.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2013-12-16"/>
<value currency="USD" value-date="2013-12-16">3894165.22</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P084022"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P084022?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P084022"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of repayments of municipal loans and contributions
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="91% (2005 Actual)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-12-31" />
<target value="95%">

</target>
<actual value="97.22%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Amount of PIPs committed
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-12-31" />
<target value="100 % : US$63.5 million (IDA share)">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of municipalities using maintenance funds for infrastructure
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="67">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of labor costs&amp;gt;20% for municipal PIPs (at each PIP level)
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="20%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="&amp;gt;20%">

</target>
<actual value="19.02%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quarterly progress reports produced within a month after the period
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="4">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Part allocated annually through the local authorities' budget to finance infrastructure and maintenance (percentage)
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="3% (2005 actual)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="7%">

</target>
<actual value="10.85%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of municipalities using maintenance funds for infrastructure
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="67">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of persons directly benefiting from at least one subproject
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0 (2005)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="1,550,000">

</target>
<actual value="1653000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of municipal budgets approved by the Prefect after generation by the municipalities before April 15 of each year (percentage)
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="50% (2005 Actual)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="90%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CMA operating costs&lt; 5%
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="&lt;5%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="&lt;5%">

</target>
<actual value="3.8%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of provisional budget reports prepared by the Treasury before March 31 of each year.
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="60% (2005 Actual)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="95 %">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Amount of PIPs disbursed (percentage)
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="100% of commitments (see Intermediate PDO 6)">

</target>
<actual value="75%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mobilization of non-tax revenues directly by the Municipalities (percentage)
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="(CFAF8.3 billion, 2005 actual revenues, for the five urban municipalities of the Greater Dakar Area and the 12 regional capitals)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="+50%">

</target>
<actual value="131%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of persons directly benefiting from at least one subproject
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0 (2005)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="1,550,000">

</target>
<actual value="1653000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of municipal budgets approved by the Prefect after generation by the municipalities before April 15 of each year (percentage)
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="50% (2005 Actual)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="90%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of provisional budget reports prepared by the Treasury before March 31 of each year.
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="60% (2005 Actual)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="95 %">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of city contracts signed
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-12-31" />
<target value="67">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Amount of PIPs disbursed (percentage)
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="100% of commitments (see Intermediate PDO 6)">

</target>
<actual value="75%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of sub-projects implemented within timeframe
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="95%">

</target>
<actual value="60.5%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quarterly progress reports produced within a month after the period
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="4">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average number of days for payment of invoices to contractors and consultants
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="6">

</target>
<actual value="5.56%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Amount of PIPs committed
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-12-31" />
<target value="100 % : US$63.5 million (IDA share)">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of city contracts signed
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-12-31" />
<target value="67">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Part allocated annually through the local authorities' budget to finance infrastructure and maintenance (percentage)
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="3% (2005 actual)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="7%">

</target>
<actual value="10.85%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average number of days for payment of invoices to contractors and consultants
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="6">

</target>
<actual value="5.56%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Level of resource mobilization (percentage of revenue increase in urban municipalities' account).
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="CFAF35.5 billion (2005 actual revenues, for the five urban municipalities of the Greater Dakar Area and the 12 regional capitals)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="30%">

</target>
<actual value="54.9%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of repayments of municipal loans and contributions
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="91% (2005 Actual)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-12-31" />
<target value="95%">

</target>
<actual value="97.22%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mobilization of non-tax revenues directly by the Municipalities (percentage)
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="(CFAF8.3 billion, 2005 actual revenues, for the five urban municipalities of the Greater Dakar Area and the 12 regional capitals)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="+50%">

</target>
<actual value="131%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CMA operating costs&lt; 5%
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="&lt;5%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="&lt;5%">

</target>
<actual value="3.8%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Level of resource mobilization (percentage of revenue increase in urban municipalities' account).
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="CFAF35.5 billion (2005 actual revenues, for the five urban municipalities of the Greater Dakar Area and the 12 regional capitals)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="30%">

</target>
<actual value="54.9%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of facilities built/rehabilitated effectively in use within 6 months of completion
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="95%">

</target>
<actual value="79%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of sub-projects implemented within timeframe
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="95%">

</target>
<actual value="60.5%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of labor costs&amp;gt;20% for municipal PIPs (at each PIP level)
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="20%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="&amp;gt;20%">

</target>
<actual value="19.02%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of facilities built/rehabilitated effectively in use within 6 months of completion
</narrative></title>
<baseline year="2006" iso-date="2006-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-26" />
<period-end iso-date="2013-12-31" />
<target value="95%">

</target>
<actual value="79%">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P128284</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SN- First Governance and Growth Support Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed operation supports the Recipient's efforts to improve economic governance by strengthening Government accountability, increasing public sector performance and promoting growth through private sector development.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the First Governance and Growth Support Credit Program for Senegal is to improve economic governance by strengthening Government accountability, increasing public sector performance, and promoting growth through private sector development. This program document states a first governance and growth support credit for the Republic of Senegal in the amount of SDR 35.8 million (US$55 million equivalent). This operation is the first of a new series of three Governance and Growth Support Credits (GGSCs), following a series of two Poverty Reduction Support Credits (PRSCs IV and V) completed over 2009-2011. The operation supports the recipient's efforts to improve economic governance by strengthening government accountability, public sector performance, and promoting growth through private sector development. Policies and reforms supported by this operation are well aligned with Senegal's National Strategy for Economic and Social Development (SNDES), which the Bank supports. The operation is also fully consistent with the objectives of the Bank's FY13-17 Country Partnership Strategy (CPS), to be presented to the Board in January 2013. The operation is rooted in the World Bank's Africa strategy. The operation is aligned with the first pillar of the Africa strategy employment and growth and emphasizes the governance foundation of that strategy. By helping create fiscal space, it also aims to improve the government's capacity to cope with external shocks the second pillar of the strategy. Gross Domestic Product (GDP) growth has slowed to levels not much above the rate of population growth and poverty remains high. The economy has shown little structural change, a continued dependence on remittances to fuel domestic demand, a growing reliance on capital-intensive exports while labor-intensive sectors faltered, and thus little job creation. The economy has suffered from the global slowdown, commodity price shocks and instability in neighboring countries, which has been exacerbated by the weakness of the domestic reform agenda.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0007686"><narrative>Ministry of Economy and Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-07-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-12-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Julio Ricardo Loayza</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="16" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="16" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="16" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="16" xml:lang="en"/><sector vocabulary="1" code="11420" percentage="16" xml:lang="en"/><sector vocabulary="1" code="23210" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="14" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="22" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="14" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="22" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="14" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="22" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="22" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="14" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="22" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="14" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="7" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="36" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="7" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="7" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="14" xml:lang="en"><narrative>Rural Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">55000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">55000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">55000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">55184984</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-258161</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-206146</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-205441</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-180444</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-197991</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-188382</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-188681</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-181825</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-188699</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-195816</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-184932</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-185587</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-185231</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-180806</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-192752</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-192628</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-187983</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-191495</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-173553</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-182968</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-177079</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-173984</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-175224</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-170957</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-175044</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-163880</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-478782</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-476981</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-475674</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-479208</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-8152</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-466691</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-490199</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-7876</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-480274</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-7686"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P128284"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P128284?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P128284"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government subsidies to the energy sector
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="200000000.00"><comment><narrative>Actual was CFAF99 bil.</narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="100000000.00">
<comment><narrative>
Target is CFAF50 bil
</narrative></comment>
</target>
<actual value="180000000.00">
<comment><narrative>
Estimate for 2013 is CFAF90 bil
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Undistributed energy due to load shedding
</narrative></title>
<baseline year="2011" iso-date="2011-10-31" value="250.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-10-31" />
<period-end iso-date="2015-12-31" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Budget Credibility for Basic Education wage
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="110.00"><comment><narrative>The baseline is 110</narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Paying taxes
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="666.00"><comment><narrative>Number of payments is also expected to fall from 59</narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2015-12-31" />
<target value="318.00">
<comment><narrative>
Number of payments to fall to 37.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Agency performance contracts
</narrative></title>
<baseline year="2012" iso-date="2012-06-29" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-29" />
<period-end iso-date="2015-12-31" />
<target value="50.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Audit Court annual reports
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="1.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government program with results framework approved by the M&amp;E Unit
</narrative></title>
<baseline year="2012" iso-date="2012-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-10-16" />
<period-end iso-date="2015-12-31" />
<target value="10.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SENELEC's debt to equity ratio
</narrative></title>
<baseline year="2012" iso-date="2012-10-16" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-10-16" />
<period-end iso-date="2015-12-31" />
<target value="1.00">
<comment><narrative>
The End Target is1
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registering property
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="122.00"><comment><narrative>Cost is also expected to fall from 20% of property value.</narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="65.00">
<comment><narrative>
Cost to fall to 12%.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Asset declaration
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="5.00">
<comment><narrative>
4 individuals have declared their assets but we are not sure how many will be expected to since the new law has not yet beenfinalized.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P167681</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Improving Youth Employability Through Informal Apprenticeship</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objectives are to strengthen the apprenticeship system and improve the employability of selected apprentices.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Improving Youth Employability Through Informal Apprenticeship Project for Senegal are to strengthen the apprenticeship system and improve the employability of selected apprentices. It has three components. First component, Strengthen the system of informal apprenticeship aims to strengthen the national system of informal apprenticeship by addressing constraints in regulatory and support functions that impact on the quality of training delivery and management of the system; Second component, Improve the quality of apprentices skills formation processes aims to improve skills formation for youth and support their transition to gainful employment through four main venues, described below. After selecting workshops; signing up masters and apprentices; analyzing the training and equipment needs of the master crafts persons; and developing tripartite agreements between master craftsperson's, OPA and the MFPAA; the following activities will be implemented; and Third component, Project Management will support project management, including fiduciary matters, communication, planning, monitoring and evaluation. It will support the different positions including project coordinator, fiduciary staff, and technical experts for various areas including training, validation and certification of competencies, MIS, M&amp;E, and communication.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0037696"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0037696"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0037695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-11-21"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-11-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Friederike Uta Rother</narrative></person-name><telephone>+1-202-473-1000</telephone><email>frother@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244802" />
            <name><narrative>Thies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.78944 -16.92602</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246452" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.01793 -16.48962</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250805" />
            <name><narrative>Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.15197 -16.07259</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252309" />
            <name><narrative>Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.64792 -16.24363</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.28333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11330" percentage="84" xml:lang="en"/><sector vocabulary="1" code="15170" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EW" percentage="59.0000000" xml:lang="en"><narrative>FY17 - Workforce Development and Vocational Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000223" percentage="74" xml:lang="en"><narrative>Youth Employment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="100" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="33" xml:lang="en"><narrative>Education Facilities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="100" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="100" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="100" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="33" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="33" xml:lang="en"><narrative>Education Facilities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="33" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="74" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="100" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="100" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">24376006.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">24376006.10</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">53000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-18954112</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">3350525</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">11890</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">78861</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">7446</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">9460</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">2880540</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">819052</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">384735</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">171809</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">527170</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">345833</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">760241</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">135988</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">60339</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">1206333</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">2131439</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">663497</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">131724</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">900350</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">295150</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">565348</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">394283</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">955074</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">3673755</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">3662982</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1007575</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">4969776</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1477179</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-13234</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-13649</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-24816</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-31516</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-33710</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-44117</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-54300</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-56008</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-67108</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-106676</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-115490</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-115893</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-112438</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-496622</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-505466</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-511075</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-37695"><narrative>Ministry of Employment, Professional Training, Apprenticeship and Economic Insertion</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P167681"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P167681?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P167681"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Professional Associations of Craftspersons (OPAs) that have benefitted from capacity building
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-31" />
<target value="154.00">
<comment><narrative>
Cumulative number of OPAs that have benefited from capacity building, in particular trainings, at least once in years 1 or 2 and once in year 3 or 4. 
A gender specific learning module was included for the OPAs and with those the target was surpassed
</narrative></comment>
</target>
<actual value="187.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Craftspersons having participated in the VAE (Validation des Acquis d’ExpErience) process (cumulative)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-31" />
<target value="5,000.00">
<comment><narrative>
Cumulative number of master craftspersons and companions who can present legitimate professional certificates for a CAP or higher qualification
11 masters participated in the pilote
</narrative></comment>
</target>
<actual value="3,682.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Workshops which have received a grant to purchase equipment (cumulative)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-31" />
<target value="6,000.00">

</target>
<actual value="6,499.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Registered apprentices who took part in the complementary literacy training
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-29" />
<target value="50.00">

</target>
<actual value="55.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of workshops receiving Covid-19 sanitary kit and operating capital
</narrative></title>
<baseline year="2020" iso-date="2020-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-08" />
<period-end iso-date="2020-09-30" />
<target value="7,000.00">
<comment><narrative>
All 7000 workshops have received the sanitary kit; the cash transfer distribution has started on December 3 2020 and is ongoing
</narrative></comment>
</target>
<actual value="7,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Registered apprentices who took part in complementary management training
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-29" />
<target value="90.00">

</target>
<actual value="93.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A national framework for certifying competencies acquired through informal training is operational
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-31" />
<target value="Yes">
<comment><narrative>
Laws and decrees have been signed and operational guidelines exist.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth having participated in the skills validation certification after informal apprenticeships (cumulative)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-06-30" />
<target value="5,000.00">
<comment><narrative>
Women among youth having participated in the skills validation certification after informal apprenticeships (percentage, custom, breakdowns).
</narrative></comment>
</target>
<actual value="5,811.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A management information system is institutionalized and operational
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-31" />
<target value="Yes">
<comment><narrative>
The MIS is functional; it has been tested and launched on the Ministry's of Labor's server.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of job-focused interventions
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-06-30" />
<target value="19,000.00">

</target>
<actual value="20,873.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A grievance redress mechanism has been developped and is functional
</narrative></title>
<baseline year="2018" iso-date="2018-10-31" value="no GRM system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-31" />
<period-end iso-date="2023-12-31" />
<target value="The GRM system is fully functional and uses the MIS to manage grievances">
<comment><narrative>
See description of the targets
</narrative></comment>
</target>
<actual value="The GRM system is fully functional and uses the MIS to manage grievances">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Regional Committees of Apprenticeship (CRAs) that have benefitted from capacity building (cumulative)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-31" />
<target value="14.00">
<comment><narrative>
Cumulative number of CRAs that have benefited from capacity building, in particular trainings at least once in years 1 or 2 and once in years 3 or 4
</narrative></comment>
</target>
<actual value="14.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Craftspersons trained (cumulative)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-31" />
<target value="8,000.00">
<comment><narrative>
Cumulative number of master craftsperson or companions registered in the program who participated to the trainings and can present the corresponding certificates. All actual certificates have been reviewed during this mission to ensure accuracy.
</narrative></comment>
</target>
<actual value="7,451.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Registered apprentices who took part in complementary socio-emotional support training
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-29" />
<target value="90.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Integrated competency-based training programs produced or revised (cumulative)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-31" />
<target value="12.00">
<comment><narrative>
Cumulative number of referentials and associated guides revised or created following the competency-based approach validated by ONFP and DECPC and available to training providers
</narrative></comment>
</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with project interventions
</narrative></title>
<baseline year="2018" iso-date="2018-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-31" />
<period-end iso-date="2023-12-29" />
<target value="75.00">
<comment><narrative>
Number of registered apprentices satisfied /total number of apprentices surveyed.
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P164525</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Second Multi-Sectoral Structural Reform DPF</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ Support Government'??s efforts in (i) strengthening the governance and management of the energy sector to reduce costs, improve reliability and facilitate equitable access; (ii) enhancing the legal and regulatory framework of the ICT sector to promote competition, investment and equitable access, and (iii) reinforcing policy, institutional, and financial foundations of the emerging digital economy.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Program Development Objective (PDO) is to support Government's efforts in the following areas critical for building the foundations of a dynamic, innovative and inclusive economy: i. Strengthening the governance and management of the energy sector to reduce costs, improve reliability and facilitate equitable access; ii. Enhancing the legal and regulatory framework of the ICT sector to promote competition, investment and equitable access; and iii. Reinforcing the policy, institutional, and financial foundations of the digital economy. Under the program, Government reforms have already achieved some significant advances, fully in line with the World Bank Group's (WBG) approach to Maximizing Financing for Development (MFD).In the Energy sector, with an aim of reducing the electricity costs through a cheaper and cleaner energy generation mix, the first DPF in the series (DPF 1) supported the adoption of the Strategic Electricity Generation Master Plan implemented by Independent Private Producers (IPPs) and further operationalized, under the second DPF (DPF 2), through an ambitious mid- and downstream gas-to-power strategy, which includes competitively procured infrastructure and appropriate arrangements for third party access. To further reduce costs and leverage private investment in the sector, the program promotes the institutional transformation of the state-owned utility into a commercially-oriented, financially resilient and credit-worthy company by establishing a focused performance contract with the Government and reinforcing its Board with independent directors. In parallel, to foster electricity access in rural areas, the program supports the Government's public-private partnership (PPP) model by way of a sustainable tariff reform and expansion of the rural concession coverage. In the ICT sector, with an ultimate objective of increasing Internet penetration rate and lowering costs, the reforms, under DPF 1, allowed the entry of three new Internet Service Providers (ISPs) and, under DPF 2, has led to the adoption of a new Telecom Law and accompanying legal provisions that significantly enhance and modernize the regulatory environment, rendering it conducive to fair competition and private sector investment. Under DPF 2, the Program further supports decisions to strengthen the regulation of market dominant players, the opening of the critical 4G market, and new PPP arrangements to facilitate access of private operators to the vast but underused state-owned fiber optic network. In the DE sector, the program aims to improve the enabling environment for a competitive private sector start-ups ecosystem by increasing proactiveness of Government institutions in using digital technologies, including recent improvements in the coverage of e-taxation and e-payments, and a participatory process to create dedicated start-up regulation in Senegal.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0034003"><narrative>Ministry of Economy, Finance and Planning</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0034003"><narrative>Ministry of Economy, Finance and Planning</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0034002"><narrative>Ministry of Petrol and Energy</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-03-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-12-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Mustafa Zakir Hussain</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mhussain2@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="22040" percentage="28" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="22" xml:lang="en"/><sector vocabulary="1" code="22020" percentage="22" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="17" xml:lang="en"/><sector vocabulary="1" code="23340" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LN" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Non-Renewable Energy Generation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="6.00000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="44.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="22" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="22" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="11" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="22" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="11" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000262" percentage="33" xml:lang="en"><narrative>ICT Policies</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">180000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">180000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">180000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">180063320</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-849159</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-649571</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-697807</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-712486</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-691465</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-643676</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-579719</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-658534</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-626242</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-638960</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-643080</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-672171</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-674816</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-672675</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2800711</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2850584</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2888051</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34004"><narrative>Ministry of Communication, Telecommunication, Post and Digital Economy; Ministry of Petrol and Energy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P164525"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P164525?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P164525"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P175325</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Casamance Economic Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective of the project is to build inclusive local governance systems that deliver climate resilient local services and infrastructure, in targeted communities in Casamance.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Casamance Economic Development Project for Senegal is to build inclusive local governance systems that deliver climate resilient local services and infrastructure, in targeted communities in Casamance. This project has five components. The first component, Strengthening local governance and enhancing access to local services for improved inclusion and resilience, has the following sub-components: Strengthening community and local governance capacity for inclusive local governance and resilience planning; and Enhancing access to climate resilient local services based. The second component, Enhancing rural mobility and enhancing access economic activities and basic services, will finance the scaling up of the community-based road maintenance program piloted under the PPDC. The third component, Broadening sustainable rural livelihood opportunities, will support rural productive activities that increase resilience of farmers and disadvantaged groups within target communities, and has the following sub-components: Enhancing the productivity and resilience of rice-growing areas; and Supporting collective and climate resilient productive activities. The fourth component, Supporting project management, digital innovations and knowledge management, will finance the PIU based in Ziguinchor to carry out day-to-day project management responsibilities.
]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0047459"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0047459"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0047460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-07-01"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-02-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Mame Safietou Djamil Gueye</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mgueye4@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243939" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.8 -16.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243943" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.52201 -16.21621</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244181" />
            <name><narrative>Velingara Department</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.986 -13.813</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.497401 -14.452362</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245705" />
            <name><narrative>Sedhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.69807 -15.58479</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246902" />
            <name><narrative>Oussouye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.48552 -16.61648</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253903" />
            <name><narrative>Bignona</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.88163 -16.36944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303937" />
            <name><narrative>Region de Sedhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70683 -15.55801</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007670821" />
            <name><narrative>Kolda Department</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.883 -14.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010402310" />
            <name><narrative>Goudomp Department</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.57778 -15.87222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010779433" />
            <name><narrative>Departement de Medina Yoro Foulah</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.22561 -14.85773</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010779434" />
            <name><narrative>Bounkiling</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.13701 -15.61163</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21022" percentage="34" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="23" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="22" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="19" xml:lang="en"/><sector vocabulary="1" code="21021" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="33.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="84" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000531" percentage="23" xml:lang="en"><narrative>Conflict Prevention</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="48" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="48" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="48" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="44" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000722" percentage="23" xml:lang="en"><narrative>Rural Non-farm Income Generation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="84" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="36" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="53" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="23" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="22" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="23" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="100" xml:lang="en"><narrative>Rural Development</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">380000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">960000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">680000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">710000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">20256673.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">20256673.58</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">45000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">1963295</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">417170</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">359935</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">226314</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">181542</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">228663</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">135043</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">198737</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">525792</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1032784</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">506062</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">228594</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">527415</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">344624</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">409900</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">3135508</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">2303128</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">2064548</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1052238</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">2545341</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1898200</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">768227</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">1217337</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1497095</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">975835</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-2967</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-12706</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-15641</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-18903</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-27355</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-36610</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-65313</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-95349</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-47460"><narrative>Ministry of Territorial Communities, Development and Land Management  (MCTDAT), Project Implementing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175325"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175325?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175325"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female beneficiaries saying they have a say in community decision-making
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-22" />
<target value="70.00">
<comment><narrative>
Women beneficiaries saying they have a say in community decision-making
</narrative></comment>
</target>
<actual value="136">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition, and population services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">
<comment><narrative>
This CRI indicator was added automatically by OPCS in July 2024. This CRI will be adjusted
later in coordination with OPCS in the coming months.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="433,437"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="850,000">

</target>
<actual value="43,3437">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total number of farmers trained in entrepreneurship and/or new agricultural skills
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="20,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of targeted communities reporting improved satisfaction with school governance
</narrative></title>
<baseline year="2026" iso-date="2026-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-07-15" />
<period-end iso-date="2030-06-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2021" iso-date="2021-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-20" />
<period-end iso-date="2026-09-14" />
<target value="8,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="189">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="64,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="240,000">

</target>
<actual value="6,4000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communes more transparent through disseminating information on local planning processes and results
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Communes complying with criteria for enhanced transparency as detailed in project POM
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="433,437"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="850,000">

</target>
<actual value="43,3437">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of LDPs in participating communes
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-21" />
<target value="90.00">
<comment><narrative>
Measures implementation of PCD and indicates efficiency and credibility of the planning process
</narrative></comment>
</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="398,362"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2030-06-15" />
<target value="850,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="398,362">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2026-06-16" />
<target value="750,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="398,362">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who can access regional size markets within 120 minutes in project area
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="700,000.00">
<comment><narrative>
Indicator to measure increase access to markets. The monitoring will be disaggregated by age, gender and those with mobility impairments.
</narrative></comment>
</target>
<actual value="18,735">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who can access regional size markets within 120 minutes in project area
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-15" />
<target value="650,000.00">
<comment><narrative>
Indicator to measure increase access to markets. The monitoring will be disaggregated by age, gender and those with mobility impairments.
</narrative></comment>
</target>
<actual value="18,735">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LDPs prepared/updated promoting participation, social inclusion and are climate-informed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="60.00">
<comment><narrative>
PCDs are prepared/updated promoting participation, social inclusion and are climate-informed
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of post harvest infrastructure facilities constructed or rehabilitated
</narrative></title>
<baseline year="2026" iso-date="2026-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-09-15" />
<period-end iso-date="2030-06-15" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in women and youth participation in CBO governance structures
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="30.00">
<comment><narrative>
Assess participation of women and youth in the governance of livelihood activities
</narrative></comment>
</target>
<actual value="17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in women and youth participation in CBO governance structures
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="30.00">
<comment><narrative>
Assess participation of women and youth in the governance of livelihood activities
</narrative></comment>
</target>
<actual value="17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of climate-smart socio-economic sub-projects
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="450.00">
<comment><narrative>
Identifies number of climate-smart socio-economic sub-project supported by the Project
</narrative></comment>
</target>
<actual value="185">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of economic inclusion programs
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="20,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Rural Mobility Plans developed promoting social inclusion and are climate-informed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="12">
<comment><narrative>
RMPs prepared following PIM methodology are adopted by Departmental Authorities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in women and youth participation in CBO governance structures
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="35.00">
<comment><narrative>
Assess participation of women and youth in the governance of livelihood activities
</narrative></comment>
</target>
<actual value="17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase  in the number of females who can access health services within 60 minutes in select project areas
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-21" />
<target value="60,000.00">
<comment><narrative>
Indicator to assess enhance access to services for women
</narrative></comment>
</target>
<actual value="9,239">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Local Mobility Plans developed promoting social inclusion and are climate-informed
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-21" />
<target value="9.00">
<comment><narrative>
RMPs prepared following PIM methodology are adopted by Departmental Authorities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pilot ecotourism circuits operational
</narrative></title>
<baseline year="2026" iso-date="2026-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-07-15" />
<period-end iso-date="2030-06-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of primary schools rehabilitated in KEdougou
</narrative></title>
<baseline year="2026" iso-date="2026-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-12-15" />
<period-end iso-date="2030-06-15" />
<target value="35">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-12-14" />
<target value="0">
<comment><narrative>
This CRI indicator was added automatically by OPCS in July 2024. This CRI will be adjusted
later in coordination with OPCS in the coming months.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-12-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of livelihoods sub-projects
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="16,000.00">
<comment><narrative>
Indicator to assess number of beneficiaries of livelihood interventions
</narrative></comment>
</target>
<actual value="9,239">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">
<comment><narrative>
This CRI indicator was added automatically by OPCS in July 2024. This CRI will be adjusted
later in coordination with OPCS in the coming months.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Casamance Knowledge Management Platform established and operational
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="Yes">
<comment><narrative>
Establishment and operation of KMP
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of livelihoods sub-projects
</narrative></title>
<baseline year="2021" iso-date="2021-09-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-26" />
<period-end iso-date="2026-09-21" />
<target value="8,000.00">
<comment><narrative>
Indicator to assess number of beneficiaries of livelihood interventions
</narrative></comment>
</target>
<actual value="4,218">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female beneficiaries saying they have a say in community decision-making
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="75.00">
<comment><narrative>
Women beneficiaries saying they have a say in community decision-making
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals in Casamance who obtain civil documentation
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="50,000">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of LDPs in participating communes
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-21" />
<target value="90.00">
<comment><narrative>
Measures implementation of PCD and indicates efficiency and credibility of the planning process
</narrative></comment>
</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regular users of digital services (CDD app and Digital Agriculture services)
</narrative></title>
<baseline year="2021" iso-date="2021-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-20" />
<period-end iso-date="2026-09-28" />
<target value="3,000.00">
<comment><narrative>
Assess users of digital innovations
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communes more transparent through disseminating information on local planning processes and results
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-21" />
<target value="60.00">
<comment><narrative>
Communes complying with criteria for enhanced transparency as detailed in project POM
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase  in the number of females who can access health services within 60 minutes in select project areas
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-21" />
<target value="60,000.00">
<comment><narrative>
Indicator to assess enhance access to services for women
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="3,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="3,300">

</target>
<actual value="3300">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LDPs prepared/updated promoting participation, social inclusion and are climate-informed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="60.00">
<comment><narrative>
PCDs are prepared/updated promoting participation, social inclusion and are climate-informed
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of livelihoods sub-projects
</narrative></title>
<baseline year="2021" iso-date="2021-09-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-26" />
<period-end iso-date="2026-09-21" />
<target value="8,000.00">
<comment><narrative>
Indicator to assess number of beneficiaries of livelihood interventions
</narrative></comment>
</target>
<actual value="9,239">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who can access regional size markets within 120 minutes in project area
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="700,000.00">
<comment><narrative>
Indicator to measure increase access to markets. The monitoring will be disaggregated by age, gender and those with mobility impairments.
</narrative></comment>
</target>
<actual value="18,735">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New job opportunities created as a result of project activities
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="30000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of livelihoods sub-projects
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="16,000.00">
<comment><narrative>
Indicator to assess number of beneficiaries of livelihood interventions
</narrative></comment>
</target>
<actual value="9,239">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals in Casamance who obtain civil documentation
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="50,000">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase  in the number of females who can access health services within 60 minutes in select project areas
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="70,000.00">
<comment><narrative>
Indicator to assess enhance access to services for women
</narrative></comment>
</target>
<actual value="9,239">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female beneficiaries saying they have a say in community decision-making
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-22" />
<target value="70.00">
<comment><narrative>
Women beneficiaries saying they have a say in community decision-making
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">

</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition, and population services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">
<comment><narrative>
This CRI indicator was added automatically by OPCS in July 2024. This CRI will be adjusted
later in coordination with OPCS in the coming months.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="64,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="240,000">

</target>
<actual value="6,4000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Casamance Knowledge Management Platform established and operational
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="Yes">
<comment><narrative>
Establishment and operation of KMP
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-12-14" />
<target value="0">
<comment><narrative>
This CRI indicator was added automatically by OPCS in July 2024. This CRI will be adjusted
later in coordination with OPCS in the coming months.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of inclusive and resilient value chain strategies
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-20" />
<target value="90.00">
<comment><narrative>
Assess preparation of value chain assessments, per methodology defined in the POM
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pilot ecotourism circuits operational
</narrative></title>
<baseline year="2026" iso-date="2026-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-07-15" />
<period-end iso-date="2030-06-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of economic inclusion programs
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="20,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">
<comment><narrative>
This CRI indicator was added automatically by OPCS in July 2024. This CRI will be adjusted
later in coordination with OPCS in the coming months.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="2170"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="9,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="189">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Female
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-12-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="398,362"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2030-06-15" />
<target value="850,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="398,362">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2021" iso-date="2021-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-20" />
<period-end iso-date="2026-09-14" />
<target value="8,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communes more transparent through disseminating information on local planning processes and results
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-21" />
<target value="60.00">
<comment><narrative>
Communes complying with criteria for enhanced transparency as detailed in project POM
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition, and population services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of inclusive and resilient value chain strategies
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-20" />
<target value="90.00">
<comment><narrative>
Assess preparation of value chain assessments, per methodology defined in the POM
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of grievances related to project activities addressed within agreed service standards
</narrative></title>
<baseline year="2026" iso-date="2026-07-15" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-07-15" />
<period-end iso-date="2030-06-15" />
<target value="90">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of LDPs in participating communes
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Measures implementation of PCD and indicates efficiency and credibility of the planning process
</narrative></comment>
</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of post harvest infrastructure facilities constructed or rehabilitated
</narrative></title>
<baseline year="2026" iso-date="2026-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-09-15" />
<period-end iso-date="2030-06-15" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Youth
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-12-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LDPs prepared/updated promoting participation, social inclusion and are climate-informed
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-27" />
<target value="60.00">
<comment><narrative>
PCDs are prepared/updated promoting participation, social inclusion and are climate-informed
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2021" iso-date="2021-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-20" />
<period-end iso-date="2026-09-14" />
<target value="8,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="189">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2021" iso-date="2021-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-20" />
<period-end iso-date="2026-09-14" />
<target value="8,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="2170"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="9,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="189">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="2170"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="9,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="189">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="2170"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="9,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="189">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-08" />
<period-end iso-date="2026-03-10" />
<target value="85.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-08" />
<period-end iso-date="2026-03-10" />
<target value="85.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="85.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2026-06-16" />
<target value="750,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="398,362">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2026-06-16" />
<target value="750,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="227,068">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural infrastructures constructed and/or rehabilitated
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="23">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="398,362"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2030-06-15" />
<target value="850,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="398,362">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="398,362"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2030-06-15" />
<target value="850,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="398,362">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="398,362"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="850,000">
<comment><narrative>
The new CRI was added to replace the custom indicator that initially existed. The end target was increased from 750,000 and has been phased to reflect the new timeline due to the AF.
</narrative></comment>
</target>
<actual value="39,8362">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="3,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="3,300">

</target>
<actual value="3300">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="3,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="3,300">

</target>
<actual value="3300">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="3,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="3,300">
<comment><narrative>
The same target is maintained but has been phased to reflect the new timeline due to the AF.
</narrative></comment>
</target>
<actual value="3300">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="64,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="240,000">

</target>
<actual value="6,4000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="64,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="240,000">

</target>
<actual value="6,4000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="64,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="240,000">
<comment><narrative>
The new CRI was added to replace the custom indicator that initially existed and has been phased to reflect the new timeline due to the AF.
</narrative></comment>
</target>
<actual value="6,4000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of primary schools rehabilitated in KEdougou
</narrative></title>
<baseline year="2026" iso-date="2026-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-12-15" />
<period-end iso-date="2030-06-15" />
<target value="35">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of climate-smart socio-economic sub-projects
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="450.00">
<comment><narrative>
Identifies number of climate-smart socio-economic sub-project supported by the Project
</narrative></comment>
</target>
<actual value="185">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of entrepreneurs (MSMEs) receiving in kind grants or cash support
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="800">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in women and youth participation in CBO governance structures
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="35.00">
<comment><narrative>
Assess participation of women and youth in the governance of livelihood activities
</narrative></comment>
</target>
<actual value="17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition, and population services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of supported school management committees (CGEs) with at least 40% female membership
</narrative></title>
<baseline year="2026" iso-date="2026-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-09-15" />
<period-end iso-date="2030-06-15" />
<target value="90">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of supported school management committees (CGEs) with at least 40% female membership
</narrative></title>
<baseline year="2026" iso-date="2026-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-09-15" />
<period-end iso-date="2030-06-15" />
<target value="90">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of climate-smart socio-economic sub-projects
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-28" />
<target value="330.00">
<comment><narrative>
Identifies number of climate-smart socio-economic sub-project supported by the Project
</narrative></comment>
</target>
<actual value="185">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient all-weather roads rehabilitated (secondary and tertiary)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="260.00">
<comment><narrative>
Indicator to measure improvement to road network
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="2170"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="9,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="189">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">

</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regular users of digital services (CDD app and Digital Agriculture services)
</narrative></title>
<baseline year="2021" iso-date="2021-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-20" />
<period-end iso-date="2026-09-28" />
<target value="3,000.00">
<comment><narrative>
Assess users of digital innovations
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="3,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="3,300">

</target>
<actual value="3300">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communes more transparent through disseminating information on local planning processes and results
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Communes complying with criteria for enhanced transparency as detailed in project POM
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">
<comment><narrative>
This CRI indicator was added automatically by OPCS in July 2024. This CRI will be adjusted
later in coordination with OPCS in the coming months.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of entrepreneurs (MSMEs) receiving in kind grants or cash support
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="800">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of LDPs in participating communes
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Measures implementation of PCD and indicates efficiency and credibility of the planning process
</narrative></comment>
</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LDPs prepared/updated promoting participation, social inclusion and are climate-informed
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-27" />
<target value="60.00">
<comment><narrative>
PCDs are prepared/updated promoting participation, social inclusion and are climate-informed
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-08" />
<period-end iso-date="2026-03-10" />
<target value="85.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-12-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of grievances related to project activities addressed within agreed service standards
</narrative></title>
<baseline year="2026" iso-date="2026-07-15" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-07-15" />
<period-end iso-date="2030-06-15" />
<target value="90">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-smart socio-economic sub-projects
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="450.00">
<comment><narrative>
Identifies number of climate-smart socio-economic sub-project supported by the Project
</narrative></comment>
</target>
<actual value="185">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female beneficiaries saying they have a say in community decision-making
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="75.00">
<comment><narrative>
Women beneficiaries saying they have a say in community decision-making
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communes more transparent through disseminating information on local planning processes and results
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Communes complying with criteria for enhanced transparency as detailed in project POM
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient all-weather roads rehabilitated (secondary and tertiary)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="260.00">
<comment><narrative>
Indicator to measure improvement to road network
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in women and youth participation in CBO governance structures
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="35.00">
<comment><narrative>
Assess participation of women and youth in the governance of livelihood activities
</narrative></comment>
</target>
<actual value="17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of LDPs in participating communes
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Measures implementation of PCD and indicates efficiency and credibility of the planning process
</narrative></comment>
</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase  in the number of females who can access health services within 60 minutes in select project areas
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="70,000.00">
<comment><narrative>
Indicator to assess enhance access to services for women
</narrative></comment>
</target>
<actual value="9,239">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of inclusive and resilient value chain strategies
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Assess preparation of value chain assessments, per methodology defined in the POM
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural Mobility Plans developed promoting social inclusion and are climate-informed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="12">
<comment><narrative>
RMPs prepared following PIM methodology are adopted by Departmental Authorities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who can access regional size markets within 120 minutes in project area
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="700,000.00">
<comment><narrative>
Indicator to measure increase access to markets. The monitoring will be disaggregated by age, gender and those with mobility impairments.
</narrative></comment>
</target>
<actual value="18,735">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Casamance Knowledge Management Platform established and operational
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2030-06-15" />
<target value="Yes">
<comment><narrative>
Establishment and operation of KMP
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of livelihoods sub-projects
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="16,000.00">
<comment><narrative>
Indicator to assess number of beneficiaries of livelihood interventions
</narrative></comment>
</target>
<actual value="9,239">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers trained in entrepreneurship and/or new agricultural skills
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="20,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of economic inclusion programs
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="20,000">
<comment><narrative>
The new CRI was added and has been phased to reflect the new AF timeline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total number of farmers trained in entrepreneurship and/or new agricultural skills
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="20,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New job opportunities created as a result of project activities
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="30000">
<comment><narrative>
The new CRI was added and has been phased to reflect the new AF timeline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
LDPs prepared/updated promoting participation, social inclusion and are climate-informed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="60.00">
<comment><narrative>
PCDs are prepared/updated promoting participation, social inclusion and are climate-informed
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2021" iso-date="2021-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-20" />
<period-end iso-date="2026-09-14" />
<target value="8,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="189">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2021" iso-date="2021-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-20" />
<period-end iso-date="2026-09-14" />
<target value="8,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="2170"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="9,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="189">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="2170"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="9,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="189">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries reporting an increase in annual income as a result of benefiting from agricultural services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="2170"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="9,000.00">
<comment><narrative>
Increase in income for female beneficiaries
</narrative></comment>
</target>
<actual value="189">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of climate-smart socio-economic sub-projects
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-28" />
<target value="330.00">
<comment><narrative>
Identifies number of climate-smart socio-economic sub-project supported by the Project
</narrative></comment>
</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area managed sustainably
</narrative></title>
<baseline year="2021" iso-date="2021-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-10" />
<period-end iso-date="2026-09-20" />
<target value="6,000.00">
<comment><narrative>
Area of land managed sustainably
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of population within 5 kms of an all-weather road
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2026-09-21" />
<target value="15.00">
<comment><narrative>
Increase access to all weather road in participating localities
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-08" />
<period-end iso-date="2026-03-10" />
<target value="85.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-08" />
<period-end iso-date="2026-03-10" />
<target value="85.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="85.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2026-06-16" />
<target value="750,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="398,362">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2026-06-16" />
<target value="750,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="227,068">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="398,362"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2030-06-15" />
<target value="850,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="398,362">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="398,362"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2030-06-15" />
<target value="850,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="398,362">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="398,362"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="850,000">
<comment><narrative>
The new CRI was added to replace the custom indicator that initially existed. The end target was increased from 750,000 and has been phased to reflect the new timeline due to the AF.
</narrative></comment>
</target>
<actual value="39,8362">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Individuals in Casamance who obtain civil documentation
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="25,000">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Entrepreneurs (MSMEs) receiving in kind grants or cash support
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="800">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of grievances related to project activities addressed within agreed service standards
</narrative></title>
<baseline year="2026" iso-date="2026-07-15" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-07-15" />
<period-end iso-date="2030-06-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="3,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="3,300">

</target>
<actual value="3300">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="3,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="3,300">

</target>
<actual value="3300">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="3,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="3,300">
<comment><narrative>
The same target is maintained but has been phased to reflect the new timeline due to the AF.
</narrative></comment>
</target>
<actual value="3300">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="64,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="240,000">

</target>
<actual value="6,4000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="64,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="240,000">

</target>
<actual value="6,4000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="64,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="240,000">
<comment><narrative>
The new CRI was added to replace the custom indicator that initially existed and has been phased to reflect the new timeline due to the AF.
</narrative></comment>
</target>
<actual value="6,4000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Local Mobility Plans developed promoting social inclusion and are climate-informed
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-21" />
<target value="9.00">
<comment><narrative>
RMPs prepared following PIM methodology are adopted by Departmental Authorities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural infrastructure constructed and/or rehabilitated
</narrative></title>
<baseline year="2026" iso-date="2026-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-09-15" />
<period-end iso-date="2030-06-15" />
<target value="23">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="5,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of inclusive and resilient value chain strategies
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="85.00">
<comment><narrative>
Assess preparation of value chain assessments, per methodology defined in the POM
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient all-weather roads rehabilitated (secondary and tertiary)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="260.00">
<comment><narrative>
Indicator to measure improvement to road network
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of targeted communities reporting improved satisfaction with school governance
</narrative></title>
<baseline year="2026" iso-date="2026-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-07-15" />
<period-end iso-date="2030-06-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural infrastructures constructed and/or rehabilitated
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="23">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-09-14" />
<target value="0">
<comment><narrative>
This CRI indicator was added automatically by OPCS in July 2024. This CRI will be adjusted
later in coordination with OPCS in the coming months.
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in project target areas provided with improved access to climate resilient socio-economic services (disaggregated by females and youth) (number)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2026-06-16" />
<target value="750,000.00">
<comment><narrative>
Number of persons having access to and use of project-built infrastructure and services (e.g., all weather roads, water, schools, health services, markets, trainings, etc.). This indicator should also be disaggregated by gender and youth. The target for women beneficiaries is 50% and youth 40%.
</narrative></comment>
</target>
<actual value="227,068">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Youth
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-12-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="90.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who can access regional size markets within 120 minutes in project area
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-15" />
<target value="650,000.00">
<comment><narrative>
Indicator to measure increase access to markets. The monitoring will be disaggregated by age, gender and those with mobility impairments.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries surveyed that feel project investments reflected their needs (disaggregated by females and youth) (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-09-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-08" />
<period-end iso-date="2026-03-10" />
<target value="85.00">
<comment><narrative>
Measures perception of community members on project investments. Percentage of community members based upon sample.
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Female
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-12-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Rural Mobility Plans developed promoting social inclusion and are climate-informed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="12">
<comment><narrative>
RMPs prepared following PIM methodology are adopted by Departmental Authorities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New job opportunities created as a result of project activities
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="30000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female beneficiaries saying they have a say in community decision-making
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="75.00">
<comment><narrative>
Women beneficiaries saying they have a say in community decision-making
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Casamance Knowledge Management Platform established and operational
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2030-06-15" />
<target value="Yes">
<comment><narrative>
Establishment and operation of KMP
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hectares of irrigated land benefiting from improved water management
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="3,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="3,300">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient all-weather roads rehabilitated (secondary and tertiary)
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-21" />
<target value="250.00">
<comment><narrative>
Indicator to measure improvement to road network
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase  in the number of females who can access health services within 60 minutes in select project areas
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2030-06-15" />
<target value="70,000.00">
<comment><narrative>
Indicator to assess enhance access to services for women
</narrative></comment>
</target>
<actual value="9,239">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hectares of irrigated land benefiting from improved water management
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="3,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2030-06-15" />
<target value="3,300">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regular users of digital services (CDD app and Digital Agriculture services)
</narrative></title>
<baseline year="2021" iso-date="2021-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-20" />
<period-end iso-date="2026-09-28" />
<target value="3,000.00">
<comment><narrative>
Assess users of digital innovations
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of inclusive and resilient value chain strategies
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2030-06-15" />
<target value="85.00">
<comment><narrative>
Assess preparation of value chain assessments, per methodology defined in the POM
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient all-weather roads rehabilitated (secondary and tertiary)
</narrative></title>
<baseline year="2022" iso-date="2022-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-06" />
<period-end iso-date="2026-09-21" />
<target value="250.00">
<comment><narrative>
Indicator to measure improvement to road network
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regular users of digital services (CDD app and Digital Agriculture services)
</narrative></title>
<baseline year="2021" iso-date="2021-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-20" />
<period-end iso-date="2026-09-28" />
<target value="3,000.00">
<comment><narrative>
Assess users of digital innovations
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Casamance Knowledge Management Platform established and operational
</narrative></title>
<baseline year="2021" iso-date="2021-09-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-19" />
<period-end iso-date="2030-06-15" />
<target value="Yes">
<comment><narrative>
Establishment and operation of KMP
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P124018</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SENEGAL - Sustainable and Inclusive Agribusiness Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to develop inclusive commercial agriculture and sustainable land management in project areas]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Sustainable and Inclusive Agribusiness Project for Senegal is to develop inclusive commercial agriculture and sustainable land management in project areas. The project has three components. The first component is support to sector actors. This component will support up to nine rural communities in Northern Senegal (Saint Louis and Louga regions) through technical assistance to ensure that land user rights are allocated to private operators in an inclusive and sustainable way, benefiting the broader community. It has following three sub-components: (i) improved rural communities and small-scale farmers' capacity; (ii) improved selected key stakeholders' capacity; and (iii) support to the land management process. The second component is development of irrigation infrastructure and sustainable natural resources management. This component will finance public irrigation infrastructure in the Ngalam valley and around Lac de Guiers. It will provide matching grants to small-scale farmers and small and medium enterprises (SMEs) for the establishment of tertiary irrigation systems as well as inputs packages for smallholders. It has following three sub-components: (i) irrigation infrastructure and water resources management in the project areas; (ii) matching grants; and (iii) sustainable management of classified forests and natural reserves. The third component is project coordination, management, communication, monitoring and evaluation. It has following three sub-components: (a) coordination and project management; (b) impact monitoring and evaluation; and (c) communication.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0005445"><narrative>Minister of Economy and Finance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0005444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-01-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-12-19"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nicolas Ahouissoussi</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nahouissoussi@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247532" />
            <name><narrative>Ngalam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.063061 -16.466669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251254" />
            <name><narrative>Lac de Guier</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.23889 -15.84028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="31140" percentage="88" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="9" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="82.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="1" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="1" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="1" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="4" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="1" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="86" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="2" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="1" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="4" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="1" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="4" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="2" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="2" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="2" xml:lang="en"><narrative>Rural Markets</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">868333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">868333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">868333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">868333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">868333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">868333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">651250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">651250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">651250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">16793376.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">16793376.07</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">80000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-10000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-236493</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">938269</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">3821744</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">178352</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">208818</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">278518</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">321316</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">58715</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">237704</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">385855</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">76202</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">373620</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">1473144</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">184903</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">122041</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">135778</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">614892</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">240480</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">678726</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">334839</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">402074</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">611544</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">95222</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">314658</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">269380</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">41918</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">318388</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">841408</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">1070141</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">762788</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">230819</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">1121344</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">876239</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">400573</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">862345</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">1865078</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">260646</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">292415</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">640915</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">1328013</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">337579</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">2202532</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">382700</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">3587459</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">1970395</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">599304</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">2033939</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">1047138</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">2235217</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">1233942</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-60327</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">3268284</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">2163330</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">1720353</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">1030167</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">3058075</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">5164095</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">1962251</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">2881153</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">1184113</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">103802</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">277808</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">1553486</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-2012</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-13541</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-18975</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-22124</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-28561</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-33097</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-41871</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-48410</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-56182</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-69504</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-81868</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-111270</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-140425</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-178885</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-223058</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-224934</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-217206</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-231317</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-215955</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-226788</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-213143</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-232464</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-216644</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-215770</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-591996</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-597782</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-607552</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-39000</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-569961</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-614499</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5444"><narrative>Ministry of Agriculture and Rural Equipment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P124018"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P124018?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P124018"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of forest trees planted
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="700000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="729268.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the water flow of the Ngalam River course per second
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="15.00">
<comment><narrative>
Increase in the water flow of the Ngalam River course
</narrative></comment>
</target>
<actual value="16.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of small and medium farmers who adopted an improved agricultural technology promoted by the project
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2017-11-15" />
<target value="3000.00">

</target>
<actual value="1815.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Target producers with use rights recorded as a result of the project
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="14249.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in private investments in project areas
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2017-11-15" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;Unit is in Million US$&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people trained on the use of tools to secure land tenure rights
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="3,000.00">

</target>
<actual value="9,990.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of land conflicts resolved through local land management entities
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="40.00">
<comment><narrative>
12 conflicts resolved out of the 33 registered
</narrative></comment>
</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in private investments in project areas
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100,000,000.00">
<comment><narrative>
Increase in private investments in project areas
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average productivity per hectare for farmers inside the blocks for sweet potatoes
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Target producers with use rights recorded as a result of the project
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="600.00">
<comment><narrative>
Target producers with use and ownership rights recorded as a result of the project
</narrative></comment>
</target>
<actual value="14,249.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people trained on the use of tools to secure land tenure rights
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="9990.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average productivity per hectare for farmers inside the blocks  for Onion
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="27.00">

</target>
<actual value="23.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of small and medium farmers who adopted an improved agricultural technology promoted by the project
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="3,000.00">

</target>
<actual value="1,815.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2017-11-15" />
<target value="6980.00">

</target>
<actual value="20846.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Carbon stored in forest ecosystems and emissions avoided from deforestation and forest degradation
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2017-11-15" />
<target value="200000.00">

</target>
<actual value="189745.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of small and medium farmers inside the blocks participating in inclusive business models
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="15.00">
<comment><narrative>
Proportion of small and medium farmers inside the blocks participating in inclusive business models
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries trained on Sustainable Land and Water Management
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="3843.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area under management plans
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="32507.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of local conventions implemented for the management of protected areas
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area secured and registered in the Land Registries at the Communes' level
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="77530.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Carbon stored in forest ecosystems and emissions avoided from deforestation and forest degradation
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="200,000.00">
<comment><narrative>
Carbon stored in forest ecosystems and emissions avoided from deforestation and forest degradation estimated based on GEF tools.
</narrative></comment>
</target>
<actual value="189,745.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Secured land plots registered in the Land Information System (NICAD Number)
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="20,000.00">
<comment><narrative>
8761 NICAD number have been attributed at this point covering 38,356ha
</narrative></comment>
</target>
<actual value="77,530.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area under management plans
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="25,000.00">

</target>
<actual value="32,507.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of management committees for protected areas created and operationnalised
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="50.00">

</target>
<actual value="56.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="6,980.00">
<comment><narrative>
Direct project beneficiaries
</narrative></comment>
</target>
<actual value="20,846.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Recovery rate of fees in areas provided with water management services by the project
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Pending to the completion of irrigation infrastructures.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the water flow of the Ngalam River course per second
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="16.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area protected by boundaries and signs
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="50,000.00">

</target>
<actual value="12,507.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Secured land area under a tripartite agreement between local authorities (Commune)/Investor/Community
</narrative></title>
<baseline year="2013" iso-date="2013-12-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-19" />
<period-end iso-date="2020-12-31" />
<target value="4,500.00">

</target>
<actual value="2,213.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of forest trees planted
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="1,000,000.00">

</target>
<actual value="29,268.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of jobs created in project areas
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="4,000.00">
<comment><narrative>
Number of jobs created in project areas
</narrative></comment>
</target>
<actual value="5,337.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of land (and conflict-related issues) management entities set in place
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="36.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with irrigation and drainage services
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="5,000.00">
<comment><narrative>
Area provided with irrigation and drainage services
</narrative></comment>
</target>
<actual value="9,720.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Secured land plots registered in the Land Information System (NICAD Number)
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="77530.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of annual agricultural outputs from project developed areas
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2017-11-15" />
<target value="70000.00">

</target>
<actual value="124874.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with irrigation and drainage services
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="1000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="2017-11-15" />
<target value="5000.00">

</target>
<actual value="1320.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Land Occupation and Use Mapping (POAS) established
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of management committees for protected areas created and operationnalised
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="56.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons trained in forest inventory, mapping, GPS use and natural resources management
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="216.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Secured land area under a tripartite agreement between local authorities (Commune)/Investor/Community
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="2213.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Land Bureaux equipped and functionning
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of annual agricultural outputs from project developed areas
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="70,000.00">
<comment><narrative>
based on the pilot operation in NGnith on 200ha and on the GIE&amp;#39;s supproted by the Project production
</narrative></comment>
</target>
<actual value="124,874.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average productivity per hectare for farmers inside the blocks  for Onion
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="23.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area secured and registered in the Land Registries at the Communes' level
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="20,000.00">

</target>
<actual value="77,530.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of small and medium farmers inside the blocks participating in inclusive business models
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2017-11-15" />
<target value="15.00">
<comment><narrative>
&lt;p&amp;gt;To be assessed when all irrigation&amp;nbsp;schemes will be completed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Land Bureaux equipped and functionning
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="9.00">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons trained in forest inventory, mapping, GPS use and natural resources management
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="250.00">

</target>
<actual value="216.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity to monitor GHG emissions in project areas is demonstrated
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="Yes">
<comment><narrative>
Capacity to monitor GHG emissions in project areas is demonstrated
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of land (and conflict-related issues) management entities set in place
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="45.00">

</target>
<actual value="36.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area where sustainable land management practices have been adopted as a result of the project
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="5,000.00">
<comment><narrative>
Land area where sustainable land management practices have been adopted as a result of the project
</narrative></comment>
</target>
<actual value="11,329.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries trained on Sustainable Land and Water Management
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="5,000.00">

</target>
<actual value="3,843.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Land Occupation and Use Mapping (POAS) established
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="9.00">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area protected by boundaries and signs
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="55000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="67507.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Recovery rate of fees in areas provided with water management services by the project
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of jobs created in project areas
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2017-11-15" />
<target value="4000.00">

</target>
<actual value="5337.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average productivity per hectare for farmers inside the blocks for sweet potatoes
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2020-12-31" />
<target value="27.00">

</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of land conflicts resolved through local land management entities
</narrative></title>
<baseline year="2017" iso-date="2017-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity to monitor GHG emissions in project areas is demonstrated
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of local conventions implemented for the management of protected areas
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2020-12-31" />
<target value="9.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area where sustainable land management practices have been adopted as a result of the project
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2017-11-15" />
<target value="5000.00">

</target>
<actual value="11329.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P097181</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Nutrition Enhancement Program II</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Second Phase objective is to expand access to and enhance nutritional conditions of vulnerable populations, in particular thoseaffecting growth of children under five in poor urban and rural areas. The extent to which this objective is attained in the intervention areas by 2011 will be measured by: (i) an increase in overall program coverage of children under five in rural areas from 15 percent in 2006 to 40 percent in 2011; (ii) an increase in the prevalence of exclusive breastfeeding among 0-6 month old infants by 30 percent; and (iii) at least 40 percent of pregnant women and children under five are sleeping under insecticide-treated bed nets.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Nutrition Enhancement Project for Senegal aims to enhance nutritional conditions of vulnerable populations, in particular those affecting growth of children under five in poor urban and rural areas. The project consists of the following components: I: This component corresponds to a package of community services and activities inclluding: community-based growth monitoring and promotion/community-based integrated management of childhoodd illnesses, and micronutrient. II: This component continues the work begun during the first phase by involving sector ministries in a more formal and systematic manner. On the basis of existing sector development plans, areas of collaboration will be identified, with particular emphasis on strengthening the planning capacity. III: The main functions of the official group for the reduction of malnutrition (CLM's) are to ensure that nutrition remains high on the national development agenda and to maintain oversight of the National Policy Letter on Nutrition and Development (PLND) implementation. The program will continue to strengthen the performance of the CLM and its decentralized representations at the regional level by enhancing the discussions on nutrition-relevant issues as well as promoting the participation of stakeholders, including local government representatives who will play a more important role in the second phase of the program.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2006-07-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-11-13"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-06-14"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-06-14"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Meint Mulder</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mmuldersibanda@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="12110" percentage="6" xml:lang="en"/><sector vocabulary="1" code="12240" percentage="13" xml:lang="en"/><sector vocabulary="1" code="12250" percentage="13" xml:lang="en"/><sector vocabulary="1" code="13020" percentage="6" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="58" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="47.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="33.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="7" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="29" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="14" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="15" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="15" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="7" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="14" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="14" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="7" xml:lang="en"><narrative>Access to Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">371287.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">371287.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">371287.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">376237.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">376237.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">376237.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">376237.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">376237.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">376237.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">376237.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">376237.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">376237.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">376237.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">376237.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">376237.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">376237.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">376237.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">376237.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">252475.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">252475.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">252475.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">371287.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">371287.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">371287.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">252475.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">252475.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">252475.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">252475.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">252475.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">252475.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">247524.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">247524.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">247524.74</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">247524.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">247524.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">247524.74</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">148514.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">148514.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">148514.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">148514.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">148514.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">148514.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">148514.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">148514.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">148514.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">163366.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">163366.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">163366.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">84158.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">84158.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">84158.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">84158.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">84158.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">84158.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">84158.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">84158.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">84158.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">79207.92</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">79207.92</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">79207.93</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">59405.94</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">59405.94</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">59405.94</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">371287.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">371287.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">371287.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">376237.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">376237.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">376237.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">376237.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">376237.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">376237.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">376237.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">376237.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">376237.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">376237.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">376237.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">376237.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">376237.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">376237.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">376237.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">252475.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">252475.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">252475.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">371287.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">371287.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">371287.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">252475.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">252475.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">252475.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">252475.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">252475.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">252475.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">247524.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">247524.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">247524.74</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">247524.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">247524.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">247524.74</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">148514.85</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">148514.85</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">148514.85</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">148514.85</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">148514.85</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">148514.85</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">148514.85</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">148514.85</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">148514.85</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">163366.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2014-06-14"/>
<value currency="USD" value-date="2014-06-14">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2014-06-14"/>
<value currency="USD" value-date="2014-06-14">0.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P097181"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P097181?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P097181"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nutrition indicators are integrated in monitoring tools and documents of Poverty Reduction Strategy and Millennium Development Goals
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2013-06-14" />
<target value="Yes">

</target>
<actual value="Yes">
<comment><narrative>
End-of-project target achieved. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Infants exclusively breastfed for the first six months (in the intervention areas)
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="34.00"><comment><narrative>National level estimate (Source DHS 2005)</narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="65.00">

</target>
<actual value="68.00">
<comment><narrative>
End-of-Project target has already been surpassed.  Variation is due to data source being population surveys (Source: LQAS surveys).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Long-lasting insecticide-treated malaria nets purchased and/or distributed (number)
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2012-05-14" />
<target value="500000.00">

</target>
<actual value="500000.00">
<comment><narrative>
Activity is completed and met end of project target (Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Pregnant women and children under five years of age sleeping under insecticide-treated bed nets in intervention areas
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="12.00"><comment><narrative>The baseline value (national estimate) is from 2005 DHS</narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="75.00">

</target>
<actual value="82.00">
<comment><narrative>
End-of-Project target has been surpassed and performance continues to go up (Source: LQAS surveys)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 6-23 months receiving yearly a minimum of 90 micronutrient sprinkles sachets for three months in intervention areas
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="2014-06-14" />
<target value="30.00">

</target>
<actual value="0.00">
<comment><narrative>
This activity has not yet started due to delay in UNICEF procurement of the micronutrient powders.  Formative research onacceptability is currently being conducted.  Once powders arrive, the distribution is ready to start immediately.  Target willlikely be met but only towards the end of the project.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mothers of targeted children participating in monthly information and education session in intervention areas
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="90.00">

</target>
<actual value="90.00">
<comment><narrative>
Participation is subject to seasonal variation but stays on or above the end-of-project target
(Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Backyard garden in intervention areas
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="350.00">

</target>
<actual value="0.00">
<comment><narrative>
The preparations took more time than foreseen due to the development of protocols with two different ministries (agriculture andlivestock).  Communities have been sensitized and organized and the actual roll out of food diversification activities will startin the coming weeks. The target will likely be reached after the project closes.
(Source: ProjectMonitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of child growth promotion in children under two years old and revision of anemia prevention and control strategy by MOHP
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2013-06-14" />
<target value="Yes">

</target>
<actual value="Yes">
<comment><narrative>
End-of-project target achieved. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Backyard garden in intervention areas
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="350.00">

</target>
<actual value="0.00">
<comment><narrative>
This activity will start in January 2014.  The development of training and monitoring tools took time to finalize.
(Source:ProjectMonitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 6-23 months receiving yearly a minimum of 90 micronutrient sprinkles sachets for three months in intervention areas
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="2014-06-14" />
<target value="30.00">

</target>
<actual value="0.00">
<comment><narrative>
This activity has not yet started due to delay in UNICEF procurement of the micronutrient powders.  Distribution is expected tostart in January 2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Pregnant women making at least four prenatal care visits (in intervention areas)
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="60.00">

</target>
<actual value="63.00">
<comment><narrative>
End-of-Project target has already been surpassed (Source: LQAS Survey)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of child growth promotion in children under two years old and revision of anemia prevention and control strategy by MOHP
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2013-06-14" />
<target value="Yes">

</target>
<actual value="Yes">
<comment><narrative>
End-of-project target achieved. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Target number of insecticide treated bed nets distributed
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2012-05-14" />
<target value="100.00">

</target>
<actual value="100.00">
<comment><narrative>
End-of-project target achieved. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Long-lasting insecticide-treated malaria nets purchased and/or distributed (number)
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2012-05-14" />
<target value="500000.00">

</target>
<actual value="500000.00">
<comment><narrative>
Activity is completed and met end of project target (Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 6-59 month receiving high preventive doses of vitamin A supplements twice yearly (in intervention areas)
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="79.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="90.00">

</target>
<actual value="94.00">
<comment><narrative>
Coverage remains above the end-of-project target (Source: LQAS survey).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted LGs having incorporated nutrition objectives and interventions in Local Development Plans
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="35.00">

</target>
<actual value="34.00">
<comment><narrative>
(Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Pregnant women making at least four prenatal care visits (in intervention areas)
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="60.00">

</target>
<actual value="61.00">
<comment><narrative>
End-of-Project target has been met (even surpassed in last ISR).
(Source: LQAS Survey)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children aged 0-24 months showing adequate monthly weight gain
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="80.00">

</target>
<actual value="82.00">
<comment><narrative>
End-of-Project target has already been surpassed (Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Target number of insecticide treated bed nets distributed
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2012-05-14" />
<target value="100.00">

</target>
<actual value="100.00">
<comment><narrative>
End-of-project target achieved. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nutrition indicators are integrated in monitoring tools and documents of Poverty Reduction Strategy and Millennium Development Goals
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2013-06-14" />
<target value="Yes">

</target>
<actual value="Yes">
<comment><narrative>
End-of-project target achieved. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children in primary education receiving weekly micronutrient supplements in school year period
</narrative></title>
<baseline year="2006" iso-date="2006-12-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-27" />
<period-end iso-date="2014-06-14" />
<target value="90.00">

</target>
<actual value="0.00">
<comment><narrative>
There has been a supply problem due to regulations causing a stock out.  Process for approval is underway.
(Source: ProjectMonitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 6-59 month receiving high preventive doses of vitamin A supplements twice yearly (in intervention areas)
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="79.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="90.00">

</target>
<actual value="94.00">
<comment><narrative>
Coverage remains above the end-of-project target (Source: LQAS survey).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted LGs having incorporated nutrition objectives and interventions in Local Development Plans
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="35.00">

</target>
<actual value="34.00">
<comment><narrative>
The target has practically been met. There has not been a new round of LDP development which explains the lack of movement in theindicator.
(Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Overall program coverage of children under the age of five in rural areas
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="70.00">

</target>
<actual value="72.60">
<comment><narrative>
Coverage has exceeded its target and performance continues to go up (Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mothers of targeted children participating in monthly information and education session in intervention areas
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="90.00">

</target>
<actual value="94.00">
<comment><narrative>
Participation is subject to seasonal variation but stays on or above the end-of-project target.
(Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children in primary education receiving weekly micronutrient supplements in school year period
</narrative></title>
<baseline year="2006" iso-date="2006-12-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-27" />
<period-end iso-date="2014-06-14" />
<target value="90.00">

</target>
<actual value="100.00">
<comment><narrative>
The supply problem due to regulations from the last ISR has been solved. Indicator is back on track, exceeding the end-of-projecttarget.
(Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Pregnant women and children under five years of age sleeping under insecticide-treated bed nets in intervention areas
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="12.00"><comment><narrative>The baseline value (national estimate) is from 2005 DHS</narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="75.00">

</target>
<actual value="86.00">
<comment><narrative>
End-of-Project target has been exceeded and performance continues to go up (Source: LQAS surveys)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Infants exclusively breastfed for the first six months (in the intervention areas)
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="34.00"><comment><narrative>National level estimate (Source DHS 2005)</narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="65.00">

</target>
<actual value="63.00">
<comment><narrative>
The slight drop in exclusive breastfeeding rate is due to: (i) continued scaling up to new Local Government Areas which have lowerrates of exclusive breastfeeding, thus bringing down the average; and (ii) seasonal influences related to agricultural labor.  Thesuccess of the program is shown by the fact that the average is still at 63 percent implying that the outcome is much higher in theexisting implementation areas. Hence we can safely consider that the target has been met. (Source: LQAS surveys).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Overall program coverage of children under the age of five in rural areas
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="70.00">

</target>
<actual value="65.00">
<comment><narrative>
Coverage is subject to seasonal variation but stays on or above the end-of-project target (Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children aged 0-24 months showing adequate monthly weight gain
</narrative></title>
<baseline year="2006" iso-date="2006-11-27" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-11-27" />
<period-end iso-date="2014-06-14" />
<target value="80.00">

</target>
<actual value="83.00">
<comment><narrative>
End-of-Project target has surpassed the target and continues to go up.
(Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P113801</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SN - Economic Governance Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is now “to enhance Senegal's investment climate through improvements in economic governance and the efficiency of commercial justice”. For the purpose of this project, economic governance means the policy, institutional, and behavioral framework that govern the activities of the private sector while efficiency of commercial justice refers to the speed of decisions of justice and the ease of access to justice for commercial cases. Revised PDO outcome indicators are: •	Number of cases pursued by CENTIF doubled from 12 to 24 by 2016;•	The average time to enforce a commercial contract is reduced from 780 to 529 days by 2016;•	Increase in the number of decisions taken per year at the TRHCD on Commercial Cases.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Economic Governance Project for Senegal is to improve aspects of the functioning of the justice sector relevant to the investment climate. There are four components to the project. The first component of the project is improving the investment climate. This component will focus on legal reforms that are necessary to improve the investment climate. These reforms will complement the ones already carried out and those ongoing aimed at making Senegal 1 of the 10 countries with the best business enabling environment in Sub-Saharan Africa. The second component of the project is improving court performance and user-friendliness. The objective of this component is to enable the judicial system to more effectively play its role as warrantor of the rules regarding economically relevant activities and transactions. Examples will be to provide for fair and efficient commercial dispute resolution, effective protection of property rights, and predictable enforcement of legally binding rules. The third component of the project is strengthening the demand-side for economic governance. The main objective of the component is to support complementary demand-side activities by stimulating demand for effective and efficient investigation of money laundering cases, more transparent procurement of goods and services, as well as fostering business-led actions against corruption. The fourth component of the project is strengthening CEDAF (Cellule d'Execution Administrative et Financiere - Implementing Unit of the Justice Sector Reform Program) and project implementation support. The objective of this component is two-fold. First, it will strengthen the CEDAF to enable it to implement the Justice Sector program successfully and become a center of excellence in the public administration. Second, component four will provide the implementation support to ensure that the project meets its development objective.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0002701"><narrative>Ministry of Justice</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0002701"><narrative>Ministry of Justice</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0002701"><narrative>Ministry of Justice</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0002700"><narrative>CEDAF</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-07-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-04-08"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jean Michel N. Marchat</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jmarchat@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243940" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.58333 -16.27194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244802" />
            <name><narrative>ThiEs</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.83417 -17.10611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244991" />
            <name><narrative>Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.77073 -13.66734</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245704" />
            <name><narrative>SEdhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70806 -15.55694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246451" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.33333 -15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248752" />
            <name><narrative>Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.65587 -13.25544</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249222" />
            <name><narrative>Louga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.61867 -16.22436</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250645" />
            <name><narrative>KEdougou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.5579 -12.1743</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250805" />
            <name><narrative>Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.1825 -16.25333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251007" />
            <name><narrative>Kaffrine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.10594 -15.5508</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251910" />
            <name><narrative>Fatick</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.28333 -16.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252308" />
            <name><narrative>Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -16.1</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.444059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="15126" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15131" percentage="25" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YF" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BG" percentage="72.0000000" xml:lang="en"><narrative>FY17 - Law and Justice</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="1" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="80" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="80" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000423" percentage="1" xml:lang="en"><narrative>Personal and Property Rights</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="1" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="19" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000422" percentage="52" xml:lang="en"><narrative>Legal Institutions for a Market Economy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="19" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000423" percentage="1" xml:lang="en"><narrative>Personal and Property Rights</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="1" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="19" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">158333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">158333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">158333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">158333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">58333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">58333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">58333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">58333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">627530.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">627530.83</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">8000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-322571</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">824170</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">113000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">102396</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">321811</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">250051</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">61519</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">18491</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">13239</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">85358</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">63001</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">41654</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">106430</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">62684</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">98920</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">71998</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">226329</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">39282</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">61018</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">177112</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">224571</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">42852</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">66933</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">174953</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">100353</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">97317</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">286844</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">28298</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">291658</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">181396</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">81020</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">47732</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">427120</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">72022</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">77249</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">90710</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">81799</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">135893</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">579891</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">150129</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">63509</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">63277</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">104950</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">121212</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">123442</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">174464</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">106365</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">97486</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">185259</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">454004</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-98701</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-4206</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-4807</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-6775</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-7754</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-10617</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-12772</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-14512</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-15187</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-20459</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-22239</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-25257</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-25535</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-26412</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-26906</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-26249</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-25602</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-25546</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-25978</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-26369</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-25570</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-26627</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-23068</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-24581</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-23432</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-21295</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-25099</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-23254</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-22953</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-23031</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-22747</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-70317</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-70905</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-70782</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-68465</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-63938</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-66078</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-65457</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-66096</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-66975</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-67246</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-68120</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-294</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-67842</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2700"><narrative>CEDAF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113801"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P113801?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113801"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of receivable cases investigated by ARMP increased  from 0% to 80% between 2009 and 2016.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="80.00">

</target>
<actual value="64.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of receivable cases investigated by ARMP increased  from 0% to 80% between 2009 and 2016.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="80.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of cases pursued by CENTIF doubled from 12 to 24 by 2016.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="24.00">

</target>
<actual value="171.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in the average time to enforce contracts through mediation from 770 days in judicial court to 90 days for half of judicialactions that will be subject to court-annexed mediation.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="770.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="90.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The No-bribe integrity pact is adopted by 50 firms
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="50.00">

</target>
<actual value="77.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of decisions taken per year at the Tribunal Rgional Hors Classe de Dakar on Commercial Cases.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="947.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="1020.00">

</target>
<actual value="1027.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of cases pursued by CENTIF doubled from 12 to 24 by 2016.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="24.00">

</target>
<actual value="125.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of decisions taken per year at the Tribunal Rgional Hors Classe de Dakar on Commercial Cases.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="947.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="1020.00">

</target>
<actual value="1371.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of decisions taken per year at the Tribunal Rgional Hors Classe de Dakar on Commercial Cases.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="947.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="1020.00">

</target>
<actual value="1371.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Judges and staff of justice sector trained
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="125.00">

</target>
<actual value="400.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Judges and staff of justice sector trained
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="125.00">

</target>
<actual value="400.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The No-bribe integrity pact is adopted by 50 firms
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="50.00">

</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of cases pursued by CENTIF doubled from 12 to 24 by 2016.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="24.00">

</target>
<actual value="164.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to enforce a commercial contract
</narrative></title>
<baseline year="2010" iso-date="2010-03-12" value="780.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-12" />
<period-end iso-date="2016-06-30" />
<target value="529.00">

</target>
<actual value="740.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Senegal's index rating for protecting investors
</narrative></title>
<baseline year="2010" iso-date="2010-03-12" value="3.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-12" />
<period-end iso-date="2016-06-30" />
<target value="4.3">

</target>
<actual value="4.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The No-bribe integrity pact is adopted by 50 firms
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="50.00">

</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Senegal's index rating for protecting investors
</narrative></title>
<baseline year="2010" iso-date="2010-03-12" value="3.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-12" />
<period-end iso-date="2016-06-30" />
<target value="4.3">

</target>
<actual value="4.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Judges and staff of justice sector trained
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="125.00">

</target>
<actual value="400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to enforce a commercial contract
</narrative></title>
<baseline year="2010" iso-date="2010-03-12" value="780.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-12" />
<period-end iso-date="2016-06-30" />
<target value="529.00">

</target>
<actual value="500.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Senegal's index rating for protecting investors
</narrative></title>
<baseline year="2010" iso-date="2010-03-12" value="3.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-12" />
<period-end iso-date="2016-06-30" />
<target value="4.3">

</target>
<actual value="4.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in the average time to enforce contracts through mediation from 770 days in judicial court to 90 days for half of judicialactions that will be subject to court-annexed mediation.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="770.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="90.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of receivable cases investigated by ARMP increased  from 0% to 80% between 2009 and 2016.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="80.00">

</target>
<actual value="64.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to enforce a commercial contract
</narrative></title>
<baseline year="2010" iso-date="2010-03-12" value="780.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-12" />
<period-end iso-date="2016-06-30" />
<target value="529.00">

</target>
<actual value="740.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in the average time to enforce contracts through mediation from 770 days in judicial court to 90 days for half of judicialactions that will be subject to court-annexed mediation.
</narrative></title>
<baseline year="2010" iso-date="2010-03-03" value="770.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-03" />
<period-end iso-date="2016-06-30" />
<target value="90.00">

</target>
<actual value="740.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P120629</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Second Sustainable and Participatory Energy Management (PROGEDE II)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to increase the availability of diversified household fuels in a sustainable way, and to increase the income of affected communities while preserving the forest ecosystems.This will be met by: (i) Increasing wood-fuels production;(ii) Increasing alternative household fuels for cooking purposes(iii) Reducing deforestation in target zones;(iv)  Reducing net CO2 emissions through the regeneration and protection of forests put under sustainable management;(v) Increasing income of participating villages, and local communities, with special attention to women, both from charcoal production and other income generating activities;(vi) completing the reform of the charcoal value chain; and(vii) improving the training, information, and participation of women in alleconomic activities and improving their participation in decision-making institutions and processes.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Second Phase of the Sustainable and Participatory Energy Management Project for Senegal is to contribute to increase the availability of diversified household fuels in a sustainable and gender equitable way, and to contribute to increase the income of participating communities while preserving the forest ecosystems. There are four components to the project: i) the institutional reforms of the charcoal value chain will address the political economy and equity issues (income and decision making) particularly in the (supplying) regions, and in the country as a whole. It will support central and decentralized government, local government, as well as communities for a full implementation of the reform; ii) the sustainable wood fuels supply management will finance technical assistance, logistical support and equipment to central and decentralized forestry services, local collectivities, including Community-Based Organizations (CBOs) and Non Governmental Organizations (NGOs) involved in forest/natural resource management/biodiversity and environmental-social protection activities; and communities to carry out; iii) the promotion and diversification of modern household energy will finance technical assistance, logistical means and equipment for the Directorate of Petroleum Products and Household Energy (DPHE) and private entrepreneurs to support massive production and dissemination of improved stoves and alternative wood fuel; and iv) the institutional arrangements for project implementation will support government institutions and community organizations to play their rightful role in scaling up the program; hence the consultants will play a more catalytic, supportive, and advisory role.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0004085"><narrative>Government of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0004086"><narrative>Direction des Eaux et Forêts</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-05-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-06-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Awa Seck</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244990" />
            <name><narrative>Region de Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.91667 -13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244994" />
            <name><narrative>Tamba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.88333 -15.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245661" />
            <name><narrative>Vallee du Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.16667 -14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246451" />
            <name><narrative>Region de Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.33333 -15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247179" />
            <name><narrative>Parc National du Niokolo-Koba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.00769 -12.91459</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248753" />
            <name><narrative>Region de Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.16667 -13.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Region de Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250804" />
            <name><narrative>Region de Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14 -16</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303937" />
            <name><narrative>Region de Sedhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70683 -15.55801</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31210" percentage="26" xml:lang="en"/><sector vocabulary="1" code="31261" percentage="74" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LB" percentage="0.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Biomass</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="53.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LW" percentage="0.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Wind</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LU" percentage="0.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LI" percentage="0.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Geothermal</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="83" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="6" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="6" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="83" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="6" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="12" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="83" xml:lang="en"><narrative>Rural Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">482500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">276666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">203333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">75350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">88333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">581108.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">581108.83</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">15000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-250820</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">1038597</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">58693</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">242875</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">120327</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">103370</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">257348</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">98918</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">167938</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">86291</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">121988</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">216544</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">33348</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">276342</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">997916</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">286002</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">368776</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">128200</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">116873</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">129548</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">560510</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">307789</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">230764</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">570007</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">413290</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">246042</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">918647</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">45644</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">563723</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">280495</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">340376</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">148166</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">101580</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">85300</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">181769</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">81741</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">87075</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">138324</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">255922</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">456152</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">77088</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">140105</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">99049</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">220842</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">118453</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">141770</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">125454</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">36880</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">371289</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">448294</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">154112</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">82546</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">248023</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">130239</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">101653</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">106729</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">177176</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">40126</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">23288</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">113004</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">133282</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">249811</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">144332</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">85478</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-13339</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-4921</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-6269</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-8573</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-12847</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-19331</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-24341</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-28894</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-30914</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-36760</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-37218</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-40256</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-42773</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-47579</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-49694</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-49989</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-50224</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-50012</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-50650</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-51635</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-50070</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-52372</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-45166</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-48723</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-45310</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-41696</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-49148</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-45535</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-44946</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-45098</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-44523</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-137693</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-138843</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-138602</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-134066</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-125861</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-129392</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-128175</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-129427</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-131147</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-131678</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-133390</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-575</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-132789</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4086"><narrative>Direction des Eaux et Forêts</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P120629"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P120629?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P120629"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Extension of community based sustainable forest management in the regions of Kedougou, Kolda, Kolda, Sedhiou and Tambacounda
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="400000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-29" />
<target value="725000.00">

</target>
<actual value="997263.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Restauration of degraded land in the regions of Kaolack and Tambacounda
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-29" />
<target value="60000.00">

</target>
<actual value="87185.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Extension of biodiversity management in Matam area
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="52000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-29" />
<target value="92000.00">

</target>
<actual value="235502.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5. Contribute to the increase of income of participating villages, with special attention to women
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="18000000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-06-29" />
<target value="34000000.00">

</target>
<actual value="70616685.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Establishment of a mapping and inventory office
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-28" />
<target value="0.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3. Reduce deforestation in target zones
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-06-29" />
<target value="71000.00">

</target>
<actual value="74127.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase alternative household fuels
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-06-29" />
<target value="5.00">

</target>
<actual value="2.85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4. Reduce net CO2 emissions
</narrative></title>
<baseline year="2010" iso-date="2010-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-24" />
<period-end iso-date="2018-06-29" />
<target value="2850000.00">

</target>
<actual value="3220826.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase direct/indirect beneficiaries numbers from sustainable forest management
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="108000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-29" />
<target value="260000.00">

</target>
<actual value="328126.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dissemination of improved stoves
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="500000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-29" />
<target value="920000.00">

</target>
<actual value="806253.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase Charcoal Production in Forests Under Sustainable Management
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="44000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-29" />
<target value="130000.00">

</target>
<actual value="388112.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Increase sustainable wood-fuels  production
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="180000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-06-29" />
<target value="1875000.00">

</target>
<actual value="2514400.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the quantity of CO2 sequestration
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-29" />
<target value="1800000.00">

</target>
<actual value="2070000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the annual share of charcoal sold at market prices by local communities
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-29" />
<target value="40.00">

</target>
<actual value="83.46">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Charcoal briquettes production from agricultural residues
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-29" />
<target value="1500.00">

</target>
<actual value="580.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installation of biodigestors in target areas
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-29" />
<target value="250.00">

</target>
<actual value="124.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in direct/indirect beneficiary numbers from household energy
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="250000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2018-06-29" />
<target value="575000.00">

</target>
<actual value="1126034.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P176544</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Adaptive Safety Net</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the project is to strengthen the social protection system in Senegal.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Adaptive Safety Net Project is to strengthen the social protection system in Senegal. This project has four components. 1) The first component, Strengthening the Core Delivery Systems for Social Protection, has the following sub-components: (i) Update, extension and quality enhancement of the National Social Registry (RNU); (ii) Decentralized delivery of frontline services; and (iii) Payment system and Grievance Redress Mechanism (GRM). 2) The second component, Promoting equity, resilience and productive inclusion, has the following sub-components: (i) Accompanying measures on human capital and productive inclusion for National Cash Transfer Program (PNBSF) beneficiaries; (ii) Productive inclusion program - Yokk Koom Koom; and (iii) Agricultural Resilience Program. 3) The third component, Providing shock-responsive assistance, has the following sub-components: (i) Delivering assistance in response to covariate shock; and (ii) Contingency Emergency Response. 4) The fourth component, Institutional support, project management and evaluation, has the following sub-components: (i) Institutional support and capacity building; and (ii) Project management and evaluation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0049033"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0049032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-03-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-07-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-05-21"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-05-21"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Stephanie Brunelin</narrative></person-name><telephone>+1-202-473-1000</telephone><email>sbrunelin@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245704" />
            <name><narrative>Sedhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70806 -15.55694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249782" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.8939 -14.94125</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250805" />
            <name><narrative>Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.15197 -16.07259</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251007" />
            <name><narrative>Kaffrine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.10594 -15.5508</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="74020" percentage="51" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="45" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="2" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="89.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="39" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="61" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="37" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="37" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="37" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000223" percentage="37" xml:lang="en"><narrative>Youth Employment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="37" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="100" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000722" percentage="37" xml:lang="en"><narrative>Rural Non-farm Income Generation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="14" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="37" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="61" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="37" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="39" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="41" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="99" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="56" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">2083333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2083333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-21"/>
<value currency="USD" value-date="2027-05-21">51360768.05</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-21"/>
<value currency="USD" value-date="2027-05-21">51360768.05</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">7608349</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">81871</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">112698</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">4332412</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">541246</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">4928426</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">1607739</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">5058297</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">6457580</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">1817501</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">882641</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">5952378</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">2615931</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">3401362</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">2608561</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">632239</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-35676</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-67589</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-68058</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-104782</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-141045</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-209933</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-337161</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49032"><narrative>Ministry of Community Development and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176544"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P176544?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176544"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Programs using the RNU for targeting purposes
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="35.00">
<comment><narrative>
Number of programs using the RNU to identify and select program beneficiaries. Cumulative over time.
</narrative></comment>
</target>
<actual value="35">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash transfers (incl. PNBSF) delivered digitally
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="60.00">
<comment><narrative>
Since no PNBSF payments were made over the past year—which, in previous years, were paid in cash through post offices—and all other payments are now processed digitally, this indicator currently stands at 100%. However, it remains unclear whether the payment mechanism under the relaunched PNBSF will be digital or not.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households benefiting from productive support programs
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="70,100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="200,100.00">
<comment><narrative>
Of the 15,000 PRA beneficiaries, 7,255 have already received their payments, and the process is ongoing. Accompanying measures under the Yokk Koom Koom program are being implemented. Payments are planned for early 2026.
</narrative></comment>
</target>
<actual value="112,558">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash transfers (incl. PNBSF) delivered digitally
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="60.00">
<comment><narrative>
Since there were no PNBSF payments made over the past year (which continue to be paid in cash via the post offices) and all other payments are digital, this indicator amounts to 100%.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-22" />
<period-end iso-date="2027-05-31" />
<target value="481,000.00">
<comment><narrative>
This indicator was now calculated using the CSC methodology, estimating the total number of people in the households benefitting from safety net programs (since there is an unknown overlap of beneficiaries among the different programs, only the largest program was considered). Going forward, the end target, which is still expressed in number of households, will need to be amended to also reflect the number of people.
</narrative></comment>
</target>
<actual value="3,550,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and grievances addressed within the time limit specified in the PIM
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="80.00">
<comment><narrative>
A workshop was held in September to review and enhance the MGP mechanism and tools, with the aim of updating procedures for receiving and addressing grievances.
</narrative></comment>
</target>
<actual value="92">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-22" />
<period-end iso-date="2027-05-31" />
<target value="481,000.00">
<comment><narrative>
This indicator was now calculated using the CSC methodology, estimating the total number of people in the households benefitting from safety net programs (since there is an unknown overlap of beneficiaries among the different programs, only the largest program was considered). Going forward, the end target, which is still expressed in number of households, will need to be amended to also reflect the number of people.
</narrative></comment>
</target>
<actual value="3,550,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quality of implementation of the PNBSF
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="6.00">
<comment><narrative>
There were no payments and no sensitization sessions for over one year.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of cash transfers (incl. PNBSF) who receive their payment according to schedule
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="70.00">
<comment><narrative>
7,255 out of the 12,576 were done in October 2025 and thus in the timeframe defined by the operational manual. The remainder as well as the shock-response payments (4,482 food insecurity, 70 fire, and 2,201 flood response were delayed).
</narrative></comment>
</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women receiving cash grants under the productive inclusion package
</narrative></title>
<baseline year="2022" iso-date="2022-03-22" value="74.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-22" />
<period-end iso-date="2027-05-31" />
<target value="80.00">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Programs with MIS interoperable with the RNU
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="3.00">
<comment><narrative>
Only the MIS of the PNBSF is interoperable with the RNU so far.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quality of implementation of the PNBSF
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="6.00">
<comment><narrative>
There were no payments and no sensitization sessions for over one year. However, progress was made in revising the sensitization sessions.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-13" />
<target value="29,6000">
<comment><narrative>
This represents the number of recipients of the productive inclusion and shock-response programs who receive their transfers via a code sent to their phone, which they use to withdraw cash.
</narrative></comment>
</target>
<actual value="20,4863">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of climate shocks response program
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="45,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="96,000.00">
<comment><narrative>
Flood, fire, and food security responses: Although assistance has already been provided to seventy households affected by fire, aid for individuals impacted by flooding and food insecurity has been delayed
</narrative></comment>
</target>
<actual value="99597">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Existence of a shock response program using ASP tools
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="Yes">
<comment><narrative>
The FSN is established by decree, with strategic documents and operational manuals developed. Key personnel are recruited.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Triggering mechanisms for shock responses are clearly defined in  the manual of operations
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households benefiting from productive support programs
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="70,100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="200,100.00">
<comment><narrative>
Of the 15,000 PRA beneficiaries, 12,756 have already received their payments, and the process is ongoing. Accompanying measures under the Yokk Koom Koom program are being implemented for 40,000. These will be accounted for in the indicator once the payment of the grant is delivered in early 2026.
</narrative></comment>
</target>
<actual value="117,912">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of cash transfers (incl. PNBSF) who receive their payment according to schedule
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="70.00">
<comment><narrative>
7,255 out of the 12,576 were done in October 2025 and thus in the timeframe defined by the operational manual. The remainder as well as the shock-response payments (4,482 food insecurity, 70 fire, and 2,201 flood response were delayed).
</narrative></comment>
</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of cash transfers (incl. PNBSF) who receive their payment according to schedule
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="70.00">
<comment><narrative>
Only the fire shock-response payments have been delivered on time. The payments for the agricultural resilience program, the food insecurity response program  and flood shock-response were/are delayed.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash transfers (incl. PNBSF) delivered digitally
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="60.00">
<comment><narrative>
Since no PNBSF payments were made over the past year—which, in previous years, were paid in cash through post offices—and all other payments are now processed digitally, this indicator currently stands at 100%. However, it remains unclear whether the payment mechanism under the relaunched PNBSF will be digital or not.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash transfers (incl. PNBSF) delivered digitally
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="60.00">
<comment><narrative>
Since there were no PNBSF payments made over the past year (which continue to be paid in cash via the post offices) and all other payments are digital, this indicator amounts to 100%.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Households in the RNU with updated socio-economic data (less than 4 years)
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="100.00">
<comment><narrative>
The mop-up data collection for the update and extension of the Registre National Unique (RNU) was completed in August 2025, resulting in a fully updated social registry, including 996,194 households and 7,796,049 individuals. This represents almost half of all Senegalese households.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Households in the RNU with updated socio-economic data (less than 4 years)
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="100.00">
<comment><narrative>
The mop-up data collection for the update and extension of the Registre National Unique (RNU) was completed in August 2025, resulting in a fully updated social registry.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and grievances addressed within the time limit specified in the PIM
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="80.00">
<comment><narrative>
A workshop was held in September 2025 to review and enhance the MGP mechanism and tools, with the aim of updating procedures for receiving and addressing grievances.
</narrative></comment>
</target>
<actual value="92">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Households in the RNU with updated socio-economic data (less than 4 years)
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="100.00">
<comment><narrative>
The mop-up data collection for the update and extension of the Registre National Unique (RNU) was completed in August 2025, resulting in a fully updated social registry, including 996,194 households and 7,796,049 individuals. This represents almost half of all Senegalese households.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of cash transfers (incl. PNBSF) who receive their payment according to schedule
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="70.00">
<comment><narrative>
Only the fire shock-response payments have been delivered on time. The payments for the agricultural resilience program, the food insecurity response program  and flood shock-response were/are delayed.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Existence of a shock response program using ASP tools
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="Yes">
<comment><narrative>
The FSN is established by decree, with strategic documents and operational manuals developed. Key personnel are recruited.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Programs using the RNU for targeting purposes
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="35.00">
<comment><narrative>
Number of programs using the RNU to identify and select program beneficiaries. Cumulative over time.
</narrative></comment>
</target>
<actual value="35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of climate shocks response program
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="45,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="96,000.00">
<comment><narrative>
This indicator encompasses flood, fire and food security responses. All payments have been late.
</narrative></comment>
</target>
<actual value="106280">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Programs with MIS interoperable with the RNU
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="3.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women receiving cash grants under the productive inclusion package
</narrative></title>
<baseline year="2022" iso-date="2022-03-22" value="74.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-22" />
<period-end iso-date="2027-05-31" />
<target value="80.00">

</target>
<actual value="72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Performance of the ASP system
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="12.00">
<comment><narrative>
The identification and selection of beneficiaries for ASP programs are based on the RNU. The RNU data is available and updated through surveys. There are data-sharing protocols in place. Some government ASP programs have interoperable MIS with the RNU MIS. Beneficiary lists are shared with payment operators, who track payments and then send follow-up reports. A complaint management system exists. Both beneficiaries and non-beneficiaries can submit complaints, but not all complaints are addressed, and they may be handled with delays. Decentralized agents of the Ministry are responsible for coordinating and supervising ASP program activities in most regions of the country. The mechanisms for coordination, monitoring, sharing, and reporting information among the various actors are defined, but their implementation is imperfect. The Ministry's ASP programs are coordinated, but the coordination is limited to the DGPSN and FSN programs.
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-13" />
<target value="29,6000">
<comment><narrative>
This represents the number of recipients of the productive inclusion and shock-response programs who receive their transfers via a code sent to their phone, which they use to withdraw cash.
</narrative></comment>
</target>
<actual value="224,192">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Triggering mechanisms for shock responses are clearly defined in  the manual of operations
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of cash transfers (incl. PNBSF) who receive their payment according to schedule
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="70.00">
<comment><narrative>
7,255 out of the 12,576 were done in October 2025 and thus in the timeframe defined by the operational manual. The remainder as well as the shock-response payments (4,482 food insecurity, 70 fire, and 2,201 flood response were delayed).
</narrative></comment>
</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of cash transfers (incl. PNBSF) who receive their payment according to schedule
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="70.00">
<comment><narrative>
Only the fire shock-response payments have been delivered on time. The payments for the agricultural resilience program, the food insecurity response program  and flood shock-response were/are delayed.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash transfers (incl. PNBSF) delivered digitally
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="60.00">
<comment><narrative>
Since no PNBSF payments were made over the past year—which, in previous years, were paid in cash through post offices—and all other payments are now processed digitally, this indicator currently stands at 100%. However, it remains unclear whether the payment mechanism under the relaunched PNBSF will be digital or not.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash transfers (incl. PNBSF) delivered digitally
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="60.00">
<comment><narrative>
Since there were no PNBSF payments made over the past year (which continue to be paid in cash via the post offices) and all other payments are digital, this indicator amounts to 100%.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Households in the RNU with updated socio-economic data (less than 4 years)
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="100.00">
<comment><narrative>
The mop-up data collection for the update and extension of the Registre National Unique (RNU) was completed in August 2025, resulting in a fully updated social registry, including 996,194 households and 7,796,049 individuals. This represents almost half of all Senegalese households.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Households in the RNU with updated socio-economic data (less than 4 years)
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="100.00">
<comment><narrative>
The mop-up data collection for the update and extension of the Registre National Unique (RNU) was completed in August 2025, resulting in a fully updated social registry.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Households in the RNU with updated socio-economic data (less than 4 years)
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="2027-05-31" />
<target value="100.00">
<comment><narrative>
The mop-up data collection for the update and extension of the Registre National Unique (RNU) was completed in August 2025, resulting in a fully updated social registry.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Performance of the ASP system
</narrative></title>
<baseline year="2022" iso-date="2022-03-16" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-16" />
<period-end iso-date="2027-05-31" />
<target value="12.00">
<comment><narrative>
The identification and selection of beneficiaries for ASP programs are based on the RNU. The RNU data is available and updated through surveys. There are data-sharing protocols in place. Some government ASP programs have interoperable MIS with the RNU MIS. Beneficiary lists are shared with payment operators, who track payments and then send follow-up reports. A complaint management system exists. Both beneficiaries and non-beneficiaries can submit complaints, but not all complaints are addressed, and they may be handled with delays. Decentralized agents of the Ministry are responsible for coordinating and supervising ASP program activities in most regions of the country. The mechanisms for coordination, monitoring, sharing, and reporting information among the various actors are defined, but their implementation is imperfect. The Ministry's ASP programs are coordinated, but the coordination is limited to the DGPSN and FSN programs.
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P161477</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Municipal Solid Waste Management Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to strengthen the governance of solid waste management in Senegal and improve solid waste management services in selected municipalities.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Municipal Solid Waste Management Project is to strengthen the governance of solid waste management in Senegal and improve solid waste management services in selected municipalities. This project has three components. 1) The first component, Strengthening Sector Governance and Institutional Capacity,has the following sub-components: (i) Operationalization of the existing laws and regulations governing SWM; and (ii) Technical assistance. 2) The second component,  Improving Solid  Waste Infrastructure and Services in Selected Agglomerations, has the following sub-components: (i) Improving waste management services for Greater Dakar;  (ii)  Establishing  integrated waste management systems in selected secondary agglomerations ; and (iii) Improving the livelihood of waste pickers. 3) The third component,  Project Implementation Support, aims to support implementation of all project activities in accordance with World Bank policies.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–00014174"><narrative>Ministry of Environment and Ecological Transition </narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–00014174"><narrative>Ministry of Environment and Ecological Transition </narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0030835"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0030835"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0030834"><narrative>PROMOGED</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2018-06-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-03-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jonas Ingemann Parby</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jparby@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243939" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.8 -16.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244388" />
            <name><narrative>Tivaouane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08519 -16.71058</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244800" />
            <name><narrative>Region de Thies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -16.86667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246451" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.33333 -15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248478" />
            <name><narrative>Mbour</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.40569 -16.85559</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248753" />
            <name><narrative>Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.16667 -13.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.28333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253435" />
            <name><narrative>Casamance</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.75 -15.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303937" />
            <name><narrative>Region de Sedhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70683 -15.55801</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14010" percentage="77" xml:lang="en"/><sector vocabulary="1" code="14050" percentage="23" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="84.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="15" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="91" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="11" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="54" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="15" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="15" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="15" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="91" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">582187.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">852625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">427375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">836500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">411375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">827875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">861250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">454375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">949625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">484000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">996000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1064500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">562250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1159625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">599250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1254375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1351125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">705875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1432625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">732375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1527125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1642500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">858000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1756875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">909875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1909625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2052750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1075000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2240250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1167000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">2428125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2557125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1337125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">2772875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1430250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2930750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">3015250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1554625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">3194125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1634750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">3339000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3457250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1783250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">3642500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1847750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3734375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">3769750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1907250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">3873500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1960500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">3955375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">4022125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">4130750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2089375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">4225125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">4288875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2168500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">4386250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">3435250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">76494103.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">76494103.47</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">12160000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">112840000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-27714570</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">1720652</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">1345458</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">2420465</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">1842859</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">1162922</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">1163909</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">2611568</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">1684283</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">1141638</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">1550406</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">1400815</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">776496</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">587727</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">4509490</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">8534878</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">8506640</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">7545689</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-299088</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-4149</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-176842</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-161845</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-4953</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-150268</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-8597</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-139848</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-17644</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-199886</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-25824</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-268040</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-33632</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-311903</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-42006</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-45171</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-516249</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-45995</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-589426</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-48116</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-605986</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-47769</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-700847</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-200143</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30834"><narrative>PROMOGED; PROMOGED - SONAGED SA</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P161477"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P161477?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P161477"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances received, recorded and acted upon within two weeks
</narrative></title>
<baseline year="2020" iso-date="2020-02-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-03" />
<period-end iso-date="2026-06-23" />
<target value="95.00">
<comment><narrative>
Percentage of project-related grievances received, recorded and acted upon within two weeks.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area of dumpsites rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="400000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW collection and transfer facilities constructed
</narrative></title>
<baseline year="2019" iso-date="2019-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-10" />
<period-end iso-date="2026-06-10" />
<target value="240">

</target>
<actual value="253">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area of dumpsites rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="400000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW recycled or disposed at sanitary landfills in selected municipalities of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with improvements in SWM services
</narrative></title>
<baseline year="2019" iso-date="2019-09-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-23" />
<period-end iso-date="2026-06-22" />
<target value="70.00">
<comment><narrative>
Percentage of beneficiaries who express their satisfaction towards improvements of SWM services through a beneficiary feedback survey.
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW recycled or disposed at sanitary landfills in selected municipalities of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of communal SWM plans elaborated by secondary cities that are beneficiaries of the project
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2026-06-09" />
<target value="97">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved SW services
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="3000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with improvements in SWM services
</narrative></title>
<baseline year="2019" iso-date="2019-09-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-23" />
<period-end iso-date="2026-06-22" />
<target value="70.00">
<comment><narrative>
Percentage of beneficiaries who express their satisfaction towards improvements of SWM services through a beneficiary feedback survey.
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from capacity building training, including central and local government officials, local communities, and entrepreneurs
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="3,000.00">

</target>
<actual value="1576">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical and institutional framework for intermunicipal coordination improved for SWM
</narrative></title>
<baseline year="2019" iso-date="2019-10-07" value="None."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-07" />
<period-end iso-date="2026-06-07" />
<target value="10 percent of the annual budget for O&amp;M identified in each of the intermunicipal SWM plans is spent">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sanitary landfills constructed and operational
</narrative></title>
<baseline year="2019" iso-date="2019-09-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-24" />
<period-end iso-date="2026-06-23" />
<target value="1">
<comment><narrative>
Cumulative number of sanitary landfills that were constructed and became operational through interventions of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from capacity building training, including central and local government officials, local communities, and entrepreneurs
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="3,000.00">

</target>
<actual value="1576">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Waste pickers provided with viable and sustainable opportunities for paid works or skills development training
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="1,500.00">
<comment><narrative>
Cumulative number, of waste pickers that benefited from opportunities for paid works or skills development training.
</narrative></comment>
</target>
<actual value="456">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances received, recorded and acted upon within two weeks
</narrative></title>
<baseline year="2020" iso-date="2020-02-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-15" />
<period-end iso-date="2028-06-15" />
<target value="95.00">
<comment><narrative>
Percentage of project-related grievances received, recorded and acted upon within two weeks.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Waste pickers provided with viable and sustainable opportunities for paid works or skills development training
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="1,500.00">
<comment><narrative>
Cumulative number, of waste pickers that benefited from opportunities for paid works or skills development training.
</narrative></comment>
</target>
<actual value="456">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances received, recorded and acted upon within two weeks
</narrative></title>
<baseline year="2020" iso-date="2020-02-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-15" />
<period-end iso-date="2028-06-15" />
<target value="95.00">
<comment><narrative>
Percentage of project-related grievances received, recorded and acted upon within two weeks.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW collection and transfer facilities constructed
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="240">

</target>
<actual value="253">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW collection and transfer facilities constructed
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="240">

</target>
<actual value="253">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sanitary landfills constructed and operational
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="1">
<comment><narrative>
Cumulative number of sanitary landfills that were constructed and became operational through interventions of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sanitary landfills constructed and operational
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="1">
<comment><narrative>
Cumulative number of sanitary landfills that were constructed and became operational through interventions of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical and institutional framework for intermunicipal coordination improved for SWM
</narrative></title>
<baseline year="2019" iso-date="2019-10-15" value="None."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-15" />
<period-end iso-date="2028-06-15" />
<target value="Adjusted to number of sites in secondary towns and number of tax databases, per subindicators">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from capacity building training, including central and local government officials, local communities, and entrepreneurs
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="3,000.00">

</target>
<actual value="1576">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with improvements in SWM services
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="70.00">
<comment><narrative>
Percentage of beneficiaries who express their satisfaction towards improvements of SWM services through a beneficiary feedback survey.
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical and institutional framework for intermunicipal coordination improved for SWM
</narrative></title>
<baseline year="2019" iso-date="2019-10-15" value="None."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-15" />
<period-end iso-date="2028-06-15" />
<target value="Adjusted to number of sites in secondary towns and number of tax databases, per subindicators">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from capacity building training, including central and local government officials, local communities, and entrepreneurs
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="3,000.00">

</target>
<actual value="1576">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with improvements in SWM services
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="70.00">
<comment><narrative>
Percentage of beneficiaries who express their satisfaction towards improvements of SWM services through a beneficiary feedback survey.
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of communal SWM plans elaborated by secondary cities that are beneficiaries of the project
</narrative></title>
<baseline year="2019" iso-date="2019-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-15" />
<period-end iso-date="2028-06-15" />
<target value="97">

</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of communal SWM plans elaborated by secondary cities that are beneficiaries of the project
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2026-06-09" />
<target value="97">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of communal SWM plans elaborated by secondary cities that are beneficiaries of the project
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2026-06-09" />
<target value="97">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of communal SWM plans elaborated by secondary cities that are beneficiaries of the project
</narrative></title>
<baseline year="2019" iso-date="2019-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-15" />
<period-end iso-date="2028-06-15" />
<target value="97">

</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area of dumpsites rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="315000">

</target>
<actual value="259243">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area of dumpsites rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="400000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area of dumpsites rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="400000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area of dumpsites rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="315000">

</target>
<actual value="259243">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW recycled or disposed at sanitary landfills in selected municipalities of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW recycled or disposed at sanitary landfills in selected municipalities of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW recycled or disposed at sanitary landfills in selected municipalities of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW recycled or disposed at sanitary landfills in selected municipalities of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved SW services
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="3000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sanitary landfills constructed and operational
</narrative></title>
<baseline year="2019" iso-date="2019-09-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-24" />
<period-end iso-date="2026-06-23" />
<target value="1">
<comment><narrative>
Cumulative number of sanitary landfills that were constructed and became operational through interventions of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved SW services
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="3000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved SW services
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="3000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved SW services
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="3000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical and institutional framework for intermunicipal coordination improved for SWM
</narrative></title>
<baseline year="2019" iso-date="2019-10-07" value="None."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-07" />
<period-end iso-date="2026-06-07" />
<target value="10 percent of the annual budget for O&amp;M identified in each of the intermunicipal SWM plans is spent">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Waste pickers provided with viable and sustainable opportunities for paid works or skills development training
</narrative></title>
<baseline year="2019" iso-date="2019-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-22" />
<period-end iso-date="2026-06-21" />
<target value="1,500.00">
<comment><narrative>
Cumulative number, of waste pickers that benefited from opportunities for paid works or skills development training.
</narrative></comment>
</target>
<actual value="456">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of communal SWM plans elaborated by secondary cities that are beneficiaries of the project
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2026-06-09" />
<target value="97">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances received, recorded and acted upon within two weeks
</narrative></title>
<baseline year="2020" iso-date="2020-02-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-03" />
<period-end iso-date="2026-06-23" />
<target value="95.00">
<comment><narrative>
Percentage of project-related grievances received, recorded and acted upon within two weeks.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical and institutional framework for intermunicipal coordination improved for SWM
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="None."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical and institutional framework for intermunicipal coordination improved for SWM
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="None."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical and institutional framework for intermunicipal coordination improved for SWM
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="None."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical and institutional framework for intermunicipal coordination improved for SWM
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="None."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Waste pickers provided with viable and sustainable opportunities for paid works or skills development training
</narrative></title>
<baseline year="2019" iso-date="2019-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-22" />
<period-end iso-date="2026-06-21" />
<target value="1,500.00">
<comment><narrative>
Cumulative number, of waste pickers that benefited from opportunities for paid works or skills development training.
</narrative></comment>
</target>
<actual value="456">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of communal SWM plans elaborated by secondary cities that are beneficiaries of the project
</narrative></title>
<baseline year="2019" iso-date="2019-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-15" />
<period-end iso-date="2028-06-15" />
<target value="97">

</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of communal SWM plans elaborated by secondary cities that are beneficiaries of the project
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2026-06-09" />
<target value="97">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of communal SWM plans elaborated by secondary cities that are beneficiaries of the project
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2026-06-09" />
<target value="97">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of communal SWM plans elaborated by secondary cities that are beneficiaries of the project
</narrative></title>
<baseline year="2019" iso-date="2019-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-15" />
<period-end iso-date="2028-06-15" />
<target value="97">

</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area of dumpsites rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="315000">

</target>
<actual value="259243">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area of dumpsites rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="400000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area of dumpsites rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="400000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area of dumpsites rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="315000">

</target>
<actual value="259243">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW recycled or disposed at sanitary landfills in selected municipalities of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW recycled or disposed at sanitary landfills in selected municipalities of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW recycled or disposed at sanitary landfills in selected municipalities of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW recycled or disposed at sanitary landfills in selected municipalities of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved SW services
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="3000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved SW services
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="3000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved SW services
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="3000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved SW services
</narrative></title>
<baseline year="2019" iso-date="2019-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-15" />
<period-end iso-date="2028-06-15" />
<target value="3000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved SW services
</narrative></title>
<baseline year="2019" iso-date="2019-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-14" />
<period-end iso-date="2026-06-14" />
<target value="3000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SW collection and transfer facilities constructed
</narrative></title>
<baseline year="2019" iso-date="2019-09-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-10" />
<period-end iso-date="2026-06-10" />
<target value="240">

</target>
<actual value="253">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P146469</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Tourism and Enterprise Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to create conditions necessary to increase private investment in tourism in the a??Salya?? area, and strengthen enterprise development in Senegal.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Tourism and Enterprise Development Project for Senegal is to create conditions necessary to increase private investment in tourism in the ‘Saly’ area, and strengthen enterprise development in Senegal. The project is aligned with the Government of Senegal(GoS)’ goal of ‘making the country an emerging economy by 2035’ as expressed in the first pillar of the country's strategic plan (PSE):‘Accelerating inclusive growth and creating employment’. This implies improving the investment climate and competitiveness of the Senegalese economy to promote growth, attraction of private investment, enterprise formation and growth, increased exports, and the development of Senegal as a regional tourism hub that would bring increased employment. There are three components. The first component, sustainable tourism development are in line with the Gos efforts to address coastal vulnerability under its Integrated Coastal Zone Management (ICZM) plan, which includes strategic measures for better coastal management, fight against coastal erosion, and measures for protecting economic investments. This component will provide support for advisory services, capacity building, destination planning and management activities, resilience measures to minimize coastal erosion due, in part, to climate change, new product and market development, and a mix of destination level investments in the Saly area. The second component, supporting enterprise creation and growth will be to further improve Senegal's investment climate with a view to establishing relevant business infrastructure to facilitate government-to-business services, enhance access to finance (risk capital), and other business development services. This component aims to contribute to the creation of innovative firms, foster the competitiveness of local enterprises, and improve their ability to strengthen their presence and growth into domestic, sub-regional, and international markets. The third component, project implementation will provide support to agency for promotion of investment and major works to manage and coordinate the project and provide resources to strengthen its capacity on procurement, financial management (FM), coastal management, environmental and social safeguards management, communication, and monitoring and evaluation (M&amp;E) through the provision of relevant advisory services.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0015138"><narrative>Ministere des Finances et du Budget</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0015139"><narrative>Agence pour la Promotion des Investissements et des Grands Travaux (APIX)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-11-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-04-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Farah Dib</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fdib@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243939" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.8 -16.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246421" />
            <name><narrative>Sali Niakhniakhal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.43498 -17.00063</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246452" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.01793 -16.48962</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246691" />
            <name><narrative>Petite Côte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -17</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248477" />
            <name><narrative>Mbour</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.42196 -16.96375</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.44406</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595222" />
            <name><narrative>Sali</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.44111 -17.01944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="33210" percentage="71" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="19" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="9" xml:lang="en"/><sector vocabulary="1" code="32130" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="26.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YT" percentage="58.0000000" xml:lang="en"><narrative>FY17 - Tourism</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YF" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Industry, Trade and Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="14" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="20" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="14" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="14" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="92" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="74" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="62" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000836" percentage="64" xml:lang="en"><narrative>Coastal Zone Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="20" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="62" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="64" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="14" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">74000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-3456266</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">2016869</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">3221004</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">54300</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">926289</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">2698879</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">393439</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">1641763</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">3755246</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">1601932</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">3709724</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">5112878</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">1611345</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">927747</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">8322887</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">1793386</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">947158</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">6896001</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">1242356</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">4942253</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">1915658</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">871703</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">2528335</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">1746470</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">1937438</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">1496644</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">2784725</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">5054657</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">3697819</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">1023749</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-18769</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-19450</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-27039</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-45227</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-96013</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-146499</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-182487</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-219518</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-213970</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-225146</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-275854</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-262715</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-263774</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-261562</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-268940</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-269204</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-398</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-268312</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1094647</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1116502</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1123892</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1174731</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1195650</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-590812</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-623753</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-15140"><narrative>Agence de Developpement et d'Encadrement des Petites et Moyennes Entreprises; Agence pour la Promotion des Investissements et des Grands Travaux (APIX); Minsitere du Tourisme et des Transports Aeriens</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P146469"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P146469?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P146469"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average reduction in time it takes to complete government-to-business services on investment platforms/OSSs
</narrative></title>
<baseline year="2017" iso-date="2017-01-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-04" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Results achieved based on data from one of three OSSs supported under the project (Saint-Louis)&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="47.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average increase in annual firm revenue among BPC beneficiaries (Percentage)
</narrative></title>
<baseline year="2017" iso-date="2017-01-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-04" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective public-private dialogue mechanisms for destination access and management are established
</narrative></title>
<baseline year="2017" iso-date="2017-01-04" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-04" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new workers employed by enterprises supported under the BPC/SMAF
</narrative></title>
<baseline year="2017" iso-date="2017-01-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-04" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This is only for BPC1 and a sample of SMAF firms and only refers to full time positions.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="359.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Firms benefiting from private sector initiatives
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="1890.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2022-06-30" />
<target value="3365.00">

</target>
<actual value="19121.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tourism sector beneficiaries who consider that the project is responsive to their views (citizen engagement)
</narrative></title>
<baseline year="2017" iso-date="2017-01-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-04" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of enterprises supported under the SMAF with increase in annual volume of exports from time of provision of support (Percentage)
</narrative></title>
<baseline year="2017" iso-date="2017-01-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-04" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This is for a sample of 57 firms and does not include the share of firms with a decline in exports (22%)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional and financial arrangements for exploiting and maintaining the infrastructures of the beaches have been defined and operationalized
</narrative></title>
<baseline year="2017" iso-date="2017-01-04" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-04" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of operational regional investment platforms/OSSs established
</narrative></title>
<baseline year="2017" iso-date="2017-01-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-04" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net area of beaches gained due to protection and restoration investments under the project in the intervention areas (according to defined criteria: sand beach for swimming, fisherman village areas -
</narrative></title>
<baseline year="2017" iso-date="2017-01-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-04" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="375000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of groins and breakwaters properly installed
</narrative></title>
<baseline year="2017" iso-date="2017-01-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-04" />
<period-end iso-date="2022-06-30" />
<target value="19.00">

</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Existence of a functional environmental and social management unit within the tourism development and planning company SAPCO
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P126470</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SN- Second Governance and Growth Support Credit</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ The proposed operation supports the Recipient&amp;rsquo;s efforts to improve economic governance by strengthening Government accountability, increasing public sector performance, and promoting growth through private sector development. The reforms supported by theoperation seek (i) to improve economic governance by strengthening accountability systems; (ii) to promote service delivery throughbetter governance and efficiency in the education, health and agriculture sectors, rationalization of agencies and strengthening monitoring and evaluation; and (iii) to enhance private sector development through energy sector reforms,&amp;nbsp;improvements in the investment climate, and&amp;nbsp;stimulating the tourism sector. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Second Governance and Growth Support Credit (GGSC II) for the Republic of Senegal is to improve the country's economic governance by strengthening government accountability, increasing public sector performance, and promoting growth through private sector development. The reforms supported by the operation seek 1) to improve economic governance by strengthening accountability systems; 2) to promote service delivery through better governance and efficiency in the education, health and agriculture sectors, rationalization of agencies and strengthening monitoring and evaluation; and 3) to enhance private sector development through energy sector reforms, and improvements in the investment climate. The GGSC II supports the National Strategy for Economic and Social Development (SNDES), the Senegal government's medium-term poverty reduction strategy for the period 2013-2017. The components of the SNDES, which are supported by the objectives of the GGSC II are: i) growth, productivity, and wealth creation ii) human capital, social protection and sustainable development, and iii) governance, institutions, peace, and security.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0006467"><narrative>Ministry of Economy and Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-05-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-12-19"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Edward Philip English</narrative></person-name><telephone>+1-202-473-1000</telephone><email>penglish@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15126" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="25" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="25" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="38.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="13" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="12" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="13" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="12" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="13" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="13" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="12" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="25" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="25" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">30000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">30000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">30184000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-139851</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-98915</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-108405</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-103137</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-103300</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-99547</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-103310</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-107206</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-101020</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-101782</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-101352</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-99098</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-105531</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-105461</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-102982</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-104777</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-95186</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-100184</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-97928</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-97222</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-97885</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-95546</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-97847</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-91701</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-260436</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-262360</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-4487</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-255448</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-268377</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-4336</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-262920</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6467"><narrative>Ministry of Economy and Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126470"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P126470?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126470"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P145585</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SENEGAL - Skills for jobs and competitiveness</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to strengthen the technical and vocational education and training (TVET) system and to improvethe employability of youth in selected priority sectors of the economy.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project development objective is to strengthen the TVET system for delivery of better quality and more relevant training in order to improve the employability of youth in selected priority sectors of the economy. The project will support investment and policy reforms that will: (i) improve the quality of training provided by LTs; (ii) improve the relevance and quality of vocational training centers; (iii) improve the competiveness of selected growth sectors; and (iv) provide opportunities for youth to enter the labor market with recognized skills. The proposed project will have three components: (i) improvement in the quality and relevance of training; (ii) reform of TVET sector?s financial system; (iii) support for system management, monitoring and evaluation (M&amp;E), and project management. Component one was created to improve the quality and relevance of training in the lycEes techniques, to establish a cluster of training centers for skills development in priority sectors; and create and implement a system for certification of skills. Component two aims to streamline and reinforce the funding instruments of the Government?s TVET policy in order to make them consistent with the sector reform as well as appropriate to the growing needs of the sector. Component three aims at improving the management of the TVET sector by strengthening the capacity of the Direction de la Formation Professionnelle et Technique (DFTP), the Directorate of Apprenticeship (DA), the unit responsible for communication and orientation, and the Unit for Studies and Planning (Cellule D?Etudes et de Planification-CEP).]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0014336"><narrative>Ministry of Economy, Finance, and Planning</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0014336"><narrative>Ministry of Economy, Finance, and Planning</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0014335"><narrative>Ministry of Professional Training</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-05-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-12-08"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-05-25"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-05-25"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hamoud Abdel Wedoud Kamil</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hkamil@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243940" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.58333 -16.27194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244170" />
            <name><narrative>Velingara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -14.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244177" />
            <name><narrative>Velingara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.15 -14.11667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244276" />
            <name><narrative>Toubere Bafal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.38333 -13.53333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244419" />
            <name><narrative>Tioukougne Peul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.44168 -16.72729</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244797" />
            <name><narrative>Thilogne</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.92389 -13.65778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244802" />
            <name><narrative>Thies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.83417 -17.10611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244805" />
            <name><narrative>Thiep</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.3 -14.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244979" />
            <name><narrative>Tanaf</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.64972 -15.42611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244991" />
            <name><narrative>Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.77073 -13.66734</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245704" />
            <name><narrative>Sedhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70806 -15.55694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246188" />
            <name><narrative>Saraya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.83167 -11.75381</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246436" />
            <name><narrative>Sakone</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.45 -16.7</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246452" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.01793 -16.48962</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246512" />
            <name><narrative>Rufisque</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72503 -17.27088</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246522" />
            <name><narrative>Rosso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.42028 -15.79834</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246544" />
            <name><narrative>Richard-Toll</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.4625 -15.70083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246737" />
            <name><narrative>Payar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.45 -14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246901" />
            <name><narrative>Oussouye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.485 -16.54694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247310" />
            <name><narrative>Niahene</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.01667 -15.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247520" />
            <name><narrative>Nganda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.83333 -15.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247552" />
            <name><narrative>Neteboulou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.57883 -13.78527</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248126" />
            <name><narrative>Naye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.4185 -12.20801</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248209" />
            <name><narrative>Mpal Keli</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.43333 -16.21667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248409" />
            <name><narrative>Mekhe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.1097 -16.6218</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248477" />
            <name><narrative>Mbour</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.42196 -16.96375</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248698" />
            <name><narrative>Mbake</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.79032 -15.90803</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248752" />
            <name><narrative>Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.65587 -13.25544</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248887" />
            <name><narrative>Mamari</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.04639 -13.71361</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248929" />
            <name><narrative>Mako</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.8555 -12.3506</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249281" />
            <name><narrative>Linguere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.3953 -15.1193</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249320" />
            <name><narrative>Leona Ndiaye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.715 -16.4573</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249437" />
            <name><narrative>Lagbar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.8329 -14.8107</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249493" />
            <name><narrative>Koussanar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.86667 -14.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249782" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.88333 -14.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249797" />
            <name><narrative>Koki</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5048 -15.9891</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250645" />
            <name><narrative>Kedougou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.5579 -12.1743</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250659" />
            <name><narrative>Kebemer</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.365 -16.4339</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250677" />
            <name><narrative>Kayar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91893 -17.11978</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250773" />
            <name><narrative>Karang</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.60778 -16.42694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251178" />
            <name><narrative>Haire Lao</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.39697 -14.32196</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251230" />
            <name><narrative>Guinguineo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.26667 -15.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251338" />
            <name><narrative>Mbaw</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.73192 -17.3274</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251470" />
            <name><narrative>Goudomp</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.57778 -15.87222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251490" />
            <name><narrative>Gossas Village</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.48409 -16.11377</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251911" />
            <name><narrative>Fatick</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.35806 -16.58583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252145" />
            <name><narrative>Doro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.7224 -15.3628</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252309" />
            <name><narrative>Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.64792 -16.24363</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252336" />
            <name><narrative>Diouloulou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.05 -16.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252568" />
            <name><narrative>Diembereng</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.46889 -16.78056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252737" />
            <name><narrative>Diana Malari</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.84833 -15.24972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252862" />
            <name><narrative>Dialakatoba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.3466 -12.04437</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253193" />
            <name><narrative>Darou Khoudos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.107 -16.8369</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.44406</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253375" />
            <name><narrative>Dagana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.47667 -15.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253453" />
            <name><narrative>Boye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.95 -16.21667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253522" />
            <name><narrative>Bounkiling</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.05 -15.7</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253901" />
            <name><narrative>Bignona</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.81028 -16.22639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254314" />
            <name><narrative>Bambey</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72 -16.61139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254441" />
            <name><narrative>Bakel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.90238 -12.45935</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595640" />
            <name><narrative>Diamniadio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72051 -17.1816</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="11330" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EW" percentage="86.0000000" xml:lang="en"><narrative>FY17 - Workforce Development and Vocational Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="16" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="4" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="84" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="42" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="84" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="4" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="4" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="84" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="4" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="42" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="42" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-25"/>
<value currency="USD" value-date="2021-05-25">2431477.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-25"/>
<value currency="USD" value-date="2021-05-25">2431477.17</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">35000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-698963</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">194537</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">2931034</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">631536</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">201715</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">171610</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">204426</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">117961</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">198978</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">505196</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">197409</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">111026</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">709068</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">195781</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">531743</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">229240</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">319870</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">2653900</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">94039</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">177406</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">1625436</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">260372</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">125220</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">134843</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">822046</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">1500406</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">71764</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">779342</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">961493</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">275301</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">470995</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">990126</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">199827</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">245497</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">718241</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">318309</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">389072</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">1558198</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">54272</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">2117879</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">69256</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">3216058</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">252348</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">1760888</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">127392</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">1544859</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">577397</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">1486209</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-452015</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2837</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-6151</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-9024</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-14354</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-17471</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-23169</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-27451</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-34193</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-47299</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-57710</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-67195</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-80742</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-101809</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-107573</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-128402</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-100054</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-119528</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-108422</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-105024</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-102747</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-93584</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-108543</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-100616</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-533398</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-527540</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-521363</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-484854</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-487838</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-490045</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-483366</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-480186</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-2675</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-470827</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-494903</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-17218</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-479532</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-14335"><narrative>Ministry of Professional Training</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P145585"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P145585?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P145585"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth graduating from tourism, poultry and horticulture training clusters (number), and the percentage of female graduating: Poultry, Horticulture, Tourism
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target missed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2140.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The annual sector statistical data are analyzed for decision making
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target met.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of trainees entrolled in short term training programs
</narrative></title>
<baseline year="2014" iso-date="2014-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="14883.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
% programs delivered by a professional trainer from the private sector in targeted institutions
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target met.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students enrolled in renovated sciences and technical programs in Lyces Techniques (number)
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="8846.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Unique Fund is established and functional for the financing and quality assurance of training centers (Yes/No, Custom)
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target met&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A project steering committee co-chaired by a private sector representative and including 50% from private and social  sectors meet at least twice a year
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target met.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of youth who graduated from short term skills development training
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator is judged to have been&amp;nbsp;achieved because once the training centers were reopened post-COVID 19, an additional 1,000 students had completed their training programs prior to submission of the ICR.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6746.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of short term programs offered
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of clusters established and functioning for tourism, poultry, and horticulture
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target met.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of performance-based contracts with training institutions
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target met.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="89870.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of TVET institutions with functioning Board of Directors
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="268.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of institutions with a Board of Directors chaired by the private sector
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Lyces Techniques that signed a performance contract to become a Lyce of excellence
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target met.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of institutions benefitting of funds froms the Fonds Unique
</narrative></title>
<baseline year="2014" iso-date="2014-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target exceeded.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="682.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P122476</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Public Financial Management Strengthening Technical Assistance Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is to enhance budget credibility, transparency and accountability mechanisms in the use and management of centralGovernment financial resources. The project aims to support the modernization of the Public Financial Management system and theimplementationof a Public Sector performance based system in Senegal. It includes five components: (1) Strengthening FiscalPolicies and Planning;2) Improving Budget Execution and Reporting Processes; (3) Strengthening the Capacity of External Audit andLegislative Oversight; (4) Project Management; and (5) Supporting the Implementation of a Public Sector Performance-BasedManagement and Results Monitoring System.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Public Financial Management Technical Assistance Project for Senegal is to enhanced credibility, transparency and accountability in the management and use of central government finances. There are four components to the project, the first component being strengthening fiscal policies and planning. This component aims at improving expenditures policy and allocations, including reduction of potential deficit financing. The second component is the improving budget execution processes. This component will support the on-going efforts by the Government of Senegal to strengthen budget execution processes. The third component is the strengthening the capacity of external audit and legislative oversight. This component aims at enhancing the external and legislative oversight in the management of public finances; and finally, the fourth component is the project management. This component will provide support for effective project coordination; administration; financial management; procurement; and monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0004690"><narrative>Ministry of Economy and Finances</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0004690"><narrative>Ministry of Economy and Finances</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0004691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-05-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-04-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Maimouna Mbow Fam</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mfam@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>Region de Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.283331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15117" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="100.000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="3" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="48" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="3" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="48" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="48" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="51" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="3" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">15000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-7096</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-875093</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">1261409</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">386109</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">37090</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">95472</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">858907</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">1052399</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">1625451</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">1010006</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1084209</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">861100</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">1235485</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">419657</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">372519</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">383319</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">180189</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">177272</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">1346816</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">4987499</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">505832</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">1947278</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">169839</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">270097</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">98474</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">235499</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">467420</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">1513564</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">285747</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">618280</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">201951</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1029551</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">102671</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">139208</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">1787484</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">1532177</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">846868</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">59972</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">573777</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">659343</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">36649</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">1182325</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">527108</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">73494</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">143530</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">535653</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">67443</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">9440</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">219554</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">32747</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">479764</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">577343</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">297525</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">41691</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">45900</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">177144</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">31764</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">18410</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">686519</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">393925</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">502490</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">699641</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-2928</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">3397843</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-18672</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-21213</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-3370</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-5283</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-5904</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-10190</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-16555</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-22543</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-26048</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-31681</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-5985</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-31544</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-6174</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-33190</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-19553</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-35777</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-33979</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-37663</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-43296</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-55094</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-39872</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-42966</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-66573</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-71524</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-45501</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-73617</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-46182</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-50251</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-77852</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-95946</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-50972</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-95473</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-50999</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-51669</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-101696</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-83201</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-45559</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-49048</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-95248</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-84707</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-45681</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-42090</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-75060</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-94887</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-49497</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-45923</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-84346</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-45343</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-82267</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-82394</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-45506</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-80453</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-44944</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-431633</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-421239</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-420508</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-136822</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-406746</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-132344</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-124244</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-381851</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-392565</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-127730</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-126528</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-388873</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-392671</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-127764</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-129462</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-397890</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-129986</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-398731</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-404691</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-131677</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-571</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1574</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-131136</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-403044</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-4691"><narrative>Cellule de Coordination des Reformes Financieres et Budgetaires</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122476"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P122476?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122476"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PEFA Indicator PI-21 = Effectiveness of Internal Audit
</narrative></title>
<baseline year="2007" iso-date="2007-11-15" value="C+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="D+">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PI-26 = Scope, Nature and Follow-up of External Audit
</narrative></title>
<baseline year="2007" iso-date="2007-11-15" value="D+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="C+">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A fully integrated budget and treasury management information system that interfaces with the other core systems, GAINDE, SIGTAS, DAIDA, Payroll/Pensions, NINEA, and Banks
</narrative></title>
<baseline year="2011" iso-date="2011-04-25" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Internal audit reports presented to and followed-up by Internal Audit Committees at MEF and line ministries.
</narrative></title>
<baseline year="2011" iso-date="2011-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="51.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Analytical work and other economic studies carried out in support of fiscal policies and management. Cost economic analysis of major investment programs are conducted (=&amp;gt; XOF 10 billion)
</narrative></title>
<baseline year="2011" iso-date="2011-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Timeline for the completion of the Annual external audits of Government Budget Review Act after Fiscal Year end
</narrative></title>
<baseline year="2011" iso-date="2011-04-25" value="36.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cost economic analysis of major investment programs (Costs greater than or equal to XOF 10 billion) are conducted
</narrative></title>
<baseline year="2011" iso-date="2011-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="69.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Production and adoption of multi-year programming documents of key sectors
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Ministries with fully costed sectoral strategies
</narrative></title>
<baseline year="2011" iso-date="2011-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="21.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Production of annual performance reports for key line ministries (Energy, Agriculture, Infrastructure, Basic Education, and Health)
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Persons trained in PFM across Ministries and Departments
</narrative></title>
<baseline year="2011" iso-date="2011-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="3325.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Performance contracts signed for the main agencies and SOEs
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="47.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal framework for public financial management revised to reflect WAEMU Directives
</narrative></title>
<baseline year="2011" iso-date="2011-04-25" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Production of monitoring indicator reports  on key PSE priority results of Energy, Agriculture, Infrastructures, Basic Education and Health on a bi-yearly basis
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average processing time for pensions and superannuation payments
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="6.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
DPI-3: Debt Management Strategy
</narrative></title>
<baseline year="2009" iso-date="2009-08-26" value="D+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-08-26" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="D">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PI-4 Stock and Monitoring of Expenditure Payment Arrears
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="B"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="D">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P175293</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal: DPF2 - Equitable and Resilient Recovery in Senegal</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective of this programmatic DPO is to enable equitable  and sustainable growth by: (I) increasing  resilience and productivity of households, and (ii) strengthening transparent and sustainable use of productive resources, and efficient management of fiscal accounts.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Second Equitable and Resilient Recovery Development Policy Financing for Senegal is to enable equitable and sustainable growth by: (i) increasing resilience and productivity of households, and (ii) strengthening transparent and sustainable use of productive resources, and efficient management of fiscal accounts. The program consists of policy reforms that will sustainably and equitably broaden access to healthcare, social assistance, and economic opportunities for women (pillar 1); and improve debt management and equitable tax revenue mobilization, while boosting the growth potential of the private sector, with a focus on access to finance and competitive private sector participation in the digital and energy sectors (pillar 2).]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0054249"><narrative>REPUBLIC OF SENEGAL</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0054250"><narrative>Ministry of Communication, Telecommunications and the Digital Economy</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2023-03-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-06-13"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Daniela Marotta</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dmarotta@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23330" percentage="20" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="10" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="10" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="10" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="9" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LC" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Oil and Gas</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="10" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="10" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="20" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="10" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="20" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="10" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="10" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="10" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="10" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="10" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="10" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="12" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="10" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="2" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="10" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="20" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="10" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="10" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="12" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="20" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="10" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="20" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="10" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="10" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="10" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="10" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="10" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="10" xml:lang="en"><narrative>Health Finance</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">300000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">300000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">280000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-54250"><narrative>Ministry of Communication, Telecommunications and the Digital Economy; Ministry of Women, Family and Child Protection</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">20000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-54250"><narrative>Ministry of Communication, Telecommunications and the Digital Economy; Ministry of Women, Family and Child Protection</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">20266750</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-54250"><narrative>Ministry of Communication, Telecommunications and the Digital Economy; Ministry of Women, Family and Child Protection</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">281614560</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-54250"><narrative>Ministry of Communication, Telecommunications and the Digital Economy; Ministry of Women, Family and Child Protection</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-212782</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-54250"><narrative>Ministry of Communication, Telecommunications and the Digital Economy; Ministry of Women, Family and Child Protection</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-170993</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-54250"><narrative>Ministry of Communication, Telecommunications and the Digital Economy; Ministry of Women, Family and Child Protection</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-167652</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-54250"><narrative>Ministry of Communication, Telecommunications and the Digital Economy; Ministry of Women, Family and Child Protection</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-181600</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-54250"><narrative>Ministry of Communication, Telecommunications and the Digital Economy; Ministry of Women, Family and Child Protection</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-179604</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-54250"><narrative>Ministry of Communication, Telecommunications and the Digital Economy; Ministry of Women, Family and Child Protection</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175293"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175293?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175293"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
(a) Share of pregnant schoolgirls receiving support to pursue their studies.
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
Target met. Calculation uses a weighted average using the number of girls as weighting.
</narrative></comment>
</target>
<actual value="83.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(b) Cumulative number of MTDS reports published since 2021.
</narrative></title>
<baseline year="2019" iso-date="2019-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
Target was met.
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in share of the value of public procurement contracts available to female-led firms.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
No data available. While ARCOP passed the necessary implementing regulation, no systematic data collection is in place. Progress show by: ARCOP has trained 900 women entrepreneurs in public procurement in 2023 and 2024
</narrative></comment>
</target>
<actual value="N.A.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of PPP transactions reaching commercial close following competitive procurement in accordance with the PPP law, the PPP decree and the ministerial orders.
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
Target was partially met.
</narrative></comment>
</target>
<actual value="33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Fixed broadband penetration rate (% of population)
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="0.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
Target was met.
</narrative></comment>
</target>
<actual value="1.97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(a) Cumulative number of fiscal risk assessments published since 2021.
</narrative></title>
<baseline year="2019" iso-date="2019-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
Target was met.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Flaring from the start of commercial oil and gas production.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
With Senegal's oil and gas production having only just begun by the time of assessment, there is no corresponding data available for the country
</narrative></comment>
</target>
<actual value="N.A.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
(b) Share of pregnant schoolgirls beneficiaries of support for school continuation who pursue their studies.
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
Target met. Calculation uses a weighted average using the number of girls as weighting.
</narrative></comment>
</target>
<actual value="69.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(a) Number of certified startups.
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
Target was not met.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total number of households registered in the RNU
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="250000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
Target was not met
</narrative></comment>
</target>
<actual value="541192">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Gas production volume available to the domestic market.
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Target not met. With gas production beginning only in January 2025 and Fortesa producing only a small quantity which is sold directly to SOCOCIM, there was no discernible impact on the production volume available to the domestic market at the time of assessment.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health insurance coverage rate
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="49"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
Target was not met. 53.2% as of 2020; new indicators increased from 55.8% to 58.5% (Total registered individuals with mutual health insurance) and 36.4% to 38.8% (Effective coverage by mutual health insurance companies)
</narrative></comment>
</target>
<actual value="53.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of total generation capacity in each year procured in line with the specific provisions of the Electricity Code's implementation decree and in line with LCDP.
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="&lt;10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
No generation projects have been awarded since the adoption of the relevant Decree.
</narrative></comment>
</target>
<actual value="N.A.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(b) Number of certified and professionally managed startup financing mechanisms.
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
Target was not met.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT Revenues (percent of non-oil GDP)
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="5.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="">
<comment><narrative>
Target was met.
</narrative></comment>
</target>
<actual value="6.3">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P051609</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SN-Priv Inv Promotion SIL (FY03)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project's development objective is to create the conditions to increase private investment. This will be accomplished through an improved investment climate, greater private participation in economic activities, and policy and sector reforms.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Private Investment Promotion Project for Senegal's development objective is to create the conditions to stimulate a sustained increase in private investment through an improved investment climate, greater private participation in economic activities, and policy and sector reform. The project is expected to make important incremental contributions towards Senegal attaining the 8 percent GDP growth called for in the Government's poverty alleviation program. The project will support these initiatives through interrelated actions aimed at stimulating private investment, and consist of four mutually reinforced components: 1) improving the investment environment by facilitating the policy, legal and regulatory interface between the public and private sectors; 2) facilitating private participation and enhancing competitiveness; 3) stimulating sector investment and implementing policy reforms; and 4) supporting implementation and capacity building. The project will finance consulting services, studies, goods, computers and equipment, vehicles, training and minor civil works repairs, and operating costs.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2000-01-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2003-05-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2011-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2011-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Korotoumou (Koro) Ouattara</narrative></person-name><telephone>+1-202-473-1000</telephone><email>kouattara@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15126" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="14" xml:lang="en"/><sector vocabulary="1" code="16020" percentage="7" xml:lang="en"/><sector vocabulary="1" code="22013" percentage="10" xml:lang="en"/><sector vocabulary="1" code="22020" percentage="15" xml:lang="en"/><sector vocabulary="1" code="32120" percentage="43" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Information and Communications Technologies</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="43.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="15.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="7" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="29" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="29" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="7" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000422" percentage="14" xml:lang="en"><narrative>Legal Institutions for a Market Economy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="7" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="7" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="7" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000423" percentage="14" xml:lang="en"><narrative>Personal and Property Rights</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2003-05-01"/>
<period-end iso-date="2003-05-31"/>
<value currency="USD" value-date="2003-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-06-01"/>
<period-end iso-date="2003-06-30"/>
<value currency="USD" value-date="2003-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-07-01"/>
<period-end iso-date="2003-07-31"/>
<value currency="USD" value-date="2003-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-08-01"/>
<period-end iso-date="2003-08-31"/>
<value currency="USD" value-date="2003-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-09-01"/>
<period-end iso-date="2003-09-30"/>
<value currency="USD" value-date="2003-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-10-01"/>
<period-end iso-date="2003-10-31"/>
<value currency="USD" value-date="2003-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-11-01"/>
<period-end iso-date="2003-11-30"/>
<value currency="USD" value-date="2003-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-12-01"/>
<period-end iso-date="2003-12-31"/>
<value currency="USD" value-date="2003-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-01-01"/>
<period-end iso-date="2004-01-31"/>
<value currency="USD" value-date="2004-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-02-01"/>
<period-end iso-date="2004-02-29"/>
<value currency="USD" value-date="2004-02-29">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-03-01"/>
<period-end iso-date="2004-03-31"/>
<value currency="USD" value-date="2004-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-04-01"/>
<period-end iso-date="2004-04-30"/>
<value currency="USD" value-date="2004-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-05-01"/>
<period-end iso-date="2004-05-31"/>
<value currency="USD" value-date="2004-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-06-01"/>
<period-end iso-date="2004-06-30"/>
<value currency="USD" value-date="2004-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-07-01"/>
<period-end iso-date="2004-07-31"/>
<value currency="USD" value-date="2004-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-08-01"/>
<period-end iso-date="2004-08-31"/>
<value currency="USD" value-date="2004-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">734782.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-05-01"/>
<period-end iso-date="2003-05-31"/>
<value currency="USD" value-date="2003-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-06-01"/>
<period-end iso-date="2003-06-30"/>
<value currency="USD" value-date="2003-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-07-01"/>
<period-end iso-date="2003-07-31"/>
<value currency="USD" value-date="2003-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-08-01"/>
<period-end iso-date="2003-08-31"/>
<value currency="USD" value-date="2003-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-09-01"/>
<period-end iso-date="2003-09-30"/>
<value currency="USD" value-date="2003-09-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-10-01"/>
<period-end iso-date="2003-10-31"/>
<value currency="USD" value-date="2003-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-11-01"/>
<period-end iso-date="2003-11-30"/>
<value currency="USD" value-date="2003-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-12-01"/>
<period-end iso-date="2003-12-31"/>
<value currency="USD" value-date="2003-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-01-01"/>
<period-end iso-date="2004-01-31"/>
<value currency="USD" value-date="2004-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-02-01"/>
<period-end iso-date="2004-02-29"/>
<value currency="USD" value-date="2004-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-03-01"/>
<period-end iso-date="2004-03-31"/>
<value currency="USD" value-date="2004-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-04-01"/>
<period-end iso-date="2004-04-30"/>
<value currency="USD" value-date="2004-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-05-01"/>
<period-end iso-date="2004-05-31"/>
<value currency="USD" value-date="2004-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-06-01"/>
<period-end iso-date="2004-06-30"/>
<value currency="USD" value-date="2004-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-07-01"/>
<period-end iso-date="2004-07-31"/>
<value currency="USD" value-date="2004-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-08-01"/>
<period-end iso-date="2004-08-31"/>
<value currency="USD" value-date="2004-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">4001775.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">4001775.16</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P051609"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P051609?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P051609"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of direct new jobs created reaches 130,000 by the end of Project IDirect project beneficiaries number, % of females)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="115,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-30" />
<target value="130,000.00">

</target>
<actual value="146,991.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of ARMP annual operating cost covered
</narrative></title>
<baseline year="2009" iso-date="2009-04-20" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-20" />
<period-end iso-date="2011-12-30" />
<target value="80.00">

</target>
<actual value="23.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of loans made using the Partial Credit Guarantee reaches 25 by end of project.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-30" />
<target value="25.00">

</target>
<actual value="0.00">
<comment><narrative>
Activity was not implemented
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The corporate marginal tax rate is reduced to 28% by 2011.
</narrative></title>
<baseline year="2005" iso-date="2005-06-01" value="28.00"><comment><narrative>Ministry of Finance data</narrative></comment></baseline>
<period>
<period-start iso-date="2005-06-01" />
<period-end iso-date="2011-12-31" />
<target value="28.00">

</target>
<actual value="25.00">
<comment><narrative>
Ministry of Finance data. Indicator met and exceeded.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of new firms registered exceeds 10,000
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="8500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2011-12-31" />
<target value="10000.00">

</target>
<actual value="19138.00">
<comment><narrative>
APIX cumulative data from 2004 to June 2011. Indicator met and exceeded.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of loans made using the Partial Credit Guarantee reaches 25 by end of project.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-30" />
<target value="25.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time to clear goods for export/imports is reduced to 8 days.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="8.00">

</target>
<actual value="12.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A decree is adopted to establish a new collecting society or societ de gestion collective to ensure payment of royalties
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="A decree to establish a Societe de gestion collective has been prepared"><comment><narrative>The decree has been prepared and is satisfactory to the stakeholders.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-30" />
<target value="The decree is approved and published.">

</target>
<actual value="The decree has not been adopted yet">
<comment><narrative>
Consultations are underway to get the decree adopted before December 31, 2011.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
APIX operating costs are covered at least by 70% by its revenues and the State budget by end of Project.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="70.00">

</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A tourism strategy is adopted by end of project.
</narrative></title>
<baseline year="2003" iso-date="2003-12-31" value="No tourism strategy has been adopted."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-12-31" />
<period-end iso-date="2011-12-30" />
<target value="A tourism strategy has been adopted">

</target>
<actual value="Tourism strategy has been  drafted.">
<comment><narrative>
A tourism strategy was drafted in 2005 but did not get updated.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
APIX operating costs are covered at least by 70% by its revenues and the State budget by end of Project.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="50.00"><comment><narrative>APIX data</narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="70.00">

</target>
<actual value="72.00">
<comment><narrative>
Indicator met. APIX does not generate any revenues. Its operating costs are covered entirely by the State and other donors.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of direct new jobs created reaches 130,000 by the end of Project IDirect project beneficiaries number, % of females)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="115000.00"><comment><narrative>APIX cumulative data from 2001 to 2007. Data is for total number of jobs created by both new and old enterprises</narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-30" />
<target value="130000.00">

</target>
<actual value="146991.00">
<comment><narrative>
APIX data from 2004 to 2010 when project was effective. Data is for jobs created by new as well as existing enterprisesonly.
Indicator met and exceeded.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A tourism strategy is adopted by end of project.
</narrative></title>
<baseline year="2003" iso-date="2003-12-31" value="No tourism strategy has been adopted."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-12-31" />
<period-end iso-date="2011-12-30" />
<target value="A tourism strategy has been adopted">

</target>
<actual value="Tourism strategy has been drafted.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of procurement complaints properly investigated and decided on.
</narrative></title>
<baseline year="2009" iso-date="2009-06-22" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-22" />
<period-end iso-date="2011-12-30" />
<target value="90.00">

</target>
<actual value="98.00">
<comment><narrative>
By January 2011, ARMP had reached 98% investigation of procurement complaints reviewed. Indicator met and exceeded.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
100 new firms with investment climate incentives start operating
</narrative></title>
<baseline year="2000" iso-date="2000-12-31" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2000-12-31" />
<period-end iso-date="2011-12-31" />
<target value="100.00">

</target>
<actual value="770.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of ARMP annual operating cost covered
</narrative></title>
<baseline year="2009" iso-date="2009-04-20" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-20" />
<period-end iso-date="2011-12-30" />
<target value="80.00">

</target>
<actual value="23.00">
<comment><narrative>
ARMP is only covering 23% of its cost from its own revenues. Indicator unlikely to be met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The time to register a firm is reduced to 8 days.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="8.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time to clear goods for export/imports is reduced to 8 days.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="10.00"><comment><narrative>Avg number of days for  import and export</narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="8.00">
<comment><narrative>
End target value exceeds average of 11 days of OECD countries
</narrative></comment>
</target>
<actual value="12.50">
<comment><narrative>
Doing Business 2012 data. 
It takes 11 days for exports and 14 days for import. Indicator not met although value exceeds averageinSub-Saharan Africa of 34.5 days.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of new firms registered exceeds 10,000
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="8,500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2011-12-31" />
<target value="10,000.00">

</target>
<actual value="19,138.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ARMP is fully operational and covers all of its operational cost from its revenues to ensure sustainability by end of Project.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="ARMP is partially operational."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="ARMP is financially self-sufficient.">

</target>
<actual value="ARMP is operational but not financially self-sufficient yet.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ARMP is fully operational and covers all of its operational cost from its revenues to ensure sustainability by end of Project.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="ARMP is partially operational."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="ARMP is financially self-sufficient.">

</target>
<actual value="ARMP is operational but not financially self-sufficient yet.">
<comment><narrative>
Indicator not met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A decree is adopted to establish a new collecting society or societE de gestion collective to ensure payment of royalties
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="A decree to establish a Societe de gestion collective has been prepared"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-30" />
<target value="The decree is approved and published.">

</target>
<actual value="The decree has not been adopted yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The time to register a firm is reduced to 8 days.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="9.00"><comment><narrative>Doing Business data</narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="8.00">

</target>
<actual value="5.00">
<comment><narrative>
DB 2012 data. Indicator met and exceeded.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The corporate marginal tax rate is reduced to 28% by 2011.
</narrative></title>
<baseline year="2005" iso-date="2005-06-01" value="28.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-06-01" />
<period-end iso-date="2011-12-31" />
<target value="28.00">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of procurement complaints properly investigated and decided on.
</narrative></title>
<baseline year="2009" iso-date="2009-06-22" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-22" />
<period-end iso-date="2011-12-30" />
<target value="90.00">

</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P159023</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Structural Reform Development Policy Operation Series</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objective (PDO) of the series is to support Government's efforts in (i) strengthening the governance and management of the energy sector to reduce costs, improve reliability and facilitate equitable access; and (ii) enhancing the legal andregulatory framework of the ICT sector to promote competition, investment and equitable access.To this end, the Program has the following two pillars:Pillar 1 - Energy Sector Pillar has three policy areas (i) improving governance of the energy sector; (ii) removing barriers to investment and competition in the energy sector; and (iii) facilitating equitable access to electricity.Pillar 2 –ICT sector will support two policy areas on (i) improving governance of the ICT sector and (ii) removing barrier to investment and competition in the internet broadband market. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0028444"><narrative>Ministry of the Economy, Finance, and Planning</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0028445"><narrative>Ministry of Oil and Energies</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-11-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-06-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-12-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-12-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Paolo B. Zacchia</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="22040" percentage="45" xml:lang="en"/><sector vocabulary="1" code="23110" percentage="33" xml:lang="en"/><sector vocabulary="1" code="23630" percentage="22" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="44.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="56.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="11" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="33" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000113" percentage="11" xml:lang="en"><narrative>Debt Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="4" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="33" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000262" percentage="11" xml:lang="en"><narrative>ICT Policies</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-15"/>
<value currency="USD" value-date="2018-12-15">60000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-15"/>
<value currency="USD" value-date="2018-12-15">60000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-15"/>
<value currency="USD" value-date="2018-12-15">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-15"/>
<value currency="USD" value-date="2018-12-15">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">60000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">64683180</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-87718</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-238702</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-232340</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-231898</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-230065</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-231537</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-250334</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-249469</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-231908</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-215913</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-218732</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-223210</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-226051</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-216918</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-209208</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-226210</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-225451</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-941878</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-917688</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-899974</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-985305</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-1001753</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-508973</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-28446"><narrative>Ministry of Communications, Telecommunications, Posts, and the Digital Economy; Ministry of Oil and Energies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159023"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P159023?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159023"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Installed Capacity of Renewable Energy
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2019-12-31" />
<target value="29.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of rural population with access to electricity
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="29.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2019-12-31" />
<target value="50.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of facility-based Internet providers
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2019-12-31" />
<target value="6.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Un-served energy (total) per year (GWh) as proxy of blackouts and brownouts
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="34.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2019-12-31" />
<target value="20.00">

</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Overall electricity losses as percent of electricity produced
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="21.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="18.00">

</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mix of non-HFO based generation
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2019-12-31" />
<target value="43.00">

</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of rural households reporting access to the Internet
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2019-12-31" />
<target value="4.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Internet penetration rate
</narrative></title>
<baseline year="2016" iso-date="2016-06-30" value="60.28"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-30" />
<period-end iso-date="2019-12-31" />
<target value="70.00">

</target>
<actual value="62.97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SENELEC debt cover ratio (EBIDTA*/debt service)
</narrative></title>
<baseline year="2016" iso-date="2016-01-01" value="0.54"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-01-01" />
<period-end iso-date="2019-12-31" />
<target value="0.90">

</target>
<actual value="0.65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ranking of Senegal with respect to the A.1.02 sub-index of the Network Readiness Index
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="81.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2019-12-31" />
<target value="72.00">

</target>
<actual value="73.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P083609</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Agricultural Markets and Agribusiness Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to improve competitiveness of selected domestic supply chains, increase non-traditional agricultural exports and increase rice production in project areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Agricultural Markets and Agribusiness Development Program for Senegal aims to increase non-traditional agricultural exports and farm revenues for project producers. The end-of-project outcome indicators will be an increase of non-traditional agricultural exports from the 2004 level of 13,000 tons to 30,000 tons by 2010; and a 60 percent increase in farm incomes of small family farms, the project's primary target group. There are four project components. Component A improves food safety and the performance of the domestic distribution channels for crop and livestock products. It consists of four subcomponents: domestic supply chains consolidation; rural market infrastructure; knowledge management; and development of animal products markets. Component B expands non-traditional agricultural exports (ie., horticultural products, confectionary nuts, essential oils and spices, and processed foodstuffs) by leveraging the results achieved under the pilot Agricultural Export Promotion Project. It consists of three subcomponents: innovation and quality management; agricultural export infrastructure; and building agricultural export institutions. Component C: promotes demand-driven, public-private partnerships for irrigation investments to expand agribusiness across Senegal. It consists of four subcomponents: constructing public irrigation infrastructures in the Senegal River delta; promoting irrigation for crop diversification in the Senegal River delta; promoting micro-irrigation for crop diversification in the Niayes zone, the Groundnut Basin and Tambacounda region; and  knowledge management and strategic studies. Component D ensures project coordination and monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0000473"><narrative>Project Coordination Unit</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2005-06-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-02-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jean-Philippe Tre</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jtre@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>Region de Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.283331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252308" />
            <name><narrative>Region de Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -16.1</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251910" />
            <name><narrative>Region de Fatick</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.28333 -16.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250804" />
            <name><narrative>Region de Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14 -16</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249221" />
            <name><narrative>Region de Louga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.41667 -15.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248753" />
            <name><narrative>Region de Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.16667 -13.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246451" />
            <name><narrative>Region de Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.33333 -15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244990" />
            <name><narrative>Region de Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.91667 -13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244800" />
            <name><narrative>Region de Thies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -16.866671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254443" />
            <name><narrative>Bakel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.23612 -12.23961</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247211" />
            <name><narrative>Niayes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.41667 -16.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249394" />
            <name><narrative>Lampsar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.094721 -16.38833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006941948" />
            <name><narrative>Senegal River</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.578291 -14.54041</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="32161" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AF" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Fisheries</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AL" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Livestock</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="46.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AH" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Crops</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="42" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="17" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="9" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="17" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="17" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="17" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="17" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="42" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="17" xml:lang="en"><narrative>MSME Finance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">333333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">333333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">583333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">583333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">583333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">333333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2006-02-28"/><value value-date="2006-02-28">35000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">10000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-1407294</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-3153620</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-03-31"/><value value-date="2007-03-31">1128238</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-04-30"/><value value-date="2007-04-30">1929423</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-06-30"/><value value-date="2007-06-30">419926</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-08-31"/><value value-date="2007-08-31">106775</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-10-31"/><value value-date="2007-10-31">234934</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-11-30"/><value value-date="2007-11-30">33418</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-12-31"/><value value-date="2007-12-31">136699</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">191104</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">10577</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">2100308</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">835182</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">327542</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">46427</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">276292</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">339060</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">510767</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">89703</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">456413</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">833207</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">60987</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">640282</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">820436</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">665822</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">1403791</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">208709</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">667655</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">59580</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">1818198</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">1441202</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">539374</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">399785</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">72437</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">82598</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">220625</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">386944</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">57918</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">266880</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">688614</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">111111</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">423337</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">4853931</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">401049</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">362897</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">1212912</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">260067</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">1002719</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">32104</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">1537398</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">77438</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">291013</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">720741</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">261221</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">319884</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">617773</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">16540</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">205648</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">1319854</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">1207631</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">551090</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">296750</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">612617</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">50826</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">459979</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">337327</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">93118</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">527457</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">25893</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">194625</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">671738</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">564859</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">66162</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">264933</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">2676219</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">238925</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">271579</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">476764</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">17035</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">699667</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">470321</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">441010</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">791974</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">428193</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">291367</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">108627</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">301385</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">1357675</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">90703</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">135451</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">25655</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">839445</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">294612</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">137834</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">116059</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">7259</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">834194</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">596389</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">553868</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">1132262</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">5849</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">368026</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">618601</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">43319</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">139815</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">432003</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">4379</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">695986</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">907430</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">1106106</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-875674</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">419491</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-07-31"/><value value-date="2007-07-31">-66763</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-01-31"/><value value-date="2008-01-31">-730</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-02-29"/><value value-date="2008-02-29">-31673</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">-35595</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">-31339</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">-41591</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">-53549</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">-68873</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">-75358</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-16110</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">-86478</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-28624</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">-91102</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-35426</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">-92362</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-35032</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">-101087</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-34147</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">-101393</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-35352</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">-106425</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-36069</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">-109173</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-34086</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">-103858</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-30966</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-116308</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-32470</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-118882</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-29226</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-114695</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-29387</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-115747</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-28483</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">-115843</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-29909</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-117145</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-30345</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-110661</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-29604</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-114397</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-29002</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-109665</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-28811</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-108103</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-29172</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-107807</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-29739</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-110432</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-28838</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-101563</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-30046</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-111101</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-26016</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-91667</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-28168</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-105214</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-26096</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-98141</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-24015</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-95678</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-28307</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-93930</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-26226</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-87608</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-25887</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-98814</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-25974</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-93722</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-25654</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-313168</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-304813</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">-314945</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-321937</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-314981</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-313483</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-311106</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-309976</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-312373</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-79305</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-323611</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-79967</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-320056</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-79829</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-316309</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-77216</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-294159</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-72490</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-302943</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-74524</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-304314</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-73823</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-300167</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-74544</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-298192</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-75535</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-1799</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-292241</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-75840</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-307331</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-76827</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-11589</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-296884</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-331</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-76513</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-473"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P083609"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P083609?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P083609"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
One-third of farming families engaged in exports crops have implemented #Origine Senegal# good agricultural practices guide based on    GlobalGAP Protocol
</narrative></title>
<baseline year="2006" iso-date="2006-02-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-02-28" />
<period-end iso-date="2014-12-31" />
<target value="35.00">

</target>
<actual value="55.00">
<comment><narrative>
Approximately 881 farming families supported by sub-projects use good irrigation practices guides.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least 2,500 ha have been developed or improved by small farmers and agribusiness SMEs
</narrative></title>
<baseline year="2006" iso-date="2006-02-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-02-28" />
<period-end iso-date="2014-12-31" />
<target value="2500.00">

</target>
<actual value="4062.00">
<comment><narrative>
The end-of-project target has been exceeded.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least 5 subprojects for each of the five targeted supply chains in the domestic market have been funded through the Matching Gran   t mechanism and implemented
</narrative></title>
<baseline year="2006" iso-date="2006-02-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-02-28" />
<period-end iso-date="2014-12-31" />
<target value="25.00">

</target>
<actual value="289.00">
<comment><narrative>
289 sub-projects are under implementation in the targeted supply chains (Banana, green bean, mango, onion, sweet potato, tomato,red meat, poultry and processed food).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased annual production of rice paddy (tons) by 52,000 tons at the end of the project
</narrative></title>
<baseline year="2010" iso-date="2010-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-30" />
<period-end iso-date="2014-12-31" />
<target value="52000.00">

</target>
<actual value="46975.00">
<comment><narrative>
Out of the 6,963 hectares rehabilitated, 6,342 ha were cultivated during the 2013/2014 rainy season (1,771 ha) and 2013 dry season(5,571 ha). The cumulative production over both periods have reached reached 46,975 tons of paddy as of March 31, 2014. Cultivatedareas and productions increased compared to the previous year, especially for 2013 dry season.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total length of water catchments constructed
</narrative></title>
<baseline year="2010" iso-date="2010-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-30" />
<period-end iso-date="2014-12-31" />
<target value="7500.00">

</target>
<actual value="0.00">
<comment><narrative>
Studies for the design of a master plan for the 5,000 ha are underway. The procurement process for the completion of 9 watercatchments is almost completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Local production of banana covers 50% of domestic consumption
</narrative></title>
<baseline year="2006" iso-date="2006-02-28" value="35.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-02-28" />
<period-end iso-date="2014-12-31" />
<target value="50.00">

</target>
<actual value="70.00">
<comment><narrative>
The end-of-project target has been exceeded.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads constructed, Rural
</narrative></title>
<baseline year="2006" iso-date="2006-02-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-02-28" />
<period-end iso-date="2014-12-31" />
<target value="37.00">

</target>
<actual value="54.50">
<comment><narrative>
All works are completed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Swine productivity reach 40% in targeted farms at the end of the project
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="4.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="40.00">

</target>
<actual value="4.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Non-traditional agricultural exports  in project areas reach 12,000 tons by end of project
</narrative></title>
<baseline year="2006" iso-date="2006-02-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-02-28" />
<period-end iso-date="2012-12-31" />
<target value="12000.00">

</target>
<actual value="5535.00">
<comment><narrative>
As of March 31, 2014, exports have reached 5,535 tons in the project area by project beneficiaries. The end-of-project target isexpected to be met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Small ruminants productivity reach 20% in targeted farms at the end of the project
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="3.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="20.00">

</target>
<actual value="3.10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Local production of onion covers 75% of domestic consumption
</narrative></title>
<baseline year="2006" iso-date="2006-02-28" value="54.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-02-28" />
<period-end iso-date="2014-12-31" />
<target value="75.00">

</target>
<actual value="70.00">
<comment><narrative>
End-of-project target is likely to be exceeded. 374 sub-projects are currently in the pipeline for improved onion domestic supplychain.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P508171</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Health System Development and Financial Protection Program (NAATANGUE 2030)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve the utilization of quality essential services in nutrition and reproductive, maternal, neonatal, child, and adolescent health, and to strengthen the resilience of the health system.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Senegal Health System Development and Financial Protection Program (P508171) is a proposed Program-for-Results (PforR) operation aimed at improving the utilization of quality essential reproductive, maternal, neonatal, child, and adolescent health and nutrition (RMNCAH-N) services and strengthening health system resilience. Aligned with the Government of Senegal's health sector strategies – including the national Reproductive, Maternal, Neonatal, Child, Adolescent Health and Nutrition Strategic Plan (PS SRMNIA-N, 2024–2030) – and the country's “Senegal 2050” vision, the operation supports critical reforms and investments to accelerate progress toward universal health coverage (UHC) and a more resilient health system. It focuses on expanding access to and quality of essential health and nutrition services, particularly for women, children, and adolescents; strengthening primary healthcare and health emergency preparedness (including integrating climate resilience and One Health approaches); and improving financial protection for vulnerable populations through health insurance reforms and reduced out-of-pocket expenditures. The operation's financing totals US$135 million, comprising a US$100 million IDA credit, a US$20 million grant from the Global Financing Facility (GFF) and a US$15 million grant from the Health System Transformation and Resilience Multi-Donor Trust Fund. This investment will co-finance a portion of the Government's broader health program, alongside domestic resources and technical support from other development partners (e.g. JICA, UNICEF, UNFPA, WHO) to ensure coordination and synergy. Expected outcomes include greater coverage of high-quality maternal and child health services – for example, more health facilities providing emergency obstetric and neonatal care and higher child immunization rates – expanded health insurance coverage among poor and informal-sector households, and the establishment of functional multi-hazard early warning systems for health emergencies. These improvements will strengthen health outcomes and resilience – helping to reduce preventable maternal and child deaths over time and advance Senegal's progress toward UHC and improved preparedness for future health crises.To strategically complement the PforR, the operation includes an Investment Project Financing (IPF) component that provides targeted support for technical assistance and program implementation. The IPF will finance institutional capacity building and multisectoral coordination, including support for MSHP and partner institutions (CNDN, SEN-CSU, One Health Secretariat). It will also fund coordination, monitoring and evaluation, independent verification of results through a recruited IVA, household surveys such as Demographic and Health Surveys, and ensure the effective functioning of the  Coordination Unit (CU) within MSHP. ]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–00010627"><narrative>Republic of Senegal/REpublique du SEnEgal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–00010627"><narrative>Republic of Senegal/REpublique du SEnEgal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-00010626"><narrative>Ministry of Health and Public Hygiene/MinistEre de la SantE et de l'HygiEne Publique</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-03-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-03-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Laurence Lannes</narrative></person-name><telephone>+1-202-473-1000</telephone><email>llannes@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>













<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="12220" percentage="49" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="49" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="16" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="16" xml:lang="en"/><sector vocabulary="1" code="12240" percentage="14" xml:lang="en"/><sector vocabulary="1" code="12240" percentage="14" xml:lang="en"/><sector vocabulary="1" code="12196" percentage="13" xml:lang="en"/><sector vocabulary="1" code="12196" percentage="13" xml:lang="en"/><sector vocabulary="1" code="13020" percentage="8" xml:lang="en"/><sector vocabulary="1" code="13020" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHG" percentage="31.0000000" xml:lang="en"><narrative>Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHQ" percentage="41.0000000" xml:lang="en"><narrative>Health Facilities and Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHF" percentage="28.0000000" xml:lang="en"><narrative>Public Administration - Health</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3750003.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">1250003.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">100000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">100000000.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11984"><narrative>High National Council for Health Security – One Health/Haut Conseil National pour la SEcuritE Sanitaire -One Health (HCNSS-OH); Ministry of Health and Public Hygiene/MinistEre de la SantE et de l'HygiEne Publique; Ministry of Infrastructures/MinistEre des Infrastructures; National Council for Nutrition Development/Conseil National de DEveloppement de la Nutrition (CNDN); Senegalese Agency for Universal Health Coverage/Agence Senegalaise de la Couverture Sanitaire Universelle (SEN-CSU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P508171"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P508171?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P508171"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nutrition budget
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="3700000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective and increased resource mobilization for the RMNCAH-N SP
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="4,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Specialists recruited in targeted areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Targeted individuals effectively covered by the national health insurance system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="831,509">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in health facilities offering Comprehensive Emergency Obstetric and Newborn Care quality services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mother-child centers built in hospitals and new constructions of health centers, health posts and regional laboratories of excellence, equipped and adapted to the climate
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency Medical Service units installed and equipped in territorial hubs
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities with full complement of maternal and child health tracer drugs and products
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in prenatal consultations including diabetes and hypertension screening
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="173,755"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="360,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of mother-child poles and construction or rehabilitation of new health facilities and laboratories
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="22">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction rate with RMNCAH-N services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="88.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency Medical Service units installed and equipped in territorial hubs
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Availability of maternal and child health tracer drugs and products in health structures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescents vaccinated against HPV
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Deployment of Health Data Managers in Priority Regions for Improved Information System Performance
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health workers effectively enrolled in the incentive strategy to work in hardship areas
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional laboratory services in CEmONC facilities
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of mother-child centers and construction or rehabilitation of new health facilities and laboratories
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="22">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health workers recruited and deployed to hard to serve areas
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving inpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Availability of maternal and child health tracer drugs and products in health facilities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children treated for severe acute malnutrition and recovered
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="46,054"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="47,054">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children treated for severe acute malnutrition and recovered
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="46,054"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="47,054">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescents vaccinated against HPV
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction rate with RMNCAH-N services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="88.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities in the network offering Comprehensive Emergency Obstetric and Neonatal Care (CEmONC) services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of human resources dedicated to RMNCAH-N in health facilities in targeted areas
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health insurance coverage in the target population
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="634,723"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="1,200,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving inpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="15,529"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="2,5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective and increased resource mobilization for the RMNCAH-N SP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New data managers deployed to regional health directorates or districts in target regions to improve health data management
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="52">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency Medical Service units installed and equipped in territorial hubs
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Establishment of a regional multi-risk and multisectoral early warning system with a One Health approach
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Specialists recruited in targeted areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional territorial mechanism for multi-risk early warning system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="27">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strengthened health information system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="52">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pregnant women attending antenatal care visits who receive screening for diabetes and hypertension
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="12800">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the allocation of the nutrition budget in the national annual budget for the effective implementation of community nutrition activities
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="3700000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescents vaccinated against HPV
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children treated for severe acute malnutrition and recovered
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="12100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1,360,816"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="530,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional laboratory services in CEmONC facilities
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities offering Comprehensive Emergency Obstetric and Newborn Care quality services
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in nutrition budget
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="3700000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Prenatal consultations including diabetes and hypertension screening
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="900,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A functional territorial mechanism for multi-risk early warning system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction rate with RMNCAH-N services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in health insurance coverage in the target population
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="634,723"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="1,200,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective and increased resource mobilization for the RMNCAH-N SP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective and increased resource mobilization for the RMNCAH-N SP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective and increased resource mobilization for the RMNCAH-N SP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective and increased resource mobilization for the RMNCAH-N SP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective and increased resource mobilization for the RMNCAH-N SP
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional laboratory services in CEmONC facilities
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional laboratory services in CEmONC facilities
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional laboratory services in CEmONC facilities
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Specialists recruited in targeted areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Specialists recruited in targeted areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1,360,816"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="2,414,187">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Specialists recruited in targeted areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children treated for severe acute malnutrition and recovered
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="46,054"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="47,054">

</target>
<actual value="46,054">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children treated for severe acute malnutrition and recovered
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="46,054"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="47,054">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children treated for severe acute malnutrition and recovered
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="46,054"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="47,054">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children treated for severe acute malnutrition and recovered
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="12100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency Medical Service units installed and equipped in territorial hubs
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="6">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency Medical Service units installed and equipped in territorial hubs
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency Medical Service units installed and equipped in territorial hubs
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency Medical Service units installed and equipped in territorial hubs
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health insurance coverage in the target population
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="634,723"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="634,723">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health insurance coverage in the target population
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="634,723"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in health insurance coverage in the target population
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="634,723"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health insurance coverage in the target population
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="634,723"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="1,200,000">

</target>
<actual value="634,723">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health insurance coverage in the target population
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="634,723"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="1,200,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in health insurance coverage in the target population
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="634,723"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="1,200,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Targeted individuals effectively covered by the national health insurance system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="831,509">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities offering Comprehensive Emergency Obstetric and Newborn Care quality services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities offering Comprehensive Emergency Obstetric and Newborn Care quality services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in health facilities offering Comprehensive Emergency Obstetric and Newborn Care quality services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New data managers deployed to regional health directorates or districts in target regions to improve health data management
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New data managers deployed to regional health directorates or districts in target regions to improve health data management
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strengthened health information system
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New data managers deployed to regional health directorates or districts in target regions to improve health data management
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="52">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New data managers deployed to regional health directorates or districts in target regions to improve health data management
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="52">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strengthened health information system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="52">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Deployment of Health Data Managers in Priority Regions for Improved Information System Performance
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health workers recruited and deployed to hard to serve areas
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health workers recruited and deployed to hard to serve areas
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of human resources dedicated to RMNCAH-N in health facilities in targeted areas
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health workers recruited and deployed to hard to serve areas
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health workers recruited and deployed to hard to serve areas
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of human resources dedicated to RMNCAH-N in health facilities in targeted areas
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health workers effectively enrolled in the incentive strategy to work in hardship areas
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nutrition budget
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="1200000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nutrition budget
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in nutrition budget
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nutrition budget
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="3700000">

</target>
<actual value="1200000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nutrition budget
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="3700000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in nutrition budget
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="3700000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the allocation of the nutrition budget in the national annual budget for the effective implementation of community nutrition activities
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="3700000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of mother-child poles and construction or rehabilitation of new health facilities and laboratories
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of mother-child poles and construction or rehabilitation of new health facilities and laboratories
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of mother-child centers and construction or rehabilitation of new health facilities and laboratories
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of mother-child poles and construction or rehabilitation of new health facilities and laboratories
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of mother-child poles and construction or rehabilitation of new health facilities and laboratories
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="22">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of mother-child centers and construction or rehabilitation of new health facilities and laboratories
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="22">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mother-child centers built in hospitals and new constructions of health centers, health posts and regional laboratories of excellence, equipped and adapted to the climate
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction rate with RMNCAH-N services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="88.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="88.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction rate with RMNCAH-N services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="88.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction rate with RMNCAH-N services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="88.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction rate with RMNCAH-N services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescents vaccinated against HPV
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="34">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescents vaccinated against HPV
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescents vaccinated against HPV
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescents vaccinated against HPV
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Prenatal consultations including diabetes and hypertension screening
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="173,755"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Prenatal consultations including diabetes and hypertension screening
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="173,755"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in prenatal consultations including diabetes and hypertension screening
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="173,755"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Prenatal consultations including diabetes and hypertension screening
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="900,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Prenatal consultations including diabetes and hypertension screening
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="900,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in prenatal consultations including diabetes and hypertension screening
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="173,755"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="360,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pregnant women attending antenatal care visits who receive screening for diabetes and hypertension
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="12800">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving inpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="15,529"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="2,5000">

</target>
<actual value="15,529">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving inpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="15,529"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="2,5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving inpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="15,529"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="2,5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving inpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1,360,816"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="530,0000">

</target>
<actual value="1,360,816">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1,360,816"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="530,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1,360,816"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="2,414,187">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="4,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities with full complement of maternal and child health tracer drugs and products
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities with full complement of maternal and child health tracer drugs and products
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Availability of maternal and child health tracer drugs and products in health facilities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities with full complement of maternal and child health tracer drugs and products
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities with full complement of maternal and child health tracer drugs and products
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Availability of maternal and child health tracer drugs and products in health facilities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Availability of maternal and child health tracer drugs and products in health structures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Establishment of a regional multi-risk and multisectoral early warning system with a One Health approach
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Establishment of a regional multi-risk and multisectoral early warning system with a One Health approach
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A functional territorial mechanism for multi-risk early warning system
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Establishment of a regional multi-risk and multisectoral early warning system with a One Health approach
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Establishment of a regional multi-risk and multisectoral early warning system with a One Health approach
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A functional territorial mechanism for multi-risk early warning system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional territorial mechanism for multi-risk early warning system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="27">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities offering Comprehensive Emergency Obstetric and Newborn Care quality services
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities offering Comprehensive Emergency Obstetric and Newborn Care quality services
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in health facilities offering Comprehensive Emergency Obstetric and Newborn Care quality services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities in the network offering Comprehensive Emergency Obstetric and Neonatal Care (CEmONC) services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving inpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="15,529"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="2,5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective and increased resource mobilization for the RMNCAH-N SP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective and increased resource mobilization for the RMNCAH-N SP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective and increased resource mobilization for the RMNCAH-N SP
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional laboratory services in CEmONC facilities
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional laboratory services in CEmONC facilities
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional laboratory services in CEmONC facilities
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Specialists recruited in targeted areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Specialists recruited in targeted areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Specialists recruited in targeted areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children treated for severe acute malnutrition and recovered
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="46,054"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="47,054">

</target>
<actual value="46,054">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children treated for severe acute malnutrition and recovered
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="46,054"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="47,054">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children treated for severe acute malnutrition and recovered
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="46,054"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="47,054">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children treated for severe acute malnutrition and recovered
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="12100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency Medical Service units installed and equipped in territorial hubs
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="6">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency Medical Service units installed and equipped in territorial hubs
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency Medical Service units installed and equipped in territorial hubs
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency Medical Service units installed and equipped in territorial hubs
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health insurance coverage in the target population
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="634,723"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="1,200,000">

</target>
<actual value="634,723">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health insurance coverage in the target population
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="634,723"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="1,200,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in health insurance coverage in the target population
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="634,723"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="1,200,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Targeted individuals effectively covered by the national health insurance system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="831,509">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New data managers deployed to regional health directorates or districts in target regions to improve health data management
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="52">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New data managers deployed to regional health directorates or districts in target regions to improve health data management
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="52">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strengthened health information system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="52">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Deployment of Health Data Managers in Priority Regions for Improved Information System Performance
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health workers recruited and deployed to hard to serve areas
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health workers recruited and deployed to hard to serve areas
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of human resources dedicated to RMNCAH-N in health facilities in targeted areas
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health workers effectively enrolled in the incentive strategy to work in hardship areas
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nutrition budget
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="3700000">

</target>
<actual value="1200000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nutrition budget
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="3700000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in nutrition budget
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="3700000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the allocation of the nutrition budget in the national annual budget for the effective implementation of community nutrition activities
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1200000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="3700000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of mother-child poles and construction or rehabilitation of new health facilities and laboratories
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of mother-child poles and construction or rehabilitation of new health facilities and laboratories
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="22">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of mother-child centers and construction or rehabilitation of new health facilities and laboratories
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="22">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mother-child centers built in hospitals and new constructions of health centers, health posts and regional laboratories of excellence, equipped and adapted to the climate
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction rate with RMNCAH-N services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="88.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="88.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction rate with RMNCAH-N services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="88.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction rate with RMNCAH-N services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="88.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction rate with RMNCAH-N services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescents vaccinated against HPV
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="34">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescents vaccinated against HPV
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescents vaccinated against HPV
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescents vaccinated against HPV
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Prenatal consultations including diabetes and hypertension screening
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="900,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Prenatal consultations including diabetes and hypertension screening
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="900,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in prenatal consultations including diabetes and hypertension screening
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="173,755"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="360,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pregnant women attending antenatal care visits who receive screening for diabetes and hypertension
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="12800">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving inpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="15,529"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="2,5000">

</target>
<actual value="15,529">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving inpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="15,529"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="2,5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving inpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="15,529"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="2,5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving inpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1,360,816"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="530,0000">

</target>
<actual value="1,360,816">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1,360,816"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="530,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="1,360,816"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="2,414,187">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="4,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities with full complement of maternal and child health tracer drugs and products
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities with full complement of maternal and child health tracer drugs and products
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Availability of maternal and child health tracer drugs and products in health facilities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Availability of maternal and child health tracer drugs and products in health structures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Establishment of a regional multi-risk and multisectoral early warning system with a One Health approach
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Establishment of a regional multi-risk and multisectoral early warning system with a One Health approach
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A functional territorial mechanism for multi-risk early warning system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional territorial mechanism for multi-risk early warning system
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="27">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities offering Comprehensive Emergency Obstetric and Newborn Care quality services
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities offering Comprehensive Emergency Obstetric and Newborn Care quality services
</narrative></title>
<baseline year="2025" iso-date="2025-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-14" />
<period-end iso-date="2031-06-14" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in health facilities offering Comprehensive Emergency Obstetric and Newborn Care quality services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="16">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities in the network offering Comprehensive Emergency Obstetric and Neonatal Care (CEmONC) services
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2031-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P178750</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SENEGAL HIGHER EDUCATION PROJECT - ESPOIR-JEUNES</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase equitable access to market-relevant short-term vocational tertiary education and strengthen governance and research in higher education.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed project will support the ongoing and planned higher education reforms to enhance the capacity of higher education institutions (HEIs) in Senegal to produce high-quality graduates with skills aligned with labor market needs. The Project will do so by improving the governance framework for higher education while concurrently supporting the Government's strategic policy options, including (i) expanding access to short-term tertiary vocational training programs, (ii) improving the quality and relevance of programs by strengthening quality assurance systems in place, performance requirements, and making courses more relevant to the labor market needs, (iii) strengthening internal and external efficiency; (iv) promoting greater use of information technology in tertiary education; (v) modernizing governance systems and management of the higher education system and (vi) developing research.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0052024"><narrative>REPUBLIC OF SENEGAL</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0052023"><narrative>MINISTRY OF HIGHER EDUCATION</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2023-05-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-06-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Pamela Mulet</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pmulet@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="74020" percentage="51" xml:lang="en"/><sector vocabulary="1" code="11330" percentage="18" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="12" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="11" xml:lang="en"/><sector vocabulary="1" code="11420" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="48.0000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EW" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Workforce Development and Vocational Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="74" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="68" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000655" percentage="70" xml:lang="en"><narrative>Student Assessment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="27" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000223" percentage="9" xml:lang="en"><narrative>Youth Employment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="30" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="9" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="30" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="9" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="68" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="75" xml:lang="en"><narrative>Education Facilities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="19" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="19" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="9" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="25" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="10" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="9" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="75" xml:lang="en"><narrative>Education Facilities</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1058333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">3641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">3641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">3641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">3641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">3641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">3641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">3641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">3641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">3641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">3641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3641666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">3550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">3741666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">3741666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">3741666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">3741666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">3741666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">3741666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">3741666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">3741666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">3741666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">3741666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">3741666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">3741666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">133570733.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">133570733.51</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">150000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-52023"><narrative>MINISTRY OF HIGHER EDUCATION</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">691094</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-52023"><narrative>MINISTRY OF HIGHER EDUCATION</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">2450694</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-52023"><narrative>MINISTRY OF HIGHER EDUCATION</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">677018</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-52023"><narrative>MINISTRY OF HIGHER EDUCATION</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">8099646</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-52023"><narrative>MINISTRY OF HIGHER EDUCATION</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">4510815</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-52023"><narrative>MINISTRY OF HIGHER EDUCATION</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-20022</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-52023"><narrative>MINISTRY OF HIGHER EDUCATION</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-26410</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-52023"><narrative>MINISTRY OF HIGHER EDUCATION</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-30615</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-52023"><narrative>MINISTRY OF HIGHER EDUCATION</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-72720</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-52023"><narrative>MINISTRY OF HIGHER EDUCATION</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178750"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178750?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178750"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Higher Education Institutions achieving 80% of PBC targets on Research
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
The indicator measures the number of higher education institutions that have achieved 80% of their research and innovation performance targets.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth enrolled in the ISEPs supported by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="5,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="21,000.00">
<comment><narrative>
Number of students enrolled, at a given time, in the ISEPs supported by the project. 5,000 was achieved pre-project; 9,913 was achieved with WB-financed support, and the total/global result is 14,913.
</narrative></comment>
</target>
<actual value="14913">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female ISEP instructors
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="30.00">
<comment><narrative>
Percentage of women among ISEP teachers, all types of contracts included
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female employees and students using childcare center who report increase in productivity
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="100.00">
<comment><narrative>
This will be self-declared based on surveys of the beneficiaries of crEches set up within the ISEPs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Higher education institutions having signed a performance-based contract
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="9.00">
<comment><narrative>
The indicator measures the number of higher education institutions that have signed a performance-based contract. All 8 public universities have signed a PBC
</narrative></comment>
</target>
<actual value="8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received (including on GBV) addressed in line with time stipulations in the operations manual
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="100.00">
<comment><narrative>
Percentage of complaints received (including on gender-based violence) dealt with within the deadlines set out in the texts.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ISEPs accredited by the 3FPT
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="9.00">
<comment><narrative>
The number of ISEPs supported by the project that are accredited by the 3FPT
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Targeted campaigns and actions undertaken to attract prospective female students in high-value fields where women are traditionally underrepresented within the ISEPs
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="87.00">
<comment><narrative>
The number of campaigns and actions that will specifically target potential female students and focus on attracting them to specific fields of study with high labor market value and low female representation (energy, railways, etc.) ).
There will be one campaign per ISEP in year one, 2 campaigns per ISEP in year 2, 3 campaigns per ISEP in year 3 and 4.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Validation and dissemination of a national operational research strategy
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="Yes">
<comment><narrative>
Validation and operationalization of the national strategy for research and innovation
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ISEP network trainers who have received financial support from 3FPT for their capacity building
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="50.00">
<comment><narrative>
Number of ISEP trainers who have benefited from 3FPT support on their capacity building out of the number of ISEP trainers
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ISEPs and childcare center built, with a certified or climate-friendly design, and staffed
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="8.00">
<comment><narrative>
The number of ISEPs and crEches built and equipped with materials that respect the environment but are also staffed ith academic and administrative personel. All three elements must be met for the indicator to be valid.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ISEP professors trained in implementing classroom based inclusive education approaches
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="100.00">
<comment><narrative>
Percentage of ISEP professors trained in implementing classroom-based inclusive education approaches
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project-supported ISEPs that have Boards of Directors with at least 40% private sector representation
</narrative></title>
<baseline year="2023" iso-date="2023-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-06" />
<period-end iso-date="2028-07-31" />
<target value="12.00">
<comment><narrative>
The indicator measures the number of ISEPs whose board of directors includes at least 40% private sector representatives. The indicator should be achieved for one ISEP, ThiEs at the next board renewal, in less than a year. Five other existing ISEPs are working on achieving it.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated information and management system for higher education in place
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="Yes">
<comment><narrative>
A functional integrated management system within the MESRI, capable of generating statistics, indicators, and reliable data for the sub-sector.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth trained in ISEPs through 3FPT funding
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="14,500.00">
<comment><narrative>
The number of youth trained with the financial assistance of 3FPT to carry out their studies within the ISEP. This indicator includes all beneficiaries whose school fees are paid directly by 3FTP to the ISEP. 1,000 was achieved pre-project; 2,658 was achieved with WB-financed support, and the total/global result is 3,658.
</narrative></comment>
</target>
<actual value="3658">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Ministry of Higher Education budget allocated to pedagogical aspects
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="45.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="60.00">
<comment><narrative>
Resources allocated to the operating expenses of higher education institutions compared to the MESRI budget
</narrative></comment>
</target>
<actual value="52">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Higher Education Institutions achieving 80% of PBC targets on Research
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Definition: The indicator measures the number of higher education institutions that have achieved 80% of their research and innovation performance targets.

Progress: PbC implementation is ongoing and evaluation is planned by the end of 2026
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Higher Education Institutions achieving 80% of PBC targets on Research
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
The indicator measures the number of higher education institutions that have achieved 80% of their research and innovation performance targets.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project-supported ISEPs that have Boards of Directors with at least 40% private sector representation
</narrative></title>
<baseline year="2023" iso-date="2023-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-06" />
<period-end iso-date="2028-07-31" />
<target value="12.00">
<comment><narrative>
Definition: The indicator measures the number of ISEPs whose board of directors includes at least 40% private sector representatives. 

Progress: The indicator should be achieved for one ISEP, ThiEs at the next board renewal, in less than a year. Five other existing ISEPs are working on achieving it.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project-supported ISEPs that have Boards of Directors with at least 40% private sector representation
</narrative></title>
<baseline year="2023" iso-date="2023-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-06" />
<period-end iso-date="2028-07-31" />
<target value="12.00">
<comment><narrative>
The indicator measures the number of ISEPs whose board of directors includes at least 40% private sector representatives. The indicator should be achieved for one ISEP, ThiEs at the next board renewal, in less than a year. Five other existing ISEPs are working on achieving it.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Higher Education Institutions achieving at least 80% of their PBCs objectives (internal efficiency, digitization)
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Definition: Percentage of higher education institutions that achieved 80% of the objectives set in the PBCs (objectives achieved compared to the total number of objectives)

Progress: PBCs signed are under implementation and the recruitment of verification agent is under process for completion
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Higher Education Institutions achieving at least 80% of their PBCs objectives (internal efficiency, digitization)
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Percentage of higher education institutions that achieved 80% of the objectives set in the PBCs (objectives achieved compared to the total number of objectives)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth enrolled in the ISEPs supported by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="5,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="21,000.00">
<comment><narrative>
Definition: Number of students enrolled, at a given time, in the ISEPs supported by the project. 

Progress: 5,000 was achieved pre-project; 9,913 was achieved with WB-financed support, and the total/global result is 14,913.
</narrative></comment>
</target>
<actual value="14913">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth enrolled in the ISEPs supported by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="5,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="21,000.00">
<comment><narrative>
Number of students enrolled, at a given time, in the ISEPs supported by the project. 5,000 was achieved pre-project; 9,913 was achieved with WB-financed support, and the total/global result is 14,913.
</narrative></comment>
</target>
<actual value="14913">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Career fairs organized in the ISEP network in collaboration with the private sector
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="34.00">
<comment><narrative>
Number of job fairs organized in the ISEP network in collaboration with the private sector for ISEP students to prepare their transition to the labor market. Year 1: 5 fairs (1 per ISEP, for 5 ISEPs)
Year 2: 5 fairs (1 per ISEP, for 5 ISEPs)
Year 3: 5 fairs (1 per ISEP, for 5 ISEPs)
Year 4: 2 additional ISEPs to be established – 7 fairs (1 per ISEP, for 7 ISEPs)
Year 4: 12 fairs (1 per ISEP, for 12 ISEPs)

Cumulative total: 34 fairs
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ISEP professors trained in implementing classroom based inclusive education approaches
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="100.00">
<comment><narrative>
Definition: Percentage of ISEP professors trained in implementing classroom-based inclusive education approaches.

Progress: ToR developed for the recruitment of consultant.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female employees and students using childcare center who report increase in productivity
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="100.00">
<comment><narrative>
Progress: This will be self-declared based on surveys of the beneficiaries of crEches set up within the ISEPs. The recruitment of the  firm for the  architectural studies is expected to be completed by end of July 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female ISEP instructors
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="30.00">
<comment><narrative>
Definition: Percentage of women among ISEP teachers, all types of contracts included.

Progress:
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ISEPs accredited by the 3FPT
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="9.00">
<comment><narrative>
Definition: The number of ISEPs supported by the project that are accredited by the 3FPT.

Progress: 2 ISEP accredited in 2024 (ThiEs &amp; Matam); 3 ISEP accredited in 2025 (Richard Toll, Bignona &amp; Diamniadio).  ISEP MbackE accreditation is underway
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Higher education institutions having signed a performance-based contract
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="9.00">
<comment><narrative>
Definition: The indicator measures the number of higher education institutions that have signed a performance-based contract. 
Progress: All 8 public universities have signed a PBC which are under implementation.
</narrative></comment>
</target>
<actual value="8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ISEP network trainers who have received financial support from 3FPT for their capacity building
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="50.00">
<comment><narrative>
Definition: Number of ISEP trainers who have benefited from 3FPT support on their capacity building out of the number of ISEP trainers.

Progress: Due to the failure of the consultant, the training of the ISEP network administrative staff has been rescheduled to September 2026. But the recruitment of consultant for the training of 50 ISEP trainers is still ongoing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth trained in ISEPs through 3FPT funding
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="14,500.00">
<comment><narrative>
Definition: The number of youth trained with the financial assistance of 3FPT to carry out their studies within the ISEP. This indicator includes all beneficiaries whose school fees are paid directly by 3FTP to the ISEP. 
Progress: 1,000 was achieved pre-project; 2,658 was achieved with WB-financed support, and the total/global result is 3,658.
</narrative></comment>
</target>
<actual value="3658">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Career fairs organized in the ISEP network in collaboration with the private sector
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="34.00">
<comment><narrative>
DEfintion: Number of job fairs organized in the ISEP network in collaboration with the private sector for ISEP students to prepare their transition to the labor market. Year 1: 5 fairs (1 per ISEP, for 5 ISEPs)
Year 2: 5 fairs (1 per ISEP, for 5 ISEPs)
Year 3: 5 fairs (1 per ISEP, for 5 ISEPs)
Year 4: 2 additional ISEPs to be established – 7 fairs (1 per ISEP, for 7 ISEPs)
Year 4: 12 fairs (1 per ISEP, for 12 ISEPs)
Cumulative total: 34 fairs

Progress: The project has developed a communication strategy which includes clear guidance on the organization of career fairs. The fair ToRs are validated and the project is working with the communication agency on the format of the fairs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Ministry of Higher Education budget allocated to pedagogical aspects
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="45.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="60.00">
<comment><narrative>
Definition: Resources allocated to the operating expenses of higher education institutions compared to the MESRI budget
</narrative></comment>
</target>
<actual value="52">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Targeted campaigns and actions undertaken to attract prospective female students in high-value fields where women are traditionally underrepresented within the ISEPs
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="87.00">
<comment><narrative>
Definition: The number of campaigns and actions that will specifically target potential female students and focus on attracting them to specific fields of study with high labor market value and low female representation (energy, railways, etc.) ).
There will be one campaign per ISEP in year one, 2 campaigns per ISEP in year 2, 3 campaigns per ISEP in year 3 and 4.

Progress: The ToR for the campaigns have been validated and activities are expected to be completed by end of December 2026
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated information and management system for higher education in place
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="Yes">
<comment><narrative>
Definition: A functional integrated management system within the MESRI, capable of generating statistics, indicators, and reliable data for the sub-sector.

Progress: The process is ongoing with recruitment of technical staff et acquisition of required equipment.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received (including on GBV) addressed in line with time stipulations in the operations manual
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="100.00">
<comment><narrative>
Definition: Percentage of complaints received (including on gender-based violence) dealt with within the deadlines set out in the texts.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="415000.00">
<comment><narrative>
Definition: Corporate WB-indicator.
Progress: Value achieved in 2025 (1871) = 14,913 (cumulative Campusen enrollments in 2024 and 2025) + 3,658 (beneficiaries in 2024 and 2025 in CCP–ACP–DiSEP).
</narrative></comment>
</target>
<actual value="18571">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Research projects financed by the competitive fund established by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="10.00">
<comment><narrative>
Definition: Number of research projects financed by the competitive fund in accordance with the manual of  procedures

Progress: 50 projects already selected and signed for funding
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ISEP Graduate Tracer Studies Surveys conducted
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="Yes">
<comment><narrative>
Definition: This indicator measures the existence of an annual report providing information on the professional progression of ISEP graduates on the labor market.

Progress: ToR is under developmented and discussion ongoing to leverage IFC experience on tracer studies
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ISEPs and childcare center built, with a certified or climate-friendly design, and staffed
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="8.00">
<comment><narrative>
Definition: The number of ISEPs and crEches built and equipped with materials that respect the environment but are also staffed with academic and administrative personnel. All three elements must be met for the indicator to be valid.

Progress:  Sites are legally secured with full cadastral documentation, topographic and hydrological studies are finalized, boundary wall contracts for all 8 lots were signed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Validation and dissemination of a national operational research strategy
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="Yes">
<comment><narrative>
Definition: Validation and operationalization of the national strategy for research and innovation.

Progress: Achieved
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Higher Education Institutions achieving 80% of PBC targets on Research
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Definition: The indicator measures the number of higher education institutions that have achieved 80% of their research and innovation performance targets.

Progress: PbC implementation is ongoing and evaluation is planned by the end of 2026
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Higher Education Institutions achieving 80% of PBC targets on Research
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
The indicator measures the number of higher education institutions that have achieved 80% of their research and innovation performance targets.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project-supported ISEPs that have Boards of Directors with at least 40% private sector representation
</narrative></title>
<baseline year="2023" iso-date="2023-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-06" />
<period-end iso-date="2028-07-31" />
<target value="12.00">
<comment><narrative>
Definition: The indicator measures the number of ISEPs whose board of directors includes at least 40% private sector representatives. 

Progress: The indicator should be achieved for one ISEP, ThiEs at the next board renewal, in less than a year. Five other existing ISEPs are working on achieving it.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project-supported ISEPs that have Boards of Directors with at least 40% private sector representation
</narrative></title>
<baseline year="2023" iso-date="2023-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-06" />
<period-end iso-date="2028-07-31" />
<target value="12.00">
<comment><narrative>
The indicator measures the number of ISEPs whose board of directors includes at least 40% private sector representatives. The indicator should be achieved for one ISEP, ThiEs at the next board renewal, in less than a year. Five other existing ISEPs are working on achieving it.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Higher Education Institutions achieving at least 80% of their PBCs objectives (internal efficiency, digitization)
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Definition: Percentage of higher education institutions that achieved 80% of the objectives set in the PBCs (objectives achieved compared to the total number of objectives)

Progress: PBCs signed are under implementation and the recruitment of verification agent is under process for completion
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Higher Education Institutions achieving at least 80% of their PBCs objectives (internal efficiency, digitization)
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Percentage of higher education institutions that achieved 80% of the objectives set in the PBCs (objectives achieved compared to the total number of objectives)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth enrolled in the ISEPs supported by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="5,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="21,000.00">
<comment><narrative>
Definition: Number of students enrolled, at a given time, in the ISEPs supported by the project. 

Progress: 5,000 was achieved pre-project; 9,913 was achieved with WB-financed support, and the total/global result is 14,913.
</narrative></comment>
</target>
<actual value="14913">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth enrolled in the ISEPs supported by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="5,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="21,000.00">
<comment><narrative>
Number of students enrolled, at a given time, in the ISEPs supported by the project. 5,000 was achieved pre-project; 9,913 was achieved with WB-financed support, and the total/global result is 14,913.
</narrative></comment>
</target>
<actual value="14913">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ISEP Graduate Tracer Studies Surveys conducted
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="Yes">
<comment><narrative>
This indicator measures the existence of an annual report providing information on the professional progression of ISEP graduates on the labor market.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Higher Education Institutions achieving at least 80% of their PBCs objectives (internal efficiency, digitization)
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="80.00">
<comment><narrative>
Percentage of higher education institutions that achieved 80% of the objectives set in the PBCs (objectives achieved compared to the total number of objectives)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="415000.00">
<comment><narrative>
Value achieved in 2025 (1871) = 14,913 (cumulative Campusen enrollments in 2024 and 2025) + 3,658 (beneficiaries in 2024 and 2025 in CCP–ACP–DiSEP).
</narrative></comment>
</target>
<actual value="18571">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Research projects financed by the competitive fund established by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-07-31" />
<target value="10.00">
<comment><narrative>
Number of research projects financed by the competitive fund in accordance with the manual of  procedures
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P172422</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Cadastre and Land Tenure Improvement Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed Project Development Objective is to strengthen the Recipient's capacity for the implementation of its cadastre at a national level; and to increase the number of land rights registered in selected areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Cadastre and Land Tenure Improvement Project for Senegal is to strengthen the Recipient's capacity for the implementation of its cadastre at a national level; and to increase the number of land rights registered in selected areas. The project comprises of five components. The first component, strengthening land institutions and investing in geospatial infrastructure objective is to improve the land administration service delivery by improving the efficiency of the involved land institutions and facilitating the digital transformation of land administration in Senegal. It consists of following sub-components: (i) strengthening public sector capacity for improved land administration service delivery; (ii) facilitating digital transformation of land administration; and (iii) strengthening the national spatial data infrastructure (NSDI). The second component, empowering project-supported municipalities in carrying out systematic land registration operations objectives are: (i) to provide the municipalities and the administrations concerned with georeferenced information on the various statuses and land boundaries; (ii) to formalize individual or collective use rights, as they exist; (iii) to contribute to the establishment of an innovative national cadastre that considers individual and collective land use rights; and (iv) to improve land governance in the selected municipalities. The third component, sustaining long-term policy dialogue, scaling-up training and innovation in the land sector objective is to support capacity building and foster innovation in the Senegalese land administration sector, including research and policy dialogue to prepare for the modernization and expansion of the land administration services at central and decentralized levels (ministries, tax service centers (CSF), municipalities). It consists of following sub-components: (i) promoting research and dialogue on land tenure governance innovations; and (ii) supporting the development of land tenure training. The fourth component, program coordination, monitoring, and knowledge management will finance modernization of land management program, KfW (PROCASEF's) investment and recurrent costs for the management of the International Development Association (IDA) finance. The fifth component, contingent emergency response component (CERC) will allow for the rapid reallocation of project funds in the event of natural or man-made crisis and major disease outbreaks of public health importance during the implementation of the project, in accordance with the World Bank investment project financing (IPF) policy, paragraph 12 (Projects in Situations of Urgent Need of Assistance or Capacity Constraints).]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0043530"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0043531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2020-10-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-06-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-01-24"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-01-24"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Andre Teyssier</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ateyssier@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243939" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.8 -16.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244800" />
            <name><narrative>Region de Thies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -16.86667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244990" />
            <name><narrative>Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.91667 -13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246451" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.33333 -15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248753" />
            <name><narrative>Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.16667 -13.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249221" />
            <name><narrative>Louga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.41667 -15.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250804" />
            <name><narrative>Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14 -16</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251910" />
            <name><narrative>Fatick</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.28333 -16.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252308" />
            <name><narrative>Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -16.1</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.28333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303935" />
            <name><narrative>Region de Kaffrine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.10528 -15.54565</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303936" />
            <name><narrative>Region de Kedougou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.55146 -12.17586</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303937" />
            <name><narrative>Region de Sedhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70683 -15.55801</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15142" percentage="61" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="39" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="90.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000726" percentage="50" xml:lang="en"><narrative>Geospatial Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="50" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="100" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="100" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="21" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="5" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="9" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="21" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="21" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="50" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="50" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="21" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="9" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="21" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="100" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000714" percentage="21" xml:lang="en"><narrative>Urban Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="39" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">556213.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">556213.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">556213.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">556213.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">556213.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">556213.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">556213.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">556213.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">556213.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">556213.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">556213.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">556213.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1262500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1792560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1729773.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1729773.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1729773.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1729773.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1729773.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1729773.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1729773.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1729773.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1729773.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1729773.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1729773.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1729773.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1325620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-24"/>
<value currency="USD" value-date="2029-01-24">8912689.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-24"/>
<value currency="USD" value-date="2029-01-24">8912689.51</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">40000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">40000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">40000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">1247894</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">1632440</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">4754123</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">321543</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">234521</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">141472</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">365725</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">765932</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">57361</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">53504</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">161027</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">40835</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">203205</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">198428</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">268489</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">423506</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">128683</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">127398</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">328692</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">328202</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">175112</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">175128</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">221903</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">220290</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">151116</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-14655</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">980652</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">985078</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">115790</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">116283</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">491383</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">491317</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">480513</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">676333</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">363176</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">2666710</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">2166749</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1986078</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1302227</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">1909054</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">2723981</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">1260201</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">1518025</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">502789</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">435626</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">763093</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">768902</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">845426</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">846792</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">751764</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">758312</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">2583070</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">1009672</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">1832709</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1896995</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1465419</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1835610</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1842498</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">1544234</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">69985</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1653308</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1642011</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">1085394</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">1083497</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">662499</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1684300</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">2346555</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">589947</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">589573</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">791499</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">799414</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1946771</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">2087766</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">1426458</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-24603</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-26098</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-30658</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-32564</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-41110</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-68300</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-82255</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-108012</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-127703</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-43531"><narrative>PROCASEF Project Implementation Unit - Ministry of Finances and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172422"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P172422?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172422"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reports produced by the Project on specific topics
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Plots mapped with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">

</target>
<actual value="469465">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of individuals with increased perception of tenure security through project activities
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="7.54"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="80.00">
<comment><narrative>
This indicator measures the percentage of individuals with a satisfactory (or above) perception of tenure security.
</narrative></comment>
</target>
<actual value="40.35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women beneficiaries of information campaigns on women property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="17,200">
<comment><narrative>
This indicator measures the number of women benefitting from information campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="12253">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A module related to the mapping of forests and protected areas has been added in the SIF
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities covered by an orthophoto
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of PROCASEF municipalities covered by an orthophoto freely accessible on the Geoportal.
</narrative></comment>
</target>
<actual value="557">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women beneficiaries of information campaigns on women's property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="12,000.00">
<comment><narrative>
This indicator measures the number of women participating in the information, consultation, and awareness campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="12253">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="500,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Draft Decree establishing a structure for ensuring the sustainability of the project's investments
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational helpdesk to provide legal and IT support to municipalities
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="2,100,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="1,393,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities covered by the CORS network
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="23.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of PROCASEF municipalities covered by a CORS network.
</narrative></comment>
</target>
<actual value="366">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational helpdesk to provide legal and IT support to municipalities
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2027-06-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or Better-Paid Jobs created as a result of the project
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="3,500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of individuals with increased perception of tenure security through project activities
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="7.54"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="80.00">
<comment><narrative>
This indicator measures the percentage of individuals with a satisfactory (or above) perception of tenure security.
</narrative></comment>
</target>
<actual value="40.35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The Programme National Foncier (PNF) has been approved by the Recipient
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal Land Offices equipped and operational with LIS access
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="180.00">
<comment><narrative>
This is an indicator that measures the number of  Land Bureaus in PROCASEF municipalities equipped and operational with LIS access. The indicator will be measured by PROCASEF PIU with input from Land Bureaus
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women beneficiaries of information campaigns on women's property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="12,000.00">
<comment><narrative>
This indicator measures the number of women participating in the information, consultation, and awareness campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="12253">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Connections to digital services as a result of the project
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of individuals with increased perception of tenure security through project activities
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="7.54"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="80.00">
<comment><narrative>
This indicator measures the percentage of individuals with a satisfactory (or above) perception of tenure security.
</narrative></comment>
</target>
<actual value="40.35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Draft Decree establishing a structure for ensuring the sustainability of the project's investments
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or Better-Paid Jobs created as a result of the project
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="3,500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="530,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Plots mapped with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">

</target>
<actual value="469465">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reports produced by the Project on specific topics
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Connections to digital services as a result of the project
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants trained on land tenure management through project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="10,900.00">
<comment><narrative>
This indicator measures the number of total participants trained on land tenure management with PROCASEF Project support.
</narrative></comment>
</target>
<actual value="3554">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities covered by the CORS network
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="23.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of PROCASEF municipalities covered by a CORS network.
</narrative></comment>
</target>
<actual value="366">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Information campaigns on women's property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="200.00">
<comment><narrative>
This indicator measures the number of information campaigns targeting women's property rights.
</narrative></comment>
</target>
<actual value="129">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reports produced by the Project on specific topics
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The National Land Program (NLP) has been approved by the Recipient
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women beneficiaries of information campaigns on women's property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="17,200.00">
<comment><narrative>
This indicator measures the number of women participating in the information, consultation, and awareness campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="12253">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational helpdesk to provide legal and IT support to municipalities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational helpdesk to provide legal and IT support to municipalities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational helpdesk to provide legal and IT support to municipalities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational helpdesk to provide legal and IT support to municipalities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The National Land Program (NLP) has been approved by the Recipient
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The National Land Program (NLP) has been approved by the Recipient
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The National Land Program (NLP) has been approved by the Recipient
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The Programme National Foncier (PNF) has been approved by the Recipient
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="2,100,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="2202476">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="1,393,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="2,100,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="2,100,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="2,100,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="543414">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="530,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="3.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The National Land Program (NLP) has been prepared and validated at a technical level by the Beneficiary
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The National Land Program (NLP) has been prepared and validated at a technical level by the Beneficiary
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The National Land Program (NLP) has been prepared and validated at a technical level by the Beneficiary
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2027-06-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Information, consultation, and awareness campaigns
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="635.00">
<comment><narrative>
This indicator measures the number of information, consultation, and awareness campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="526">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants trained on land tenure management through project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="15,600.00">
<comment><narrative>
This indicator measures the number of total participants trained on land tenure management with PROCASEF Project support.
</narrative></comment>
</target>
<actual value="3554">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal Land Bureaus equipped and operational with LIS access
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="120.00">
<comment><narrative>
This is an indicator that measures the number of  Land Bureaus in PROCASEF municipalities equipped and operational with LIS access. The indicator will be measured by PROCASEF PIU with input from Land Bureaus
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities covered by the CORS network
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="23.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of PROCASEF municipalities covered by a CORS network.
</narrative></comment>
</target>
<actual value="366">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Information, consultation, and awareness campaigns
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="900.00">
<comment><narrative>
This indicator measures the number of information, consultation, and awareness campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="526">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal Land Offices equipped and operational with LIS access
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="171.00">
<comment><narrative>
This is an indicator that measures the number of  Land Bureaus in PROCASEF municipalities equipped and operational with LIS access. The indicator will be measured by PROCASEF PIU with input from Land Bureaus
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="2,100,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The National Land Program (NLP) has been approved by the Recipient
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2027-12-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A module related to the mapping of forests and protected areas has been added in the SIF
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Plots mapped with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">

</target>
<actual value="469465">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reports produced by the Project on specific topics
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Information, consultation, and awareness campaigns
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="900.00">
<comment><narrative>
This indicator measures the number of information, consultation, and awareness campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="526">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational helpdesk to provide legal and IT support to municipalities
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Information campaigns on women's property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="200.00">
<comment><narrative>
This indicator measures the number of information campaigns targeting women's property rights.
</narrative></comment>
</target>
<actual value="129">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of individuals with increased perception of tenure security through project activities
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="7.54"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="80.00">
<comment><narrative>
This indicator measures the percentage of individuals with a satisfactory (or above) perception of tenure security.
</narrative></comment>
</target>
<actual value="40.35">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Information, consultation, and awareness campaigns
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="900.00">
<comment><narrative>
This indicator measures the number of information, consultation, and awareness campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="526">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal Land Offices equipped and operational with LIS access
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="171.00">
<comment><narrative>
This is an indicator that measures the number of  Land Bureaus in PROCASEF municipalities equipped and operational with LIS access. The indicator will be measured by PROCASEF PIU with input from Land Bureaus
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Information campaigns on women's property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of information campaigns targeting women's property rights.
</narrative></comment>
</target>
<actual value="129">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities covered by the CORS network
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="23.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of PROCASEF municipalities covered by a CORS network.
</narrative></comment>
</target>
<actual value="366">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities covered by an orthophoto
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of PROCASEF municipalities covered by an orthophoto freely accessible on the Geoportal.
</narrative></comment>
</target>
<actual value="557">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities covered by an orthophoto
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of PROCASEF municipalities covered by an orthophoto freely accessible on the Geoportal.
</narrative></comment>
</target>
<actual value="557">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reports produced by the Project on specific topics
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Information campaigns on women's property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of information campaigns targeting women's property rights.
</narrative></comment>
</target>
<actual value="129">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women beneficiaries of information campaigns on women's property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="12,000.00">
<comment><narrative>
This indicator measures the number of women participating in the information, consultation, and awareness campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="12253">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants trained on land tenure management through project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="15,600.00">
<comment><narrative>
This indicator measures the number of total participants trained on land tenure management with PROCASEF Project support.
</narrative></comment>
</target>
<actual value="3554">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or Better-Paid Jobs created as a result of the project
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="3,500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities covered by the CORS network
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="23.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of PROCASEF municipalities covered by a CORS network.
</narrative></comment>
</target>
<actual value="366">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities covered by an orthophoto
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of PROCASEF municipalities covered by an orthophoto freely accessible on the Geoportal.
</narrative></comment>
</target>
<actual value="557">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants trained on land tenure management through project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="15,600.00">
<comment><narrative>
This indicator measures the number of total participants trained on land tenure management with PROCASEF Project support.
</narrative></comment>
</target>
<actual value="4748">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Information campaigns on women's property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="200.00">
<comment><narrative>
This indicator measures the number of information campaigns targeting women's property rights.
</narrative></comment>
</target>
<actual value="136">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Information, consultation, and awareness campaigns
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="900.00">
<comment><narrative>
This indicator measures the number of information, consultation, and awareness campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="660">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of individuals with increased perception of tenure security through project activities
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="7.54"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="80.00">
<comment><narrative>
This indicator measures the percentage of individuals with a satisfactory (or above) perception of tenure security.
</narrative></comment>
</target>
<actual value="40.35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal Land Offices equipped and operational with LIS access
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="171.00">
<comment><narrative>
This is an indicator that measures the number of  Land Bureaus in PROCASEF municipalities equipped and operational with LIS access. The indicator will be measured by PROCASEF PIU with input from Land Bureaus
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women beneficiaries of information campaigns on women property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="17,200">
<comment><narrative>
This indicator measures the number of women benefitting from information campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="17171">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A module related to the mapping of forests and protected areas has been added in the SIF
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reports produced by the Project on specific topics
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational helpdesk to provide legal and IT support to municipalities
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2027-06-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The National Land Program (NLP) has been approved by the Recipient
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2027-12-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Draft Decree establishing a structure for ensuring the sustainability of the project's investments
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or Better-Paid Jobs created as a result of the project
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="3,500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Connections to digital services as a result of the project
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities covered by an orthophoto
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="136.00">
<comment><narrative>
This indicator measures the number of PROCASEF municipalities covered by an orthophoto freely accessible on the Geoportal.
</narrative></comment>
</target>
<actual value="557">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants trained on land tenure management through project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="15,600.00">
<comment><narrative>
This indicator measures the number of total participants trained on land tenure management with PROCASEF Project support.
</narrative></comment>
</target>
<actual value="3554">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="2,100,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="2202476">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="1,393,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="2,100,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="2,100,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="2,100,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Degree of satisfaction of beneficiaries with respect to land tenure services in targeted areas
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="55.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="80.00">
<comment><narrative>
This is a citizen engagement indicator that measures the overall satisfaction of beneficiaries with respect to land tenure and other services in PROCASEF municipalities.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="543414">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="530,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Occupancy titles with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">
<comment><narrative>
This is an indicator on the number of occupancy titles with NICAD in LIS. The data will be collected through the Land Information System through the PROCASEF M&amp;amp;E system.
</narrative></comment>
</target>
<actual value="351899">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="3.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the delivery of land tenure related services
</narrative></title>
<baseline year="2021" iso-date="2021-10-01" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-01" />
<period-end iso-date="2026-09-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the average time it takes to deliver land services from the request to the delivery of the final occupancy title. It will be measured using (i) the data on the current average processing time assessed by the baseline study and (ii) the data on average transaction time provided by the Land Bureaus to the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The National Land Program (NLP) has been prepared and validated at a technical level by the Beneficiary
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2027-06-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Plots mapped with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="800,000.00">

</target>
<actual value="630470">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Connections to digital services as a result of the project
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women beneficiaries of information campaigns on women property rights
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="12,000">
<comment><narrative>
This indicator measures the number of women benefitting from information campaigns that will take place in PROCASEF municipalities over the life of the Project.
</narrative></comment>
</target>
<actual value="12253">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Plots mapped with NICAD recorded in LIS with Project support
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2026-09-15" />
<target value="530000">

</target>
<actual value="469465">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Draft Decree establishing a structure for ensuring the sustainability of the project's investments
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-01-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household members whose land rights are officially validated by an occupancy title
</narrative></title>
<baseline year="2021" iso-date="2021-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-15" />
<period-end iso-date="2029-01-15" />
<target value="2,100,000.00">
<comment><narrative>
This is an indicator to measure the number of household members with recognized occupancy titles. This indicator will be measured by Land Bureaus in PROCASEF municipalities each time a NICAD for a property is issued. It will be recorded through the PROCASEF M&amp;E system.
</narrative></comment>
</target>
<actual value="1903964">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P133597</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Safety Net Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the Project are to: (a) support the establishment of building blocks for the social safety net system; and (b) increase the access of poor and vulnerable households to targeted and adaptive cash transfers programs.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Social Safety Net Project for Senegal are to support the establishment of building blocks for the social safety net system and to provide targeted cash transfers to poor and vulnerable households. The project has two components. (1) Support to the development of the social safety net system component will support the government in the development of the social safety net system, as part of a national social protection framework. This component will support (i) the development of core instruments and procedures that will form the backbone of a social safety net system, and (ii) the strengthening of the institutional capacity of the Social Protection Delegation (DGPSN) and sectoral actors of the social safety net system. (2) Support to the national targeted cash transfer program for poor and vulnerable household?s component will support the expansion and strengthening of the National Cash Transfer Program (PNBSF). This component will finance: (i) monetary transfers to PNBSF beneficiary households; (ii) accompanying measures put in place by the DGPSN, sectoral actors and local institutions; and (iii) selected program management and evaluation costs.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0011827"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0011826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-03-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-04-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-03-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-03-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Stephanie Brunelin</narrative></person-name><telephone>+1-202-473-1000</telephone><email>sbrunelin@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="88" xml:lang="en"/><sector vocabulary="1" code="12261" percentage="12" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="88.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="2" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="2" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="4" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="2" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="3" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="4" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="79" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="2" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="2" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="4" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="91" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="2" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="4" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">41229.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">171477.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">216675.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">260941.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">302980.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">344007.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">391837.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">442948.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">484096.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">514795.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">268839.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">565258.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">597861.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">621837.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">645570.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">672664.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">701743.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">735399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">774279.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">812025.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">418405.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">853942.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">877189.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">921780.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">947214.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">945391.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">943609.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">969003.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">966775.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">941260.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">932958.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">931095.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">461862.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">910521.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">888691.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">876582.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">865201.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">851674.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">834259.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">818545.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">803479.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">395766.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">781974.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">770674.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">756094.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">738639.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">723856.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">711301.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">698058.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">683113.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">666792.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">326592.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">643342.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">637834.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">635728.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">627061.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">618435.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">611104.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">604705.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">598023.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">502605.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">242392.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">2553299.98</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">13642.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">67125.09</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">25293.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">281627.04</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">545961.32</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">399475.36</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">96587.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">86587.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">2945670.79</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">456685.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2473405.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">830316.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2651924.23</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">1616422.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1826412.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">3294380.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">330889.88</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1913351.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">2422098.73</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1895231.60</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">3370615.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">2901709.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1330116.06</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">2240987.40</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">216095.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">4460229.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1366878.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">482124.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1487802.06</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1429453.84</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">262712.59</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">336797.29</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">702894.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">4113727.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">445453.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">792390.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2068391.26</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">223909.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">217616.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1375716.78</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">3307330.14</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">14890542.97</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1031285.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">451590.08</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">392842.15</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">551141.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-15"/>
<value currency="USD" value-date="2024-03-15">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-15"/>
<value currency="USD" value-date="2024-03-15">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">40500000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">57000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-2057</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">40000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">40000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-4951515</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-828058</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-242330</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">2553300</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">13642</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">67125</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">25293</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">281627</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">545961</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">399475</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">96587</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">86588</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">2945671</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">456685</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">2473405</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">830317</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">2651924</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">1826412</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">3294380</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">319292</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">1913352</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">978968</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">1895232</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">3370616</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">2699719</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">2024860</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">3228601</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">1366879</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">480453</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-66349</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">4053741</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">59986</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">4687</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">787704</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">2068391</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">224197</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">416685</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">1375717</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">3307330</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">14890543</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">1031286</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">451590</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">392842</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">551141</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">4205155</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">60887</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">1300105</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">202018</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">107406</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">12368562</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">12300436</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">15469476</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">416987</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">1254730</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">6054781</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">6013245</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">394265</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">243273</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">5153058</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">11486809</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">6170930</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">860420</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">1709389</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">251099</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">1263582</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">4367370</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">4360321</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">2224466</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">148151</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">125372</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">1216482</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">1207377</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">13894</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-7565</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-693441</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-4904047</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-236361</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-7919</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-9674</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-11487</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-20689</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-37609</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-63736</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-82993</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-106860</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-116008</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-135925</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-136456</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-13137</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-139177</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-29484</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-139253</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-98676</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-141155</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-121562</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-132843</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-25982</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-163983</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-129748</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-70695</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-167544</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-130201</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-200203</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-115502</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-126950</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-198633</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-127418</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-133819</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-202305</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-133574</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-132757</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-203700</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-134263</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-131796</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-131250</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-211815</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-132806</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-8678</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-113957</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-213787</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-130785</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-212043</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-124038</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-353497</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-354928</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-884447</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-360697</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-902924</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2912</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-356547</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-142328</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-770904</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11826"><narrative>Delegation Generale a la Protection Sociale et la Solidarite Nationale; Ministry of Community Development, National Solidarity and Social and Territorial Equity</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P133597"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P133597?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P133597"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Impact of the PNBSF on women's decision making inside the household
</narrative></title>
<baseline year="2017" iso-date="2017-11-12" value="47.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-12" />
<period-end iso-date="2024-03-12" />
<target value="60.00">
<comment><narrative>
Women's decision-making is measured as the share of women who participate in household decisions concerning the following five aspects: education, health, nutrition, agriculture/livestock, and shock response. The impact evaluation of the PNBSF finds that 55 percent of the women are in charge of making the decisions within their household on these five aspects.
</narrative></comment>
</target>
<actual value="55.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quality of the management of the PNBSF
</narrative></title>
<baseline year="2018" iso-date="2018-09-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-12" />
<period-end iso-date="2024-03-12" />
<target value="6.00">
<comment><narrative>
This indicator measured the quality of the management of the PNBSF across six sub-indicators. Each indicator met was assigned one point. The points were not cumulative, with every point being calculated from zero every year. The sub-indicators included: (i) the MIS generates monitoring reports of the PNBSF with the monitoring indicators, (ii) the payment module in the PNBSF MIS automatically and electronically reconciles payment with the payment provider, (iii) on average, 80 percent of the sensitization sessions planned per year are implemented in the country, (iv) on average each regional coordinator has conducted at least 30 supervision missions over the year, (v) there was no delay in the payment of the cash transfer in any of the 4 trimesters in any department, and (iv) the satisfaction rate of the beneficiaries regarding the program is higher than 80 percent.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households in the RNU benefitting from productive transfers
</narrative></title>
<baseline year="2016" iso-date="2016-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-12" />
<period-end iso-date="2024-03-12" />
<target value="50,000">
<comment><narrative>
This target was exceeded, with 59,766 households benefiting from the YKK program against a revised target of 50,000 households.
</narrative></comment>
</target>
<actual value="59,766">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of climate-related emergency response
</narrative></title>
<baseline year="2013" iso-date="2013-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-06-23" />
<period-end iso-date="2024-02-04" />
<target value="85,000.00">
<comment><narrative>
This OI was included with AF3. This includes the response to floods, food insecurity, and fires. The target was overly exceeded, with 113,551 households benefitting from climate-related emergency response against a revised target of 85,000. This was due to the gradual piloting and scaling of three key programs and an enabling institutional framework.
</narrative></comment>
</target>
<actual value="113,551.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints and grievances of the PNBSF registered in the MIS and resolved without delay
</narrative></title>
<baseline year="2014" iso-date="2014-05-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-12" />
<period-end iso-date="2024-03-12" />
<target value="80.00">
<comment><narrative>
This target was partially achieved. The MIS functionality &quot;resolved without delay&quot; became available in 2021. Since then, 100% of complaints (29,303) were resolved, 76 percent of which without delay, and 24 percent beyond 15 days after registration, as specified in the manual. The total number of complaints registered in the MIS since its deployment in 2018 amounts to 40,023, all of which were resolved.
</narrative></comment>
</target>
<actual value="76% of cases registered in the MIS resolved without delay">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households in the RNU
</narrative></title>
<baseline year="2014" iso-date="2014-04-29" value="60,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-29" />
<period-end iso-date="2024-03-13" />
<target value="1,000,000.00">
<comment><narrative>
The target was slightly exceeded, with 1,013,505 households registered in the RNU, surpassing the revised target of 1 million. All household identification data were collected before project closure and were utilized by the DGPSN for identification purposes in social safety net programs.
</narrative></comment>
</target>
<actual value="1,013,505">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Use of the Social Protection monitoring and evaluation platform
</narrative></title>
<baseline year="2018" iso-date="2018-09-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-12" />
<period-end iso-date="2024-03-12" />
<target value="17.00">
<comment><narrative>
This indicator measures the number of programs that used the RNU to identify and select program beneficiaries. While regular monitoring of this indicator was not conducted throughout the project, the actual target far exceeded the initial target of 17 programs, with 34 programs successfully using the RNU as a targeting tool. Some of these programs included the PNBSF, the agricultural resilience program, the Yokk Koom Koom program, nutrition programs, shock response programs and programs not implemented by the government but by partners such as UNICEF, GIZ or NGOs.
</narrative></comment>
</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints and grievances of the RNU registered in the MIS and resolved as per the operations manual
</narrative></title>
<baseline year="2016" iso-date="2016-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-12" />
<period-end iso-date="2024-03-12" />
<target value="80.00">
<comment><narrative>
The target was exceeded, with 95 percent of complaints and grievances of the RNU registered in the MIS and resolved as per the operations manual against an end target of 80 percent.
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of local committees who understand the objectives of the RNU
</narrative></title>
<baseline year="2016" iso-date="2016-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-12" />
<period-end iso-date="2024-03-12" />
<target value="80">
<comment><narrative>
This indicator was designed to measure the community's level of understanding of the RNU. It was initially captured by an evaluation called Community Performance Scorecard (Carte Communautaire de Performance, CCP) conducted by a firm. The latest CCP was conducted in 2022, and a debriefing workshop was held in January 2023. As part of the extension of the RNU to 1 million households, all the local committees were updated on the RNU's objectives, as well as on the various stages of the extension process, which required a high level of involvement on their part as the community targeting process is one of the cornerstones of the extension process. Community targeting took place in the second half of 2023, and all communal committees received training on the extension process prior to deployment.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PNBSF beneficiary households currently enrolled in the program
</narrative></title>
<baseline year="2014" iso-date="2014-05-12" value="48,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-12" />
<period-end iso-date="2024-03-12" />
<target value="300,000">
<comment><narrative>
The target was significantly surpassed, with a total of 355,000 households benefiting from the PNBSF, compared to a revised target of 300,000 households. In January 2023, the government opted to broaden the program's reach by including an additional 65,000 households with individuals who have disabilities who were already part of the CEC program. The original target of 300,000 households remained unchanged, as the project had recently undergone restructuring.
</narrative></comment>
</target>
<actual value="355,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regions visited every year for supervision mission by the PNBSF team of the sensitization sessions
</narrative></title>
<baseline year="2018" iso-date="2018-09-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-12" />
<period-end iso-date="2024-03-12" />
<target value="14.00">
<comment><narrative>
The target was fully achieved, with all of Senegal's 14 regions visited by supervision missions.
</narrative></comment>
</target>
<actual value="14.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of PNBSF beneficiary households who attended the last four sensitization sessions
</narrative></title>
<baseline year="2014" iso-date="2014-05-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-12" />
<period-end iso-date="2024-03-12" />
<target value="75.00">
<comment><narrative>
The target was partially achieved, with 69 percent of PNBSF beneficiary households attending the last four sensitization sessions, falling short of the end target of 75 percent. In 2023 and 2024, with the funding of the PAFS and PAPSA, the DGPSN initiated the revision of the PNBSF's accompanying measures to broaden the number of topics covered during PNBSF awareness-raising sessions. The low number of themes may have led to a certain degree of beneficiary fatigue. The number of themes is being expanded and adapted to beneficiary needs, covering eight themes and 30 key practices on topics linked to human capital strengthening, economic inclusion, natural resource management, and resilience to climate shocks. The implementation of the revised set of accompanying measures will start in January 2025.
</narrative></comment>
</target>
<actual value="69.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of PNBSF beneficiary households who live below the poverty line
</narrative></title>
<baseline year="2014" iso-date="2014-04-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-29" />
<period-end iso-date="2024-03-13" />
<target value="80.00">
<comment><narrative>
The target was exceeded, with 93 percent of PNBSF beneficiary households living below the poverty line against a target of 80 percent.
</narrative></comment>
</target>
<actual value="93.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of PNBSF beneficiary households who attended the last four sensitization sessions
</narrative></title>
<baseline year="2014" iso-date="2014-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-28" />
<period-end iso-date="2024-03-07" />
<target value="75.00">
<comment><narrative>
There is no sensitization session during 2023 due to irregularity of payment and changes of the replacement of social operators by direction of community development&amp;nbsp;
</narrative></comment>
</target>
<actual value="69.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households benefitting from temporary transfers in response to shocks
</narrative></title>
<baseline year="2016" iso-date="2016-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-12" />
<period-end iso-date="2024-03-12" />
<target value="625,000">
<comment><narrative>
A total of 598,261 households benefited from the assistance of shock response programs financed by the project, including 484,710 households benefitting from the exceptional cash transfer program in response to the impact of COVID-19 and inflation, which was the largest cash transfer operation ever being implemented in Senegal. The program was implemented before the second update of the RNU was completed, leading to some difficulties in reaching households whose RNU data were not up to date due to migration, change of phone numbers, change of household composition, etc.  However, the exceptional cash transfer operation was able to reach 90 percent of its intended beneficiaries – accounting for 26 percent of the total population - in the 14 regions of the country with digital transfers.
</narrative></comment>
</target>
<actual value="598,261">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Complete update of RNU data
</narrative></title>
<baseline year="2017" iso-date="2017-06-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-12" />
<period-end iso-date="2024-03-12" />
<target value="2.00">
<comment><narrative>
The indicator measures the number of campaigns to update the RNU in its entirety and as per the manual of operations.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households in the RNU benefitting from agricultural transfers
</narrative></title>
<baseline year="2018" iso-date="2018-09-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-12" />
<period-end iso-date="2024-03-12" />
<target value="26,500">
<comment><narrative>
The target was exceeded, with 28,957 households benefiting from the PRA against a target of 20,000 households.
</narrative></comment>
</target>
<actual value="28,957">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Setting up the mechanism to respond to shocks
</narrative></title>
<baseline year="2018" iso-date="2018-09-12" value="The pilot was carried out in 2017"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-12" />
<period-end iso-date="2024-03-12" />
<target value="The food security response program is implemented before the lean season starts">
<comment><narrative>
As shown by the implementation of the exceptional cash transfer program in response to the impact of Covid-19 and inflation, the GoS successfully set up mechanisms to respond to shocks. Although the initial focus was on responding to food insecurity, the project quickly surpassed this objective by demonstrating the ability of the social protection system to respond to a wide range of shocks (climatic or economic). Not only did the project support the establishment of the tools for a rapid and effective response, but it also contributed to the institutionalization of adaptive social protection and the clarification of mandates between the various social protection agencies. Finally, it supported the establishment of an early shock response mechanism relying on objective data to mitigate the risk of a food insecurity crisis should severe drought conditions arise.
</narrative></comment>
</target>
<actual value="The government created the FSN with a clear mandate to respond to shocks using RNU-based targeting, digital cash transfers and a trigger-based mechanism for early implementation.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of female among beneficiaries of the PNBSF
</narrative></title>
<baseline year="2014" iso-date="2014-04-15" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-15" />
<period-end iso-date="2024-03-15" />
<target value="50.00">

</target>
<actual value="63.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quality of the RNU MIS
</narrative></title>
<baseline year="2018" iso-date="2018-09-12" value="Poor"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-12" />
<period-end iso-date="2024-03-12" />
<target value="Very satisfactory">
<comment><narrative>
This indicator measures the general appreciation by the audit of the quality of the MIS based on two criteria: (i) the quality of the data (accuracy, completeness) and (ii) the use of each module by the users. The quality was measured on a scale from poor, to fair, average, satisfactory, and very satisfactory. The target was achieved since the RNU MIS contained data about a growing number of poor and vulnerable households throughout the entire country. These data were updated twice, and the various modules were used by a growing number of users over the course of the project. The value for this indicator was revised after the last ISR was published to reflect the completion of the community-based targeting process that allowed the RNU to include updated data about 1 million households.
</narrative></comment>
</target>
<actual value="Very satisfactory">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P125565</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Electricity Sector Support Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objectives are to contribute to (i) reducing SENELEC's technical and commercial losses; and (ii) improving the access to and reliability of electricity services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0006051"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0006052"><narrative>Ministry of Energy and Mining</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-10-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-07-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Petra Valickova</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pvalickova@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243939" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.8 -16.366671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244374" />
            <name><narrative> TobÃ¨ne</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.03333 -16.783331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244374" />
            <name><narrative>TobEne</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.03333 -16.783331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244799" />
            <name><narrative> ThiÃ¨s Nones</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.78333 -16.966669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244799" />
            <name><narrative>ThiEs Nones</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.78333 -16.966669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244800" />
            <name><narrative> Region de Thies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -16.866671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246512" />
            <name><narrative> Rufisque</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72503 -17.27088</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246512" />
            <name><narrative>Rufisque</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72503 -17.27088</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248477" />
            <name><narrative> Mbour</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.42196 -16.963751</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248477" />
            <name><narrative>Mbour</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.42196 -16.963751</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248752" />
            <name><narrative> Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.65587 -13.25544</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249543" />
            <name><narrative> Kounoun</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.75266 -17.253151</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249543" />
            <name><narrative>Kounoun</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.75266 -17.253151</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250805" />
            <name><narrative> Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.1825 -16.25333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251149" />
            <name><narrative> Hann</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72111 -17.436939</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251149" />
            <name><narrative>Hann</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72111 -17.436939</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251338" />
            <name><narrative> Mbaw</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.73192 -17.3274</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251338" />
            <name><narrative>Mbaw</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.73192 -17.3274</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251339" />
            <name><narrative> Grand Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71331 -17.45472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251339" />
            <name><narrative>Grand Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71331 -17.45472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.444059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253911" />
            <name><narrative> Cap des Biches</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72064 -17.30715</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253911" />
            <name><narrative>Cap des Biches</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72064 -17.30715</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303936" />
            <name><narrative> Region de Kedougou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.55146 -12.17586</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="23630" percentage="95" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="85.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="15" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="23" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="15" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="23" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="61" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">883137.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">883137.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">883137.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">883137.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">883137.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">883137.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">883137.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">883137.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">883137.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">883137.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">883137.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">883137.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">85000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">70000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-8272</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">1982523</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">47223</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">80269</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">16363</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">406330</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">1113925</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">721554</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">1042209</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">3170365</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">1238736</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">4119928</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">1779446</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">771928</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">1443471</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">1005090</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">1714090</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">2988022</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">454983</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">5011441</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">1969373</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">1363452</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">1208762</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">2734795</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">77244</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">1151835</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">940082</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">4909054</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">1785933</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">2997223</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">541180</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">564090</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">1060045</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">1875687</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">1506470</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">686528</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">5543373</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">1018145</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">2361736</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">3810282</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">367239</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1037276</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">3587278</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">2483544</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">201248</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">1052414</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">1409494</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1742688</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">1632704</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">1123776</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">3173177</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">1084026</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">1497054</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">1172669</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">500273</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">3977195</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">4190192</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">524496</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">321129</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">3509194</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">2576885</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">2428850</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">182519</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">3751435</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">2279813</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">2394318</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">3987631</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">35863</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">4422557</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">6302801</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">256685</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">3978725</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">701839</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">1110780</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">1916341</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">4634190</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">933891</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">2847527</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">548525</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">956942</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">393682</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-2435</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-251110</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-6347</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-7735</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-9052</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-29296</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-74649</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-115519</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-151359</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-180214</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-214268</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-177950</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-264266</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-131954</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-258462</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-139377</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-268384</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-164553</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-283760</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-249739</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-284151</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-334629</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-302634</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-444373</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-302767</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-542327</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-295779</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-652857</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-300937</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-691726</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-258652</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-722361</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-299382</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-851070</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-275638</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-805496</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-270782</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-821187</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-272705</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-827731</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-266023</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-864109</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-272310</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-879521</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-254853</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-877213</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-741898</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-752868</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-750036</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-747980</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-753538</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-12679</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-733981</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-770820</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1695473</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-12351</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-755249</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1728531</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6052"><narrative>Ministry of Energy and Mining; SENELEC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P125565"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P125565?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P125565"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total installed capacity of power transformers installed in Southern Senegal under the project.
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="26400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Low-income households provided with access to electricity under the project
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="21601.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission and distribution lines constructed or rehabilitated under the project
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="1613.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Recommendations from SENELEC's accounting separation implemented, including institutional and organizational audit and physical assets audit
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
System Average Interruption Frequency Index (SAIFI) in Greater Dakar
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="50.44"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Medium and high power customers (above 17kV) with smart meters
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average response time to customer complaints related to blackouts and malfunctions (LV)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.75">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Distribution masterplan developed and adopted
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Overall SENELEC recovery rate (total energy billed divided by total energy dispatched)
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="79.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="82.77">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bill collection rate (residential, commercial, industrial, and municipalities)
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="79.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="98.79">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission and distribution lines constructed or rehabilitated in Southern Senegal under the project
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="548.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
System Average Interruption Duration Index (SAIDI) in Greater Dakar
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="95.38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="6.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of residential pre-payment meters installed under the Project
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="262039.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="944801.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="2084648.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Latest SENELEC generation master plan updated and adopted
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Un-served energy (total) per year on the interconnected system
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="11.95">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P160652</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Supporting Gas Project Negotiations and Enhancing Institutional Capacities</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Support the government's capacity to drive negotiations towards final investments decisions and lay the foundations for the gas sector's contributions to the economy through enhanced legal and regulatory framework and capacity building.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Supporting Gas Project Negotiations and Enhancing Institutional Capacities Project for Senegal is to support the government's capacity to drive negotiations towards final investments decisions and lay the foundations for the gas sector's contributions to the economy through enhanced legal and regulatory framework and capacity building.The project consists of five components. The first component, support for hydrocarbon project negotiations the objective of this component is to help the Government of Senegal (GoSN) engage in a timely and constructive manner with the Government of Mauritania and Production Sharing Contract (PSC) holders to ensure the sustainable development of its oil and gas resources. The second component, enhancement of the strategic and policy framework is to support the GoSN develop an oil and gas sector policy and strategy. The third component, institutional diagnostic and capacity building is to identify the needs for capacity building, develop tailored training programs, and support the Government's effort to mobilize instrumental ad hoc expertise. The fourth component, stakeholders engagement campaign is to mobilize international third party expertise needed for the GoSN to develop a communications strategy and information campaign to engage effectively and sustain ably with all key stakeholders on issues relating to oil and gas development projects in SNE and Grand Tortue. This component, which will create and maximize synergies with the Senegal Extractive Industry Transparency Initiative (EITI) activity on communications campaign.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0029998"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0029999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-12-21"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-05-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Martin Oswald</narrative></person-name><telephone>+1-202-473-1000</telephone><email>moswald@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="32262" percentage="93" xml:lang="en"/><sector vocabulary="1" code="32210" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="45.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LC" percentage="55.0000000" xml:lang="en"><narrative>FY17 - Oil and Gas</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="7" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="7" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="100" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="100" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="7" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">20360.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">84680.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">78110.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">94067.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">149620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">82320.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">180980.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">206560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">229600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">88855.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">254220.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">270020.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">287840.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">301420.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">154940.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">318800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">332180.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">346540.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">363160.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">188820.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">391780.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">409380.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">421700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">433180.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">225160.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">463240.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">468800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">464160.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">472740.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">240220.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">477420.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">464820.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">460720.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">230320.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">457560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">449640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">438860.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">432880.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">214360.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">424220.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">416220.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">408040.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">400560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">197420.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">389140.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">383500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">377260.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">369140.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">181280.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">357460.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">351260.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">344720.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">337340.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">165840.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">324720.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">317700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">314980.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">157360.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">312000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">307420.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">303520.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">300180.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">148920.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">295320.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">248200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">87381.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">4677887.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">4677887.62</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">29000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-5847140</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">1499915</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">287404</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">95740</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">233626</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">927164</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">174490</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">928418</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">324468</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">88730</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">649063</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">1317854</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">392290</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">1855169</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">445387</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">622613</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">521979</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">941513</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">447745</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">898644</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">904676</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">831552</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">384861</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">239547</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">830957</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">696365</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">492871</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">387506</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">367201</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">383794</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">576549</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">750284</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">1253781</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">709595</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">741591</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">435166</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">519411</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">675834</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">488355</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-6365</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-5615</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-9560</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-13859</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-17281</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-29857</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-36950</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-39171</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-44967</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-58343</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-61406</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-70305</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-76921</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-80234</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-86327</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-85987</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-447015</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-455940</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-458958</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-479719</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-388728</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-393499</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-29999"><narrative>Gestion ExEcutive et StratEgique du ComitE d’Orientation StratEgique et de Suivi du DEveloppement du</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P160652"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P160652?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P160652"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Unitization agreement for the Grand Tortue reservoir developed
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
A unitization agreement for the joint development of the GTA reservoir with Mauritania is developed by the government using technical expertise provided by international experts.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained in oil and gas law and oil contracts management
</narrative></title>
<baseline year="2017" iso-date="2017-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-23" />
<period-end iso-date="2025-06-15" />
<target value="30.00">
<comment><narrative>
Staff from the legal and contract management departments of PETROSEN, MPE, and MFB
</narrative></comment>
</target>
<actual value="52">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Key staff recruited to fill the technical capacity gap
</narrative></title>
<baseline year="2021" iso-date="2021-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-23" />
<period-end iso-date="2025-06-22" />
<target value="7.00">
<comment><narrative>
Staff for the role of Oil and gas development advisor, upstream expert, upstream engineer, petroleum architecture engineer, oil and gas operations monitoring expert, petroleum cost engineer, expert in reservoir engineering.
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifting agreement for Sangomar Phase 1 in place
</narrative></title>
<baseline year="2021" iso-date="2021-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-23" />
<period-end iso-date="2023-06-22" />
<target value="1.00">
<comment><narrative>
Lifting agreements for Sangomar Phase 1 is developed by international experts recruited by the Government
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained in BOSUET-HUET
</narrative></title>
<baseline year="2017" iso-date="2017-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-23" />
<period-end iso-date="2024-12-23" />
<target value="25.00">
<comment><narrative>
Number of specialists from PETROSEN, MPE, MPEM, MEDD, SP-COS-PETROGAZ, MFB, MEPC requiring training in BOSUET-HUET to perform their duties.
</narrative></comment>
</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Intergovernmental cooperation agreement developed and signed
</narrative></title>
<baseline year="2017" iso-date="2017-06-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-23" />
<period-end iso-date="2023-06-22" />
<target value="Yes">
<comment><narrative>
Intergovernmental cooperation agreement for joint development of Grand Tortue reservoir with Mauritania developed by the Government using technical expertise provided by international experts, and the final agreement is approved by the Government.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Delineation and estimation of transnational gas finalized
</narrative></title>
<baseline year="2017" iso-date="2017-06-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-23" />
<period-end iso-date="2023-06-22" />
<target value="Yes">
<comment><narrative>
Unitized delineation and estimation of the transnational gas resource area regarding the Grand Tortue reservoir produced by international experts recruited by the Government.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Framework for the monitoring and evaluation of environmental and social impacts of oil and gas operations is in place
</narrative></title>
<baseline year="2021" iso-date="2021-07-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-25" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
The majority of the components under this activity have been completed notably: (i) environmental atlas; (ii) docking study; (iii) geographic information system. Item (iv) (Prevention plan for water and air pollution) is complete but has not yet been formally issued through a decree or an arret.
</narrative></comment>
</target>
<actual value="Partially completed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional diagnostic conducted and results publicly disseminated
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
Institutional diagnostic of key ministries and PETROSEN conducted by international experts recruited by the Government, with findings of the diagnostic being available to the general public.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained in petroleum engineering
</narrative></title>
<baseline year="2017" iso-date="2017-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-23" />
<period-end iso-date="2025-06-15" />
<target value="30.00">
<comment><narrative>
Number of engineers from PETROSEN, SP COS-PETROGAZ, SPE, CRSE and MPE
</narrative></comment>
</target>
<actual value="48">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Grand Tortue Ahmeyim phase 1 LNG commercialization agreement developed
</narrative></title>
<baseline year="2017" iso-date="2017-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-23" />
<period-end iso-date="2023-06-22" />
<target value="1.00">
<comment><narrative>
A marketing agreement was concluded for GTA phase 1.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained in management of the environmental and social impacts of oil operations
</narrative></title>
<baseline year="2017" iso-date="2017-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-23" />
<period-end iso-date="2025-06-15" />
<target value="20.00">
<comment><narrative>
Number of specialists from PETROSEN, MPE, MPEM, MEDD, SP-COS-PETROGAZ, MFB, MEPC
</narrative></comment>
</target>
<actual value="21.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training completed for institutional capacity building
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2025-06-27" />
<target value="500.00">
<comment><narrative>
485 (against the target of 500) project beneficiaries who received training. This indicator refers to trainings provided within the framework of consulting contracts, covering the following areas:
- Offshore engineering aspects (GTA, SANGOMAR)
- Major stages of an oil and gas development project
- Liquefaction of natural gas
- Different types of seabed-to-surface connections
- Fundamentals of flow assurance
- Fundamentals of availability studies
- Risk prevention in the O&amp;G industry
- Implementation and design of an onshore site
- Monitoring environmental standards
- Measurement and characteristics of liquids and gases
- Legal metrology: regulations applicable to liquids and gases
- LNG value chain economics
- Economic models for O&amp;G valorization projects
- ARCGIS and QGIS
- Modeling oil and gas fiscal revenues
- Economic, contractual, and fiscal framework of O&amp;G operations
- Oil and gas value chain economics
- Establishing a petroleum register
</narrative></comment>
</target>
<actual value="485">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Communications strategy and roadmap for government agencies developed and implemented
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
A firm was hired to complete the communication strategy and has presented an inception report for validation.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A transparent system for the award of oil and gas exploration and production rights is established
</narrative></title>
<baseline year="2021" iso-date="2021-07-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-23" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
The oil and gas cadaster is developed and functional
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Communications strategy and roadmap for government agencies developed and implemented
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
A firm was hired to complete the communication strategy and has presented an inception report for validation.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Unitization agreement for the Grand Tortue reservoir developed
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
A unitization agreement for the joint development of the GTA reservoir with Mauritania is developed by the government using technical expertise provided by international experts.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training completed for institutional capacity building
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2025-06-27" />
<target value="500.00">
<comment><narrative>
485 (against the target of 500) project beneficiaries who received training. This indicator refers to trainings provided within the framework of consulting contracts, covering the following areas:
- Offshore engineering aspects (GTA, SANGOMAR)
- Major stages of an oil and gas development project
- Liquefaction of natural gas
- Different types of seabed-to-surface connections
- Fundamentals of flow assurance
- Fundamentals of availability studies
- Risk prevention in the O&amp;G industry
- Implementation and design of an onshore site
- Monitoring environmental standards
- Measurement and characteristics of liquids and gases
- Legal metrology: regulations applicable to liquids and gases
- LNG value chain economics
- Economic models for O&amp;G valorization projects
- ARCGIS and QGIS
- Modeling oil and gas fiscal revenues
- Economic, contractual, and fiscal framework of O&amp;G operations
- Oil and gas value chain economics
- Establishing a petroleum register
</narrative></comment>
</target>
<actual value="485">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional diagnostic conducted and results publicly disseminated
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
Institutional diagnostic of key ministries and PETROSEN conducted by international experts recruited by the Government, with findings of the diagnostic being available to the general public.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development concept for phase 1 of Grand Tortue Ahmeyim and Sangomar validated
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
Development concepts completed and validated. Both projects are producing hydrocarbons since late 2024 (Sangomar) and early 2025 (GTA).
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Master plan for the oil and gas sector is developed
</narrative></title>
<baseline year="2021" iso-date="2021-07-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-25" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
The master plan for the development of the oil and gas sector is prepared by the Government
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Survey of citizens conducted with summary of findings publicly disclosed
</narrative></title>
<baseline year="2017" iso-date="2017-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-23" />
<period-end iso-date="2025-06-15" />
<target value="2.00">
<comment><narrative>
Number of citizen engagement surveys and published summary results carried out by Government-recruited communications and citizen engagement experts. PIU reports that by project end 2 surveys will be completed.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Communications strategy and roadmap for government agencies developed and implemented
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
A firm was hired to complete the communication strategy and has presented an inception report for validation.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Unitization agreement for the Grand Tortue reservoir developed
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
A unitization agreement for the joint development of the GTA reservoir with Mauritania is developed by the government using technical expertise provided by international experts.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training completed for institutional capacity building
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2025-06-27" />
<target value="500.00">
<comment><narrative>
485 (against the target of 500) project beneficiaries who received training. This indicator refers to trainings provided within the framework of consulting contracts, covering the following areas:
- Offshore engineering aspects (GTA, SANGOMAR)
- Major stages of an oil and gas development project
- Liquefaction of natural gas
- Different types of seabed-to-surface connections
- Fundamentals of flow assurance
- Fundamentals of availability studies
- Risk prevention in the O&amp;G industry
- Implementation and design of an onshore site
- Monitoring environmental standards
- Measurement and characteristics of liquids and gases
- Legal metrology: regulations applicable to liquids and gases
- LNG value chain economics
- Economic models for O&amp;G valorization projects
- ARCGIS and QGIS
- Modeling oil and gas fiscal revenues
- Economic, contractual, and fiscal framework of O&amp;G operations
- Oil and gas value chain economics
- Establishing a petroleum register
</narrative></comment>
</target>
<actual value="485">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional diagnostic conducted and results publicly disseminated
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
Institutional diagnostic of key ministries and PETROSEN conducted by international experts recruited by the Government, with findings of the diagnostic being available to the general public.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development concept for phase 1 of Grand Tortue Ahmeyim and Sangomar validated
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
Development concepts completed and validated. Both projects are producing hydrocarbons since late 2024 (Sangomar) and early 2025 (GTA).
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A regulatory framework for the integration of off-shore projects into the maritime economy is developed
</narrative></title>
<baseline year="2017" iso-date="2017-11-22" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-22" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
The regulatory framework to ensure the safety of artisanal fishery is in place, and the manual for inspection of platforms and floating installations was completed and adopted. The law on commercial shipping is readily prepared and currently with the government for review and approval before being submitted to parliament.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained in petroleum taxation and accounting
</narrative></title>
<baseline year="2017" iso-date="2017-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-23" />
<period-end iso-date="2025-06-15" />
<target value="70.00">
<comment><narrative>
Accountant and tax specialists from PETROSEN, MPE, and MFB and SP-COS-PETROGAZ
</narrative></comment>
</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Environnemental and Social Assessment completed
</narrative></title>
<baseline year="2021" iso-date="2021-07-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-23" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
The SESA was completed, reviewed by the ESF functions and confirmed by RSA.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
High level training completed for institutional capacity building
</narrative></title>
<baseline year="2017" iso-date="2017-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-23" />
<period-end iso-date="2025-06-15" />
<target value="90.00">
<comment><narrative>
Participants to training sessions so far have included Ministry of Petroleum and Energy and Ministry of Finance staff. The former Minister of Energy participated to one session.
</narrative></comment>
</target>
<actual value="48">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development concept for phase 1 of Grand Tortue Ahmeyim and Sangomar validated
</narrative></title>
<baseline year="2017" iso-date="2017-06-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-28" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
Development concepts completed and validated. Both projects are producing hydrocarbons since late 2024 (Sangomar) and early 2025 (GTA).
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Assessment on the current existing communications options/mechanisms and institutional capacity regarding communications conducted
</narrative></title>
<baseline year="2017" iso-date="2017-06-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-23" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
Assessment on the current existing communications options/mechanisms and institutional capacity regarding communications in key ministries conducted by experts recruited by the Government.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P164967</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>AGRICULTURE AND LIVESTOCK COMPETITIVENESS PROGRAM FOR RESULTS</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objective is to enhance productivity and market access of priority commodity value chains and livestock, in the Extended Groundnut Basin and Agro-pastoral Areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Agriculture and Livestock Competitiveness Program-for-Results (PforR) Project for Senegal is to enhance productivity and market access of priority commodity value chains and livestock, in the Extended Groundnut Basin and Agro-pastoral Areas. The PforR draws on selected activities of PRACAS II (Program for Accelerated Pace of Agriculture) and PNDE (National Livestock Development Plan), with a focus on the following three priority Results Areas (RAs). Results Area 1. Improved crop and livestock productivity and resilience has the following sub-results areas: 1.1.a. Increased crop productivity - results under SRA (Sub-Results Area) 1.1.a will be achieved through the sustainable intensification of major agricultural production systems, particularly groundnuts, and other high potential priority crop. 1.1.b. Increased livestock productivity will support the sustainable intensification of selected livestock production systems, with a greater focus on dairy, small ruminant, and poultry production, which are closely related to groundnut-based production systems. 1.2. Increased agricultural resilience will include diversifying the agricultural production base and establishing a cash transfer program. Results Area 2. Improved business environment and market integration has three sub-results areas. SRA 2.1. Improved groundnut business environment will support three main sets of activities: (i) Lifting distortionary policies and regulatory measures; (ii) Reorganizing the groundnut inter-profession and establishing Public-Private Partnerships (PPPs): technical assistance to restructure the National Inter-professional Groundnut Committee (CNIA) and subsequent action plan; and contractual agreements between Producers Organizations (Pos) and buyers; and (iii) Reinforcing agri-food product quality control and meeting export quality standards. SRA 2.2. Increased livestock market access will support two main sets of activities: (i) providing targeted support to producers, POs and Small and Medium Enterprises (SMEs) to connect with and meet the requirements of the main companies for processing and marketing dairy products in urban areas and (ii) providing targeted support to milk producers and value chain actors. Activities to be supported under SRA 2.3. Increased access to financial services will include: (i) Expanding the Warehouse Receipt System (WRS); (ii) Improving access to agricultural insurance. Results Area 3. Improved sector governance, coordination, and program management will support the strengthening of the organizational and institutional environment of agri-food value-chains and improve the coordination and execution of government programs in the agricultural and livestock sector, while meeting climate adaptation and mitigation challenges.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0034549"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0034549"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0034550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2018-11-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-05-12"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Franck Berthe</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fberthe1@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="31150" percentage="53" xml:lang="en"/><sector vocabulary="1" code="31195" percentage="20" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="19" xml:lang="en"/><sector vocabulary="1" code="31163" percentage="5" xml:lang="en"/><sector vocabulary="1" code="31120" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="53.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AL" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Livestock</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="9" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="39" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="91" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="74" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="13" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="13" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="91" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="25" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">357900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">270300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">636450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">761700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">425850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">937950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">512850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1130850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1276800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">684150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1439400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">749100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1560600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1651500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">857250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1775400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">917250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1872750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1945500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1012200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">2133750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1126200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">2334300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">2449500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1272300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2645400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1380300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2881800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">3007350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1535400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">3114900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1597050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">3297750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">3365250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1682550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">3381000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1722750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">3492450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">3519600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1756200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">3517800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1783050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">3594000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">3593400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1778100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">3549150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1787850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">3568800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3501000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1710150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3389400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1690050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3336300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">3232950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1574250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3106650.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1530600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">3007350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2925450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1428600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2787900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1364250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2684100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2643000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1302600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2559150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2499300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1228050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2415000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1187250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2333250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1145250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">3774450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">21997176.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">21997176.21</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">150000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">568117</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">28723091</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">18822069</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">33445144</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">130062</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">7518556</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">17554228</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">21241555</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-415727</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-229864</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-267716</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-252627</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-269844</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-758060</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-327</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1509003</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-2200495</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2221223</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-748</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-2160952</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2025479</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1959773</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-34550"><narrative>Ministry of Agriculture, Food Sovereignty and Livestock; Ministry of Livestock and Animal Production</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P164967"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P164967?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P164967"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of groundnut production under contract farming agreements
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of fodder certified seeds acquired by the producers
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="300.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="411">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted beneficiaries (total and female) with rating ‘satisfied’ or above on project interventions/support (survey)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="85.00">
<comment><narrative>
Survey not yet done
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Committees on Agricultural Framework Law are functionning (CROASP)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Not yet
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantities of certified groundnut seed acquired annually
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="40,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="120,000.00">
<comment><narrative>
More efforts to secure collect of certified groundnut seeds
</narrative></comment>
</target>
<actual value="71,109">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and evaluation system for agriculture and livestock performance
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="Draft Monitoring and Evaluation system at MAER and MEPA"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Monitoring and evaluation system for agriculture and livestock performance">
<comment><narrative>
M&amp;E manual and digital platform almost completed for livestoc sub-sector but yet to be completed for the crops sub-sector. Consultants are working on it.
</narrative></comment>
</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="200,000.00">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
  
  NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
  Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
  Technology includes a change in practices compared to currently used pactices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
  Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="193,515.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decrease in mortality rate of small ruminants
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="15.00">
<comment><narrative>
Achieved because of the vaccination program
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Genetic Improvement Strategy &amp; Plan developed and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Study yet to start
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="30,0000">

</target>
<actual value="35,0263">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of producers with access to agriculture insurance for crops and livestock
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="269,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="475,000.00">
<comment><narrative>
Over achieved
</narrative></comment>
</target>
<actual value="869,165.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Yield increase of diversification crops
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="2.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="3.00">

</target>
<actual value="2.03">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="47,5000">
<comment><narrative>
Not applicable
</narrative></comment>
</target>
<actual value="86,9165">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of milk collection centers supported and/or equipped and operational
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="72.00">
<comment><narrative>
New milk centers under building and others under rehabilitation to meet the target.
</narrative></comment>
</target>
<actual value="42.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Warehouses in the groundnut basin licensed by the Warehouse Receipt System regulatory body (ORSRE)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="10.00">
<comment><narrative>
Over achieved
</narrative></comment>
</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Groundnut interprofession (CNIA) restructured (new action plan and framework agreement with government)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No existing action plan to restructure the National Committee on the Groundnut Value chain (CNIA)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Groundnut interprofession (CNIA) restructured (new action plan and framework agreement with government)">
<comment><narrative>
Yet to be done but ongoing progress to speed up
</narrative></comment>
</target>
<actual value="Framework agreement is signed between CNIA and the Government, encompassing new price setting mechanism for groundnut.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area producing fodder with certified seeds
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="15,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="15,875">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in volume of milk commercialized
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="3,763,150.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="15,938,050.00">
<comment><narrative>
This indicator will measure the increase in the volume of milk commercialized from the milk collection centers supported through the program.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Livestock Master Plan developed
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Under process
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase exports of shelled groundnuts
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="215,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="350,000.00">
<comment><narrative>
Final target is likely to be not achieved and this indicator is revised. Due to government policy supporting groundnut oil domestic processing and value addition, combined with global market declines resulting in sharply reduced prices, and increased seed collection, the PrDO indicator target of “Increase exports of shelled groundnuts” will not be achieved. Consequently, the government has requested a revision of this indicator to reflect the volume of groundnuts formally commercialized by exporters and processing industries, thereby more accurately representing efforts to encourage commercialization and enhance value addition in groundnut oil processing.
</narrative></comment>
</target>
<actual value="2,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategy for the control of Newcastle Disease and fowlpox established and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Under process
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Restructuration of interprofessions' organization finalized
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Restructuring process on going with a committee set up under the leadership of FNDAPS&amp;gt; Excepted to be completed by end june 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Livestock husbandry guidelines (housing and management best practices) developed and disseminated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Completed
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of certified seeds acquired for diversification crops
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="53,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="52,264">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="300,000.00">
<comment><narrative>
This indicator measures the number of farmers who were provided with agricultural assets or services as a result of World Bank project support. &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber, and non-timber forest products. Assets include property, biological assets, and farm and processing equipment. Biological assets may include animal agriculture breeds (e.g., livestock, fisheries) and genetic material of livestock, crops, trees, and shrubs (including fiber and fuel crops). Services include research, extension, training, education, ICTs, inputs (e.g., fertilizers, pesticides, labor), production-related services (e.g., soil testing, animal health/veterinary services), phyto-sanitary and food safety services, agricltural marketing support services (e.g., price monitoring, export promotion), access to farm and post-harvest machinery and storage facilities, employment, irrigation and drainage, and finance. Farmers are people engaged in agricultural activities or members of a agriculture-related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="350,263.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against small ruminant plague (PPR)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1644254.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Number of small ruminants vaccinated against small ruminant&amp;nbsp;plague (PPR)
</narrative></comment>
</target>
<actual value="5,875,201">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against small ruminant plague (PPR)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1644254.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Number of small ruminants vaccinated against small ruminant&amp;nbsp;plague (PPR)
</narrative></comment>
</target>
<actual value="5,875,201">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and Evaluation (M&amp;E) system each at MAER and MEPA for agriculture and livestock performance in place and functioning
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Draft Monitoring and evaluation system for agriculture and livestock sectors"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Adequate monitoring and evaluation systems in place and operating in each MAER and MEPA to track Program performance
</narrative></comment>
</target>
<actual value="No - Livestock M&amp;E manual and digital platform deployed. Agriculture sub-program manual done and digital platform design on-going">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against pasteurellosis of small ruminants
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="335,850.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2025-12-31" />
<target value="1,000,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="875,468">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against pasteurellosis of small ruminants
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="335,850.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2025-12-31" />
<target value="1,000,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="875,468">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of milk collection centers supported and/or equipped and operational
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Number of milk collection centers supported/equipped with milk storage
</narrative></comment>
</target>
<actual value="42.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of milk collection centers supported and/or equipped and operational
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Number of milk collection centers supported/equipped with milk storage
</narrative></comment>
</target>
<actual value="42.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Horses vaccinated against African horse sickness
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="73,663.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2025-12-31" />
<target value="320,000.00">
<comment><narrative>
On track
</narrative></comment>
</target>
<actual value="247,007">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Horses vaccinated against African horse sickness
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="73,663.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2025-12-31" />
<target value="320,000.00">
<comment><narrative>
On track
</narrative></comment>
</target>
<actual value="247,007">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the WRS in the Extended Groundnut Basin
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="The WRS regulatory body (ORSE) has not been implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI aims to promote the warehouse receipt system in order to improve access to finance for agricultural producers, consolidators, traders and processors. ORSRE is the body that oversees the operation of the system and issues approvals to warehouse managers to enable them to issue warehouse receipts recognized by financial institutions. This DLI has three milstones: (i) ORSE is fully operational (key personnel and budget are put in place); (ii) the warehouses are approved by ORSR and iii) receipts are financed by financial institutions.
</narrative></comment>
</target>
<actual value="Yes - The WRS regulatory body (ORSE) has been implemented">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the WRS in the Extended Groundnut Basin
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="The WRS regulatory body (ORSE) has not been implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI aims to promote the warehouse receipt system in order to improve access to finance for agricultural producers, consolidators, traders and processors. ORSRE is the body that oversees the operation of the system and issues approvals to warehouse managers to enable them to issue warehouse receipts recognized by financial institutions. This DLI has three milstones: (i) ORSE is fully operational (key personnel and budget are put in place); (ii) the warehouses are approved by ORSR and iii) receipts are financed by financial institutions.
</narrative></comment>
</target>
<actual value="Yes - The WRS regulatory body (ORSE) has been implemented">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Livestock husbandry guidelines (housing and management best practices) developed and disseminated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Completed
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Livestock husbandry guidelines (housing and management best practices) developed and disseminated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Completed
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of producers with access to agriculture insurance for crops and livestock
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="269,000 farmers covered with insurance"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI intends to ensure access to financial services as this is a major bidding constraint. It includes at least two milestones: (i) paying off premium arrears due by the Gvt., which is already engaged in paying it gradually; (ii) ensuring insurance coverage for up to 475,000&amp;nbsp;farmers and herders. In 2019 about 269,000 were insured with this premium subsidy via IFC-funded program ensuring phasing out of insurance premium subsidizing by the GoS. This DLI is under the responsibility of the Ministry of Finance and Budget. It is expected that each year about 41,200 farmers and herders will be covered.
</narrative></comment>
</target>
<actual value="835,080">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of producers with access to agriculture insurance for crops and livestock
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="269,000 farmers covered with insurance"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI intends to ensure access to financial services as this is a major bidding constraint. It includes at least two milestones: (i) paying off premium arrears due by the Gvt., which is already engaged in paying it gradually; (ii) ensuring insurance coverage for up to 475,000&amp;nbsp;farmers and herders. In 2019 about 269,000 were insured with this premium subsidy via IFC-funded program ensuring phasing out of insurance premium subsidizing by the GoS. This DLI is under the responsibility of the Ministry of Finance and Budget. It is expected that each year about 41,200 farmers and herders will be covered.
</narrative></comment>
</target>
<actual value="835,080">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and Evaluation (M&amp;E) system each at MAER and MEPA for agriculture and livestock performance in place and functioning
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Draft Monitoring and evaluation system for agriculture and livestock sectors"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Adequate monitoring and evaluation systems in place and operating in each MAER and MEPA to track Program performance
</narrative></comment>
</target>
<actual value="No - Livestock M&amp;E manual and digital platform deployed. Agriculture sub-program manual done and digital platform design on-going">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Genetic Improvement Strategy &amp; Plan developed and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Study yet to start
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Genetic Improvement Strategy &amp; Plan developed and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Study yet to start
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area producing fodder with certified seeds
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="15,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="15,875">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area producing fodder with certified seeds
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="15,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="15,875">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of fodder certified seeds acquired by the producers
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="300.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="411">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of fodder certified seeds acquired by the producers
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="300.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="411">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Yield increase of diversification crops
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="2.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="3.00">

</target>
<actual value="2.03">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Yield increase of diversification crops
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="2.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="3.00">

</target>
<actual value="2.03">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Groundnut interprofession (CNIA) restructured
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No existing action plan to restructure the National Committee on the Groundnut Valuechain (CNIA)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The CNIA will be restructured to ensure representation of all stakeholders to be implicated in the price setting mechanism. An action plan to ensure its operationalization will be designed and implemented. Both the CNIA restructuring and action plan will need to be acceptable to the Bank.  This DLI comprises three main milestones: (i) CNIA restructured with an action plan ; (ii) agreement framework is signed between CNIA and the Gvt.; (iii) action plan implemented
</narrative></comment>
</target>
<actual value="Existing action plan to restructure the National Committee on the Groundnut Value chain (CNIA)">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Groundnut interprofession (CNIA) restructured
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No existing action plan to restructure the National Committee on the Groundnut Valuechain (CNIA)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The CNIA will be restructured to ensure representation of all stakeholders to be implicated in the price setting mechanism. An action plan to ensure its operationalization will be designed and implemented. Both the CNIA restructuring and action plan will need to be acceptable to the Bank.  This DLI comprises three main milestones: (i) CNIA restructured with an action plan ; (ii) agreement framework is signed between CNIA and the Gvt.; (iii) action plan implemented
</narrative></comment>
</target>
<actual value="Existing action plan to restructure the National Committee on the Groundnut Value chain (CNIA)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategy for the control of Newcastle Disease and fowlpox established and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Under process
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategy for the control of Newcastle Disease and fowlpox established and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Under process
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of fodder certified seeds acquired by the producers (tons)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Cumulative quantity of fodder certified seeds acquired by the producers (tons)
</narrative></comment>
</target>
<actual value="441">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of fodder certified seeds acquired by the producers (tons)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Cumulative quantity of fodder certified seeds acquired by the producers (tons)
</narrative></comment>
</target>
<actual value="441">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against small ruminant plague (PPR)
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="1,644,254.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="6,000,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="5,875,501">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against small ruminant plague (PPR)
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="1,644,254.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="6,000,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="5,875,501">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Restructuration of interprofessions' organization finalized
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Restructuring process on going with a committee set up under the leadership of FNDAPS&amp;gt; Excepted to be completed by end june 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Restructuration of interprofessions' organization finalized
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Restructuring process on going with a committee set up under the leadership of FNDAPS&amp;gt; Excepted to be completed by end june 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Vaccination coverage rate for small ruminant plague (PPR)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="17.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Vaccination coverage rate for small ruminant plague (PPR)
</narrative></comment>
</target>
<actual value="31">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Vaccination coverage rate for small ruminant plague (PPR)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="17.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Vaccination coverage rate for small ruminant plague (PPR)
</narrative></comment>
</target>
<actual value="31">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Warehouses in the groundnut basin licensed by the Warehouse Receipt System regulatory body (ORSRE)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="10.00">
<comment><narrative>
Over achieved
</narrative></comment>
</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Warehouses in the groundnut basin licensed by the Warehouse Receipt System regulatory body (ORSRE)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="10.00">
<comment><narrative>
Over achieved
</narrative></comment>
</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="300,000.00">
<comment><narrative>
This indicator measures the number of farmers who were provided with agricultural assets or services as a result of World Bank project support. &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber, and non-timber forest products. Assets include property, biological assets, and farm and processing equipment. Biological assets may include animal agriculture breeds (e.g., livestock, fisheries) and genetic material of livestock, crops, trees, and shrubs (including fiber and fuel crops). Services include research, extension, training, education, ICTs, inputs (e.g., fertilizers, pesticides, labor), production-related services (e.g., soil testing, animal health/veterinary services), phyto-sanitary and food safety services, agricltural marketing support services (e.g., price monitoring, export promotion), access to farm and post-harvest machinery and storage facilities, employment, irrigation and drainage, and finance. Farmers are people engaged in agricultural activities or members of a agriculture-related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="350,263.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of milk collection centers supported and/or equipped and operational
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="72.00">
<comment><narrative>
New milk centers under building and others under rehabilitation to meet the target.
</narrative></comment>
</target>
<actual value="42.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of milk collection centers supported and/or equipped and operational
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="72.00">
<comment><narrative>
New milk centers under building and others under rehabilitation to meet the target.
</narrative></comment>
</target>
<actual value="42.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="300,000.00">
<comment><narrative>
This indicator measures the number of farmers who were provided with agricultural assets or services as a result of World Bank project support. &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber, and non-timber forest products. Assets include property, biological assets, and farm and processing equipment. Biological assets may include animal agriculture breeds (e.g., livestock, fisheries) and genetic material of livestock, crops, trees, and shrubs (including fiber and fuel crops). Services include research, extension, training, education, ICTs, inputs (e.g., fertilizers, pesticides, labor), production-related services (e.g., soil testing, animal health/veterinary services), phyto-sanitary and food safety services, agricltural marketing support services (e.g., price monitoring, export promotion), access to farm and post-harvest machinery and storage facilities, employment, irrigation and drainage, and finance. Farmers are people engaged in agricultural activities or members of a agriculture-related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="350,263.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted beneficiaries (total and female) with rating ‘satisfied’ or above on project interventions/support (survey)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="85.00">
<comment><narrative>
Survey not yet done
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted beneficiaries (total and female) with rating ‘satisfied’ or above on project interventions/support (survey)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="85.00">
<comment><narrative>
Survey not yet done
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the WRS in the Extended Groundnut Basin
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="The WRS regulatory body (OSRE) has not been implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="The WRS is operational in the extended groundnut basin and facilitating access to credit">
<comment><narrative>
Almost achieved
</narrative></comment>
</target>
<actual value="The WRS regulatory body (OSRE) has been implemented. US$ 10,000,000 financed by financial institutions through warehouse receipts, from a baseline of US$ 0, (out of which 9,178,484 achieved)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the WRS in the Extended Groundnut Basin
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="The WRS regulatory body (OSRE) has not been implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="The WRS is operational in the extended groundnut basin and facilitating access to credit">
<comment><narrative>
Almost achieved
</narrative></comment>
</target>
<actual value="The WRS regulatory body (OSRE) has been implemented. US$ 10,000,000 financed by financial institutions through warehouse receipts, from a baseline of US$ 0, (out of which 9,178,484 achieved)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in volume of milk commercialized
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="3,763,150.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="15,938,050.00">
<comment><narrative>
This indicator will measure the increase in the volume of milk commercialized from the milk collection centers supported through the program.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in volume of milk commercialized
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="3,763,150.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="15,938,050.00">
<comment><narrative>
This indicator will measure the increase in the volume of milk commercialized from the milk collection centers supported through the program.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Livestock Master Plan developed
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Under process
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Livestock Master Plan developed
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Under process
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subsidy targeted to small producers and climate-smart technologies
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The Govt. will have to develop and implement a new input (including seed, fertilizer and agriculture equipment) subsidy plan acceptable to the Bank. This strategy will emphasize on targeting on both beneficiaries and the technologies. It will be measured by the percentage of the total subsidy that is targeted to small farmers and CSA technologies
</narrative></comment>
</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subsidy targeted to small producers and climate-smart technologies
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The Govt. will have to develop and implement a new input (including seed, fertilizer and agriculture equipment) subsidy plan acceptable to the Bank. This strategy will emphasize on targeting on both beneficiaries and the technologies. It will be measured by the percentage of the total subsidy that is targeted to small farmers and CSA technologies
</narrative></comment>
</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of certified seeds acquired for diversification crops
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Cumulative quantity of certified seed acquired for diversification crops (fonio, maize, sesame, etc.)
</narrative></comment>
</target>
<actual value="70,150">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of certified seeds acquired for diversification crops
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Cumulative quantity of certified seed acquired for diversification crops (fonio, maize, sesame, etc.)
</narrative></comment>
</target>
<actual value="70,150">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="200,000.00">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
  
  NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
  Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
  Technology includes a change in practices compared to currently used pactices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
  Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="193,515.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="200,000.00">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
  
  NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
  Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
  Technology includes a change in practices compared to currently used pactices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
  Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="193,515.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Animal Health and Veterinary Public Health Code finalized and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
National validation work remained but planned by december 2024 but still not yet done.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Animal Health and Veterinary Public Health Code finalized and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
National validation work remained but planned by december 2024 but still not yet done.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decrease in mortality rate of small ruminants
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="15.00">
<comment><narrative>
Achieved because of the vaccination program
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decrease in mortality rate of small ruminants
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="15.00">
<comment><narrative>
Achieved because of the vaccination program
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of producers with access to agriculture insurance for crops and livestock
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="269,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="475,000.00">
<comment><narrative>
Over achieved
</narrative></comment>
</target>
<actual value="869,165.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of producers with access to agriculture insurance for crops and livestock
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="269,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="475,000.00">
<comment><narrative>
Over achieved
</narrative></comment>
</target>
<actual value="869,165.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Committees on Agricultural Framework Law are functionning (CROASP)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Not yet
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Committees on Agricultural Framework Law are functionning (CROASP)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Not yet
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subsidy targeted to small producers and climate-smart technologies
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="90.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subsidy targeted to small producers and climate-smart technologies
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="90.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase exports of shelled groundnuts
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="215,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="350,000.00">
<comment><narrative>
Final target is likely to be not achieved and this indicator is revised. Due to government policy supporting groundnut oil domestic processing and value addition, combined with global market declines resulting in sharply reduced prices, and increased seed collection, the PrDO indicator target of “Increase exports of shelled groundnuts” will not be achieved. Consequently, the government has requested a revision of this indicator to reflect the volume of groundnuts formally commercialized by exporters and processing industries, thereby more accurately representing efforts to encourage commercialization and enhance value addition in groundnut oil processing.
</narrative></comment>
</target>
<actual value="2,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase exports of shelled groundnuts
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="215,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="350,000.00">
<comment><narrative>
Final target is likely to be not achieved and this indicator is revised. Due to government policy supporting groundnut oil domestic processing and value addition, combined with global market declines resulting in sharply reduced prices, and increased seed collection, the PrDO indicator target of “Increase exports of shelled groundnuts” will not be achieved. Consequently, the government has requested a revision of this indicator to reflect the volume of groundnuts formally commercialized by exporters and processing industries, thereby more accurately representing efforts to encourage commercialization and enhance value addition in groundnut oil processing.
</narrative></comment>
</target>
<actual value="2,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of certified seeds acquired for diversification crops
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="53,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="52,264">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of certified seeds acquired for diversification crops
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="53,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="52,264">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantity of certified groundnut seeds acquired annually
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="40000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Quantities of certified groundnut foundation seeds acquired annually
</narrative></comment>
</target>
<actual value="57,897">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantity of certified groundnut seeds acquired annually
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="40000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Quantities of certified groundnut foundation seeds acquired annually
</narrative></comment>
</target>
<actual value="57,897">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of groundnut production under contract farming agreements
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of groundnut production under contract farming agreements
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Application of DECRET n° 2008-1260 (Nov. 10, 2008, concerning recognition, organization and functioning of the Interprofessional Organizations in the Agricultural sector (OIA).
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Draft decreet under signature
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Application of DECRET n° 2008-1260 (Nov. 10, 2008, concerning recognition, organization and functioning of the Interprofessional Organizations in the Agricultural sector (OIA).
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Draft decreet under signature
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantities of certified groundnut seed acquired annually
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="40,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="120,000.00">
<comment><narrative>
More efforts to secure collect of certified groundnut seeds
</narrative></comment>
</target>
<actual value="71,109">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantities of certified groundnut seed acquired annually
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="40,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="120,000.00">
<comment><narrative>
More efforts to secure collect of certified groundnut seeds
</narrative></comment>
</target>
<actual value="71,109">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Groundnut interprofession (CNIA) restructured (new action plan and framework agreement with government)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No existing action plan to restructure the National Committee on the Groundnut Value chain (CNIA)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Groundnut interprofession (CNIA) restructured (new action plan and framework agreement with government)">
<comment><narrative>
Yet to be done but ongoing progress to speed up
</narrative></comment>
</target>
<actual value="Framework agreement is signed between CNIA and the Government, encompassing new price setting mechanism for groundnut.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Groundnut interprofession (CNIA) restructured (new action plan and framework agreement with government)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No existing action plan to restructure the National Committee on the Groundnut Value chain (CNIA)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Groundnut interprofession (CNIA) restructured (new action plan and framework agreement with government)">
<comment><narrative>
Yet to be done but ongoing progress to speed up
</narrative></comment>
</target>
<actual value="Framework agreement is signed between CNIA and the Government, encompassing new price setting mechanism for groundnut.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and evaluation system for agriculture and livestock performance
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="Draft Monitoring and Evaluation system at MAER and MEPA"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Monitoring and evaluation system for agriculture and livestock performance">
<comment><narrative>
M&amp;E manual and digital platform almost completed for livestoc sub-sector but yet to be completed for the crops sub-sector. Consultants are working on it.
</narrative></comment>
</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and evaluation system for agriculture and livestock performance
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="Draft Monitoring and Evaluation system at MAER and MEPA"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Monitoring and evaluation system for agriculture and livestock performance">
<comment><narrative>
M&amp;E manual and digital platform almost completed for livestoc sub-sector but yet to be completed for the crops sub-sector. Consultants are working on it.
</narrative></comment>
</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Yield increase of groundnut
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="1.50">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="1,02">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Yield increase of groundnut
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="1.50">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="1,02">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="30,0000">

</target>
<actual value="35,0263">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="30,0000">

</target>
<actual value="35,0263">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="47,5000">
<comment><narrative>
Not applicable
</narrative></comment>
</target>
<actual value="86,9165">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="47,5000">
<comment><narrative>
Not applicable
</narrative></comment>
</target>
<actual value="86,9165">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against pasteurellosis of small ruminants
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="335,850.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2025-12-31" />
<target value="1,000,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="875,468">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses using financial services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses using financial services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against pasteurellosis of small ruminants
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="335,850.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2025-12-31" />
<target value="1,000,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="875,468">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against pasteurellosis of small ruminants
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="335,850.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2025-12-31" />
<target value="1,000,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="875,468">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Horses vaccinated against African horse sickness
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="73,663.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2025-12-31" />
<target value="320,000.00">
<comment><narrative>
On track
</narrative></comment>
</target>
<actual value="247,007">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Horses vaccinated against African horse sickness
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="73,663.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2025-12-31" />
<target value="320,000.00">
<comment><narrative>
On track
</narrative></comment>
</target>
<actual value="247,007">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Livestock husbandry guidelines (housing and management best practices) developed and disseminated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Completed
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Livestock husbandry guidelines (housing and management best practices) developed and disseminated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Completed
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Genetic Improvement Strategy &amp; Plan developed and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Study yet to start
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Genetic Improvement Strategy &amp; Plan developed and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Study yet to start
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area producing fodder with certified seeds
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="15,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="15,875">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surface area producing fodder with certified seeds
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="15,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="15,875">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of fodder certified seeds acquired by the producers
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="300.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="411">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of fodder certified seeds acquired by the producers
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="300.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="411">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Yield increase of diversification crops
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="2.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="3.00">

</target>
<actual value="2.03">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Yield increase of diversification crops
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="2.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="3.00">

</target>
<actual value="2.03">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategy for the control of Newcastle Disease and fowlpox established and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Under process
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategy for the control of Newcastle Disease and fowlpox established and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Under process
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against small ruminant plague (PPR)
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="1,644,254.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="6,000,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="5,875,501">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against small ruminant plague (PPR)
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="1,644,254.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="6,000,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="5,875,501">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of milk collection centers supported and/or equipped and operational
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="72.00">
<comment><narrative>
New milk centers under building and others under rehabilitation to meet the target.
</narrative></comment>
</target>
<actual value="42.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Warehouses in the groundnut basin licensed by the Warehouse Receipt System regulatory body (ORSRE)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="10.00">
<comment><narrative>
Over achieved
</narrative></comment>
</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Warehouses in the groundnut basin licensed by the Warehouse Receipt System regulatory body (ORSRE)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="10.00">
<comment><narrative>
Over achieved
</narrative></comment>
</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="300,000.00">
<comment><narrative>
This indicator measures the number of farmers who were provided with agricultural assets or services as a result of World Bank project support. &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber, and non-timber forest products. Assets include property, biological assets, and farm and processing equipment. Biological assets may include animal agriculture breeds (e.g., livestock, fisheries) and genetic material of livestock, crops, trees, and shrubs (including fiber and fuel crops). Services include research, extension, training, education, ICTs, inputs (e.g., fertilizers, pesticides, labor), production-related services (e.g., soil testing, animal health/veterinary services), phyto-sanitary and food safety services, agricltural marketing support services (e.g., price monitoring, export promotion), access to farm and post-harvest machinery and storage facilities, employment, irrigation and drainage, and finance. Farmers are people engaged in agricultural activities or members of a agriculture-related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="350,263.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="300,000.00">
<comment><narrative>
This indicator measures the number of farmers who were provided with agricultural assets or services as a result of World Bank project support. &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber, and non-timber forest products. Assets include property, biological assets, and farm and processing equipment. Biological assets may include animal agriculture breeds (e.g., livestock, fisheries) and genetic material of livestock, crops, trees, and shrubs (including fiber and fuel crops). Services include research, extension, training, education, ICTs, inputs (e.g., fertilizers, pesticides, labor), production-related services (e.g., soil testing, animal health/veterinary services), phyto-sanitary and food safety services, agricltural marketing support services (e.g., price monitoring, export promotion), access to farm and post-harvest machinery and storage facilities, employment, irrigation and drainage, and finance. Farmers are people engaged in agricultural activities or members of a agriculture-related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="350,263.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of milk collection centers supported and/or equipped and operational
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="72.00">
<comment><narrative>
New milk centers under building and others under rehabilitation to meet the target.
</narrative></comment>
</target>
<actual value="42.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Restructuration of interprofessions' organization finalized
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Restructuring process on going with a committee set up under the leadership of FNDAPS&amp;gt; Excepted to be completed by end june 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Restructuration of interprofessions' organization finalized
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Restructuring process on going with a committee set up under the leadership of FNDAPS&amp;gt; Excepted to be completed by end june 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted beneficiaries (total and female) with rating ‘satisfied’ or above on project interventions/support (survey)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="85.00">
<comment><narrative>
Survey not yet done
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted beneficiaries (total and female) with rating ‘satisfied’ or above on project interventions/support (survey)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="85.00">
<comment><narrative>
Survey not yet done
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the WRS in the Extended Groundnut Basin
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="The WRS regulatory body (OSRE) has not been implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="The WRS is operational in the extended groundnut basin and facilitating access to credit">
<comment><narrative>
Almost achieved
</narrative></comment>
</target>
<actual value="The WRS regulatory body (OSRE) has been implemented. US$ 10,000,000 financed by financial institutions through warehouse receipts, from a baseline of US$ 0, (out of which 9,178,484 achieved)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the WRS in the Extended Groundnut Basin
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="The WRS regulatory body (OSRE) has not been implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="The WRS is operational in the extended groundnut basin and facilitating access to credit">
<comment><narrative>
Almost achieved
</narrative></comment>
</target>
<actual value="The WRS regulatory body (OSRE) has been implemented. US$ 10,000,000 financed by financial institutions through warehouse receipts, from a baseline of US$ 0, (out of which 9,178,484 achieved)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in volume of milk commercialized
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="3,763,150.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="15,938,050.00">
<comment><narrative>
This indicator will measure the increase in the volume of milk commercialized from the milk collection centers supported through the program.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in volume of milk commercialized
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="3,763,150.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="15,938,050.00">
<comment><narrative>
This indicator will measure the increase in the volume of milk commercialized from the milk collection centers supported through the program.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Livestock Master Plan developed
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Under process
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Livestock Master Plan developed
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Under process
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Animal Health and Veterinary Public Health Code finalized and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
National validation work remained but planned by december 2024 but still not yet done.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Animal Health and Veterinary Public Health Code finalized and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
National validation work remained but planned by december 2024 but still not yet done.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="200,000.00">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
  
  NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
  Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
  Technology includes a change in practices compared to currently used pactices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
  Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="193,515.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subsidy targeted to small producers and climate-smart technologies
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="90.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="200,000.00">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
  
  NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
  Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
  Technology includes a change in practices compared to currently used pactices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
  Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="193,515.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decrease in mortality rate of small ruminants
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="15.00">
<comment><narrative>
Achieved because of the vaccination program
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decrease in mortality rate of small ruminants
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="15.00">
<comment><narrative>
Achieved because of the vaccination program
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of producers with access to agriculture insurance for crops and livestock
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="269,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="475,000.00">
<comment><narrative>
Over achieved
</narrative></comment>
</target>
<actual value="869,165.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of producers with access to agriculture insurance for crops and livestock
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="269,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="475,000.00">
<comment><narrative>
Over achieved
</narrative></comment>
</target>
<actual value="869,165.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Committees on Agricultural Framework Law are functionning (CROASP)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Not yet
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Committees on Agricultural Framework Law are functionning (CROASP)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Not yet
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subsidy targeted to small producers and climate-smart technologies
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="90.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subsidy targeted to small producers and climate-smart technologies
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="90.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase exports of shelled groundnuts
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="215,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="350,000.00">
<comment><narrative>
Final target is likely to be not achieved and this indicator is revised. Due to government policy supporting groundnut oil domestic processing and value addition, combined with global market declines resulting in sharply reduced prices, and increased seed collection, the PrDO indicator target of “Increase exports of shelled groundnuts” will not be achieved. Consequently, the government has requested a revision of this indicator to reflect the volume of groundnuts formally commercialized by exporters and processing industries, thereby more accurately representing efforts to encourage commercialization and enhance value addition in groundnut oil processing.
</narrative></comment>
</target>
<actual value="2,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase exports of shelled groundnuts
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="215,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="350,000.00">
<comment><narrative>
Final target is likely to be not achieved and this indicator is revised. Due to government policy supporting groundnut oil domestic processing and value addition, combined with global market declines resulting in sharply reduced prices, and increased seed collection, the PrDO indicator target of “Increase exports of shelled groundnuts” will not be achieved. Consequently, the government has requested a revision of this indicator to reflect the volume of groundnuts formally commercialized by exporters and processing industries, thereby more accurately representing efforts to encourage commercialization and enhance value addition in groundnut oil processing.
</narrative></comment>
</target>
<actual value="2,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of certified seeds acquired for diversification crops
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="53,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="52,264">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative quantity of certified seeds acquired for diversification crops
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="53,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="52,264">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of groundnut production under contract farming agreements
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of groundnut production under contract farming agreements
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Application of DECRET n° 2008-1260 (Nov. 10, 2008, concerning recognition, organization and functioning of the Interprofessional Organizations in the Agricultural sector (OIA).
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Draft decreet under signature
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Application of DECRET n° 2008-1260 (Nov. 10, 2008, concerning recognition, organization and functioning of the Interprofessional Organizations in the Agricultural sector (OIA).
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Draft decreet under signature
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantities of certified groundnut seed acquired annually
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="40,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="120,000.00">
<comment><narrative>
More efforts to secure collect of certified groundnut seeds
</narrative></comment>
</target>
<actual value="71,109">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantities of certified groundnut seed acquired annually
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="40,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="120,000.00">
<comment><narrative>
More efforts to secure collect of certified groundnut seeds
</narrative></comment>
</target>
<actual value="71,109">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Groundnut interprofession (CNIA) restructured (new action plan and framework agreement with government)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No existing action plan to restructure the National Committee on the Groundnut Value chain (CNIA)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Groundnut interprofession (CNIA) restructured (new action plan and framework agreement with government)">
<comment><narrative>
Yet to be done but ongoing progress to speed up
</narrative></comment>
</target>
<actual value="Framework agreement is signed between CNIA and the Government, encompassing new price setting mechanism for groundnut.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Groundnut interprofession (CNIA) restructured (new action plan and framework agreement with government)
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No existing action plan to restructure the National Committee on the Groundnut Value chain (CNIA)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Groundnut interprofession (CNIA) restructured (new action plan and framework agreement with government)">
<comment><narrative>
Yet to be done but ongoing progress to speed up
</narrative></comment>
</target>
<actual value="Framework agreement is signed between CNIA and the Government, encompassing new price setting mechanism for groundnut.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and evaluation system for agriculture and livestock performance
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="Draft Monitoring and Evaluation system at MAER and MEPA"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Monitoring and evaluation system for agriculture and livestock performance">
<comment><narrative>
M&amp;E manual and digital platform almost completed for livestoc sub-sector but yet to be completed for the crops sub-sector. Consultants are working on it.
</narrative></comment>
</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and evaluation system for agriculture and livestock performance
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="Draft Monitoring and Evaluation system at MAER and MEPA"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Monitoring and evaluation system for agriculture and livestock performance">
<comment><narrative>
M&amp;E manual and digital platform almost completed for livestoc sub-sector but yet to be completed for the crops sub-sector. Consultants are working on it.
</narrative></comment>
</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Yield increase of groundnut
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="1.50">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="1,02">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Yield increase of groundnut
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="1.50">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="1,02">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="30,0000">

</target>
<actual value="35,0263">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="30,0000">

</target>
<actual value="35,0263">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="47,5000">
<comment><narrative>
Not applicable
</narrative></comment>
</target>
<actual value="86,9165">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="47,5000">
<comment><narrative>
Not applicable
</narrative></comment>
</target>
<actual value="86,9165">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses using financial services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses using financial services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small ruminants vaccinated against small ruminant plague (PPR)
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="1,644,254.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2025-12-31" />
<target value="6,000,000.00">
<comment><narrative>
Good progress
</narrative></comment>
</target>
<actual value="5,875,501">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Application of DECRET n° 2008-1260 (Nov. 10, 2008, concerning recognition, organization and functioning of the Interprofessional Organizations in the Agricultural sector (OIA).
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Draft decreet under signature
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the WRS in the Extended Groundnut Basin
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="The WRS regulatory body (OSRE) has not been implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="The WRS is operational in the extended groundnut basin and facilitating access to credit">
<comment><narrative>
Almost achieved
</narrative></comment>
</target>
<actual value="The WRS regulatory body (OSRE) has been implemented. US$ 10,000,000 financed by financial institutions through warehouse receipts, from a baseline of US$ 0, (out of which 9,178,484 achieved)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Animal Health and Veterinary Public Health Code finalized and validated
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
National validation work remained but planned by december 2024 but still not yet done.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Yield increase of groundnut
</narrative></title>
<baseline year="2019" iso-date="2019-12-04" value="0.98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-04" />
<period-end iso-date="2025-12-31" />
<target value="1.50">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="1,02">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Horses vaccinated against African horse sickness
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="73,663.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2025-12-31" />
<target value="320,000.00">
<comment><narrative>
On track
</narrative></comment>
</target>
<actual value="247,007">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses using financial services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P162042</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Investing in Maternal, Child and Adolescent Health</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed Project Development Objective is to improve utilization of essential reproductive, maternal, neonatal, child and adolescent health and nutrition (RMNCAH-N) services meeting quality standards in Priority Regions.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Investing in Maternal, Child and Adolescent Health Project in Senegal is to improve utilization of essential reproductive, maternal, neonatal, child and adolescent health and nutrition (RMNCAH-N) services meeting quality standards in Priority Regions. This project consists of four components. Component one will support key interventions to overcome bottlenecks identified as major constraints for health system performance and effective delivery of Reproductive, Maternal, Newborn, Child, and Adolescent Health and Nutrition (RMNCAH-N) services in the six targeted regions. There are three subcomponents: (1) Supporting the availability and distribution of human resources and other key inputs in Priority Regions; (2) Strengthening clinical competence and capacity of health care professionals and regional planning services to deliver quality care to mothers, children, and adolescents, and; (3) Supporting nutrition services at community and health facilities levels. The second component will promote adolescent health and women's empowerment. There are two subcomponents: (1) Supporting behavioral change through communication, community, and individual interventions, and; (2) Strengthening adolescent and women’ s empowerment. Component three will support reforms to strengthen governance, equity, and financing sustainability in the health sector. There are two subcomponents: (1) Improving financial protection against health risks, and; (2) Improving governance of the health system. Component four is the Contingent Emergency Response Component (CERC). This will allow for rapid reallocation of project proceeds in the event of a natural or man-made disaster or crisis that has caused, or is likely to imminently cause, a major adverse economic and/or social impact.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0031450"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0031449"><narrative>Ministry of Health and Social Action</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-01-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-09-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Christophe Lemiere</narrative></person-name><telephone>+1-202-473-1000</telephone><email>clemiere@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243940" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.56801 -16.27326</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244991" />
            <name><narrative>Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.77073 -13.66734</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250645" />
            <name><narrative>Kedougou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.55561 -12.18076</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303935" />
            <name><narrative>REgion de Kaffrine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.10528 -15.54565</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303937" />
            <name><narrative>REgion de SEdhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70683 -15.55801</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12110" percentage="53" xml:lang="en"/><sector vocabulary="1" code="12240" percentage="11" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15180" percentage="9" xml:lang="en"/><sector vocabulary="1" code="13020" percentage="9" xml:lang="en"/><sector vocabulary="1" code="13081" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HQ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Health Facilities and Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000636" percentage="25" xml:lang="en"><narrative>Adolescent Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="12" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="18" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="26" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="12" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="9" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="7" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="11" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="45" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="11" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="11" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2080086.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2080086.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2080086.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2080086.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2080086.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2080086.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2080086.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2080086.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2080086.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2080086.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2080086.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2080086.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">3154161.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">3154161.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">3154161.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">3154161.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">3154161.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">3154161.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">3154161.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">3154161.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">3154161.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">3154161.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">3154161.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">3154161.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2923640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2427691.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2427691.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2427691.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2427691.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2427691.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">2427691.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2427691.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">2427691.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">2427691.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">2427691.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2427691.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2427691.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2162173.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">2162173.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">2162173.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">2162173.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2162173.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2162173.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2162173.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">2162173.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">2162173.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">2162173.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2162173.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2162173.35</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">24666654.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">24666654.24</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">140000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-19999999</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">412673</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">3158576</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">5666123</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">464907</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">2092297</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">4795592</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">4134449</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">3247698</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">911135</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">4003279</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">1376965</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">3366301</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">2679718</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">3257071</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">704822</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">2331640</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">8966682</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">1446734</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">1642411</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">4254569</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">909028</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">14002789</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">273901</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">2046329</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">6617754</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">5859958</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">2689945</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">5249173</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">3529246</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">3440511</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">9024280</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">2437896</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">338892</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-1666</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-13719</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-13344</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-26579</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-75897</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-129870</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-181075</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-251601</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-337118</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-404748</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-432643</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-456503</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1908492</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1933576</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-31449"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162042"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P162042?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162042"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Utilization of health services by patients covered by a community-based insurance mechanism
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-24" />
<target value="40.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Midwives for 1,500 women of reproductive age
</narrative></title>
<baseline year="2021" iso-date="2021-01-04" value="0.78"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-04" />
<period-end iso-date="2024-12-31" />
<target value="1.00">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="1.19">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services (Number)
</narrative></title>
<baseline year="2019" iso-date="2019-07-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-11" />
<period-end iso-date="2025-06-13" />
<target value="2,843,864">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="3,424,908">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Completion rate for ANCs
</narrative></title>
<baseline year="2018" iso-date="2018-12-21" value="55.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-21" />
<period-end iso-date="2024-12-24" />
<target value="81.00">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="68.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of vulnerable beneficiaries (pregnant women) covered by the CBHIS
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2024-12-31" />
<target value="184,830.00">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="96138">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children under 5 suffering from childhood stunting in the project regions
</narrative></title>
<baseline year="2017" iso-date="2017-06-06" value="22.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-06" />
<period-end iso-date="2024-12-06" />
<target value="10.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="18.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescent girls not pregnant among cash transfer beneficiaries
</narrative></title>
<baseline year="2019" iso-date="2019-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-30" />
<period-end iso-date="2024-12-31" />
<target value="96.00">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="99.98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional health posts in the intervention area
</narrative></title>
<baseline year="2022" iso-date="2022-01-03" value="572.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-03" />
<period-end iso-date="2024-12-31" />
<target value="616.00">
<comment><narrative>
On track.
</narrative></comment>
</target>
<actual value="603.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Midwives for 1,500 women of reproductive age
</narrative></title>
<baseline year="2021" iso-date="2021-01-04" value="0.78"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-04" />
<period-end iso-date="2024-12-31" />
<target value="1.00">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="1.19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nurses per 5,000 Population
</narrative></title>
<baseline year="2021" iso-date="2021-01-04" value="0.34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-04" />
<period-end iso-date="2024-12-31" />
<target value="1.00">
<comment><narrative>
On track.
</narrative></comment>
</target>
<actual value="0.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of deliveries in health facilities
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2024-12-31" />
<target value="80.00">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="92.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Contraceptive prevalence rate (Percentage)
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-24" />
<target value="36.00">
<comment><narrative>
Not achieved
</narrative></comment>
</target>
<actual value="25.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Contraceptive prevalence rate (Percentage)
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-24" />
<target value="36.00">
<comment><narrative>
Not achieved
</narrative></comment>
</target>
<actual value="25.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women benefiting from revolving credit
</narrative></title>
<baseline year="2021" iso-date="2021-01-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-04" />
<period-end iso-date="2024-12-31" />
<target value="9,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="9000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of vulnerable beneficiaries (children aged 0-5) covered by the CBHIS
</narrative></title>
<baseline year="2019" iso-date="2019-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-30" />
<period-end iso-date="2024-12-31" />
<target value="954,465.00">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="538585">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of vulnerable beneficiaries (pregnant women) covered by the CBHIS
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2024-12-31" />
<target value="184,830.00">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="96138">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children under 5 suffering from childhood stunting in the project regions
</narrative></title>
<baseline year="2017" iso-date="2017-06-06" value="22.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-06" />
<period-end iso-date="2024-12-06" />
<target value="10.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="18.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children under 5 suffering from childhood stunting in the project regions
</narrative></title>
<baseline year="2017" iso-date="2017-06-06" value="22.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-06" />
<period-end iso-date="2024-12-06" />
<target value="10.00">
<comment><narrative>
Not Achieved
</narrative></comment>
</target>
<actual value="18.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adolescent girls not pregnant among cash transfer beneficiaries
</narrative></title>
<baseline year="2019" iso-date="2019-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-30" />
<period-end iso-date="2024-12-31" />
<target value="96.00">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="99.98">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Completion rate for ANCs
</narrative></title>
<baseline year="2018" iso-date="2018-12-21" value="55.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-21" />
<period-end iso-date="2024-12-24" />
<target value="81.00">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="68.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Completion rate for ANCs
</narrative></title>
<baseline year="2018" iso-date="2018-12-21" value="55.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-21" />
<period-end iso-date="2024-12-24" />
<target value="81.00">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="68.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Utilization of health services by patients covered by a community-based insurance mechanism
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-24" />
<target value="40.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Utilization of health services by patients covered by a community-based insurance mechanism
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-24" />
<target value="40.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries of the CBHIS
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="816,393.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="2,837,532.00">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="4,932,038">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adolescent girls who benefited from  cash transfers
</narrative></title>
<baseline year="2019" iso-date="2019-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-08" />
<period-end iso-date="2025-06-15" />
<target value="36000">
<comment><narrative>
On track
</narrative></comment>
</target>
<actual value="35,994">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Maturity level achieved on the WHO Global Benchmarking Tool for evaluation of national regulatory systems of medical products (Number)
</narrative></title>
<baseline year="2021" iso-date="2021-01-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-15" />
<period-end iso-date="2025-06-15" />
<target value="3">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Maturity level achieved on the WHO Global Benchmarking Tool for evaluation of national regulatory systems of medical products (Number)
</narrative></title>
<baseline year="2021" iso-date="2021-01-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-15" />
<period-end iso-date="2025-06-15" />
<target value="3">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services (Number)
</narrative></title>
<baseline year="2019" iso-date="2019-07-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-11" />
<period-end iso-date="2025-06-13" />
<target value="2,843,864">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="3,424,908">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services (Number)
</narrative></title>
<baseline year="2019" iso-date="2019-07-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-11" />
<period-end iso-date="2025-06-13" />
<target value="2,843,864">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="3,424,908">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women benefiting from revolving credit
</narrative></title>
<baseline year="2021" iso-date="2021-01-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-04" />
<period-end iso-date="2024-12-31" />
<target value="9,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="9000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adolescent girls who benefited from  cash transfers
</narrative></title>
<baseline year="2019" iso-date="2019-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-08" />
<period-end iso-date="2025-06-15" />
<target value="36000">
<comment><narrative>
On track
</narrative></comment>
</target>
<actual value="35,994">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Contraceptive prevalence rate (Percentage)
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-24" />
<target value="36.00">
<comment><narrative>
Not achieved
</narrative></comment>
</target>
<actual value="25.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Contraceptive prevalence rate (Percentage)
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-24" />
<target value="36.00">
<comment><narrative>
Not achieved
</narrative></comment>
</target>
<actual value="25.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children under 5 suffering from childhood stunting in the project regions
</narrative></title>
<baseline year="2017" iso-date="2017-06-06" value="22.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-06" />
<period-end iso-date="2024-12-06" />
<target value="10.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="18.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children under 5 suffering from childhood stunting in the project regions
</narrative></title>
<baseline year="2017" iso-date="2017-06-06" value="22.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-06" />
<period-end iso-date="2024-12-06" />
<target value="10.00">
<comment><narrative>
Not Achieved
</narrative></comment>
</target>
<actual value="18.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Completion rate for ANCs
</narrative></title>
<baseline year="2018" iso-date="2018-12-21" value="55.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-21" />
<period-end iso-date="2024-12-24" />
<target value="81.00">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="68.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Completion rate for ANCs
</narrative></title>
<baseline year="2018" iso-date="2018-12-21" value="55.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-21" />
<period-end iso-date="2024-12-24" />
<target value="81.00">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="68.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Utilization of health services by patients covered by a community-based insurance mechanism
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-24" />
<target value="40.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Utilization of health services by patients covered by a community-based insurance mechanism
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-24" />
<target value="40.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Maturity level achieved on the WHO Global Benchmarking Tool for evaluation of national regulatory systems of medical products (Number)
</narrative></title>
<baseline year="2021" iso-date="2021-01-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-15" />
<period-end iso-date="2025-06-15" />
<target value="3">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Maturity level achieved on the WHO Global Benchmarking Tool for evaluation of national regulatory systems of medical products (Number)
</narrative></title>
<baseline year="2021" iso-date="2021-01-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-15" />
<period-end iso-date="2025-06-15" />
<target value="3">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services (Number)
</narrative></title>
<baseline year="2019" iso-date="2019-07-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-11" />
<period-end iso-date="2025-06-13" />
<target value="2,843,864">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="3,424,908">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services (Number)
</narrative></title>
<baseline year="2019" iso-date="2019-07-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-11" />
<period-end iso-date="2025-06-13" />
<target value="2,843,864">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="3,424,908">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Contraceptive prevalence rate (Percentage)
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-24" />
<target value="36.00">
<comment><narrative>
Not achieved
</narrative></comment>
</target>
<actual value="25.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of vulnerable beneficiaries (children aged 0-5) covered by the CBHIS
</narrative></title>
<baseline year="2019" iso-date="2019-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-30" />
<period-end iso-date="2024-12-31" />
<target value="954,465.00">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="538585">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nurses per 5,000 Population
</narrative></title>
<baseline year="2021" iso-date="2021-01-04" value="0.34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-04" />
<period-end iso-date="2024-12-31" />
<target value="1.00">
<comment><narrative>
On track.
</narrative></comment>
</target>
<actual value="0.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of deliveries in health facilities
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2024-12-31" />
<target value="80.00">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="92.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Maturity level achieved on the WHO Global Benchmarking Tool for evaluation of national regulatory systems of medical products (Number)
</narrative></title>
<baseline year="2021" iso-date="2021-01-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-15" />
<period-end iso-date="2025-06-15" />
<target value="3">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries of the CBHIS
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="816,393.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="2,837,532.00">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="4,932,038">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional health posts in the intervention area
</narrative></title>
<baseline year="2022" iso-date="2022-01-03" value="572.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-03" />
<period-end iso-date="2024-12-31" />
<target value="616.00">
<comment><narrative>
On track.
</narrative></comment>
</target>
<actual value="603.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P161332</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Investing in the Early Years for Human Development</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve delivery of select services that promote early childhood development in underserved areas of Senegal]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Investing in the Early Years for Human Development Project is to improve delivery of select services that promote early childhood development in underserved areas of Senegal. There are four components to the project, the first component being child nutrition and early stimulation in the first 1,000 days. The objective of this component is to improve child nutrition and early stimulation, especially in the first 1,000 days. This component includes two subcomponents: (i) early stimulation and community-based growth monitoring and promotion; and (ii) multi-sectoral coordination for nutrition. The second component is the quality early learning. objective of this component is to expand access to quality early learning services. With this component, the GoS aims to improve children's cognitive and socio-emotional development and facilitate children's on-time transition to primary school through quality early learning interventions. This component includes four subcomponents: (a) early learning quality enhancement; (b) parent engagement to promote early learning; (c) performance-based financing for Daaras; and, (d) construction and rehabilitation. The implementation of this component will be led by the MEN, with participation by the ANPECTP. The third component is the child protection and system strengthening. The objective of this component is to expand coverage of services to protect children and build system capacity to coordinate and promote child development. This component includes three subcomponents: (1) birth registration; (2) social mobilization, communication, and behavior change; and, (3) system strengthening. The implementation of this component will be led by the MBGPE and the Project Implementation Unit (PIU). Finally, the fourth component is the project management and technical assistance. The objectives of this subcomponent are to strengthen the management capacity of the MBGPE, ensure smooth project implementation, and ensure evaluation and adaptive learning across the project activities. This component will finance project management costs, including staffing of the PIU, training for PIU staff, supervision, evaluations, project audits, M&amp;E, and other operating costs. Capacity assessments and other types of research and analytic activities needed to support service delivery and project management will be carried out, including joint diagnostics, joint work plans, an M&amp;E framework, and knowledge management systems.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0030692"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0030691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-03-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-09-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Pamela Mulet</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pmulet@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244994" />
            <name><narrative>Tamba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.88333 -15.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248753" />
            <name><narrative>Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.16667 -13.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250805" />
            <name><narrative>Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.15197 -16.07259</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251007" />
            <name><narrative>Kaffrine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.10594 -15.5508</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251910" />
            <name><narrative>Fatick</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.28333 -16.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252310" />
            <name><narrative>Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.23333 -16.18333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.44406</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="12240" percentage="41" xml:lang="en"/><sector vocabulary="1" code="11240" percentage="24" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="12" xml:lang="en"/><sector vocabulary="1" code="11120" percentage="8" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="7" xml:lang="en"/><sector vocabulary="1" code="11130" percentage="5" xml:lang="en"/><sector vocabulary="1" code="13010" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="39.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EC" percentage="39.0000000" xml:lang="en"><narrative>FY17 - Early Childhood Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="12" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="19" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="17" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="26" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="20" xml:lang="en"><narrative>Education Facilities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="9" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="46" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="19" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="26" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="56" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="17" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="26" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="20" xml:lang="en"><narrative>Education Facilities</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">76350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">317550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">190200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">442650.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">251625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">561075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">308700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">678675.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">774600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">420975.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">896475.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">953325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">497850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1046775.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">547350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1130325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1172850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">603675.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1245675.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">642900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1328325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1398225.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">725775.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1503750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">774825.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1581375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1624425.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">844350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1737150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">879600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1750725.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1747425.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">893625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1800225.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">890925.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1743075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1727700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">863700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1715850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">847875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1665300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1633125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">808875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1602225.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">792450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1560825.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1530150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">754500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1487925.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">732900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1448100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1427175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">703950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1384275.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">679800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1340475.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1317225.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">649725.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1278900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">629100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1234800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1203000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">593175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1181175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">590100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1152825.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">570825.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1131675.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">561375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1113825.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1100700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">382125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">448875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">5542867.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">5542867.33</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">75000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">260182</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">3866077</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">1637276</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">258569</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">1302601</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">321036</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">1013559</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">2126748</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">865023</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">2036580</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">573303</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">635524</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">1397268</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">531812</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">1624246</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">571641</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">1850284</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">1508385</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">897582</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">273415</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">250992</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">1141334</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">2198588</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">1684368</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">1251444</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">1506308</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">3242026</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">1014975</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">1573742</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">540674</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">470962</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">2109119</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">1110140</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">2210797</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">619812</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">428468</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">2809378</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">1700679</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">1685789</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">488639</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">686932</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">2370203</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">746179</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">3201406</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">428606</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1273629</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">495764</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">1421293</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">263462</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">958233</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1050627</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">541953</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">405654</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">816140</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">578117</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1416319</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">1213272</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-648</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-19211</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-38248</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-54305</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-77919</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-94846</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-109360</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-140415</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-173507</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-204511</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-231213</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-238816</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-254863</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-250837</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1128750</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1183700</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1175150</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-30691"><narrative>Ministry of  Family and Solidarity (MFS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P161332"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P161332?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P161332"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="206,000.00">
<comment><narrative>
Target exceeded
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="280,986.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="206,000.00">
<comment><narrative>
Target exceeded
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="280,986.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Religious leaders engaged to promote child development
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="840.00">
<comment><narrative>
Target exceeded.
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="959.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="1,800.00">
<comment><narrative>
Target exceeded
Source: Project Monitoring System

&amp;nbsp;
</narrative></comment>
</target>
<actual value="3,517.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="2,400,000.00">
<comment><narrative>
Target exceeded and by massive amount
Source: CNDN Monitoring System

&amp;nbsp;
</narrative></comment>
</target>
<actual value="16,337,512.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sites for GMP with the complete integrated package (SPC, PCIME-C, PECMA, early stimulation)
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="80.00">
<comment><narrative>
Target exceeded
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="1,800.00">
<comment><narrative>
Target exceeded
Source: Project Monitoring System

&amp;nbsp;
</narrative></comment>
</target>
<actual value="3,517.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 0-23 months benefiting from early stimulation activities through community-based health and nutrition platforms
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="65.00">
<comment><narrative>
Target exceeded
Source: CNDN Monitoring System
</narrative></comment>
</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National survey implemented to measure cognitive and socioemotional development in early childhood
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Target achieved.Source: Project Monitoring System.

The data collection is completed and database shared with the PCU. The survey draft was shared in February 2024.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Birth registration rate of children 0-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="46.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="60.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ECD structures built or rehabilitated that conform with standards
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="230.00">
<comment><narrative>
Target not achieved 
Source: Project Monitoring System

&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community early learning centers established
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="3,000.00">
<comment><narrative>
Target not achieved
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="1,828.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families benefitting from national parental education programs
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="2,000,000.00">
<comment><narrative>
Target not achieved
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="574,499.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Citizens and/or communities involved in planning/implementation/evaluation of development programs
</narrative></title>
<baseline year="2019" iso-date="2019-01-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-30" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Target achieved
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Citizens and/or communities involved in planning/implementation/evaluation of development programs
</narrative></title>
<baseline year="2019" iso-date="2019-01-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-30" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Target achieved
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families benefitting from national parental education programs
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="2,000,000.00">
<comment><narrative>
Target not achieved
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="574,499.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Religious leaders engaged to promote child development
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="840.00">
<comment><narrative>
Target exceeded.
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="959.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="2,400,000.00">
<comment><narrative>
Target exceeded and by massive amount
Source: CNDN Monitoring System

&amp;nbsp;
</narrative></comment>
</target>
<actual value="16,337,512.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Local governments that include ECD in their planning tools
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="133.00">
<comment><narrative>
Target exceeded
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Birth registration rate of children 0-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="46.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="60.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Local governments that include ECD in their planning tools
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="133.00">
<comment><narrative>
Target exceeded
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sites for GMP with the complete integrated package (SPC, PCIME-C, PECMA, early stimulation)
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="80.00">
<comment><narrative>
Target exceeded
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sites for GMP with the complete integrated package (SPC, PCIME-C, PECMA, early stimulation)
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="80.00">
<comment><narrative>
Target exceeded.
Source: CNDN Monitoring System
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community early learning centers established
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="3,000.00">
<comment><narrative>
Target not achieved.
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="1,828.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ECD structures built or rehabilitated that conform with standards
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="230.00">
<comment><narrative>
Target not achieved.
Source: Project Monitoring System

Progress: 58 sites have received provisional acceptance, five sites will be delivered by June 30, and  1 remaining site is transferred to the GoS with clear E&amp;S plan developed. Five additional sites have been transfered to PAPSE project for completion.
</narrative></comment>
</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Citizens and/or communities involved in planning/implementation/evaluation of development programs
</narrative></title>
<baseline year="2019" iso-date="2019-01-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-30" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Target achieved.
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Local governments that include ECD in their planning tools
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="133.00">
<comment><narrative>
Target exceeded.
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="2,400,000.00">
<comment><narrative>
Target exceeded. 
Source: CNDN Monitoring System
</narrative></comment>
</target>
<actual value="16,337,512.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="1,800.00">
<comment><narrative>
Target exceeded.
Source: Project Monitoring System

&amp;nbsp;
</narrative></comment>
</target>
<actual value="3,517.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Religious leaders engaged to promote child development
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="840.00">
<comment><narrative>
Target exceeded.
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="959.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Early learning enrollment rates of children 3-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="9.08"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="18.00">
<comment><narrative>
Target achieved.Source: ANPECTP et DEPS
</narrative></comment>
</target>
<actual value="18.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Early learning enrollment rates of children 3-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="9.08"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="18.00">
<comment><narrative>
Target achieved.Source: ANPECTP et DEPS
</narrative></comment>
</target>
<actual value="18.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Early learning enrollment rates of children 3-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="9.08"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="18.00">
<comment><narrative>
Target achieved.Source: ANPECTP et DEPS
</narrative></comment>
</target>
<actual value="18.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families benefitting from national parental education programs
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="2,000,000.00">
<comment><narrative>
Target not achieved.
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="574,499.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="206,000.00">
<comment><narrative>
Target exceeded.
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="280,986.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Birth registration rate of children 0-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="46.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="60.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Birth registration rate of children 0-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="46.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="60.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Birth registration rate of children 0-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="46.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="60.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National survey implemented to measure cognitive and socioemotional development in early childhood
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Target achieved.Source: Project Monitoring System.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National survey implemented to measure cognitive and socioemotional development in early childhood
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Target achieved.Source: Project Monitoring System.

The data collection is completed and database shared with the PCU. The survey draft was shared in February 2024.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National survey implemented to measure cognitive and socioemotional development in early childhood
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Target achieved.Source: Project Monitoring System.

The data collection is completed and database shared with the PCU. The survey draft was shared in February 2024.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 0-23 months benefiting from early stimulation activities through community-based health and nutrition platforms
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="65.00">
<comment><narrative>
Target exceeded.
Source: CNDN Monitoring System
</narrative></comment>
</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 0-23 months benefiting from early stimulation activities through community-based health and nutrition platforms
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="65.00">
<comment><narrative>
Target exceeded
Source: CNDN Monitoring System
</narrative></comment>
</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 0-23 months benefiting from early stimulation activities through community-based health and nutrition platforms
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="65.00">
<comment><narrative>
Target exceeded
Source: CNDN Monitoring System
</narrative></comment>
</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 0-23 months benefiting from early stimulation activities through community-based health and nutrition platforms
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="65.00">
<comment><narrative>
Target exceeded
Source: CNDN Monitoring System
</narrative></comment>
</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Early learning enrollment rates of children 3-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="9.08"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="18.00">
<comment><narrative>
Target achieved.Source: ANPECTP et DEPS
</narrative></comment>
</target>
<actual value="18.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Early learning enrollment rates of children 3-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="9.08"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="18.00">
<comment><narrative>
Target achieved.Source: ANPECTP et DEPS
</narrative></comment>
</target>
<actual value="18.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Early learning enrollment rates of children 3-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="9.08"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="18.00">
<comment><narrative>
Target achieved.Source: ANPECTP et DEPS
</narrative></comment>
</target>
<actual value="18.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Birth registration rate of children 0-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="46.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="60.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Birth registration rate of children 0-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="46.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="60.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Birth registration rate of children 0-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="46.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="60.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National survey implemented to measure cognitive and socioemotional development in early childhood
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Target achieved.Source: Project Monitoring System.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National survey implemented to measure cognitive and socioemotional development in early childhood
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Target achieved.Source: Project Monitoring System.

The data collection is completed and database shared with the PCU. The survey draft was shared in February 2024.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National survey implemented to measure cognitive and socioemotional development in early childhood
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Target achieved.Source: Project Monitoring System.

The data collection is completed and database shared with the PCU. The survey draft was shared in February 2024.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 0-23 months benefiting from early stimulation activities through community-based health and nutrition platforms
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="65.00">
<comment><narrative>
Target exceeded.
Source: CNDN Monitoring System
</narrative></comment>
</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 0-23 months benefiting from early stimulation activities through community-based health and nutrition platforms
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="65.00">
<comment><narrative>
Target exceeded
Source: CNDN Monitoring System
</narrative></comment>
</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 0-23 months benefiting from early stimulation activities through community-based health and nutrition platforms
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="65.00">
<comment><narrative>
Target exceeded
Source: CNDN Monitoring System
</narrative></comment>
</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Early learning enrollment rates of children 3-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="9.08"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="18.00">
<comment><narrative>
Target achieved.Source: ANPECTP et DEPS
</narrative></comment>
</target>
<actual value="18.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community early learning centers established
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="3,000.00">
<comment><narrative>
Target not achieved
Source: Project Monitoring System
</narrative></comment>
</target>
<actual value="1,828.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Early learning enrollment rates of children 3-5 years
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="9.08"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="18.00">
<comment><narrative>
Target achieved.Source: ANPECTP et DEPS
</narrative></comment>
</target>
<actual value="18.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ECD structures built or rehabilitated that conform with standards
</narrative></title>
<baseline year="2018" iso-date="2018-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-07" />
<period-end iso-date="2026-06-15" />
<target value="230.00">
<comment><narrative>
Target not achieved 
Source: Project Monitoring System

&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National survey implemented to measure cognitive and socioemotional development in early childhood
</narrative></title>
<baseline year="2018" iso-date="2018-06-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-08" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Target achieved.Source: Project Monitoring System.

The data collection is completed and database shared with the PCU. The survey draft was shared in February 2024.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P510613</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Strengthening Senegal's Fiscal Sustainability Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–00009730"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–00009730"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-00009727"><narrative>Ministry of Finance and Budget</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-06-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-06-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Julia Dhimitri</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jdhimitri@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<contact-info type="2">
<mailing-address><narrative>
Rue RenE Ndiaye x Avenue Carde, Dakar, Senegal
,  www.finances.gouv.sn/contact/
</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Rue RenE Ndiaye x Avenue Carde, Dakar, Senegal
,  www.finances.gouv.sn/contact/
</narrative></mailing-address></contact-info><recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15119" percentage="28" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="23" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="21" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15118" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15196" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="100.000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2458344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2291665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2291665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2291665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2291665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2291665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2291665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2291665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2291665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2291665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2291665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2291665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2291677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">3636362.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">3636362.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">3636362.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">3636362.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">3636362.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">3636362.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">3636362.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">3636362.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">3636362.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">3636362.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">3636373.60</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-29"/>
<value currency="USD" value-date="2029-06-29">87048184.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-29"/>
<value currency="USD" value-date="2029-06-29">87048184.52</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">115000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-9727"><narrative>Ministry of Finance and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">27951815</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-9727"><narrative>Ministry of Finance and Budget</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P510613"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P510613?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P510613"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Management Accounts produced by ministerial public accountants using SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Incremental adoption of Recipient's electronic procurement solution by contracting authorities (ministries/agencies or associated entities) for electronic review of bidding documents &amp; contract award
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Performance contracts signed with the customs operational units of the directorate of customs operations in Dakar and the units of the directorate of customs investigations
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="9">
<comment><narrative>
The first three PBCs were signed on March 6, 2026, with the remaining six expected by end-March 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The electronic procurement system (e-SIGMAP) collects the necessary data to monitor the implementation of Decree No. 012635, which provides for 2% of contracts to be reserved for women-led SMEs
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The electronic procurement system (e-SIGMAP) collects the necessary data to monitor the implementation of Decree No. 012635, which provides for 2% of contracts to be reserved for women-led SMEs
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A Medium-Term Debt Strategy is adopted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in public debt
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="79">

</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Performance contracts signed with the customs operational units of the directorate of customs operations in Dakar and the units of the directorate of customs investigations
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="9">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reconciliation of public debt records conducted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reconciliation of public debt records conducted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of VAT payers using the recipient's e-invoicing solution
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bank accounts, other than donor-financed project accounts, held in the name of the Recipient, and managed by persons other than public accountants, are closed
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-06-15" />
<target value="0">

</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A new public debt recording system is established
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Management Accounts produced by ministerial public accountants using SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in public debt
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="79">
<comment><narrative>
Progress will require addressing persistent challenges related to the quality and comprehensiveness of public debt data, as well as the lack of consensus on a credible medium-term debt reduction path.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full budget cycle is managed through SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An arrears clearance framework is established and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full budget cycle is managed through SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of the Opening Balance Sheet ‘at minima’
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consolidated tax expenditure reports using new methodology published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bank accounts, other than donor-financed project accounts, held in the name of the Recipient, and managed by persons other than public accountants, are closed
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-06-15" />
<target value="0">

</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A new public debt recording system is established
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A comprehensive data dashboard is discussed monthly at the management-level for customs operations forward planning
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="24">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving training in public financial management, public debt management and domestic resources mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accrual Basis Annual Financial Statements produced by the DGCPT using SIGIF  and certified by the Court of Accounts
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public procurement contracts awarded using the Recipient's e-procurement system
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full budget cycle is managed through SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full budget cycle is managed through SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax audit correction rate
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2029-06-15" />
<target value="98">

</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax audit correction rate
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2029-06-15" />
<target value="98">

</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A comprehensive data dashboard is discussed monthly at the management-level for customs operations forward planning
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="24">
<comment><narrative>
Agreement has been reached on the content and design of the comprehensive data dashboard that is to be discussed monthly at management level for customs operations forward planning. The dashboard is expected to be operational by the end of June 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A comprehensive data dashboard is discussed monthly at the management-level for customs operations forward planning
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="24">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Performance contracts signed with the customs operational units of the directorate of customs operations in Dakar and the units of the directorate of customs investigations
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="9">
<comment><narrative>
The first three PBCs were signed on March 6, 2026, with the remaining six expected by end-March 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Performance contracts signed with the customs operational units of the directorate of customs operations in Dakar and the units of the directorate of customs investigations
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="9">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of VAT payers using the recipient's e-invoicing solution
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">
<comment><narrative>
DGID is expected to the identification and selection of a firm for the VAT e-invoicing solution.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of VAT payers using the recipient's e-invoicing solution
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consolidated tax expenditure reports using new methodology published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consolidated tax expenditure reports using new methodology published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A Medium-Term Debt Strategy is adopted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A Medium-Term Debt Strategy is adopted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A new public debt recording system is established
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A new public debt recording system is established
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An arrears clearance framework is established and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An arrears clearance framework is established and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Detailed consolidated quarterly public debt bulletins prepared and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Detailed consolidated quarterly public debt bulletins prepared and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reconciliation of public debt records conducted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reconciliation of public debt records conducted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving training in public financial management, public debt management and domestic resources mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving training in public financial management, public debt management and domestic resources mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Periodic procurement performance reports published based on electronic procurement key performance indicator data
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-05-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Periodic procurement performance reports published based on electronic procurement key performance indicator data
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-05-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The electronic procurement system (e-SIGMAP) collects the necessary data to monitor the implementation of Decree No. 012635, which provides for 2% of contracts to be reserved for women-led SMEs
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The electronic procurement system (e-SIGMAP) collects the necessary data to monitor the implementation of Decree No. 012635, which provides for 2% of contracts to be reserved for women-led SMEs
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Incremental adoption of Recipient's electronic procurement solution by contracting authorities (ministries/agencies or associated entities) for electronic review of bidding documents &amp; contract award
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Incremental adoption of Recipient's electronic procurement solution by contracting authorities (ministries/agencies or associated entities) for electronic review of bidding documents &amp; contract award
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PFM systems are interoperable
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PFM systems are interoperable
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bank accounts, other than donor-financed project accounts, held in the name of the Recipient, and managed by persons other than public accountants, are closed
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-06-15" />
<target value="0">

</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bank accounts, other than donor-financed project accounts, held in the name of the Recipient, and managed by persons other than public accountants, are closed
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-06-15" />
<target value="0">

</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accrual Basis Annual Financial Statements produced by the DGCPT using SIGIF  and certified by the Court of Accounts
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accrual Basis Annual Financial Statements produced by the DGCPT using SIGIF  and certified by the Court of Accounts
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of the Opening Balance Sheet ‘at minima’
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of the Opening Balance Sheet ‘at minima’
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Management Accounts produced by ministerial public accountants using SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Management Accounts produced by ministerial public accountants using SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in tax expenditure
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="6.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2028-12-15" />
<target value="5.2">
<comment><narrative>
DGID (tax administration) is expected to expedite the finalization, approval, and publication of the tax expenditure reports for 2023 and 2024 which are critical to identifying tax expenditures to be streamlined or abolished.
</narrative></comment>
</target>
<actual value="6.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in tax expenditure
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="6.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2028-12-15" />
<target value="5.2">

</target>
<actual value="6.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax to GDP ratio
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="18.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="20.0">

</target>
<actual value="18.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax to GDP ratio
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="18.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="20.0">

</target>
<actual value="18.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in public debt
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="79">
<comment><narrative>
Progress will require addressing persistent challenges related to the quality and comprehensiveness of public debt data, as well as the lack of consensus on a credible medium-term debt reduction path.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in public debt
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="79">

</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extrabudgetary expenditures
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="1.44"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="1.15">

</target>
<actual value="1.44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax to GDP ratio
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="18.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="20.0">

</target>
<actual value="18.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extrabudgetary expenditures
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="1.44"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="1.15">

</target>
<actual value="1.44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public procurement contracts awarded using the Recipient's e-procurement system
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">
<comment><narrative>
The APPEL platform, the national e-procurement solution, was launched on October 14, 2025; with 57 contracting authorities on boarded, 38 public procurement plans published, 385 suppliers registered and six electronic ongoing tenders in process. To further advance the achievement, the AutoritE de REgulation de la Commande Publique-ARCOP/ Public Procurement Regulatory Authority will continue to intensify implementation efforts, with key actions including the finalization and publication of the pilot phase completion report on ARCOP's website, alongside measures to further expand and institutionalize the use of the e-procurement solution among contracting authorities.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public procurement contracts awarded using the Recipient's e-procurement system
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Detailed consolidated quarterly public debt bulletins prepared and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax audit correction rate
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2029-06-15" />
<target value="98">

</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Periodic procurement performance reports published based on electronic procurement key performance indicator data
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-05-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in tax expenditure
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="6.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2028-12-15" />
<target value="5.2">

</target>
<actual value="6.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of the Opening Balance Sheet ‘at minima’
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of VAT payers using the recipient's e-invoicing solution
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">
<comment><narrative>
DGID is expected to the identification and selection of a firm for the VAT e-invoicing solution.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Incremental adoption of Recipient's electronic procurement solution by contracting authorities (ministries/agencies or associated entities) for electronic review of bidding documents &amp; contract award
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A Medium-Term Debt Strategy is adopted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An arrears clearance framework is established and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Periodic procurement performance reports published based on electronic procurement key performance indicator data
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-05-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accrual Basis Annual Financial Statements produced by the DGCPT using SIGIF  and certified by the Court of Accounts
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PFM systems are interoperable
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Detailed consolidated quarterly public debt bulletins prepared and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in tax expenditure
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="6.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2028-12-15" />
<target value="5.2">
<comment><narrative>
DGID (tax administration) is expected to expedite the finalization, approval, and publication of the tax expenditure reports for 2023 and 2024 which are critical to identifying tax expenditures to be streamlined or abolished.
</narrative></comment>
</target>
<actual value="6.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A comprehensive data dashboard is discussed monthly at the management-level for customs operations forward planning
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="24">
<comment><narrative>
Agreement has been reached on the content and design of the comprehensive data dashboard that is to be discussed monthly at management level for customs operations forward planning. The dashboard is expected to be operational by the end of June 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extrabudgetary expenditures
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="1.44"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="1.15">

</target>
<actual value="1.44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extrabudgetary expenditures
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="1.44"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="1.15">

</target>
<actual value="1.44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax to GDP ratio
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="18.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="20.0">

</target>
<actual value="18.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full budget cycle is managed through SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full budget cycle is managed through SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax audit correction rate
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2029-06-15" />
<target value="98">

</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax audit correction rate
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2029-06-15" />
<target value="98">

</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A comprehensive data dashboard is discussed monthly at the management-level for customs operations forward planning
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A comprehensive data dashboard is discussed monthly at the management-level for customs operations forward planning
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A comprehensive data dashboard is discussed monthly at the management-level for customs operations forward planning
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="24">
<comment><narrative>
Agreement has been reached on the content and design of the comprehensive data dashboard that is to be discussed monthly at management level for customs operations forward planning. The dashboard is expected to be operational by the end of June 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A comprehensive data dashboard is discussed monthly at the management-level for customs operations forward planning
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="24">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Performance contracts signed with the customs operational units of the directorate of customs operations in Dakar and the units of the directorate of customs investigations
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Performance contracts signed with the customs operational units of the directorate of customs operations in Dakar and the units of the directorate of customs investigations
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Performance contracts signed with the customs operational units of the directorate of customs operations in Dakar and the units of the directorate of customs investigations
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="9">
<comment><narrative>
The first three PBCs were signed on March 6, 2026, with the remaining six expected by end-March 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Performance contracts signed with the customs operational units of the directorate of customs operations in Dakar and the units of the directorate of customs investigations
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="9">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of VAT payers using the recipient's e-invoicing solution
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of VAT payers using the recipient's e-invoicing solution
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of VAT payers using the recipient's e-invoicing solution
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">
<comment><narrative>
DGID is expected to the identification and selection of a firm for the VAT e-invoicing solution.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of VAT payers using the recipient's e-invoicing solution
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consolidated tax expenditure reports using new methodology published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consolidated tax expenditure reports using new methodology published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A Medium-Term Debt Strategy is adopted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A Medium-Term Debt Strategy is adopted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A new public debt recording system is established
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A new public debt recording system is established
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An arrears clearance framework is established and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An arrears clearance framework is established and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Detailed consolidated quarterly public debt bulletins prepared and published
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Detailed consolidated quarterly public debt bulletins prepared and published
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Detailed consolidated quarterly public debt bulletins prepared and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public procurement contracts awarded using the Recipient's e-procurement system
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">
<comment><narrative>
The APPEL platform, the national e-procurement solution, was launched on October 14, 2025; with 57 contracting authorities on boarded, 38 public procurement plans published, 385 suppliers registered and six electronic ongoing tenders in process. To further advance the achievement, the AutoritE de REgulation de la Commande Publique-ARCOP/ Public Procurement Regulatory Authority will continue to intensify implementation efforts, with key actions including the finalization and publication of the pilot phase completion report on ARCOP's website, alongside measures to further expand and institutionalize the use of the e-procurement solution among contracting authorities.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Detailed consolidated quarterly public debt bulletins prepared and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reconciliation of public debt records conducted and published
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reconciliation of public debt records conducted and published
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reconciliation of public debt records conducted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual reconciliation of public debt records conducted and published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving training in public financial management, public debt management and domestic resources mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving training in public financial management, public debt management and domestic resources mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Periodic procurement performance reports published based on electronic procurement key performance indicator data
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-05-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Periodic procurement performance reports published based on electronic procurement key performance indicator data
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-05-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The electronic procurement system (e-SIGMAP) collects the necessary data to monitor the implementation of Decree No. 012635, which provides for 2% of contracts to be reserved for women-led SMEs
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The electronic procurement system (e-SIGMAP) collects the necessary data to monitor the implementation of Decree No. 012635, which provides for 2% of contracts to be reserved for women-led SMEs
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Incremental adoption of Recipient's electronic procurement solution by contracting authorities (ministries/agencies or associated entities) for electronic review of bidding documents &amp; contract award
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Incremental adoption of Recipient's electronic procurement solution by contracting authorities (ministries/agencies or associated entities) for electronic review of bidding documents &amp; contract award
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Incremental adoption of Recipient's electronic procurement solution by contracting authorities (ministries/agencies or associated entities) for electronic review of bidding documents &amp; contract award
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Incremental adoption of Recipient's electronic procurement solution by contracting authorities (ministries/agencies or associated entities) for electronic review of bidding documents &amp; contract award
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PFM systems are interoperable
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PFM systems are interoperable
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bank accounts, other than donor-financed project accounts, held in the name of the Recipient, and managed by persons other than public accountants, are closed
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bank accounts, other than donor-financed project accounts, held in the name of the Recipient, and managed by persons other than public accountants, are closed
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bank accounts, other than donor-financed project accounts, held in the name of the Recipient, and managed by persons other than public accountants, are closed
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-06-15" />
<target value="0">

</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bank accounts, other than donor-financed project accounts, held in the name of the Recipient, and managed by persons other than public accountants, are closed
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-06-15" />
<target value="0">

</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accrual Basis Annual Financial Statements produced by the DGCPT using SIGIF  and certified by the Court of Accounts
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accrual Basis Annual Financial Statements produced by the DGCPT using SIGIF  and certified by the Court of Accounts
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accrual Basis Annual Financial Statements produced by the DGCPT using SIGIF  and certified by the Court of Accounts
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accrual Basis Annual Financial Statements produced by the DGCPT using SIGIF  and certified by the Court of Accounts
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving training in public financial management, public debt management and domestic resources mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of the Opening Balance Sheet ‘at minima’
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of the Opening Balance Sheet ‘at minima’
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of the Opening Balance Sheet ‘at minima’
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of the Opening Balance Sheet ‘at minima’
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Management Accounts produced by ministerial public accountants using SIGIF
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Management Accounts produced by ministerial public accountants using SIGIF
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Management Accounts produced by ministerial public accountants using SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Management Accounts produced by ministerial public accountants using SIGIF
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in tax expenditure
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="6.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="6.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in tax expenditure
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="6.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="6.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in tax expenditure
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="6.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2028-12-15" />
<target value="5.2">
<comment><narrative>
DGID (tax administration) is expected to expedite the finalization, approval, and publication of the tax expenditure reports for 2023 and 2024 which are critical to identifying tax expenditures to be streamlined or abolished.
</narrative></comment>
</target>
<actual value="6.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in tax expenditure
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="6.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2028-12-15" />
<target value="5.2">

</target>
<actual value="6.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax to GDP ratio
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="18.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="20.0">

</target>
<actual value="18.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax to GDP ratio
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="18.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="20.0">

</target>
<actual value="18.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in public debt
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in public debt
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in public debt
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="79">
<comment><narrative>
Progress will require addressing persistent challenges related to the quality and comprehensiveness of public debt data, as well as the lack of consensus on a credible medium-term debt reduction path.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in public debt
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="79">

</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extrabudgetary expenditures
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="1.44"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="1.15">

</target>
<actual value="1.44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extrabudgetary expenditures
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="1.44"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="1.15">

</target>
<actual value="1.44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public procurement contracts awarded using the Recipient's e-procurement system
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">
<comment><narrative>
The APPEL platform, the national e-procurement solution, was launched on October 14, 2025; with 57 contracting authorities on boarded, 38 public procurement plans published, 385 suppliers registered and six electronic ongoing tenders in process. To further advance the achievement, the AutoritE de REgulation de la Commande Publique-ARCOP/ Public Procurement Regulatory Authority will continue to intensify implementation efforts, with key actions including the finalization and publication of the pilot phase completion report on ARCOP's website, alongside measures to further expand and institutionalize the use of the e-procurement solution among contracting authorities.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public procurement contracts awarded using the Recipient's e-procurement system
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="35">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consolidated tax expenditure reports using new methodology published
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PFM systems are interoperable
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-06-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tax audit correction rate
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2029-06-15" />
<target value="98">

</target>
<actual value="98">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P123673</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SENEGAL Tertiary Education Governance and Financing For Results</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to enhance the efficiency and quality of the higher education system and the oversight and accountability of higher education institutions (HEI).]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Tertiary Education Governance and Financing for Results Project for Senegal is to enhance the efficiency and quality of the higher education system and the oversight and accountability of Higher Education Institution (HEI). There are two components to the project, the first component being strengthening the governance of the tertiary education system. For this component the concept of governance includes the aspects of providing: (a) reliable information to improve both transparency and decision-making: (b) standards and benchmarks to allow for measuring results and facilitating accountability: (c) providing incentives to encourage good management and create a culture of results; and (d) accountability mechanisms to hold service providers answerable for processes and outcomes. The second component is the improvement of the effectiveness of the tertiary education institutions. This component includes three sub-components: performance based contracts (PBC); diversifying and increasing access to short term tertiary education; and improving the learning environment.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0005285"><narrative>REPUBLIC OF SENEGAL</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0005285"><narrative>REPUBLIC OF SENEGAL</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0005282"><narrative>Ministry of Higher Education and Scientific Research (MOHESR)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-05-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-05-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-12-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-12-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hamoud Abdel Wedoud Kamil</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hkamil@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243939" />
            <name><narrative>REgion de Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.8 -16.366671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244800" />
            <name><narrative>REgion de ThiEs</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -16.866671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246451" />
            <name><narrative>REgion de Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.33333 -15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252308" />
            <name><narrative>REgion de Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -16.1</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>REgion de Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.283331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11110" percentage="10" xml:lang="en"/><sector vocabulary="1" code="11420" percentage="75" xml:lang="en"/><sector vocabulary="1" code="11430" percentage="15" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="75.0000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EW" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Workforce Development and Vocational Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="25" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="25" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="25" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="25" xml:lang="en"><narrative>Access to Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">316666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">316666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">316666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">3016666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">3016666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">3016666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">683333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">683333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">630799.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">630799.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">630799.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">2633333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">2633333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">2633333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">632902.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">632902.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">632902.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">686666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">686666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">686666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">3010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">3010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">3010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">3633333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">3633333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">3633333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">830552.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">830552.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">830552.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">630799.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">630799.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">630799.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">3350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">3350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">3350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1690666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1690666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1690666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1690666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1690666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1690666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">1690666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">1690666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">1690666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">2694666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">2694666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">2694666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2018-12-30"/>
<value currency="USD" value-date="2018-12-30">11211666.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2018-12-30"/>
<value currency="USD" value-date="2018-12-30">11211666.56</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">101300000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-2745922</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">654856</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">1891812</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">6024091</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">5267688</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">8212080</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">1819526</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">1586140</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">1039247</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">1300218</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">1103372</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">520310</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">716419</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">1885896</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1323189</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">1830516</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">1604788</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">5397691</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">805460</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">33080</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">79580</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">16033894</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">4813838</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">1811332</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">33849</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">10677771</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">246004</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">366468</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">179736</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">466718</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">140380</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">1794293</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">2973299</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">3718899</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">543160</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">5062367</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">885618</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">17442</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-2770901</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-1503</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-291</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-4413</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-9467</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-67213</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-98295</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-113792</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-143218</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-157797</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-221571</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-270038</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-263541</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-284806</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-310969</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-325409</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-330753</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-115</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-336096</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-320347</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-311854</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-332597</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-337044</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-305303</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-301399</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-323227</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-302315</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-295698</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-291850</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-258734</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-320612</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-290923</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-289954</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-869652</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-823747</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-814586</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-831107</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-821375</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-819135</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-173</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-814246</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-834982</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-18548</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-826538</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-846799</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-5284"><narrative>General Directorate of Higher Education; Ministry of Higher Education and Scientific Research (MOHESR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P123673"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P123673?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P123673"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Undergraduate programs elaborated according to LMD with complete description
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;Target achieved 100%.&amp;nbsp; &lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Budget allocated based on performance-based contracts
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title/>
<baseline year="2011" iso-date="2011-06-09" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
- Students in the new ISEP
School,
of which female %
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="68322
33%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Universities with performance-based contracts negotiated and overseen by GHED
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;Target exceeded by 20 percentage points. All five of the public universities overseen by DGHE&amp;nbsp; achieved &amp;nbsp;their&amp;nbsp;respective&amp;nbsp;targets. &lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Academic programs that meet the minimum quality standards as set
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="117">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tertiary institutions with a Board of Director that approves the annual budget
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
All tertiary education institutions use the new financial law to manage their budget
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2017-12-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Target 100% achieved.&amp;nbsp; &lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Budget allocated based on performance-based contracts
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="15.00">
<comment><narrative>
&lt;p&amp;gt;Target achieved&amp;nbsp; 100%.&amp;nbsp;Over the life of the project, the MOHESR/DGHE was to begin replacing project funds with counterpart funds for implementation of the annual PBCs from a baseline of 0 to the end target of 15 percent. By project closing, the percentage of PBC budget provided by the DGHE, for implementation of the PBCs, had reached the target of 15 percent thereby meeting the target. However, the more substantial achievement of the project was that upon completion, the use of PBCs had been institutionalized and government funding is now 100 percent of the HEIs annual budgets based on PBCs.&lt;/p&amp;gt;

&lt;p&amp;gt;&lt;em&amp;gt;Although this indicator was not revsed during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual tertiary education statistics report produced
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Target 100% achieved.&amp;nbsp; &lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
All tertiary education institutions use the new financial law to manage their budget
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tertiary institutions with a Board of Director (Conseil d'Administration) that approves the annual budget
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;Target not achieved. Only the University of Thies established the Board of Directors.&amp;nbsp; &lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Promotion rate at grade one by university
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="UCAD: 30%; UGB (Saint-Louis): 70%; Bambey: 80%; Thies: 70%; Ziguinchor: 57%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="UCAD: 60%; UGB, Saint Louis: 90%; Bambey: 90.0% ; Thies: 80% ; Ziguinchor: 80%">
<comment><narrative>
&lt;p&amp;gt;Overall progress was achieved in the promotion rates&amp;nbsp;though 4 out of 5 universities did not achieve their targets. University of Thies: &lt;strong&amp;gt;Exceeded the target by 8.53%&lt;/strong&amp;gt; ( 26.5% increase over the baseline). University of Ziguinchor: Was short of the target by 8.22% (25.9% increase over the baseline).&amp;nbsp; University of Dakar: Was short of the target by 14.58% (51.4% increase over the baseline).&amp;nbsp; University of Bambey: Missed the target by 14.64%.&amp;nbsp; Gaston Bergier University, St. Louis: Missed the target by 15% (7.1% increase over the baseline).&amp;nbsp;&lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date&lt;/em&amp;gt;.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="UCAD: 45.42%; UGB (Saint-Louis): 75%; Bambey: 75.36%; Thies: 88.53%; Ziguinchor: 71.78%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The ISEP is functional
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Repeating students in year 1 in UCAD
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="20.00">
<comment><narrative>
&lt;p&amp;gt;Target exceeded by 9.8%.&amp;nbsp; &lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="29.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual tertiary education statistics report produced
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Institutions that achieve at least 80% of the annual targets set in the performance-based contracts
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;100 percent&amp;nbsp;of the targeted universities reached annual targets in their respective PBCs exceeding the target of 80% by 20%.&amp;nbsp; &lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Undergraduate programs elaborated according to LMD with complete description
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutions that achieve at least 80% of the annual targets as set in the performance based contract s
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers having followed training in the LMD requirements for teaching
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="50.00">
<comment><narrative>
&lt;p&amp;gt;Target exceeded by 100%&amp;nbsp;&amp;nbsp;&lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The ISEP is functional
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Target achieved 100%.&amp;nbsp; &lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Promotion rate grade one by university
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="30
70
80
70
57"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2011" iso-date="2011-09-09" value="68322.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-09" />
<period-end iso-date="2018-12-30" />
<target value="86000.00">
<comment><narrative>
&lt;p&amp;gt;&lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date&lt;/em&amp;gt;.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="191095.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(a) Students in the new ISEP
School
of which % female

(b) Students enrolled in
HEIs, of which
female (%)
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="0.00
(a) 0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Academic programs that meet the minimum quality standard as set
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="90.00">
<comment><narrative>
&lt;p&amp;gt;Target exceeded by 47.7%.&amp;nbsp;&lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="133.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers having followed training in the LMD requirements for teaching
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Repeating students in year 1 in 
(a) UCAD
(b) Other Institutions %
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="(a) 40
(b) 16"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="(a) 19.4
(b) 19.6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct Project Beneficiaries
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students enrolled in programs designed with private sector in the ISEP
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="538">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GDHE is implemented to (i) coordinate the implementation of the tertiary education program, (ii) provide oversight for PBC implementation, and (iii) monitor the status of reforms
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GDHE is implemented to (i) coordinate the implementation of the tertiary education program, (ii) provide oversight for PBC implementation, and (iii) monitor the status of reforms
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Target was successfully achieved.&amp;nbsp; &lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students enrolled in programs designed with private sector in the ISEP
</narrative></title>
<baseline year="2011" iso-date="2011-09-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-06" />
<period-end iso-date="2018-12-30" />
<target value="3000.00">
<comment><narrative>
&lt;p&amp;gt;Target not achieved. &lt;em&amp;gt;Although this indicator was not revised during the life of the project, the target date was revised to&amp;nbsp;align with the new&amp;nbsp;closing date.&amp;nbsp; &lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="950.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Universities with performance based contracts negotiated and overseen by GHDE
</narrative></title>
<baseline year="2011" iso-date="2011-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-09" />
<period-end iso-date="2017-10-04" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P150351</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Urban Water and Sanitation Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ The proposed Project Development Objective (PDO) is to improve access to water and sanitation services in selected urban areas in afinancially sustainable manner. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Urban Water and Sanitation Project for Senegal will improve access to water and sanitation services in selected urban areas in a financially sustainable manner. The project will consist of the following three components: 1) water supply, which will aim at improving water services and expanding access through the developing of groundwater resources, rehabilitating water infrastructure in the urban center of Nguekhokh, increasing access to safe water in selected urban centers, and carrying out technical studies; 2) sanitation, which will aim at increasing access to improved sanitation outside of Dakar through providing sanitation facilities in the urban center of Joal-Fadiouth, increasing access to sewerage services in selected urban centers, supporting supervision, communication, information and education activities under component two, and carrying out technical studies; and 3) institutional strengthening and project management. Most of the lessons incorporated in the proposed project design derive from the previous IDA operations in Senegal, and also from the experience accumulated in West Africa in developing access to water and sanitation services through social connection programs and sanitation programs. The experience with urban sanitation in Latin America and the Caribbean is also particularly relevant for Senegal.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0019392"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0019392"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0019389"><narrative>Office National de l'Assainissement du Senegal (ONAS)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-07-09"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-06-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Mouhamed Fadel Ndaw</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mndaw2@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244918" />
            <name><narrative>Tasset Ouolof</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6 -16.866671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245222" />
            <name><narrative>Somone</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.48649 -17.075239</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247381" />
            <name><narrative>Nguekhokh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.51255 -17.004471</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248477" />
            <name><narrative>Mbour</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.42196 -16.963751</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.283331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595222" />
            <name><narrative>Sali</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.44111 -17.01944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="14021" percentage="73" xml:lang="en"/><sector vocabulary="1" code="14032" percentage="27" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="24.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="100" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">236202.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">236202.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">236202.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">472404.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">472404.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">472404.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">472404.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">472404.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">472404.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">708606.74</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">708606.74</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">708606.74</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">944808.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">944808.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">944808.97</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">944808.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">944808.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">944808.97</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">857076.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">857076.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">857076.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1417213.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1417213.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1417213.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1653415.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1653415.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1653415.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1653415.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1653415.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1653415.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1889617.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1889617.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1889617.98</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">2125820.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">2125820.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">2125820.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">2362022.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">2362022.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">2362022.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">2834426.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">2834426.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">2834426.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">3070629.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">3070629.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">3070629.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">3070629.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">3070629.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">3070629.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">3306831.44</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">3306831.44</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">3306831.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2834426.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2834426.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2834426.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1889617.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1889617.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1889617.98</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">236202.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">236202.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">236202.24</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">472404.49</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">472404.49</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">472404.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">472404.49</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">472404.49</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">472404.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">708606.74</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">708606.74</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">708606.74</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">944808.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">944808.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">944808.97</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">944808.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">944808.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">944808.97</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">857076.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">857076.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">857076.73</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1417213.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1417213.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1417213.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1653415.73</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1653415.73</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1653415.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1653415.73</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1653415.73</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1653415.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1889617.96</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1889617.96</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1889617.98</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">2125820.21</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">2125820.21</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">2125820.21</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">2362022.46</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">2362022.46</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">2362022.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">2834426.95</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">2834426.95</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">2834426.95</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">3070629.20</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">3070629.20</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">3070629.19</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">3070629.20</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">3070629.20</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">3070629.19</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">3306831.44</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">3306831.44</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">3306831.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2834426.95</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2834426.95</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2834426.95</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1889617.96</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1889617.96</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1889617.98</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">70000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-61633</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-591057</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">3878583</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">1120016</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">2292415</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">1728594</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">3927849</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">2215192</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">2212067</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">3419645</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">3539945</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">4026152</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">2661813</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">3090654</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">1093064</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">6153738</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">876480</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1822891</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">1796815</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">5473512</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">1000850</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">3212369</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">48717</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">4716284</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">3939475</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">2392983</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">968420</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">3043018</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">1653952</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">1061453</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">966547</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">5272272</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">1303552</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">1124474</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">5801743</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">1327309</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">1287256</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">1245546</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">857065</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">2642975</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">900430</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">169415</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">1694451</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">877419</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">1172482</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">923762</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">1028987</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">680056</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-57240</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-442840</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-4393</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-17680</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-24276</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-49726</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-75061</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-13012</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-133840</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-12599</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-170751</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-12195</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-214125</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-12263</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-237812</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-42384</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-257516</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-81828</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-266291</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-100276</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-273401</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-106089</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-232001</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-107945</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-260297</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-102658</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-238476</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-114278</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-209537</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-108692</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-263149</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-109130</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-234850</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-108215</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-111267</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-229375</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-229723</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-111538</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-224502</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-110869</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1131888</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-1094843</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1022445</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-1055629</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1045701</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-452884</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1055915</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-461926</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1069950</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-464983</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1072210</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-486017</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1088238</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-494671</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-4259</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1083782</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-500161</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-19389"><narrative>Office National de l'Assainissement du Senegal (ONAS); Programme Eau Potable et Assainissement pour le Millenaire (PEPAM); Societe Nationale des Eaux du Senegal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P150351"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P150351?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P150351"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water storage capacity constructed under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="24600.00">
<comment><narrative>
&lt;p&amp;gt;Monitored through construction supervision and completion reports.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="25400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial equilibrium of the urban water supply sub-sector
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="Yes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="180000.00">

</target>
<actual value="180000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water storage capacity constructed under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="24600.00">

</target>
<actual value="25400.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New household sewer connections constructed under the project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="6000.00">
<comment><narrative>
&lt;p&amp;gt;Monitored through construction supervision and completion reports.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6117.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a new institutional framework for urban water and sanitation
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New household sewer connections constructed under the project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="6000.00">

</target>
<actual value="6117.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="820000.00">

</target>
<actual value="825349.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional water production capacity constructed under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="35500.00">
<comment><narrative>
&lt;p&amp;gt;Monitored through construction supervision and completion reports.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="35243.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of cash operating expenditures of sewerage activities of ONAS
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="69.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="90.00">
<comment><narrative>
&lt;p&amp;gt;Based on ONAS financial reporting.&amp;nbsp; Coverage is defined as: &amp;quot;Annual revenues from sewage surcharges/Annual cash operating expenditures of ONAS&amp;rsquo; sewage activities.&amp;quot;&lt;/p&amp;gt;

&lt;p&amp;gt;Progress over the project implementation period:&lt;/p&amp;gt;

&lt;p&amp;gt;Baseline 08/2015 =&amp;nbsp;69%;&amp;nbsp;11/2016 = 85%; 09/2017 = 83%; 10/2018 = 90%; 09/2019 = 85%; 03/2020 = 78%; 09/2020 = 78%; 03/2021 = 96%; 10/2021 = 96%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to &quot;improved sanitation facilities under the proj.
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="80000.00">
<comment><narrative>
&lt;p&amp;gt;This result is calculated as follows:&lt;/p&amp;gt;

&lt;p&amp;gt;Number of people in urban areas provided with access to &amp;ldquo;improved sanitation&amp;rdquo; under the Project = (Number of new sewer connections + Number of on-site sanitation facilities) x 13 people per connection or per on-site facility.&lt;/p&amp;gt;

&lt;p&amp;gt;???????&lt;u&amp;gt;NB&lt;/u&amp;gt;: The average number of people per water connection (9) is lower than the average number of people per sewerage connection (13) because there is only one sewerage connection per compound/housing unit, while there maybe multiple water connections per compound/housing unit.&amp;nbsp; Number&amp;nbsp;of people per connection verified through various studies and surveys.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="83694.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investments reflected their needs (percentage)
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;At MTR (2019) 81.7% of respondents indicated that the PEAMU reflected their needs.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="89.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional water production capacity constructed under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="35500.00">

</target>
<actual value="33914.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial equilibrium of the urban water supply sub-sector
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="Y"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Based on SONES financial reporting.&amp;nbsp; Financial equilibrium has been maintained throughout the project. Equilibrium defined as:&amp;nbsp; &amp;quot;SONES&amp;rsquo; net cash balance (previous year plus net cash flow from operations minus debt service and variation of working capital requirements) positive or equal to zero&amp;quot;.&lt;/p&amp;gt;

&lt;p&amp;gt;Using &amp;quot;debt service coverage ratio&amp;quot; (the ability of SONES to generate enough income to cover its debt payments) as a proxy indicator substantiates the results on financial equilibrium of SONES, as the ratio in every project year remains well above a target value of 1.1:&lt;/p&amp;gt;

&lt;p&amp;gt;2015 - 1.40; 2016 - 1.58; 2017 - 1.9; 2018 - 1.14; 2019 - 1.23; 2020 - 1.86; 2021 - 1.46&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="180000.00">
<comment><narrative>
&lt;p&amp;gt;The water conveyance, water storage and 20,000 social water connections financed under the PEAMU benefitted on average 9 people per connection, so 180,000 people in total.&lt;/p&amp;gt;

&lt;p&amp;gt;Number&amp;nbsp;of people per connection verified through various studies and surveys.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="180000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of cash operating expenditures of sewerage activities of ONAS
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="69.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="90.00">

</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
On-site sanitation facilities constructed under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="320.00">

</target>
<actual value="321.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to &quot;improved sanitation facilities under the proj.
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="80000.00">

</target>
<actual value="83694.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of sewers constructed under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="100.00">

</target>
<actual value="72.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
On-site sanitation facilities constructed under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="320.00">
<comment><narrative>
&lt;p&amp;gt;Monitored through construction supervision and completion reports.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="321.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of sewers constructed under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;Monitored through construction supervision and completion reports.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a new institutional framework for urban water and sanitation
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="Y">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to enhanced water supply services under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="560000.00">

</target>
<actual value="424286.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to enhanced water supply services under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="560000.00">
<comment><narrative>
&lt;p&amp;gt;This result is calculated as follows:&lt;/p&amp;gt;

&lt;p&amp;gt;Number of people = (Additional water production of PEAMU financed facilities (m3/day) x 0.8 (network efficiency)) / (1.3 (peak factor) x 0.065 (m3/cap.day average daily consumption per capita))&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="562000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of feeder pipes constructed under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="99.50">
<comment><narrative>
&lt;p&amp;gt;Monitored through construction supervision and completion reports.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="117.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="20000.00">

</target>
<actual value="20000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="20000.00">
<comment><narrative>
&lt;p&amp;gt;Monitored through construction supervision and completion reports.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="20000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of feeder pipes constructed under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-14" />
<period-end iso-date="2021-12-31" />
<target value="99.50">

</target>
<actual value="117.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P173838</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal COVID-19 Response Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objective is to prevent, detect and respond to the threat posed by COVID-19 and strengthen national systems for public health preparedness in Senegal]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of COVID-19 (Coronavirus) Response Project for Senegal is to prevent, detect and respond to the threat posed by COVID-19 (Coronavirus) and strengthen national systems for public health preparedness. This project has three components. 1) The first component, Emergency COVID-19 (Coronavirus) Response, aims to provide immediate support to Senegal to prevent COVID-19 (Coronavirus) and to limit local transmission through containment strategies. It has the following subcomponents: (i) Case Detection, Confirmation, Contact Tracing, Recording, Reporting; (ii) Health System Strengthening; and (iii) Social and Financial Support to Households. 2) The second component, Community Engagement and Risk Communication, aims to support activities that will ensure effective risk communication and community engagement to raise public awareness and knowledge on prevention and control of COVID-19 (Coronavirus) among the general population. It has the following subcomponents: (i) Community Engagement for Prevention; and (ii) Comprehensive Behavioral Change and Risk Communication. 3) The third component, Project Management and Monitoring and Evaluation, has two sub-components: (i) project management and (ii) monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0045315"><narrative>Ministry of Finances and Budget</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0045314"><narrative>Ministry of Health and Social Action</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-04-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Christophe Lemiere</narrative></person-name><telephone>+1-202-473-1000</telephone><email>clemiere@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12191" percentage="79" xml:lang="en"/><sector vocabulary="1" code="16015" percentage="21" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="75.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="25" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="83" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="11" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="25" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="79" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="11" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="11" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="83" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">340900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">970800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1426260.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1986220.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2218700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2349520.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2239820.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2060820.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2057780.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1683400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1402160.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1263620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2311965.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">4149473.26</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1498111.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2347746.20</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">167916.43</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">3311234.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1647146.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">884979.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1439168.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">670603.09</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1261637.14</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1213413.74</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">10733935.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">5120779.01</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">22680759.19</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">7683.05</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">3400.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">3676835.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">108606.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2328883.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">433466.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">20000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">67000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">67000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-852672</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-11688876</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">2311966</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">4149473</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">1498111</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">2347746</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">167916</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">3311235</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">1647147</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">884979</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">1439169</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">670603</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">1261637</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">1213414</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">10733935</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">5001649</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">119130</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">22680759</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">7683</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">3401</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">3676835</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">108606</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">2328884</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">433467</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">71102</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">5562615</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">231351</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">14019</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">23875</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">45236</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">833571</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">93161</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-16803360</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">173063</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">432499</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">249060</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">451115</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">1441962</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">2673304</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">3125110</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">7293624</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">902217</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">3970559</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">25197093</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">2624088</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2750279</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">3549020</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">5659937</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-30021</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-56425</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-75511</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-73725</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-59132</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-49185</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-66532</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-78810</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-75471</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-96789</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-71782</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-104806</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-73215</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-109158</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-73700</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-510</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-122024</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-76648</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-151061</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-78412</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-178521</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-79374</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-330742</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-45314"><narrative>Ministry of Health and Social Action</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173838"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173838?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173838"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health facilities that have received equipment of RMNCH
</narrative></title>
<baseline year="2023" iso-date="2023-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-12" />
<period-end iso-date="2025-12-12" />
<target value="150">
<comment><narrative>
A new indicator was introduced to better reflect efforts to build the capacity of facilities, including maternal and child health equipment
</narrative></comment>
</target>
<actual value="140">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached through hygiene promotion activities
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="55000">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="53.998.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community actors trained
</narrative></title>
<baseline year="2023" iso-date="2023-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-02" />
<period-end iso-date="2025-12-02" />
<target value="500.00">

</target>
<actual value="571">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Designated laboratories with COVID-19 diagnostic equipment, test kits, and reagents per MOHSA guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="7.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health personnel trained
</narrative></title>
<baseline year="2023" iso-date="2023-03-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-30" />
<period-end iso-date="2025-11-29" />
<target value="1,000.00">

</target>
<actual value="1231">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached through hygiene promotion activities
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="55000">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="53.998.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population vaccinated
</narrative></title>
<baseline year="2021" iso-date="2021-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-23" />
<period-end iso-date="2025-12-22" />
<target value="20.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="37.24">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases of COVID-19 cases reported and investigated per approved protocol
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="600,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="1,028,260.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of joint M&amp;E systems supporting the One Health approach and epidemic preparedness and response
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2021-06-01" />
<target value="Yes">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health personnel trained
</narrative></title>
<baseline year="2023" iso-date="2023-03-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-30" />
<period-end iso-date="2025-11-29" />
<target value="1,000.00">

</target>
<actual value="1231">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Pharmacovigilance System (PVS) adapted to detect Adverse Events Following Vaccination (AEFI) for the COVID-19 vaccine
</narrative></title>
<baseline year="2021" iso-date="2021-01-17" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-17" />
<period-end iso-date="2021-12-02" />
<target value="Yes">
<comment><narrative>
Yes
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health centers/hospitals received supervision for COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="80.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="99.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Healthcare workers and community-based actors trained on GBV/SEA/SH
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2025-12-08" />
<target value="500.00">
<comment><narrative>
Achieved &quot;community-based actors&quot;  instead of &quot;community-based nurses&quot; for more accuracy.
</narrative></comment>
</target>
<actual value="1685">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Healthcare workers and community-based nurses trained on COVID-19 prevention, control and contact tracing
</narrative></title>
<baseline year="2020" iso-date="2020-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-20" />
<period-end iso-date="2025-12-09" />
<target value="5000">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="6,335.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
TV, radio and social media spots on COVID19 and essential health services
</narrative></title>
<baseline year="2021" iso-date="2021-01-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-20" />
<period-end iso-date="2025-11-19" />
<target value="4000">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="4110.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Assessment conducted to identify behavioral and socio-cultural risk factors for COVID-19 covering all the regions
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2021-06-01" />
<target value="Yes">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population vaccinated
</narrative></title>
<baseline year="2021" iso-date="2021-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-23" />
<period-end iso-date="2025-12-22" />
<target value="20.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="37.24">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Meetings held by the platform
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="125.00">
<comment><narrative>
on track
</narrative></comment>
</target>
<actual value="117.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Assessment conducted to identify behavioral and socio-cultural risk factors for COVID-19 covering all the regions
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2021-06-01" />
<target value="Yes">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health staff trained in COVID-19 prevention, testing and care per MoHSA-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-11-08" value="1,518.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-08" />
<period-end iso-date="2025-12-22" />
<target value="5000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="6,610.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Pharmacovigilance System (PVS) adapted to detect Adverse Events Following Vaccination (AEFI) for the COVID-19 vaccine
</narrative></title>
<baseline year="2021" iso-date="2021-01-17" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-17" />
<period-end iso-date="2021-12-02" />
<target value="Yes">
<comment><narrative>
Yes
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Healthcare facilities that received protective equipment and hygiene materials
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="119.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="139.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases that test positive
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="50,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="88,998.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
TV, radio and social media spots on COVID19 and essential health services
</narrative></title>
<baseline year="2021" iso-date="2021-01-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-20" />
<period-end iso-date="2025-11-19" />
<target value="4000">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="4110.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social Distancing communication strategy developed
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2020-07-02" />
<target value="Yes">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of AEFI cases reported
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2025-12-02" />
<target value="100.00">
<comment><narrative>
Yes
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children immunized
</narrative></title>
<baseline year="2024" iso-date="2024-09-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-05" />
<period-end iso-date="2025-12-05" />
<target value="650,0000">
<comment><narrative>
This indicator was created to reflect the project's significant support for the implementation of the measles campaign, which targeted girls and boys aged 9 to 14.
</narrative></comment>
</target>
<actual value="6,960,257">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health centers/hospitals received supervision for COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="80.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="99.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of AEFI cases reported
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2025-12-02" />
<target value="100.00">
<comment><narrative>
Yes
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Designated laboratories with COVID-19 diagnostic equipment, test kits, and reagents per MOHSA guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="7.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Patients that are satisfied with the treatment of COVID-19 received
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="70.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="71.53">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Healthcare workers and community-based actors trained on GBV/SEA/SH
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2025-12-08" />
<target value="500.00">
<comment><narrative>
Achieved &quot;community-based actors&quot;  instead of &quot;community-based nurses&quot; for more accuracy.
</narrative></comment>
</target>
<actual value="1685">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases that test positive
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="50,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="88,998.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of the third and fourth phases of the rapid surveillance system for the continuity of EHS
</narrative></title>
<baseline year="2023" iso-date="2023-03-06" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-06" />
<period-end iso-date="2025-12-02" />
<target value="Yes">
<comment><narrative>
not Achieved
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community actors trained
</narrative></title>
<baseline year="2023" iso-date="2023-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-02" />
<period-end iso-date="2025-12-02" />
<target value="500.00">

</target>
<actual value="571">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Meetings held by the platform
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="125.00">
<comment><narrative>
on track
</narrative></comment>
</target>
<actual value="117.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of joint M&amp;E systems supporting the One Health approach and epidemic preparedness and response
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2021-06-01" />
<target value="Yes">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Healthcare facilities that received protective equipment and hygiene materials
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="119.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="139.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population vaccinated
</narrative></title>
<baseline year="2021" iso-date="2021-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-23" />
<period-end iso-date="2025-12-22" />
<target value="20.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="37.24">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population vaccinated
</narrative></title>
<baseline year="2021" iso-date="2021-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-23" />
<period-end iso-date="2025-12-22" />
<target value="20.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="37.24">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
District health centers/hospitals with personal protective equipment and infection control products and supplies
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="90.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
District health centers/hospitals with personal protective equipment and infection control products and supplies
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="90.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health staff trained in COVID-19 prevention, testing and care per MoHSA-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-11-08" value="1,518.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-08" />
<period-end iso-date="2025-12-22" />
<target value="5000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="6,610.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health staff trained in COVID-19 prevention, testing and care per MoHSA-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-11-08" value="1,518.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-08" />
<period-end iso-date="2025-12-22" />
<target value="5000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="6,610.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases that test positive
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="50,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="88,998.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases that test positive
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="50,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="88,998.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases of COVID-19 cases reported and investigated per approved protocol
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="600,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="1,028,260.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases of COVID-19 cases reported and investigated per approved protocol
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="600,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="1,028,260.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases of COVID-19 cases reported and investigated per approved protocol
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="600,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="1,028,260.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Healthcare workers and community-based nurses trained on COVID-19 prevention, control and contact tracing
</narrative></title>
<baseline year="2020" iso-date="2020-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-20" />
<period-end iso-date="2025-12-09" />
<target value="5000">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="6,335.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social Distancing communication strategy developed
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2020-07-02" />
<target value="Yes">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health staff trained in COVID-19 prevention, testing and care per MoHSA-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-11-08" value="1,518.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-08" />
<period-end iso-date="2025-12-22" />
<target value="5000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="6,610.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population vaccinated
</narrative></title>
<baseline year="2021" iso-date="2021-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-23" />
<period-end iso-date="2025-12-22" />
<target value="20.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="37.24">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population vaccinated
</narrative></title>
<baseline year="2021" iso-date="2021-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-23" />
<period-end iso-date="2025-12-22" />
<target value="20.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="37.24">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
District health centers/hospitals with personal protective equipment and infection control products and supplies
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="90.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
District health centers/hospitals with personal protective equipment and infection control products and supplies
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="90.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health staff trained in COVID-19 prevention, testing and care per MoHSA-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-11-08" value="1,518.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-08" />
<period-end iso-date="2025-12-22" />
<target value="5000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="6,610.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health staff trained in COVID-19 prevention, testing and care per MoHSA-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-11-08" value="1,518.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-08" />
<period-end iso-date="2025-12-22" />
<target value="5000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="6,610.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases that test positive
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="50,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="88,998.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases that test positive
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="50,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="88,998.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases of COVID-19 cases reported and investigated per approved protocol
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="600,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="1,028,260.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suspected cases of COVID-19 cases reported and investigated per approved protocol
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="600,000.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="1,028,260.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Patients that are satisfied with the treatment of COVID-19 received
</narrative></title>
<baseline year="2020" iso-date="2020-02-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-19" />
<period-end iso-date="2025-12-02" />
<target value="70.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="71.53">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of the third and fourth phases of the rapid surveillance system for the continuity of EHS
</narrative></title>
<baseline year="2023" iso-date="2023-03-06" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-06" />
<period-end iso-date="2025-12-02" />
<target value="Yes">
<comment><narrative>
not Achieved
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health facilities that have received equipment of RMNCH
</narrative></title>
<baseline year="2023" iso-date="2023-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-12" />
<period-end iso-date="2025-12-12" />
<target value="150">
<comment><narrative>
A new indicator was introduced to better reflect efforts to build the capacity of facilities, including maternal and child health equipment
</narrative></comment>
</target>
<actual value="140">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
District health centers/hospitals with personal protective equipment and infection control products and supplies
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="90.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children immunized
</narrative></title>
<baseline year="2024" iso-date="2024-09-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-05" />
<period-end iso-date="2025-12-05" />
<target value="650,0000">
<comment><narrative>
This indicator was created to reflect the project's significant support for the implementation of the measles campaign, which targeted girls and boys aged 9 to 14.
</narrative></comment>
</target>
<actual value="6,960,257">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
District health centers/hospitals with personal protective equipment and infection control products and supplies
</narrative></title>
<baseline year="2020" iso-date="2020-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-10" />
<period-end iso-date="2025-12-22" />
<target value="90.00">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P169916</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SENEGAL - Project for the Improvement of Education System Performance - PAPSE</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Development Objective is to improve quality, equity, and access in the education sector.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed project is expected to improve quality, equity, and access of the education sector through the following critical interventions: (i) support to scale up of structured pedagogy literacy in select regions in Senegal; (ii) reform of curriculum, and integration of improved learning modules for pre-service training at the Centre Regional de Formation des Personnels de l’Education (CRFPEs); (iii) provision of lycees d'excellence; (iv) increasing access for out-of-school children and vulnerable populations with the inclusion of a national digitally enabled access intervention that will offer a blended learning approach through a mix of virtual and face to face instruction, (iv) support to daaras through performance based contracts which support foundational learning and improved learning conditions, and (vi) supporting good governance practices through support to inspection interne, approaches to better managing partner financing, and support to a teacher deployment strategy for hardship regions. The Project's direct beneficiaries include present and future students in primary education who will benefit from a better quality education focused on equipping them with basic foundational learning skills; as well as current and future students enrolled in the CRFPEs, and students enrolled in the LYNAQEs (high schools of excellence). The proposed Project will also benefit teachers by professionalizing and investing in their continuous professional development. Through the digitally enabled access intervention, the proposed Project will benefit out-of-children to give them a second chance education, as well as children enrolled in daaras. Administrators at regional, district and school levels will also benefit. ]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0040276"><narrative>The Republic of Senegal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0040276"><narrative>The Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0040277"><narrative>Ministry of Education</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-03-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-02-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Alison Marie Grimsland</narrative></person-name><telephone>+1-202-473-1000</telephone><email>agrimsland@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244991" />
            <name><narrative>Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.77073 -13.66734</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246452" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.01793 -16.48962</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248752" />
            <name><narrative>Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.65587 -13.25544</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249222" />
            <name><narrative>Louga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.61867 -16.22436</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250645" />
            <name><narrative>Kedougou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.55561 -12.18076</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250805" />
            <name><narrative>Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.15197 -16.07259</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251007" />
            <name><narrative>Kaffrine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.10594 -15.5508</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251911" />
            <name><narrative>Fatick</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.33236 -16.40513</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252309" />
            <name><narrative>Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.64792 -16.24363</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="11110" percentage="69" xml:lang="en"/><sector vocabulary="1" code="11130" percentage="31" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="58.0000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="60" xml:lang="en"><narrative>Education Facilities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="40" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="72" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="8" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="30" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="6" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="30" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="16" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="30" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="60" xml:lang="en"><narrative>Education Facilities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="40" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="30" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="30" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="14" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="31" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="9" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="30" xml:lang="en"><narrative>Science and Technology</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">940000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1339375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1603541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1603541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1603541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1603541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1603541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1603541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1603541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1603541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1603541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1603541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1603541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1603541.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1820208.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1820208.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1820208.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1820208.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1820208.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1820208.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1820208.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1820208.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1820208.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1820208.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1820208.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1820208.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2838541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2838541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2838541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2838541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2838541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2838541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2838541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2838541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2838541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2838541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2838541.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2838541.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">55347157.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">55347157.56</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">100000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">2398785</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">2453667</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">1680293</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">2795483</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">467386</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">1240060</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">3516550</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">477950</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">2109742</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">540523</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">3169415</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">836054</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">181546</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">185359</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">5207830</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">4800852</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">475726</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">723733</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">4752932</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">2262838</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">2910462</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">1465655</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-4904</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-18075</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-49986</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-92881</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-120925</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-166847</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-206400</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40277"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P169916"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P169916?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P169916"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Equitable allocation of teachers, as measured by the correlation between the number of teachers and the number of pupils per school
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="0.85">
<comment><narrative>
Equitable allocation of teachers, as measured by the correlation between the number of teachers and the number of pupils per school. Please note that the indicator is expressed as a coefficient and reports for 2024.
</narrative></comment>
</target>
<actual value="0.951">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers participating in the PROMET program trained in the technology and remote teaching strategies
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
Percentage of teachers participating in the PROMET program trained in the technology and remote teaching strategies
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers trained in local language instruction
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="6,400.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="8,400.00">
<comment><narrative>
The number of teachers who have participated in local language instruction training and who have been certified. The baseline for this indicator is defined based on results achieved through the USAID-supported All Children Reading Project. 6,400 was achieved pre-project; 6,660 was achieved with WB-financed support, and the total/global result is 13,060.
</narrative></comment>
</target>
<actual value="13060">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training program modules revised in French and mathematics
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="6.00">
<comment><narrative>
Number of CRFPE modules revised in French and mathematics.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Learners participating in the 'classe passarelle' benefitting from project support
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="14,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="25,000.00">
<comment><narrative>
Number of learners participation in the &amp;#39;classe passarelle&amp;#39; benefitting from project support. New round of classe passarelle will be launched October 2023.&amp;nbsp;
14,000 was achieved pre-project; 4,420 was achieved with WB-financed support, and the total/global result is 18,420. nothing new since sept 2025
</narrative></comment>
</target>
<actual value="18420">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Learning assessment (EGRA) completed in schools benefitting from coaching and local language interventions
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Learning assessment (EGRA) completed in schools benefitting from coaching and local language interventions.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Survival Rate
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="69.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="75.00">
<comment><narrative>
Percentage of a cohort of students enrolled in the first grade of a given level or cycle of education in a given school year who are expected to reach a given grade, regardless of repetition.

No updated figure obtained
</narrative></comment>
</target>
<actual value="69.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CRFPE students trained with new curriculum and training methods
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
The indicator measures the number of CRFPE students trained with new curriculum and training methods. Nothing was done from Sept 2025. so 100 is from last reporting period
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Competitively selected coaches who complete coaching training program
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="1,000.00">
<comment><narrative>
The number of coaches selected through a competitive selection that successfully complete their training coaching program and are certified by the Ministry of Education.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Open school evaluations completed
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="3.00">
<comment><narrative>
Number of open school evaluations completed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G1-3 learners receiving local language materials for reading (in targeted schools in select regions)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
Percentage of G1-3 learners receiving local language materials for reading.
</narrative></comment>
</target>
<actual value="66.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Large-scale primary/secondary learning assessments completed
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="2.00">
<comment><narrative>
The indicator measures the number of Bank-supported completed large-scale assessment rounds at the primary or secondary levels. &quot;Completed large-scale assessment rounds&quot; refers to rounds of a large-scale assessment, for which the results are made publicly available within 2 years of the assessment administration. The supported activities could include capacity building, design, administration, analysis, reporting, use, publication, and/or dissemination of an assessment. &quot;Large-scale assessment&quot; includes both national large-scale assessments (NLSA) and international large-scale assessments (ILSA). Report for the following education levels: Primary (ISCED 1) and Secondary (ISCED 2 &amp; 3)
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completed, validated lessons available on platform
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="691.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="3,000.00">
<comment><narrative>
The number of completed and validated lessons available on platform. cumulative with 200 additional done since Sept 2025
</narrative></comment>
</target>
<actual value="891">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Daaras that achieve 75% of the agreed targets
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
Percentage of daaras that achieve 75% of the agreed targets
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Learners in the daaras benefitting from project supported interventions
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="31,500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="55,000.00">
<comment><narrative>
Number of learners in the daaras benefitting from project supported interventions. Number will increase substantially once selection round of daaras is complete.&amp;nbsp;
</narrative></comment>
</target>
<actual value="77079">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Structured pedagogy teachers guides in G1-3 literacy developed and distributed to teachers
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="1,000.00">
<comment><narrative>
The teachers guides have been developed for grades 1 and 2 in 6 languages. For Grade 3, versions exist in 3 languages and additional languages are being added.  All G1 teachers received digital copies of the guides. Hard copy version for Grade 1 and Grade 2 are expected to be distributed in October, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual evaluation of the coaching program completed
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Annual evaluation of the coaching program completed
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students participating in the PROMET program who benefit from technology provision for distance learning in foundation subjects (French, mathematics)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
Percetnage of students participating in the PROMET program who benefit from technology provision to improve distance learning in foundation subjects (French, mathematics)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Learners participating in the 'classe passarelle' benefitting from project support
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="14,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="25,000.00">
<comment><narrative>
Number of learners participation in the classe passarelle benefitting from project support. 14,000 was achieved pre-project; 4,420 was achieved with WB-financed support, and the total/global result is 18,420.
</narrative></comment>
</target>
<actual value="18402">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training program modules revised in French and mathematics
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="6.00">
<comment><narrative>
Number of CRFPE modules revised in French and mathematics. This indicator is being adjusted to reflect the bilingual literacy modules which are currently being printed to be introduced at CRFPE level.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Learners in the daaras benefitting from project supported interventions
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="31,500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="55,000.00">
<comment><narrative>
Number of learners in the daaras benefitting from project supported interventions.
</narrative></comment>
</target>
<actual value="77079">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CRFPE students trained with new curriculum and training methods
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
The indicator measures the number of CRFPE students trained with new curriculum and training methods.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers participating in the PROMET program trained in the technology and remote teaching strategies
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
Percentage of teachers participating in the PROMET program trained in the technology and remote teaching strategies

This indicator is being reflected to  show DELLUSIL teachers trained since this is accurately aligned with the revised intervention. 93 facilitators have been trained in digital technologies (100 percent of those responsible for teaching the DELLUSIL classes).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G1-3 learners receiving local language materials for reading (in targeted schools in select regions)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
Percentage of G1-3 learners receiving local language materials for reading.
</narrative></comment>
</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students participating in the PROMET program who benefit from technology provision for distance learning in foundation subjects (French, mathematics)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
Percentage of students participating in the PROMET program who benefit from technology provision to improve distance learning in foundation subjects (French, mathematics). 

This indicator is being updated during restructuring to reflect DELLUSIL enrolled students who benefit from technology provision.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Daaras that achieve 75% of the agreed targets
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
Percentage of daaras that achieve 75% of the agreed targets. 

All performance based contracts are signed and independent verification agency is being recruited.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers trained in local language instruction
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="6,400.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="8,400.00">
<comment><narrative>
The number of teachers who have participated in local language instruction training and who have been certified. The baseline for this indicator is defined based on results achieved through the USAID-supported All Children Reading Project. 6,400 was achieved pre-project; 6,660 was achieved with WB-financed support, and the total/global result is 13,060.
</narrative></comment>
</target>
<actual value="13060">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Learners enrolled in the lycEes for excellence supported by the project
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="180.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="2,400.00">
<comment><narrative>
Number of students enrolled in the lycees for excellence supported by the project. This is now lower since lycee Diourbel cannot be supported given that the works extend far beyond rehabilitation

There are currently 987 students enrolled in the LYNAQEs.
</narrative></comment>
</target>
<actual value="987">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completed, validated lessons available on platform
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="691.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="3,000.00">
<comment><narrative>
The number of completed and validated lessons available on platform. Cumulative.
</narrative></comment>
</target>
<actual value="689">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
School management committees utlizing school management tools
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2026-06-30" />
<target value="90.00">
<comment><narrative>
The indicator measures the percentage of school management committees that are trained on the use of school management tools. it is being slightly revised to reflect engagement of school management committees as it relates to teaching and learning materials (childrens books and kits).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual evaluation of the coaching program completed
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Annual evaluation of the coaching program completed
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Open school evaluations completed
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="3.00">
<comment><narrative>
Number of open school evaluations completed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Large-scale primary/secondary learning assessments completed
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="2.00">
<comment><narrative>
The indicator measures the number of Bank-supported completed large-scale assessment rounds at the primary or secondary levels. &quot;Completed large-scale assessment rounds&quot; refers to rounds of a large-scale assessment, for which the results are made publicly available within 2 years of the assessment administration. The supported activities could include capacity building, design, administration, analysis, reporting, use, publication, and/or dissemination of an assessment. &quot;Large-scale assessment&quot; includes both national large-scale assessments (NLSA) and international large-scale assessments (ILSA). Report for the following education levels: Primary (ISCED 1) and Secondary (ISCED 2 &amp; 3)
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New students enrolled into Open School platform
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="8,000.00">
<comment><narrative>
Number of new students enrolled into Open Schools platform. 

This will be updated to reflect DELLUSIL instead of open school.
</narrative></comment>
</target>
<actual value="2072.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Learning assessment (EGRA) completed in schools benefitting from coaching and local language interventions
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Learning assessment (EGRA) completed in schools benefitting from coaching and local language interventions.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Structured pedagogy teachers guides in G1-3 literacy developed and distributed to teachers
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="1,000.00">
<comment><narrative>
The teachers guides have been developed for grades 1 and 2 in 6 languages. For Grade 3, versions exist in 3 languages and additional languages are being added.  All G1 teachers in the target regions have received teachers guides. G2 teachers have received reproduced guides, and G3 teachers are expected to receive term 1 extracts for G3 in the beginning of the next school year.
</narrative></comment>
</target>
<actual value="5100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Equitable allocation of teachers, as measured by the correlation between the number of teachers and the number of pupils per school
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="0.85">
<comment><narrative>
Equitable allocation of teachers, as measured by the correlation between the number of teachers and the number of pupils per school. Please note that the indicator is expressed as a coefficient and reports for 2024.
</narrative></comment>
</target>
<actual value="0.964">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Competitively selected coaches who complete coaching training program
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="1,000.00">
<comment><narrative>
The number of coaches selected through a competitive selection that successfully complete their training coaching program and are certified by the Ministry of Education.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Schools offering face to face sessions as part of blended Open Schooling Approach
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="1,500.00">
<comment><narrative>
Number of schools offering face to face sessions as part of blended Open Schooling Approach.

Indicator is being changed in restructuring to reflect the revised DELLUSIL approach. Currently 93 DELLUSIL open school classes are operating.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="600000.00">
<comment><narrative>
Direct beneficiaries number has been growing steadily. This includes children benefitting under the literacy intervention, children in daaras, classes passerelle beneficiaries, DELLUSIl beneficiaries, student teachers enrolled in CRFPEs who have benefitted and students within LYNAQEs.
</narrative></comment>
</target>
<actual value="436734">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="600000.00">
<comment><narrative>
Direct beneficiaries number has been growing steadily and will exceed 50 percent of the target once the school year begins (with distribution of grade 1 and grade 2 books, as well as launch of daara intervention).
</narrative></comment>
</target>
<actual value="283453">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G1-3 teachers in the schools targeted by the project participating in coaching program
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Percentage of G1-3 teachers in the schools targeted by the project participating in the coaching program.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G1-3 teachers in the schools targeted by the project participating in coaching program
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Percentage of G1-3 teachers in the schools targeted by the project participating in the coaching program.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G3 students in the schools targeted by the project who can read and understand grade level text in french
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="17.05"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-07-30" />
<target value="25.00">
<comment><narrative>
Percentage of G3 students who can read and understand grade-level text using EGRA French.  

This indicator is being updated to adequately reflect the project intervention in the PAPSE targeted regions and the languages used. It will be rewritten as the decrease in zero scores of children in the early grade reading assessment measure of oral reading fluency. Effectively measuring the reduction in non readers. Two EGRAs have been completed to inform this revised indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G3 students in the schools targeted by the project who can read and understand grade level text in french
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="17.05"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-07-30" />
<target value="25.00">
<comment><narrative>
Percentage of G3 students who can read and understand grade-level text using EGRA French.  Baseline will be completed by year 1 of the project and targets students benefitting from the coaching intervention. Baseline and targets are estimated based on existing EGRA data in other regions. Updated baseline data i will inform revision of targets if needed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G3 students in the schools targeted by the project who can read and understand grade level text (in local languages)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
Percentage of G3 students who can read and understand grade-level text using EGRA, disaggregated by national languages. Placeholder estimations are based on EGRA results in national languages in other regions. 

As written, this indicator is being updated since the regions and languages were unknown at project approval. This meant the baseline utilized was a placeholder. Two EGRAs have since been completed. The indicator will become increase in performance on reading assessment in targeted schools, and will be measured using oral reading fluency in the target language. Data points are available for 2024 and 2025 with 2026 pending.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G3 students in the schools targeted by the project who can read and understand grade level text (in local languages)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
Percentage of G3 students who can read and understand grade-level text using EGRA, disaggregated by national languages. Placeholder estimations are based on EGRA results in national languages in other regions. The baseline will be completed by year 2 of the projet, and will inform the annual targets.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Survival Rate
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="69.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="75.00">
<comment><narrative>
Percentage of a cohort of students enrolled in the first grade of a given level or cycle of education in a given school year who are expected to reach a given grade, regardless of repetition.

This indicator is being updated in the restructuring to be attributable to the project interventions and more directly measure enhanced access and equity linked to the three interventions which target out of school children (daaras, classes passerelles, and the hybrid learning approach).
</narrative></comment>
</target>
<actual value="69.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Survival Rate
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="69.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="75.00">
<comment><narrative>
Percentage of a cohort of students enrolled in the first grade of a given level or cycle of education in a given school year who are expected to reach a given grade, regardless of repetition.

No updated figure obtained
</narrative></comment>
</target>
<actual value="69.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G1-3 teachers in the schools targeted by the project participating in coaching program
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Percentage of G1-3 teachers in the schools targeted by the project participating in the coaching program.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G3 students in the schools targeted by the project who can read and understand grade level text (in local languages)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
Percentage of G3 students who can read and understand grade-level text using EGRA, disaggregated by national languages. Placeholder estimations are based on EGRA results in national languages in other regions. The baseline will be completed by year 2 of the projet, and will inform the annual targets.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New students enrolled into Open School platform
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="8,000.00">
<comment><narrative>
Number of new students enrolled into Open Schools platform
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Schools offering face to face sessions as part of blended Open Schooling Approach
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="1,500.00">
<comment><narrative>
Number of schools offering face to face sessions as part of blended Open Schooling Approach
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G3 students in the schools targeted by the project who can read and understand grade level text in french
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="17.05"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-07-30" />
<target value="25.00">
<comment><narrative>
Percentage of G3 students who can read and understand grade-level text using EGRA French.  Baseline will be completed by year 1 of the project and targets students benefitting from the coaching intervention. Baseline and targets are estimated based on existing EGRA data in other regions. Updated baseline data i will inform revision of targets if needed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="600000.00">
<comment><narrative>
Direct beneficiaries number has been growing steadily and will exceed 50 percent of the target once the school year begins (with distribution of grade 1 and grade 2 books, as well as launch of daara intervention).
</narrative></comment>
</target>
<actual value="283453">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
School management committees utlizing school management tools
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2026-06-30" />
<target value="90.00">
<comment><narrative>
The indicator measures the percentage of school management committees that are trained on the use of school management tools.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="600000.00">
<comment><narrative>
Direct beneficiaries number has been growing steadily. This includes children benefitting under the literacy intervention, children in daaras, classes passerelle beneficiaries, DELLUSIl beneficiaries, student teachers enrolled in CRFPEs who have benefitted and students within LYNAQEs.
</narrative></comment>
</target>
<actual value="436734">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="600000.00">
<comment><narrative>
Direct beneficiaries number has been growing steadily and will exceed 50 percent of the target once the school year begins (with distribution of grade 1 and grade 2 books, as well as launch of daara intervention).
</narrative></comment>
</target>
<actual value="283453">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G1-3 teachers in the schools targeted by the project participating in coaching program
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Percentage of G1-3 teachers in the schools targeted by the project participating in the coaching program.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G1-3 teachers in the schools targeted by the project participating in coaching program
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Percentage of G1-3 teachers in the schools targeted by the project participating in the coaching program.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G3 students in the schools targeted by the project who can read and understand grade level text in french
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="17.05"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-07-30" />
<target value="25.00">
<comment><narrative>
Percentage of G3 students who can read and understand grade-level text using EGRA French.  

This indicator is being updated to adequately reflect the project intervention in the PAPSE targeted regions and the languages used. It will be rewritten as the decrease in zero scores of children in the early grade reading assessment measure of oral reading fluency. Effectively measuring the reduction in non readers. Two EGRAs have been completed to inform this revised indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G3 students in the schools targeted by the project who can read and understand grade level text in french
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="17.05"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-07-30" />
<target value="25.00">
<comment><narrative>
Percentage of G3 students who can read and understand grade-level text using EGRA French.  Baseline will be completed by year 1 of the project and targets students benefitting from the coaching intervention. Baseline and targets are estimated based on existing EGRA data in other regions. Updated baseline data i will inform revision of targets if needed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G3 students in the schools targeted by the project who can read and understand grade level text (in local languages)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
Percentage of G3 students who can read and understand grade-level text using EGRA, disaggregated by national languages. Placeholder estimations are based on EGRA results in national languages in other regions. 

As written, this indicator is being updated since the regions and languages were unknown at project approval. This meant the baseline utilized was a placeholder. Two EGRAs have since been completed. The indicator will become increase in performance on reading assessment in targeted schools, and will be measured using oral reading fluency in the target language. Data points are available for 2024 and 2025 with 2026 pending.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
G3 students in the schools targeted by the project who can read and understand grade level text (in local languages)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
Percentage of G3 students who can read and understand grade-level text using EGRA, disaggregated by national languages. Placeholder estimations are based on EGRA results in national languages in other regions. The baseline will be completed by year 2 of the projet, and will inform the annual targets.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Survival Rate
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="69.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="75.00">
<comment><narrative>
Percentage of a cohort of students enrolled in the first grade of a given level or cycle of education in a given school year who are expected to reach a given grade, regardless of repetition.

This indicator is being updated in the restructuring to be attributable to the project interventions and more directly measure enhanced access and equity linked to the three interventions which target out of school children (daaras, classes passerelles, and the hybrid learning approach).
</narrative></comment>
</target>
<actual value="69.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Survival Rate
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="69.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="75.00">
<comment><narrative>
Percentage of a cohort of students enrolled in the first grade of a given level or cycle of education in a given school year who are expected to reach a given grade, regardless of repetition.

No updated figure obtained
</narrative></comment>
</target>
<actual value="69.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Learners enrolled in the lycEes for excellence supported by the project
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="180.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="2,400.00">
<comment><narrative>
Number of students enrolled in the lycees for excellence supported by the project. This is now lower since lycee Diourbel cannot be supported given that the works extend far beyond rehabilitation
180 was achieved pre-project; 470 was achieved with WB-financed support, and the total/global result is 650. We have noted a slight decrease of 10 students due to withdrawals that were not replaced.
</narrative></comment>
</target>
<actual value="807">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P085708</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SN-Elec. Serv. for Rural Areas (FY05)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project's development objective is to increase the access of Senegal's rural population to modern energy services and to ensure the environmental and social sustainability of woodfuels in urban and peri-urban areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Electricity Services for Rural Areas Project for Senegal aims to support the progressive transformation and improvement in the living conditions of rural Senegal. The project has the following four components: Component 1) comprises the following 2 subcomponents: (i) OBA (output-based-aid) type capital subsidies under a transparent and competitive concession bidding process to: (a) ensure economic sustainability of rural electrification in priority concession areas; (b) ensure adequate energy provision in other sectoral programs to be implemented in the primary concession areas; and (c) increase productive use of electricity of small and medium enterprises; and (ii) financing under similar mechanisms for smaller concessions. Component 2) will provide: Operational support, training and technical assistance to the Rural Electrification Agency (ASER); operational support, training and technical assistance to build capacity of the Regulatory Commission (CRSE); support for institutional strengthening of the Ministry of Energy to monitor program implementation progress; support for institutional strengthening of the multi-sectoral committee; assistance to enhance the participation of international and local private stakeholders in rural electrification concession bidding processes; support for implementation, capacity development, and institutional strengthening of the Rural electrification Fund (FER) through the banking sector. Component3) will comprise project implementation, communication, and monitoring &amp; evaluation. Component 4) will consists of two subcomponents: Sustainable Wood-fuels Supply Management; and Demand Management and Inter-fuel Substitution.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2004-03-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2004-09-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2012-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2012-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Awa Seck</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243943" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.52201 -16.216209</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244177" />
            <name><narrative>Velingara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.15 -14.11667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244388" />
            <name><narrative>Tivaouane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08519 -16.710581</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244804" />
            <name><narrative>Thies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.73004 -16.86974</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244993" />
            <name><narrative>Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.605 -13.647</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245705" />
            <name><narrative>Sedhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.75 -15.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246451" />
            <name><narrative>Region de Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.33333 -15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246656" />
            <name><narrative>Podor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.2502 -14.59767</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246902" />
            <name><narrative>Oussouye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.48552 -16.61648</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247158" />
            <name><narrative>Nioro du Rip</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.73513 -15.83925</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248478" />
            <name><narrative>Mbour</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.40569 -16.855591</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248699" />
            <name><narrative>Mbake</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.80828 -15.86454</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249224" />
            <name><narrative>Louga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.75 -16</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249283" />
            <name><narrative>Linguere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.359 -15.158</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250648" />
            <name><narrative>Kedougou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.81716 -12.17834</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250660" />
            <name><narrative>Kebemer</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.318 -16.221001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250807" />
            <name><narrative>Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.05726 -16.078979</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251008" />
            <name><narrative>Kaffrine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.25 -15.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251492" />
            <name><narrative>Gossas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.49176 -15.84674</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251792" />
            <name><narrative>Foundiougne</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.86997 -16.4573</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252312" />
            <name><narrative>Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.77831 -16.22319</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253376" />
            <name><narrative>Dagana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.334 -15.839</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253903" />
            <name><narrative>Bignona</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.88163 -16.36944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254315" />
            <name><narrative>Bambey</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.80266 -16.48258</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254443" />
            <name><narrative>Bakel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.23612 -12.23961</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007670821" />
            <name><narrative>Kolda Department</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.883 -14.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007670866" />
            <name><narrative>Fatick Department</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.25909 -16.49884</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007670870" />
            <name><narrative>Matam Department</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.73191 -13.63393</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14021" percentage="2" xml:lang="en"/><sector vocabulary="1" code="14031" percentage="2" xml:lang="en"/><sector vocabulary="1" code="23310" percentage="39" xml:lang="en"/><sector vocabulary="1" code="23210" percentage="39" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="5" xml:lang="en"/><sector vocabulary="1" code="31120" percentage="12" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FL" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Other Non-bank Financial Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="57.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="10" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="10" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="10" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="10" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="10" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="7" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="10" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="28" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="28" xml:lang="en"><narrative>Mitigation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">825000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">916666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">916666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">9745577.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">9745577.13</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P085708"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P085708?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P085708"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduce net CO2 emissions and promote conservation by encouraging use of renewable sources of energy, efficient lamps and improved cookstoves, improved carbonisation methods and improved woodfuel stove
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="No renewable energy based capacity installed by the project. No LBC installed yet."><comment><narrative>Installed capacity in renewable energy based systems (Measured in W or Wp); Number of highly efficient lamps; Green house gasesemissions avoided .</narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Project Year 4: 8,000">
<comment><narrative>
The full implementation of the project will significantly exceed the objectives.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
As of August 2012 six (6) concessions were awarded, including two (2) from IDA financing. The implementation of the full programthrough concessions, ERILs (village based concessions), multisectoral projects (PREMS) by all donors financing will allow aninstall capacity of 4.1 MWc through solar systems as follows: by end of 2012, 1.1 MWc). The full implementation of the program willenable the installation of 610065 efficient lamps. This will result in a reduction of CO2 emissions of 38 000 metric tons. This hasresulted in a CDM project . Two contracts of CO2 purchase have been signed with CDCF and UCFT2 for an amount of 235 000 tones ofC02. For theconcessions and ERILs an EMF was validated by the Direction of Environment.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementing Multi-Sectoral Energy Programs (PREMs).
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="No Multi-Sectoral Energy Programs (PREMs) implemented as of end 2004."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="6 PREMs implemented in the 3 IDA/GEF financed concessions.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Awarding private concessions for the provision of electricity services in rural areas.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="No rural concession awarded."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Three private rural concessions awarded and financed by the IDA Credit and GEF Grant. All (10) concessions awarded.">

</target>
<actual value="six (6) concessions already awarded, including two from IDA financing.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Building preparation-implementation capacities for Rural Electrification Agency (ASER), Electricity Sector Regulatory Commission (CRSE),  Energy Ministry, Multisectoral committees and private sector.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="Capacity of ASER, CRSE, Energy Ministry, Multisectoral Commitees and private sector to implement the RE program."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2009-06-30" />
<target value="Full autonomy of ASER, CRSE, Ministry of Energy and other institutions to implement RE program.">

</target>
<actual value="Capacity building was provided to all actors.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation sustainable woodfuels supply and demand management and inter-fuel substitution options.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2008-12-31" />
<target value="Charcoal: + 60,000 t/yr; community management: + 230 000 ha; + 150 new carboniza tion units; + 120,000 improved woodfuel stoves and30 000 alternative fuel stove s. Generate additional $6 million/yr.">

</target>
<actual value="Component completed and all indicators exceeded.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation sustainable woodfuels supply and demand management and inter-fuel substitution options.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2008-12-31" />
<target value="Charcoal: + 60,000 t/yr; community management: + 230 000 ha; + 150 new carbonization units; + 120,000 improved woodfuel stoves and30 000 alternative fuel stoves. Generate additional $6 million/yr.">
<comment><narrative>
All target indicators were exeeded.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
The PROGEDE components ended on December 31, 2008.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supporting and implementing local initiatives (ERILs) for the provision of electricity services.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="Number of new communities of at least 1000 inhabitants gaining access to electricity through the ERILs."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="On average at least 10 ERIL's approved per year.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementing Multi-Sectoral Energy Programs (PREMs).
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="No Multi-Sectoral Energy Programs (PREMs) implemented as of end 2004."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="6 PREMs implemented in the 3  IDA/GEF financed concessions.">
<comment><narrative>
Objective is largely exceeded.
</narrative></comment>
</target>
<actual value="29 PREMS financed under IDA against a target oend project between 6 to 9 PREMs.">
<comment><narrative>
The full implementation of the program will enable the implementation of 233 PREMs by all donors, includding the Bank.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Awarding private concessions for the provision of electricity services in rural areas.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="1 private rural concession in 2005."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2009-12-31" />
<target value="Three private rural concessions awarded and financed by the IDA Credit and GEF Grant.">

</target>
<actual value="two concessions have been awarded under IDA financing, 4 under other donors.">
<comment><narrative>
The second concession (Mbour) was signed in November 2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Awarding private concessions for the provision of electricity services in rural areas.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="1 private rural concession in 2005."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2009-12-31" />
<target value="Three private rural concessions awarded and financed by the IDA Credit and GEF Grant.">

</target>
<actual value="two concessions have been awarded under IDA financing, 4 under other donors.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Carrying studies and providing technical assistance to ASER and ERIL's sponsors; Carrying project monitoring and evaluation and information and communication.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="None."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2010-12-31" />
<target value="At least 3 concession contracts signed; Local electrification plans for Phase 2 of the APL finalized; Program monitoring in place.">

</target>
<actual value="A more up to date monitoring and evaluation system is under preparation.">
<comment><narrative>
An evaluation system is under preparation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation sustainable woodfuels supply and demand management and inter-fuel substitution options.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2008-12-31" />
<target value="Charcoal: + 60,000 t/yr; community management: + 230 000 ha; + 150 new carbonization units; + 120,000 improved woodfuel stoves and 30 000 alternative fuel stoves. Generate additional $6 million/yr.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementing Multi-Sectoral Energy Programs (PREMs).
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="No Multi-Sectoral Energy Programs (PREMs) implemented as of end 2004."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="6 PREMs implemented in the 3 IDA/GEF financed concessions.">

</target>
<actual value="29 PREMS financed under IDA against a target oend project between 6 to 9 PREMs.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Carrying studies and providing technical assistance to ASER and ERIL's sponsors; Carrying project monitoring and evaluation and information and communication.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="None."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2010-12-31" />
<target value="At least 3 concession contracts signed; Local electrification plans forPhase 2 of the APL finalized; Program monitoring in place.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supporting and implementing local initiatives (ERILs) for the provision of electricity services.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="Number of new communities of at least 1000 inhabitants gaining access to electricity through the ERILs."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="On average at least 10 ERIL's approved per year.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Awarding private concessions for the provision of electricity services in rural areas.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="No rural concession awarded."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Three private rural concessions awarded and financed by the IDA Credit and GEF Grant. All (10) concessions awarded.">
<comment><narrative>
Three private rural concessions awarded and financed by the IDA Credit and GEF Grant. All (10) concessions awarded.
</narrative></comment>
</target>
<actual value="six (6) concessions already awarded, including two from IDA financing.">
<comment><narrative>
six (6) concessions already awarded, including two from IDA financing.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation sustainable woodfuels supply and demand management and inter-fuel substitution options.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2008-12-31" />
<target value="Charcoal: + 60,000 t/yr; community management: + 230 000 ha; + 150 new carboniza tion units; + 120,000 improved woodfuel stovesand30 000 alternative fuel stove s. Generate additional $6 million/yr.">

</target>
<actual value="Component completed and all indicators exceeded.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
GE -  Global Environmental Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduce net CO2 emissions and promote conservation by encouraging use of renewable sources of energy, efficient lamps and improved cookstoves, improved carbonisation methods and improved woodfuel stove
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="No renewable energy based capacity installed by the project. No LBC installed yet."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Project Year 4: 8,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supporting and implementing local initiatives (ERILs) for the provision of electricity services.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="Number of new communities of at least 1000 inhabitants gaining access to electri city through the ERILs."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="7 ERILs signed">

</target>
<actual value="4189 households by end of 2012 against a target end project of 5000.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Households connected to electricity through the project (number) CORE
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="No households benefitting electricity from the project."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Project closing: 35 000 new households electrified.">

</target>
<actual value="37339">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supporting and implementing local initiatives (ERILs) for the provision of electricity services.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="Number of new communities of at least 1000 inhabitants gaining access to electri city through the ERILs."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="7 ERILs signed">
<comment><narrative>
The objective is largely exceeded.
</narrative></comment>
</target>
<actual value="4189 households by end of 2012 against a target end project of 5000.">
<comment><narrative>
58 ERILs have been awarded by end of 2012 by all donors against 40 for the target end project.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementing Multi-Sectoral Energy Programs (PREMs).
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="No Multi-Sectoral Energy Programs (PREMs) implemented as of end 2004."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="6 PREMs implemented in the 3  IDA/GEF financed concessions.">
<comment><narrative>
indicators are exceeded.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
58 PREMS are under implementation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Building preparation-implementation capacities for Rural Electrification Agency (ASER), Electricity Sector Regulatory Commission (CRSE),  Energy Ministry, Multisectoral committees and private sector.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="Capacity of ASER, CRSE, Energy Ministry, Multisectoral Commitees and private sector to implement the RE program to be improved."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Full autonomy of ASER, CRSE, Ministry of Energy and other institutions to implem ent RE program.">
<comment><narrative>
The action was fully implemented
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
A new action plan was developed during the restructuring mission  to speed up project implementation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Additional sustainable woodfuel production capacity, areas under community management, improved woodfuel stoves disseminated and incremental revenues generated.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2007-12-31" />
<target value="Charcoal: + 60,000 t/yr; community management: + 230 000 ha; + 150 new carbonization units; + 120,000 improved woodfuel stoves and30 000 alternative fuel stoves. Generate additional $6 million/yr.">
<comment><narrative>
component completed
</narrative></comment>
</target>
<actual value="No change from previous ISR">
<comment><narrative>
The PROGEDE component closed in December 2008 with results exceeding objectives.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Building preparation-implementation capacities for Rural Electrification Agency (ASER), Electricity Sector Regulatory Commission (CRSE),  Energy Ministry, Multisectoral committees and private sector.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="Capacity of ASER, CRSE, Energy Ministry, Multisectoral Commitees and private sector to implement the RE program."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2009-06-30" />
<target value="Full autonomy of ASER, CRSE, Ministry of Energy and other institutions to implement RE program.">
<comment><narrative>
6 concessions were awarded as a result of improved capacity of all actors.
</narrative></comment>
</target>
<actual value="Capacity building was provided to all actors.">
<comment><narrative>
this activity was completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Carrying studies and providing technical assistance to ASER and ERIL's sponsors; Carrying project monitoring and evaluation and information and communication.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="None."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2010-12-31" />
<target value="At least 3 concession contracts signed; Local electrification plans forPhase 2 of the APL finalized; Program monitoring in place.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Building preparation-implementation capacities for Rural Electrification Agency (ASER), Electricity Sector Regulatory Commission (CRSE),  Energy Ministry, Multisectoral committees and private sector.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="Capacity of ASER, CRSE, Energy Ministry, Multisectoral Commitees and private sector to implement the RE program to be improved."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Full autonomy of ASER, CRSE, Ministry of Energy and other institutions to implem ent RE program.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Additional sustainable woodfuel production capacity, areas under community management, improved woodfuel stoves disseminated and incremental revenues generated.
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2007-12-31" />
<target value="Charcoal: + 60,000 t/yr; community management: + 230 000 ha; + 150 new carbonization units; + 120,000 improved woodfuel stoves and 30 000 alternative fuel stoves. Generate additional $6 million/yr.">

</target>
<actual value="No change from previous ISR">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P133333</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Quality and Equity of Basic Education</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to improve learning outcomes for early grades, increase access to the science and mathematics tracks of secondary schools, and to improve equity in access to basic education.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Quality Improvement and Equity of Basic Education Project for Senegal are to: (i) improve learning outcomes for early grades, (ii) increase access to the science and mathematics tracks for secondary schools, and (iii) improve equity in access to basic education. There are three components to the project, the first component being quality improvement of basic education. This component aims at improving the accountability chain of the results chain for improving the quality of learning in the early grades of primary education at four levels. The first will be to provide performance financing education grants to District Education Authorities (IEF) under performance-based contracts (PBCs) between Regional Education Authorities and IEFs to improve the management of the education district and the quality and quantity of services they provide to schools in terms of supervision, support and advice, and teacher training. The second component is the strengthening equity in access to education. This component aims at reaching out-of-school children and providing them with a better quality education. This will be done by providing additional assistance to less advantaged areas in terms of new primary schools and by ensuring that all children notably in selected Daaras receive a quality basic education based on a well-defined curriculum. Finally, the third component is the supporting project management and capacity building.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0011587"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0011587"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0011590"><narrative>Government of Senegal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0011590"><narrative>Government of Senegal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0011591"><narrative>Ministry of Economy and Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0011591"><narrative>Ministry of Economy and Finance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0011586"><narrative>Ministry of Education</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-05-23"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-06-13"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hamoud Abdel Wedoud Kamil</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hkamil@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243940" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.58333 -16.27194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244802" />
            <name><narrative>ThiEs</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.83417 -17.10611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244991" />
            <name><narrative>Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.77073 -13.66734</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245704" />
            <name><narrative>SEdhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70806 -15.55694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246451" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.33333 -15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248752" />
            <name><narrative>Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.65587 -13.25544</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249222" />
            <name><narrative>Louga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.61867 -16.22436</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250645" />
            <name><narrative>KEdougou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.5579 -12.1743</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250805" />
            <name><narrative>Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.1825 -16.25333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251007" />
            <name><narrative>Kaffrine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.10594 -15.5508</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251910" />
            <name><narrative>Fatick</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.28333 -16.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252308" />
            <name><narrative>Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -16.1</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.444059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="11220" percentage="50" xml:lang="en"/><sector vocabulary="1" code="11260" percentage="37" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="10" xml:lang="en"/><sector vocabulary="1" code="11120" percentage="2" xml:lang="en"/><sector vocabulary="1" code="11130" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="37.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="51.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="48" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="1" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="1" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="1" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="48" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="49" xml:lang="en"><narrative>Access to Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">2391666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">2391666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">2391666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">2391666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">2391666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">2391666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">2391666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">2391666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">2391666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">2391666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">2391666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">2391666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">938000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">58333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">58333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">58333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">58333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">551680.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">770086.29</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">29448442.38</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1084850.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">3682810.48</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">15381237.80</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">3955949.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">426471.01</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">10179747.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1805026.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1803770.39</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">2858516.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">-332786.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">-132333.05</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">571444.98</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">7691559.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">816848.18</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">20000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">60000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-796335</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">312883</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">7768998</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">1857042</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">6808725</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">426471</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">1360550</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">577611</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">2719430</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">3127950</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-269434</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-332786</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-132333</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">571445</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">7691559</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">816848</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">7730079</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">5487371</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">3699078</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">12444602</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">10045453</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-1336948</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1394081</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-5348422</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-885</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-29194</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-32732</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-36092</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-64977</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-61616</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-64836</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-70510</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-70450</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-69632</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-67066</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-17061</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-21856</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-65728</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-42142</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-67251</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-68919</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-56116</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-83349</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-67865</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-64428</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-111126</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-161373</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-61988</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-66110</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-201956</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-191980</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-57998</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-67724</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-195920</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-197325</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-59746</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-200025</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-66087</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-171221</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-61152</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-60945</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-170335</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-167947</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-168923</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-170483</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-821736</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-858908</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-173362</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-11117</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-3144</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-162685</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-871096</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-883905</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-175344</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-11586"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P133333"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P133333?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P133333"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of  middle school students enrolled in math and science tracks (S1, S2) in  secondary level
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="32.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target missed.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="31.29">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the % of students who, by the end of grade 2  and 4 of primary schooling, demonstrate their ability to compute and solve grade level math problems
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="CP: 51.09
CE2: 46"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="CP: 60
 CE2:65">

</target>
<actual value="CP :73.96 ; 
CE2 : 70.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of schools with a QIA based on Quality Improvement Plan
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="80.00">

</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the % of students of Grades 2 and 4 of primary schooling, able to integrate experimental approaches or reasoned investigation into situations of discovery and creation of common objects in
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="CP: 0.0 CE2 : 0.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;CP target missed and CE2 target exceeded.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="CP: 67.57 CE2: 62.02">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the % of students of Grades 2 and 4 of primary schooling, able to integrate experimental approaches or reasoned investigation into situations of discovery and creation of common objects in
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="CP: 0,0
CE2 : 0,0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2022-06-30" />
<target value="CP: 80
CE2: 50">

</target>
<actual value="CP: 67,57 
CE2: 62,02">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the % of students who, by the end of grade 2  and 4 of primary schooling, demonstrate their ability to compute and solve grade level math problems
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="CP: 51.09 CE2: 46.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="CP: 65.0 CE2: 65.0">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Targets exceeded.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="CP :73.96 ; 
CE2 : 70.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Academic Inspectorates and Inspectorates of Training and Education have at least two officials in HR, statistics, and budget management trained to handle the transferred roles and responsibilitie
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of school heads trained
</narrative></title>
<baseline year="2018" iso-date="2018-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-03" />
<period-end iso-date="2022-06-30" />
<target value="70.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of education personnel trained on gender-informed management approaches
</narrative></title>
<baseline year="2021" iso-date="2021-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target achieved.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of action plans integrating gender and adolescent protection implemented (at the institution, IEF and AI levels)
</narrative></title>
<baseline year="2021" iso-date="2021-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-01" />
<period-end iso-date="2022-06-30" />
<target value="350.00">

</target>
<actual value="1593.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of large-scale assessments carried out at the primary or secondary level
</narrative></title>
<baseline year="2013" iso-date="2013-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-10-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target exceeded.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls directly benefitting from socio-emotional health and well-being interventions.
</narrative></title>
<baseline year="2021" iso-date="2021-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-01" />
<period-end iso-date="2022-06-30" />
<target value="20000.00">

</target>
<actual value="20000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="1073450.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="2500000.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target exceeded.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2700000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the % of students who, by the end of Grades 2 and 4 of primary schooling, demonstrate their ability to read and comprehend grade level texts
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="CP: 34.5

 CE2: 51.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="CP: 63.0 CE2: 65.0">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Targets exceeded.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="CP: 72.82 CE2: 75.37">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of school heads trained
</narrative></title>
<baseline year="2018" iso-date="2018-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target exceeded.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls directly benefitting from socio-emotional health and well-being interventions.
</narrative></title>
<baseline year="2021" iso-date="2021-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target achieved.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="20000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative number of schools built by the project to extend the primary education network
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="200.00">

</target>
<actual value="200.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of IEF that achieved all least 95% of targets
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Substantial progress from the baseline value observed, though end-of-project target missed.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="76.71">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of schools with a functional school-based management committee
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="90.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the % of students who, by the end of Grades 1 of primary schooling, demonstrate their ability to read and comprehend grade level texts
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="53.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2022-06-30" />
<target value="60.00">

</target>
<actual value="65.87">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A regional education report is produced yearly
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target achieved.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in the project supported Lycees
</narrative></title>
<baseline year="2018" iso-date="2018-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target missed.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of non-repeater enrolled students in grade 1 to 4 in 5 regions:Kafrine, Tambacounda, Matam, Louga, Diourbel
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="288,417"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="409,953">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Overall target exceeded.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="413,831">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of schools with a QIA based on Quality Improvement Plan
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Substantial progress from the baseline value observed, though end-of-project target slightly missed.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of school based focal points trained on GBV reporting and mitigation measures
</narrative></title>
<baseline year="2021" iso-date="2021-03-01" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-01" />
<period-end iso-date="2022-06-30" />
<target value="200.00">

</target>
<actual value="200.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
number of school community members trained using the revised materials in local languages
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="14000.00">

</target>
<actual value="13.94">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
System for learning assessment at the primary level
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="Y"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target achieved.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A regional education report is produced yearly
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A human resources (HR), statistics and budget management system including software and equipment is established in all Academic Inspectorates and in all Training and Education Inspectorates (Yes/No, C
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of out of school children back into the system
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target exceeded.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="56869.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of schools with a functional school-based management committee
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target achieved.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of large-scale assessments carried out at the primary or secondary level
</narrative></title>
<baseline year="2013" iso-date="2013-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-10-31" />
<period-end iso-date="2022-06-30" />
<target value="1.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the % of students who, by the end of Grades 1 of primary schooling, demonstrate their ability to read and comprehend grade level texts
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="53.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2022-06-30" />
<target value="55.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Original and revised target exceeded.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="65.87">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of newly recruited teachers trained and certified in CRFPE using the new training program
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target achieved.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Academic Inspectorates and Inspectorates of Training and Education have at least two officials in HR, statistics, and budget management trained to handle the transferred roles and responsibilitie
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target achieved.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Daaras that achieved the 75% of the agreed targets
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="85.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Progress from the baseline value observed, though end-of-project target missed.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="82.37">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Daaras that achieved the 75% of the agreed targets
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="80.00">

</target>
<actual value="82.37">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A human resources (HR), statistics and budget management system including software and equipment is established in all Academic Inspectorates and in all Training and Education Inspectorates (Yes/No, C
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target achieved.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of IEF that achieved all least 95% of targets
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="90.00">

</target>
<actual value="76.71">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of In-Service Teachers Trained
</narrative></title>
<baseline year="2018" iso-date="2018-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Substantial progress from the baseline value observed, though end-of-project target missed.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="21056.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of newly recruited teachers trained and certified in CRFPE using the new training program
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of action plans integrating gender and adolescent protection implemented (at the institution, IEF and AI levels)
</narrative></title>
<baseline year="2021" iso-date="2021-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target exceeded.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1593.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of school based focal points trained on GBV reporting and mitigation measures
</narrative></title>
<baseline year="2021" iso-date="2021-03-01" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target achieved.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="200.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of middle school teachers trained in the utilization of the new teaching guides
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Substantial progress from the baseline value observed, though end-of-project target slightly missed.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="91.68">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative number of schools built by the project to extend the primary education network
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target achieved.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="200.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of middle school teachers trained in the utilization of the new teaching guides
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="100.00">

</target>
<actual value="91.68">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the % of students who, by the end of Grades 2 and 4 of primary schooling, demonstrate their ability to read and comprehend grade level texts
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="CP: 34.5

 CE2: 51.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2022-06-30" />
<target value="CP: 63 CE2: 65">

</target>
<actual value="CP: 72.82 CE2: 75.37">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of education personnel trained on gender-informed management approaches
</narrative></title>
<baseline year="2021" iso-date="2021-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-01" />
<period-end iso-date="2022-06-30" />
<target value="5000.00">

</target>
<actual value="5000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
number of school community members trained using the revised materials in local languages
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target slightly missed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="13941.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of In-Service Teachers Trained
</narrative></title>
<baseline year="2018" iso-date="2018-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-03" />
<period-end iso-date="2022-06-30" />
<target value="25000.00">

</target>
<actual value="21056.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2013" iso-date="2013-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-10-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Target exceeded.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2059073.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P129472</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Health &amp; Nutrition Financing</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the project is to increase utilization and quality of maternal, neonatal and child health and nutritional services, especially among the poorest households in Targeted Areas in the Recipient's territory.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Health and Nutrition Financing Project for Senegal is to increase utilization and quality of maternal, neonatal, and child health and nutritional services, especially among the poorest households in targeted areas of Senegal. The project has three components. The first component is result based financing for health and nutrition services and capacity building. It has following two sub-components: (i) financing of result based financing to directly contribute to the extension of the existing supply-side pre-pilot result-based financing (RBF) scheme in six selected regions in a phased manner; and (ii) building capacities for RBF extension to strengthen the capacities of the Ministry of Health and Social Action (MoHSA) to support the extension of the RBF mechanism in six regions. The second component is improvement to accessibility of maternal, nutrition, and child health services. This component will support several mechanisms whose main purpose is to subsidize demand for healthcare and nutrition services. It has following three sub-components: (i) support to the implementation of the universal health insurance scheme; (ii) strengthening demand for nutrition services and behavior change; and (iii) setting up demand-side RBF (that is maternal health vouchers) to improve access to health care. The third component is institutional strengthening and project implementation. It has following three sub-components: (i) capacity building for better regulation of the hospital sector; (ii) capacity building for better monitoring and evaluation (M and E) of the overall health system; and (iii) capacity building for better general and financial management within the health system.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0008415"><narrative>Government of Senegal</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0008414"><narrative>Ministry of Health and Prevention</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-10-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-12-11"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Maud Juquois</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mjuquois@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243939" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.8 -16.366671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244990" />
            <name><narrative>Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.91667 -13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252308" />
            <name><narrative>Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -16.1</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303935" />
            <name><narrative>Region de Kaffrine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.10528 -15.54565</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303936" />
            <name><narrative>Region de Kedougou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.55146 -12.17586</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303937" />
            <name><narrative>Region de Sedhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70683 -15.55801</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12191" percentage="52" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="31" xml:lang="en"/><sector vocabulary="1" code="12240" percentage="12" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="73.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FD" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Insurance and Pension</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="12" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="12" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="17" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="71" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="6" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="71" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="12" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="17" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="6" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="12" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="71" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">203562.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">203562.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">203562.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">254452.93</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">254452.93</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">254452.92</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">508905.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">508905.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">508905.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">508905.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">508905.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">508905.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">500239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">500239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">500239.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">500239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">500239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">500239.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">500239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">500239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">500239.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">500239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">500239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">500239.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">500239.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">500239.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">500239.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">500239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">500239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">500239.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">508905.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">508905.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">508905.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">508905.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">508905.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">508905.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">342239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">342239.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">342239.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">344020.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">344020.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">344020.36</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">52000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">52000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">52000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1612616.72</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1612616.72</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">20000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-45696</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">1451955</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">108174</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">361</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">18721</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">15148</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">10284</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">610331</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">104060</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">151902</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">578231</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">465108</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">177036</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">782926</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">47273</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">202872</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">330213</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">342523</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">555226</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">283374</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">63447</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">353661</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">246801</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1633837</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">179297</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">51034</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">89977</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">99508</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">770694</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">373713</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">1142219</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">114777</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">1202325</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">309424</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">553308</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">319618</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">1180064</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">422994</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">368407</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">907757</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">600764</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">1101960</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">101808</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-31713</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-4019</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-2569</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-4740</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-5688</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-7942</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-11821</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-17439</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-23655</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-34254</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-43844</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-49121</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-59958</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-68120</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-68546</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-70239</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-69049</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-65883</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-63079</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-67373</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-62802</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-65953</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-61984</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-67603</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-62983</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-62779</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-172159</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-173842</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-176683</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-11342</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-165791</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-178703</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-8414"><narrative>Ministry of Health and Prevention</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P129472"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P129472?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P129472"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health facilities that have an RBF contract
</narrative></title>
<baseline year="2013" iso-date="2013-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-01" />
<period-end iso-date="2019-06-30" />
<target value="318.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target: 117%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="373.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
One continuous Demographic and Health Survey (DHS) report and one health Service Delivery report are produced every year (cumulative number)
</narrative></title>
<baseline year="2013" iso-date="2013-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-01" />
<period-end iso-date="2019-06-30" />
<target value="8.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target: 100%.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Births (deliveries) attended by skilled health personnel (number)
</narrative></title>
<baseline year="2011" iso-date="2011-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-02-01" />
<period-end iso-date="2019-06-30" />
<target value="271679.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target: 108%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="292572.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New acceptors of modern contraceptive method
</narrative></title>
<baseline year="2013" iso-date="2013-06-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-06-05" />
<period-end iso-date="2019-06-30" />
<target value="107041.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target: 120%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="128648.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of pregnant women having 4 antenatal care visits (at standard quality)
</narrative></title>
<baseline year="2011" iso-date="2011-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-02-01" />
<period-end iso-date="2019-06-30" />
<target value="35.00">
<comment><narrative>
&lt;p&amp;gt;The baseline was adjusted in 2018 (the 50% rate recorded in the PAD was incorrect).&lt;/p&amp;gt;

&lt;p&amp;gt;Achievement against target: 126%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of poor people reached by the project
</narrative></title>
<baseline year="2011" iso-date="2011-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-02-01" />
<period-end iso-date="2019-06-30" />
<target value="2800000.00">
<comment><narrative>
&lt;p&amp;gt;The original indicator was expressed as a percentage: 25% of poorest people among the total direct beneficiaries. However, the definition had to be changed, as the&amp;nbsp;poorest among the beneficiaries&amp;nbsp;could not be identified accurately. The revised indicator counts the poor among the beneficiaries of maternal vouchers, nutrition services, and the beneficiaries of the PNBSF affiliated to a&amp;nbsp;CBHI.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Achievement against target: 157%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4408425.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of facilities with verified results and having received their payments
</narrative></title>
<baseline year="2013" iso-date="2013-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-01" />
<period-end iso-date="2019-06-30" />
<target value="85.00">
<comment><narrative>
&lt;p&amp;gt;The&amp;nbsp;RBF bonuses for the years 2017 and 2018 were paid&amp;nbsp;after June 30, 2019 (the RBF manual states that the payment must be made in a maximum of 72 business days - 3 months).&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Achievement against target: 0%.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people effectively targeted by the communication activities of the CMU (cumulative number)
</narrative></title>
<baseline year="2013" iso-date="2013-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-01" />
<period-end iso-date="2019-06-30" />
<target value="165000.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target: 146%.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="239840.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospitals where the cost accounting system has been implemented
</narrative></title>
<baseline year="2013" iso-date="2013-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-01" />
<period-end iso-date="2019-06-30" />
<target value="34.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target: 0%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pregnant women receiving antenatal care during a visit to a health provider (cumulative number)
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-06-30" />
<target value="468884.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target: 113%.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="528114.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Index of quality of health care
</narrative></title>
<baseline year="2011" iso-date="2011-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-02-01" />
<period-end iso-date="2019-06-30" />
<target value="70.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target: 109%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="76.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of maternal health vouchers distributed (cumulative number)
</narrative></title>
<baseline year="2013" iso-date="2013-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-01" />
<period-end iso-date="2019-06-30" />
<target value="50245.00">
<comment><narrative>
&lt;p&amp;gt;Definition changed in 2018; the indicator initially measured the number of&amp;nbsp;beneficiaries of maternal health incentives, butthe data collected was not reliable. The revised indicator and target capture the output of this activity more accurately.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Achievement against target: 78%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="39164.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of operationnal SIGICMU modules
</narrative></title>
<baseline year="2017" iso-date="2017-12-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-22" />
<period-end iso-date="2019-06-30" />
<target value="5.00">
<comment><narrative>
&lt;p&amp;gt;Procurement process completed for all 5 modules financed by the project.&lt;/p&amp;gt;

&lt;p&amp;gt;Achievement against target: 100%.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services
</narrative></title>
<baseline year="2013" iso-date="2013-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-01" />
<period-end iso-date="2019-06-30" />
<target value="3016899.00">
<comment><narrative>
&lt;p&amp;gt;Definition updated to reflect the new corporate indicator definition (sum of intermediate indicators &amp;quot;number of children immunized&amp;quot; and &amp;quot;women and children who have received basic nutrition services&amp;quot;, and PDO &amp;quot;number of deliveries attended by skilled health personnel&amp;quot;) instead of &amp;quot;women of child-bearing age and under-five children among beneficiaries&amp;quot;.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Achievement against target: 130%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3908118.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of eligible women that have received a maternal health financial incentive
</narrative></title>
<baseline year="2013" iso-date="2013-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-01" />
<period-end iso-date="2019-06-30" />
<target value="72.00">
<comment><narrative>
&lt;p&amp;gt;The actual rate on June 30, 2018 was 36%.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Achievement against target: 32%.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="23.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Severly malnourished detected children who are referred and received at the health center for all necessary visits
</narrative></title>
<baseline year="2011" iso-date="2011-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-02-01" />
<period-end iso-date="2019-06-28" />
<target value="6745.00">
<comment><narrative>
&lt;p&amp;gt;The original target was expressed as a percentage (80%). The new indicator reflect data available at the CLM.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Achievement against target: 85%&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5721.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health personnel receiving training (number)
</narrative></title>
<baseline year="2011" iso-date="2011-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-02-01" />
<period-end iso-date="2019-06-30" />
<target value="3144.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target: 172%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5414.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children aged 0-23 months who attended at least one growth monitoring and promotion service during the 3 precedent months (cumulative number)
</narrative></title>
<baseline year="2013" iso-date="2013-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-01" />
<period-end iso-date="2019-06-30" />
<target value="585456.00">
<comment><narrative>
&lt;p&amp;gt;The original target was expressed as a percentage (50%); the new indicator and target reflect available data.&lt;/p&amp;gt;

&lt;p&amp;gt;Achievement against target: 108%.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="629555.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P115938</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Rapid Response Child-Focused Social Cash Transfer and Nutrition Security Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is to reduce the risk of nutrition insecurity of vulnerable populations, in particular children under five in poor rural and urban areas by scaling up the Government Nutrition Enhancement Program and providing cash transfers to vulnerable mothers of children under five.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2009-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-05-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2012-08-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2012-08-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Meint Mulder</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mmuldersibanda@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="12240" percentage="50" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="49.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="44.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="65" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="65" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="65" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="8" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="4" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="65" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="20" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="23" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="45" xml:lang="en"><narrative>Food Security</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P115938"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P115938?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P115938"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quantity of salt adequately iodized by small producers
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="87000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="139000">

</target>
<actual value="90000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mothers targeted providing exclusive breastfeeding
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="44.00">

</target>
<actual value="57.00">
<comment><narrative>
The result has surpassed the end of project target but has not increased from previous assessment.  Source: LQAS surveys.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mothers of target children who participate in monthly information and education sessions
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children 6-59 months receiving vitamin A supplementation
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="123.00">
<comment><narrative>
Coverage continues to be above the end-of-project target.  However, recent data (from the last round in December 2011) are notavailable due to problems in the information system of Ministry of Health. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Target population (children under five) reached by the community nutrition program
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="22.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="45.00">

</target>
<actual value="61.00">
<comment><narrative>
Project is well above the end-of-project target
(Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 6-59 months screened for acute malnutrition
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="90.00">
<comment><narrative>
This result is above the target of 80%.  (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Selected beneficiaries who receive all intended cash transfers
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="96.00">
<comment><narrative>
This result is above the target of 80%.  Each &quot;cohort&quot; has shown similar high coverage. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Quantity of adequatly fortified oil with vitamin A by oil industry (litres)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80000.00">

</target>
<actual value="15425.00">
<comment><narrative>
This result is not on target (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pregnant/lactating women, adolescent girls and/or children under age five-reached by basic nutrition services (number)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="">

</target>
<actual value="2,510,746.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children in primary education receiving weekly micronutrient supplements
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="95.00">
<comment><narrative>
This result is above the target of 80%.  (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mothers targeted providing exclusive breastfeeding
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="44.00">

</target>
<actual value="62.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and adoption by the government of an efficient child-focused social cash transfer scheme as part of the NSPS
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2012-08-31" />
<target value="Yes">

</target>
<actual value="Yes">
<comment><narrative>
Both, the social cash transfer to mothers of vulnerable children under five and the community targeting system have been adoptedbyGovernment.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Local Governments incorporating nutrition objectives and interventions in Local Development Plans
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="25.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children 6-59 months receiving vitamin A supplementation
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Selected beneficiaries who do not meet eligibility criteria (inclusion error)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="20.00">

</target>
<actual value="2.50">
<comment><narrative>
The target is to stay below 20% and this result is well below the target (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children in primary education receiving weekly micronutrient supplements
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="95.00">
<comment><narrative>
This result is above the target of 80%.  (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Transfers made by local payment service providers
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 0-24 months showing adequate weight gain
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="75.00">

</target>
<actual value="81.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 6-59 months screened for acute malnutrition
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children 6-59 months receiving vitamin A supplementation
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="94.00">
<comment><narrative>
Results are above end of project target.  (Source: LQAS)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Pregnant women making at least 4 prenatal care visits
</narrative></title>
<baseline year="2005" iso-date="2005-05-31" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-05-31" />
<period-end iso-date="2012-08-31" />
<target value="51.00">

</target>
<actual value="51.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children in primary education deworming medication twice in a one-year
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Pregnant women making at least 4 prenatal care visits
</narrative></title>
<baseline year="2005" iso-date="2005-05-31" value="39.00"><comment><narrative>Area specific baseline will be available within 4 months of effectiveness.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-05-31" />
<period-end iso-date="2012-08-31" />
<target value="51.00">
<comment><narrative>
Target will be 30 percentage points above the baseline
</narrative></comment>
</target>
<actual value="51.00">
<comment><narrative>
It seems unlikely that the target will be met when the project closes in three months.  Source: LQAS surveys.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Transfers made by local payment service providers
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="100.00">
<comment><narrative>
The result has surpassed the end of project target. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quantity of salt adequately iodized by small producers
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="87000"><comment><narrative>tons</narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="139000">
<comment><narrative>
tons
</narrative></comment>
</target>
<actual value="90000">
<comment><narrative>
While last year's production surpassed the project target; this year's production falls short. Source: Project Monitoring System
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Selected beneficiaries who do not meet eligibility criteria (inclusion error)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="20.00">

</target>
<actual value="2.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Target population (children under five) reached by the community nutrition program
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="22.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="45.00">

</target>
<actual value="61.00">
<comment><narrative>
Project is well above the end-of-project target
(Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and adoption by the government of an efficient child-focused social cash transfer scheme as part of the NSPS
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2012-08-31" />
<target value="Yes">

</target>
<actual value="No">
<comment><narrative>
(Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Selected beneficiaries who do not meet eligibility criteria (inclusion error)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="20.00">

</target>
<actual value="2.50">
<comment><narrative>
The target is to stay below 20% and this result is well below the target (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Pregnant women making at least 4 prenatal care visits
</narrative></title>
<baseline year="2005" iso-date="2005-05-31" value="39.00"><comment><narrative>Area specific baseline will be available within 4 months of effectiveness.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-05-31" />
<period-end iso-date="2012-08-31" />
<target value="51.00">
<comment><narrative>
Target will be 30 percentage points above the baseline
</narrative></comment>
</target>
<actual value="50.00">
<comment><narrative>
It seems unlikely that the target will be met when the project closes in three months.  Source: LQAS surveys.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quantity of salt adequately iodized by small producers
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="87000"><comment><narrative>tons</narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="139000">
<comment><narrative>
tons
</narrative></comment>
</target>
<actual value="90000">
<comment><narrative>
While last year's production surpassed the project target; this year's production falls short. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mothers of target children who participate in monthly information and education sessions
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children in primary education deworming medication twice in a one-year
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="95.00">
<comment><narrative>
Results are above end of project target.  (Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Quantity of adequatly fortified oil with vitamin A by oil industry (litres)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80000.00">

</target>
<actual value="15425.00">
<comment><narrative>
This year's result is not on track to reach the target.  Last year, production reached close to 45000 tons. (Source: ProjectMonitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mothers of target children who participate in monthly information and education sessions
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="91.00">
<comment><narrative>
The result has surpassed the end of project target. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children in primary education receiving deworming medication twice in one year period
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="95.00">
<comment><narrative>
Results are above end of project target.  (Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mothers targeted providing exclusive breastfeeding
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="44.00">

</target>
<actual value="62.00">
<comment><narrative>
The result has surpassed the end of project target.  (Source: LQAS surveys).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 0-24 months showing adequate weight gain
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="75.00">

</target>
<actual value="78.00">
<comment><narrative>
Results are above end of project target of 75% (Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted children in primary education receiving weekly micronutrient supplements
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="50,000.00">

</target>
<actual value="55,323.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Quantity of adequatly fortified oil with vitamin A by oil industry (litres)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80,000.00">

</target>
<actual value="15,425.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Target population (children under five) reached by the community nutrition program
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="22.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="45.00">

</target>
<actual value="61.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Local Governments incorporating nutrition objectives and interventions in Local Development Plans
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="25.00">

</target>
<actual value="31.00">
<comment><narrative>
This result has surpassed the end-of-project targets. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Local Governments incorporating nutrition objectives and interventions in Local Development Plans
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="25.00">

</target>
<actual value="31.00">
<comment><narrative>
This result has surpassed the end-of-project targets. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Selected beneficiaries who receive all intended cash transfers
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Transfers made by local payment service providers
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 0-24 months showing adequate weight gain
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="75.00">

</target>
<actual value="81.00">
<comment><narrative>
Results are above end of project target of 75% (Source: Project Monitoring System).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 6-59 months screened for acute malnutrition
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="84.00">
<comment><narrative>
This result is above the target of 80%.  (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Selected beneficiaries who receive all intended cash transfers
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-08-31" />
<target value="80.00">

</target>
<actual value="96.00">
<comment><narrative>
This result is above the target of 80%.  Each &quot;cohort&quot; has shown similar high coverage. (Source: Project Monitoring System)
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P174757</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Jobs, Economic Transformation &amp; Recovery Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve the competitiveness of selected value chains, MSMEs capabilities, and private sector investment in Senegal]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Senegal Jobs, Economic Transformation and Recovery Program is to improve the competitiveness of selected value chains, MSMEs capabilities, and private sector investment in Senegal. The main pillars of the PSE plan, which guides the PAP/AA, are the following: Pillar 1: Growth and structural economic transformation; Pillar 2: Human capital, social protection and sustainable development; and Pillar 3: Governance, institutions, peace and security. This Program-for-Results (PforR) aims at supporting Senegal's resilient economic recovery from COVID-19 by operationalizing the JET agenda in line with the WBG guidance on the COVID-19 response and the JET Framework. Result Area 1: Competitiveness Reinforcement, aims at strengthening the competitiveness of key sectors considered as priorities of the government program through value chains and sector-level interventions. Result Area 2: Technology Adoption, aims to address key obstacles to technology adoption, namely lack of financing, lack of capabilities and lack of demand and related uncertainties. Result Area 3: Access to finance, aims to remove the most severe constraints for Micro, Small, and Medium Enterprise (MSMEs).]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0046660"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-00009773"><narrative>APIX</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-05-12"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-05-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jana Malinska</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jmalinska@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
52 – 54 Rue Mohamed V, Dakar
, https://investinsenegal.sn/
</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
SphEre ministErielle Habib THIAM - Diamniadio - Bâtiment C ( du 1er au 6 Etage aile B), Diamniadio
, https://industriecommerce.gouv.sn/
</narrative></mailing-address></contact-info>




<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="24010" percentage="52" xml:lang="en"/><sector vocabulary="1" code="32130" percentage="40" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Information and Communications Technologies</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FK" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Capital Markets</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FL" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Non-bank Financial Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="15" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="80" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="80" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000242" percentage="100" xml:lang="en"><narrative>Global value chains</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="80" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="4" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="4" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="80" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="80" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="4" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">27800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">32400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-28"/>
<value currency="USD" value-date="2024-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">32400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">32400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">16910000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">24045000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-28"/>
<value currency="USD" value-date="2028-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">24045000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-28"/>
<value currency="USD" value-date="2024-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-28"/>
<value currency="USD" value-date="2028-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">38700954.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">38700954.18</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">125000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">34250000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">30750000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">27803082</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">19889728</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">4115780</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">7829650</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">9716274</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">8015500</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">8929031</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-294402</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-201247</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-176884</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-538156</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-969308</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1288506</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1337420</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1187144</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1060713</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1165874</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-46656"><narrative>ADEPME; APIX; FONGIP; FONSIS; Ministry of Economy, Planning and Cooperation; The Ministry of Finance and Budget; The Ministry of Industry and Commerce</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174757"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P174757?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174757"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PPP projects opined and supported by UNAPPP (with UNAPPP opinion as per PPP law requirements)
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="25">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Support Fund is established and capitalized with a minimum of $ 1 million and its operational manual prepared
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses using debt financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="150"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="1,075">

</target>
<actual value="251">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private co-investments in investee-SMEs generated by the FONSIS SME acceleration fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="30,000,000.00">
<comment><narrative>
updated.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in MSMEs with loans or equity supported by the Program
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="35300">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Competitiveness Taskforce is established at the Ministry of Economy, Planning and Cooperation, with at least 8 members.
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses using debt financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="150"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="1,075">

</target>
<actual value="251">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual publications on ADEPME website of updated information on programs for SMEs and WSMESand progress reports on number of SMEs (and WSMEs) supported
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP projects supported by FAPPP and UNAPP
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="28">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of registered businesses included in APIX's database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="82500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="167500">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the OYASS Fund (Yes/No)
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of investment projects included in the APIX database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="400">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in beneficiary MSMEs supported with training and capacity building
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-08" />
<target value="40000">

</target>
<actual value="20,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Territorial Pole's mappings of private sector players and action plans.
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="16">
<comment><narrative>
revised and expanded indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses with access to equity financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of additional private investments in technology adoption generated by the matching grant fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="12000000">

</target>
<actual value="2,154,593">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress reports of the technical and financial implementation of the PACE program
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-12-15" />
<target value="10">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
FONGIP's FOGADEV's NPL ratio every year
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="6.00">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the OYASS Fund (Yes/No)
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Unit is established and equipped with at least 3 qualified full-time staff
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private co-investments in investee-SMEs generated by the FONSIS SME acceleration fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="30,000,000.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adoption and Publication of Industry Reforms
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses with access to equity financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public-private dialogues conducted by the Directorate for Private Sector Development including to improve value chains competitiveness
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="20.00">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in MSMEs with loans or equity supported by the Program
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="35300">

</target>
<actual value="15824">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
FONGIP's FOGADEV's NPL ratio every year
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="6.00">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Territorial Pole's mappings of private sector players and action plans.
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="16">
<comment><narrative>
revised and expanded indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Banks and MFIs loans to MSMEs guaranteed by the FONGIP's FOGADEV and FOGAEX guarantee funds
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="50,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="150,000,000.00">
<comment><narrative>
updated.
</narrative></comment>
</target>
<actual value="96102720">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of First-time MSMEs borrowers covered by the FOGADEV guarantee scheme
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="30.00">

</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress reports of the technical and financial implementation of the PACE program
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-12-15" />
<target value="10">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average value of gross sales by beneficiary MSMEs
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
APIX adopts and publishes annual reports on business registration, investor services and the investment climate reform matrix
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="4">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The FONSIS SME Acceleration Fund adopts a governance structure based on a general partner/ limited partner framework
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital enabled
</narrative></title>
<baseline year="2020" iso-date="2020-10-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-13" />
<period-end iso-date="2030-12-13" />
<target value="385,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improving competitiveness by publishing and keeping up to date key trade information
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="8">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The FONSIS SME Acceleration Fund adopts a governance structure based on a general partner/ limited partner framework
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The FONSIS SME Acceleration Fund adopts a governance structure based on a general partner/ limited partner framework
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public-private dialogues conducted by the Directorate for Private Sector Development including to improve value chains competitiveness
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="20.00">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public-private dialogues conducted by the Directorate for Private Sector Development including to improve value chains competitiveness
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="20.00">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of First-time MSMEs borrowers covered by the FOGADEV guarantee scheme
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="30.00">

</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of First-time MSMEs borrowers covered by the FOGADEV guarantee scheme
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="30.00">

</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Territorial Pole's mappings of private sector players and action plans.
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="16">
<comment><narrative>
revised and expanded indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Territorial Pole's mappings of private sector players and action plans.
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="16">
<comment><narrative>
revised and expanded indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Support Fund is established and capitalized with a minimum of $ 1 million and its operational manual prepared
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Support Fund is established and capitalized with a minimum of $ 1 million and its operational manual prepared
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of additional private investments in technology adoption generated by the matching grant fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="12000000">
<comment><narrative>
data being collected
</narrative></comment>
</target>
<actual value="2,154,593">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of additional private investments in technology adoption generated by the matching grant fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="12000000">

</target>
<actual value="2,154,593">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
FONGIP's FOGADEV's NPL ratio every year
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="6.00">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
FONGIP's FOGADEV's NPL ratio every year
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="6.00">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Competitiveness Taskforce is established at the Ministry of Economy, Planning and Cooperation, with at least 8 members.
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Competitiveness Taskforce is established at the Ministry of Economy, Planning and Cooperation, with at least 8 members.
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Unit is established and equipped with at least 3 qualified full-time staff
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Unit is established and equipped with at least 3 qualified full-time staff
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private co-investments in investee-SMEs generated by the FONSIS SME acceleration fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="30,000,000.00">
<comment><narrative>
updated.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private co-investments in investee-SMEs generated by the FONSIS SME acceleration fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="30,000,000.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital enabled
</narrative></title>
<baseline year="2020" iso-date="2020-10-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-13" />
<period-end iso-date="2030-12-13" />
<target value="385,000,000">
<comment><narrative>
Data is being collected, to be updated.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital enabled
</narrative></title>
<baseline year="2020" iso-date="2020-10-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-13" />
<period-end iso-date="2030-12-13" />
<target value="385,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Banks and MFIs loans to MSMEs guaranteed by the FONGIP's FOGADEV and FOGAEX guarantee funds
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="50,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="150,000,000.00">
<comment><narrative>
updated.
</narrative></comment>
</target>
<actual value="96102720">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Banks and MFIs loans to MSMEs guaranteed by the FONGIP's FOGADEV and FOGAEX guarantee funds
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="50,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="150,000,000.00">

</target>
<actual value="75,487,009.31">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average value of gross sales by beneficiary MSMEs
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">
<comment><narrative>
Data is being collected, to be updated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average value of gross sales by beneficiary MSMEs
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in MSMEs with loans or equity supported by the Program
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="35300">

</target>
<actual value="15824">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in MSMEs with loans or equity supported by the Program
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="35300">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MSMEs completing a technology project with the adoption of a specific technology
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7,000">
<comment><narrative>
Data is being collected, to be updated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MSMEs completing a technology project with the adoption of a specific technology
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7,000">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in beneficiary MSMEs supported with training and capacity building
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-08" />
<target value="40000">
<comment><narrative>
good progress
</narrative></comment>
</target>
<actual value="29,391">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in beneficiary MSMEs supported with training and capacity building
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-08" />
<target value="40000">

</target>
<actual value="20,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the OYASS Fund (Yes/No)
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the OYASS Fund (Yes/No)
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adoption and Publication of Industry Reforms
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adoption and Publication of Industry Reforms
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improving competitiveness by publishing and keeping up to date key trade information
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="8">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improving competitiveness by publishing and keeping up to date key trade information
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="8">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
APIX adopts and publishes annual reports on business registration, investor services and the investment climate reform matrix
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="4">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
APIX adopts and publishes annual reports on business registration, investor services and the investment climate reform matrix
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="4">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of investment projects included in the APIX database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="400">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of investment projects included in the APIX database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="400">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of registered businesses included in APIX's database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="82500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="167500">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of registered businesses included in APIX's database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="82500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="167500">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PPP projects opined and supported by UNAPPP (with UNAPPP opinion as per PPP law requirements)
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="25">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PPP projects opined and supported by UNAPPP (with UNAPPP opinion as per PPP law requirements)
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="25">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual publications on ADEPME website of updated information on programs for SMEs and WSMESand progress reports on number of SMEs (and WSMEs) supported
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual publications on ADEPME website of updated information on programs for SMEs and WSMESand progress reports on number of SMEs (and WSMEs) supported
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress reports of the technical and financial implementation of the PACE program
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-12-15" />
<target value="10">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress reports of the technical and financial implementation of the PACE program
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-12-15" />
<target value="10">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP projects supported by FAPPP and UNAPP
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="28">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP projects supported by FAPPP and UNAPP
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="28">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses with access to equity financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses with access to equity financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses using debt financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="150"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="1,075">

</target>
<actual value="251">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses using debt financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="150"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="1,075">

</target>
<actual value="251">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual publications on ADEPME website of updated information on programs for SMEs and WSMESand progress reports on number of SMEs (and WSMEs) supported
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Support Fund is established and capitalized with a minimum of $ 1 million and its operational manual prepared
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average value of gross sales by beneficiary MSMEs
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">
<comment><narrative>
Data is being collected, to be updated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MSMEs completing a technology project with the adoption of a specific technology
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7,000">
<comment><narrative>
Data is being collected, to be updated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PPP projects opined and supported by UNAPPP (with UNAPPP opinion as per PPP law requirements)
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="25">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Banks and MFIs loans to MSMEs guaranteed by the FONGIP's FOGADEV and FOGAEX guarantee funds
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="50,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="150,000,000.00">

</target>
<actual value="75,487,009.31">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Competitiveness Taskforce is established at the Ministry of Economy, Planning and Cooperation, with at least 8 members.
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of investment projects included in the APIX database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="400">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improving competitiveness by publishing and keeping up to date key trade information
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="8">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital enabled
</narrative></title>
<baseline year="2020" iso-date="2020-10-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-13" />
<period-end iso-date="2030-12-13" />
<target value="385,000,000">
<comment><narrative>
Data is being collected, to be updated.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of additional private investments in technology adoption generated by the matching grant fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="12000000">
<comment><narrative>
data being collected
</narrative></comment>
</target>
<actual value="2,154,593">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
FAPPP supports launch of prefeasability and feasibility studies and structuring reports to develop category 2 PPP projects
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
E&amp;S = Environmental and Social
Notification received that RFP has been issued, and TOR and evaluation documents received to demonstrate consistency of the project preparation with FAPPP requirements, including with respect to E&amp;S assessment.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
FAPPP supports launch of prefeasability and feasibility studies and structuring reports to develop category 2 PPP projects
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
E&amp;S = Environmental and Social
Notification received that RFP has been issued, and TOR and evaluation documents received to demonstrate consistency of the project preparation with FAPPP requirements, including with respect to E&amp;S assessment.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
EUR 25,560,000 of private investments levied by Hybrid SME Acceleration Fund in a 51-49% private-public split respectively for each closing, from a baseline of zero EUR of private investment
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Amount of private funds levied with a share of private investors in the hybrid SME Accelerated Fund that is greater than 51% at any closing after the first one to be made between FONSIS with KfW.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
EUR 25,560,000 of private investments levied by Hybrid SME Acceleration Fund in a 51-49% private-public split respectively for each closing, from a baseline of zero EUR of private investment
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Amount of private funds levied with a share of private investors in the hybrid SME Accelerated Fund that is greater than 51% at any closing after the first one to be made between FONSIS with KfW.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Leverage Ratio higher than 2.7
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The leverage ratio is the size of loans portfolios guaranteed by FOGADEV's guarantees divided by FOGADEV's guarantees granted as measured at the end of calendar year 2024, i.e during calendar year 2024. This leverage ration has to be greater than 3.
</narrative></comment>
</target>
<actual value="2.21">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Leverage Ratio higher than 2.7
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The leverage ratio is the size of loans portfolios guaranteed by FOGADEV's guarantees divided by FOGADEV's guarantees granted as measured at the end of calendar year 2024, i.e during calendar year 2024. This leverage ration has to be greater than 3.
</narrative></comment>
</target>
<actual value="2.27">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
EUR 127,800,000 bank and microfinance loans guaranteed by and registered in FONGIP's database, from a baseline of EUR 42,600,000
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="50000000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The amount of banks and MFIs loans to MSMEs guaranteed by the FONGIP's FOGADEV and FOGAREX guarantee funds.
</narrative></comment>
</target>
<actual value="81887694">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
EUR 127,800,000 bank and microfinance loans guaranteed by and registered in FONGIP's database, from a baseline of EUR 42,600,000
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="50000000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The amount of banks and MFIs loans to MSMEs guaranteed by the FONGIP's FOGADEV and FOGAREX guarantee funds.
</narrative></comment>
</target>
<actual value="69 273 203">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of support provided to MSMEs through matching grants and other official awards and recorded in the ADEPME database
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="9000000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Amount in USD that the beneficiaries of the PforR matching grants - administered by ADEPME- have spent on the technical assistance co-financed by the Matching grants.
</narrative></comment>
</target>
<actual value="26,055,750">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of support provided to MSMEs through matching grants and other official awards and recorded in the ADEPME database
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="9000000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Amount in USD that the beneficiaries of the PforR matching grants - administered by ADEPME- have spent on the technical assistance co-financed by the Matching grants.
</narrative></comment>
</target>
<actual value="10,300,000">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of SME support plans, fully filled and stored in ADEPME's database, from a baseline of 1,830 plans
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1830"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Percentage aggregate increase in the TECH adoption index between before and after the matching grant(s) intervention, for beneficiary-MSMEs. The indicator will be calculated on the intensive margin (intensity of use of technologies). Detailed calculations will be stated in the Program operations manual. 
An MSME can benefit from several matching grants interventions.
The calculation will cove the period from July 1, 2021 to December 31, 2024.
</narrative></comment>
</target>
<actual value="o">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of SME support plans, fully filled and stored in ADEPME's database, from a baseline of 1,830 plans
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1830"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Percentage aggregate increase in the TECH adoption index between before and after the matching grant(s) intervention, for beneficiary-MSMEs. The indicator will be calculated on the intensive margin (intensity of use of technologies). Detailed calculations will be stated in the Program operations manual. 
An MSME can benefit from several matching grants interventions.
The calculation will cove the period from July 1, 2021 to December 31, 2024.
</narrative></comment>
</target>
<actual value="o">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Territorial Pole's mappings of private sector players and action plans
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The action plans will have to follow these steps: i) preparation of the strategic segmentation study; ii) meetings with at least 20 cluster stakeholders; iii) the registration of beneficiaries in a database; iv) holding 3 public-private dialogues; v) a (virtual)eference trip to meet with advanced buyers and learn about advanced markets requirements; and vi) organizing strategic and thematic working groups formed with cluster stakeholders to work on key action lines. 

The following deliverables be annexed to the action plans: i) Cluster description document, ii) Cluster stakeholders database, Strategic segmentation document, iii) PowerPoint presenttions of the 3 public-private dialogues, iv) Documents describing the (virtual) reference trip to interview advanced buyers, v) Table of action lines. 

The action plans will refer to the instruments of the Program (matching grants, partial credit guarantees, SME mezzanine financing and PPPs) so maximize their use to improve value chains' competitiveness.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Territorial Pole's mappings of private sector players and action plans
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The action plans will have to follow these steps: i) preparation of the strategic segmentation study; ii) meetings with at least 20 cluster stakeholders; iii) the registration of beneficiaries in a database; iv) holding 3 public-private dialogues; v) a (virtual)eference trip to meet with advanced buyers and learn about advanced markets requirements; and vi) organizing strategic and thematic working groups formed with cluster stakeholders to work on key action lines. 

The following deliverables be annexed to the action plans: i) Cluster description document, ii) Cluster stakeholders database, Strategic segmentation document, iii) PowerPoint presenttions of the 3 public-private dialogues, iv) Documents describing the (virtual) reference trip to interview advanced buyers, v) Table of action lines. 

The action plans will refer to the instruments of the Program (matching grants, partial credit guarantees, SME mezzanine financing and PPPs) so maximize their use to improve value chains' competitiveness.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The FONSIS SME Acceleration Fund adopts a governance structure based on a general partner/ limited partner framework
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The FONSIS SME Acceleration Fund adopts a governance structure based on a general partner/ limited partner framework
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public-private dialogues conducted by the Directorate for Private Sector Development including to improve value chains competitiveness
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="20.00">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public-private dialogues conducted by the Directorate for Private Sector Development including to improve value chains competitiveness
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="20.00">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of First-time MSMEs borrowers covered by the FOGADEV guarantee scheme
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="30.00">

</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of First-time MSMEs borrowers covered by the FOGADEV guarantee scheme
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="30.00">

</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Territorial Pole's mappings of private sector players and action plans.
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="16">
<comment><narrative>
revised and expanded indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Territorial Pole's mappings of private sector players and action plans.
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="16">
<comment><narrative>
revised and expanded indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Support Fund is established and capitalized with a minimum of $ 1 million and its operational manual prepared
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Support Fund is established and capitalized with a minimum of $ 1 million and its operational manual prepared
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of additional private investments in technology adoption generated by the matching grant fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="12000000">
<comment><narrative>
data being collected
</narrative></comment>
</target>
<actual value="2,154,593">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of additional private investments in technology adoption generated by the matching grant fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="12000000">

</target>
<actual value="2,154,593">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
FONGIP's FOGADEV's NPL ratio every year
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="6.00">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
FONGIP's FOGADEV's NPL ratio every year
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="6.00">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Competitiveness Taskforce is established at the Ministry of Economy, Planning and Cooperation, with at least 8 members.
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Competitiveness Taskforce is established at the Ministry of Economy, Planning and Cooperation, with at least 8 members.
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Unit is established and equipped with at least 3 qualified full-time staff
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Unit is established and equipped with at least 3 qualified full-time staff
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private co-investments in investee-SMEs generated by the FONSIS SME acceleration fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="30,000,000.00">
<comment><narrative>
updated.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private co-investments in investee-SMEs generated by the FONSIS SME acceleration fund
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="30,000,000.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital enabled
</narrative></title>
<baseline year="2020" iso-date="2020-10-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-13" />
<period-end iso-date="2030-12-13" />
<target value="385,000,000">
<comment><narrative>
Data is being collected, to be updated.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital enabled
</narrative></title>
<baseline year="2020" iso-date="2020-10-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-13" />
<period-end iso-date="2030-12-13" />
<target value="385,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Banks and MFIs loans to MSMEs guaranteed by the FONGIP's FOGADEV and FOGAEX guarantee funds
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="50,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="150,000,000.00">
<comment><narrative>
updated.
</narrative></comment>
</target>
<actual value="96102720">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Banks and MFIs loans to MSMEs guaranteed by the FONGIP's FOGADEV and FOGAEX guarantee funds
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="50,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="150,000,000.00">

</target>
<actual value="75,487,009.31">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average value of gross sales by beneficiary MSMEs
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">
<comment><narrative>
Data is being collected, to be updated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average value of gross sales by beneficiary MSMEs
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in MSMEs with loans or equity supported by the Program
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="35300">

</target>
<actual value="15824">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in MSMEs with loans or equity supported by the Program
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="35300">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MSMEs completing a technology project with the adoption of a specific technology
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7,000">
<comment><narrative>
Data is being collected, to be updated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MSMEs completing a technology project with the adoption of a specific technology
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7,000">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in beneficiary MSMEs supported with training and capacity building
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-08" />
<target value="40000">
<comment><narrative>
good progress
</narrative></comment>
</target>
<actual value="29,391">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in beneficiary MSMEs supported with training and capacity building
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-08" />
<target value="40000">

</target>
<actual value="20,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the OYASS Fund (Yes/No)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the OYASS Fund (Yes/No)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the OYASS Fund (Yes/No)
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of the OYASS Fund (Yes/No)
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adoption and Publication of Industry Reforms
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adoption and Publication of Industry Reforms
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adoption and Publication of Industry Reforms
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adoption and Publication of Industry Reforms
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improving competitiveness by publishing and keeping up to date key trade information
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improving competitiveness by publishing and keeping up to date key trade information
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improving competitiveness by publishing and keeping up to date key trade information
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="8">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improving competitiveness by publishing and keeping up to date key trade information
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="8">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
APIX adopts and publishes annual reports on business registration, investor services and the investment climate reform matrix
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
APIX adopts and publishes annual reports on business registration, investor services and the investment climate reform matrix
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
APIX adopts and publishes annual reports on business registration, investor services and the investment climate reform matrix
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="4">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
APIX adopts and publishes annual reports on business registration, investor services and the investment climate reform matrix
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="4">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of investment projects included in the APIX database
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="589"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of investment projects included in the APIX database
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="589"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of investment projects included in the APIX database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="400">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of investment projects included in the APIX database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="400">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of registered businesses included in APIX's database
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="82500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of registered businesses included in APIX's database
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="82500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of registered businesses included in APIX's database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="82500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="167500">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of registered businesses included in APIX's database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="82500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="167500">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PPP projects opined and supported by UNAPPP (with UNAPPP opinion as per PPP law requirements)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PPP projects opined and supported by UNAPPP (with UNAPPP opinion as per PPP law requirements)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PPP projects opined and supported by UNAPPP (with UNAPPP opinion as per PPP law requirements)
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="25">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PPP projects opined and supported by UNAPPP (with UNAPPP opinion as per PPP law requirements)
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="25">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual publications on ADEPME website of updated information on programs for SMEs and WSMESand progress reports on number of SMEs (and WSMEs) supported
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual publications on ADEPME website of updated information on programs for SMEs and WSMESand progress reports on number of SMEs (and WSMEs) supported
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual publications on ADEPME website of updated information on programs for SMEs and WSMESand progress reports on number of SMEs (and WSMEs) supported
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual publications on ADEPME website of updated information on programs for SMEs and WSMESand progress reports on number of SMEs (and WSMEs) supported
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress reports of the technical and financial implementation of the PACE program
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress reports of the technical and financial implementation of the PACE program
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress reports of the technical and financial implementation of the PACE program
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-12-15" />
<target value="10">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress reports of the technical and financial implementation of the PACE program
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-12-15" />
<target value="10">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP projects supported by FAPPP and UNAPP
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="28">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP projects supported by FAPPP and UNAPP
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="28">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses with access to equity financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses with access to equity financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses using debt financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="150"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="1,075">

</target>
<actual value="251">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Businesses using debt financing
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="150"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="1,075">

</target>
<actual value="251">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public-private dialogues conducted by the Directorate for Private Sector Development including to improve value chains competitiveness
</narrative></title>
<baseline year="2020" iso-date="2020-10-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-08" />
<period-end iso-date="2027-12-08" />
<target value="20.00">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MSMEs completing a technology project with the adoption of a specific technology
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7,000">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The PPP Unit is established and equipped with at least 3 qualified full-time staff
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
APIX adopts and publishes annual reports on business registration, investor services and the investment climate reform matrix
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="4">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adoption and Publication of Industry Reforms
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="7">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The FONSIS SME Acceleration Fund adopts a governance structure based on a general partner/ limited partner framework
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP projects supported by FAPPP and UNAPP
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-15" />
<target value="28">
<comment><narrative>
revised
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New and maintained jobs in beneficiary MSMEs supported with training and capacity building
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2027-12-08" />
<target value="40000">
<comment><narrative>
good progress
</narrative></comment>
</target>
<actual value="29,391">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of First-time MSMEs borrowers covered by the FOGADEV guarantee scheme
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2027-12-08" />
<target value="30.00">

</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of registered businesses included in APIX's database
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="82500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-12-15" />
<target value="167500">
<comment><narrative>
new
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P170366</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal - Third Multi-Sectoral Structural Reforms Development Policy Financing</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Support Government's efforts in (i) the energy sector by improving financial performance, reliability and facilitating equitable access; (ii) enhancing the legal and regulatory framework of the ICT sector to promote competition, investment and equitable access, and (iii) reinforcing policy, institutional, and financial foundations of the emerging digital economy.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Third Multi-Sectoral Structural Reforms Development Policy Financing (DPF) Project for Senegal aims to support government's efforts in (i) the energy sector by improving financial performance, reliability and facilitating equitable access; (ii) enhancing the legal and regulatory framework of the ICT sector to promote competition, investment and equitable access, and (iii) reinforcing policy, institutional, and financial foundations of the emerging digital economy. The energy sector in Senegal requires profound transformation to make it affordable for the country. The focus of DPF3 follows from DPF2 and consists of critical government policy and reforms in the energy and ICT sectors, as well as policy needed for development of the digital economy. Driven by the content of the Emerging Senegal Plan (PSE), the DPF series has a strong focus on Maximizing Finance for Development (MFD). This DPF series supports the government's efforts to achieve this transformation. The change required is anchored around changing the fuel mix from Heavy Fuel Oil (HFO) to a significantly lower cost mix of natural gas and renewables.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0040727"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0040726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-01-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-12-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-06-17"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-06-17"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Manuel Luengo</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mluengo@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23010" percentage="35" xml:lang="en"/><sector vocabulary="1" code="22020" percentage="25" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="10" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="10" xml:lang="en"/><sector vocabulary="1" code="23630" percentage="5" xml:lang="en"/><sector vocabulary="1" code="22011" percentage="5" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="5" xml:lang="en"/><sector vocabulary="1" code="15142" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LC" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Oil and Gas</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="40.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="10" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000262" percentage="30" xml:lang="en"><narrative>ICT Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="5" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="20" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="5" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="10" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="10" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="10" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="10" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="10" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="40" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-17"/>
<value currency="USD" value-date="2021-06-17">180000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-17"/>
<value currency="USD" value-date="2021-06-17">180000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-17"/>
<value currency="USD" value-date="2021-06-17">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-17"/>
<value currency="USD" value-date="2021-06-17">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">180000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-175355</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">180638880</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">50181842</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">51559100</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-893462</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-261618</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-734350</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-711108</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-202553</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-195719</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-686717</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-617597</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-176121</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-184765</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-648283</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-661780</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-188612</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-187292</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-657042</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-666411</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-189931</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-185981</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-653184</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-707295</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-201544</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-199406</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-700225</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-305914</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2625704</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-40726"><narrative>Ministry of Finance and Budget, Government of Senegal</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170366"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P170366?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170366"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms registered as startups by a licensed private or public support structure (as defined in the startup law).
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="150.00">
<comment><narrative>
&lt;p&amp;gt;Not enough data to objectively assess the RI.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ranking of Senegal with respect to the A.1.02 sub-index of the Network Readiness Index, which assesses how the legal framework facilitates ICT penetration and a safe development of business activities
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="81.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="65.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Internet penetration rate (source ARTP)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="75.00">

</target>
<actual value="92.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of generation capacity that is not HFO- based
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="45.00">
<comment><narrative>
&lt;p&amp;gt;The value the authorities communicated to the ICR mission was 44%, which was later corrected by the energy team to 36%.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="36.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Installed capacity of renewable energies
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="30.00">

</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase by 10 percent in the number of MSME taxpayers registered with the DSF/DGID.
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="65534.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="72088.00">

</target>
<actual value="72015.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of facility-based Internet providers
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="6.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of rural population with access to electricity
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="29.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="60.00">

</target>
<actual value="58.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Unserved energy (total) per year (GWh) as proxy for blackouts and brownouts
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="34.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="13.00">
<comment><narrative>
&lt;p&amp;gt;The value the authorities communicated to the ICR mission was 6.3 GWh, which was later corrected by the Bank energy team to 13.6 GWh&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="13.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Overall electricity losses as percentage of electricity produced
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="21.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="15.00">

</target>
<actual value="18.90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of rural households reporting access to the Internet (Source: Gallup survey)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="30.00">
<comment><narrative>
&lt;p&amp;gt;Survey was discontinued, rural households access data non-existent. The percentage in 2019 had, however, exceeded the target at 32.0%.A case can be made that this result indicator was achieved.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="32.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of tax payments. Source: Doing Business Paying Taxes indicator
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="58.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="40.00">

</target>
<actual value="29.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
SENELEC debt coverage ratio (EBIDTA adjusted/debt service)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="1.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="1.00">
<comment><narrative>
&lt;p&amp;gt;the value the authorities communicated to the ICR mission was 1.3, which was later amended by the team to 0.9&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.90">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P175830</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Stormwater Management and Climate Change Adaptation Project 2</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To reduce flood risks in peri-urban areas of Dakar and improve capacity for integrated urban flood risks planning and management for selected cities in Senegal.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed project has 4 components: (1) Integrated urban planning and management accounting for climate risk and sustainability with the objective to integrate climate risk and sustainability in urban planning and management; (2) Drainage investment and management, community engagement, environmental and social management with the objective to reduce the risk of flooding in select peri-urban of Dakar; (3) Contingent Emergency Response Component to provide funding for immediate response in the event of an eligible crisis or emergency, defined as an event that has caused or is likely to imminently cause a major adverse economic and/or social impact associated with natural or man-made crises or disasters; and (4) Project management to finance incremental project management costs for the implementing and technical agency, financial and technical audits, monitoring and evaluation of project activities (including gender disaggregated data), implementation of the environmental and social framework, operating the grievance redress mechanism, citizen engagement, communication, technical assistance and consultant services, training and knowledge exchange. Changes are proposed through this restructuring to (i) align the Results Framework with current realities and achievable targets by project closing; (ii) remove an indicator that has become impossible to measure due to a government policy decision; (iii) introduce new indicators that better capture emerging project outcomes; (iv) reduce the minimal value for withdrawal Applications from US$ 400,000 to US$ 100,000 (v) modify the closing dates of the initial credit IDA68890, which currently closes on July 31st, 2026, to remain available until July 29, 2028, with no change to the two additional credits IDA73720 and IDA73730 closing date. The restructuring does not modify the PDO. ]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0048109"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0048110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-05-21"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-05-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Lorenzo Carrera</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lcarrera@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243977" />
            <name><narrative>Yeumbeul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.78183 -17.34961</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244318" />
            <name><narrative>Toubab Dialaw</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.60584 -17.15017</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244802" />
            <name><narrative>Thies</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.78944 -16.92602</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245222" />
            <name><narrative>Somone</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.48649 -17.07524</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245533" />
            <name><narrative>Sindou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.74842 -12.84533</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246274" />
            <name><narrative>Sangalkam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.78023 -17.22761</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246419" />
            <name><narrative>Sali Portudal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.44444 -17.01679</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246452" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.01793 -16.48962</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246678" />
            <name><narrative>Pikine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76457 -17.39071</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247318" />
            <name><narrative>Niaga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.81219 -17.25072</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247507" />
            <name><narrative>Ngaparou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.46419 -17.05619</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248021" />
            <name><narrative>Ndayane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.56494 -17.12457</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248902" />
            <name><narrative>Malikounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.48333 -16.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248905" />
            <name><narrative>Malika</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.79076 -17.33904</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250211" />
            <name><narrative>Keur Matar Gueye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.82026 -17.09263</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250226" />
            <name><narrative>Keur Massar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.463 -15.8859</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250677" />
            <name><narrative>Kayar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91893 -17.11978</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251338" />
            <name><narrative>Mbaw</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.73192 -17.3274</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.44406</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254082" />
            <name><narrative>Bayakh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.83058 -17.13782</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254154" />
            <name><narrative>Bargny</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.69707 -17.23015</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254313" />
            <name><narrative>Bambilor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.80144 -17.18454</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595640" />
            <name><narrative>Diamniadio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72051 -17.1816</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595682" />
            <name><narrative>Tivaouane Peul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.8069 -17.28046</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595778" />
            <name><narrative>Guediawaye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.77446 -17.40212</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595779" />
            <name><narrative>Medina Gounas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76844 -17.38633</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595785" />
            <name><narrative>Darou Rahmane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.75251 -17.35314</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010300611" />
            <name><narrative>Dalifort</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.70639 -17.41083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011101623" />
            <name><narrative>Djidah thiaroye kao</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76277 -17.38385</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011101624" />
            <name><narrative>Rufisque nord</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.73836 -17.25652</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="15142" percentage="75" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="6" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="5" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="5" xml:lang="en"/><sector vocabulary="1" code="43060" percentage="5" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="85.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="45" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="8" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000714" percentage="6" xml:lang="en"><narrative>Urban Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="45" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="85" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="87" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="4" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000716" percentage="9" xml:lang="en"><narrative>Urban Water and Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="4" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="80" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="10" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="82" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="82" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="85" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="15" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="10" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="21" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000134" percentage="4" xml:lang="en"><narrative>Spatial Growth</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">165850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">272490.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">649450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">377425.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">857460.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">477865.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1049195.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">571795.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1261235.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">693935.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1492805.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">788330.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1639435.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1729645.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">905045.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1875655.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">962705.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1966485.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1003625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2056385.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1057720.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2186120.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1138785.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2368090.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1224190.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2526810.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1299055.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2658560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1368960.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">2841615.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1459635.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">2959725.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1486450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">2993980.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1528610.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">3093645.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3090855.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1537755.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3094730.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1556510.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3128055.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1569530.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">3142935.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1572320.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3162465.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1589835.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">3195480.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1602390.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">3217025.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1615565.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">3240120.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1621455.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">3237950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1623315.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">3263680.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1635405.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">3268175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1631375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">3275925.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1648580.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">3304135.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">3294525.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1641450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">3259495.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1621610.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">3242445.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1624245.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">3261510.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1636180.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">3278405.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1641760.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">3288790.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1647495.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">3302275.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1654780.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">3315915.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1436385.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1953907.19</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">4034074.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">3630400.90</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1802303.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2574013.24</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">570974.23</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1469664.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">871858.01</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">3029958.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2545201.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">662191.07</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">53184459.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">53184459.78</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">155000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">80000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">55000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">1953907</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">4034075</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">3630401</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">1802303</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">2574013</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">570974</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">1469664</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">871858</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">3029959</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">2545201</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">662191</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">4217922</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">1334660</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">782764</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">1513025</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">4068343</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">506456</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">2908398</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">1267274</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">7212978</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">3450083</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">7437948</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">1171418</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">5945828</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">6559511</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">3265642</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">3646130</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">905178</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">2887849</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">7902370</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">5679590</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">3076288</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">2931339</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-377627</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-249471</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-174241</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-410488</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-730966</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-988140</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1227653</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-38</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1224067</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1280</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1355979</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-561</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1555426</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-48110"><narrative>Municipal Development Agency (Agence de DEveloppement Municipal - ADM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175830"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175830?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175830"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women are consulted and involved in the development of policies, strategies, and plans in local and national level
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="50.00">
<comment><narrative>
The target can be achieved by the end of 2025 if another training session is organized.

The final target can be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="44.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women participating in/leading management committees for the COLIGEP
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="35.00">
<comment><narrative>
The target has been reached halfway through.

There are 60 women out of 154 members on the COLIGEP executive boards, or 39%
</narrative></comment>
</target>
<actual value="39%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A stakeholder digital knowledge sharing platform on data related to integrated flood risk management is designed and operational
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The target can be achieved by the end of the year if the appropriate decisions are taken in a timely manner.

The final target can be achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Local flood management committees (COLIGEP) created in Keur Massar/Mbao catchment and strategy for sustainability designed and implemented
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="6">
<comment><narrative>
Target Achieved
The COLIGEPs in the municipalities of Keur Massar Nord, Keur Massar Sud, Mbao, and Parcelles Assainies–Jaxaay are up and running.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capitalization knowledge document developed and disseminated at local and national levels
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The indicator cannot yet be assessed.
However, as the production of the capitalisation report is part of a contract financed by the FND, it is necessary to obtain an extension of funding from this donor until 2029 in order to be able to carry out the activity in a timely manner.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Planning documents related to urban resilience and sustainability including climate change, validated
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3.00">
<comment><narrative>
The target will not be achieved by the end of 2025 due to considerable delays in the preparation of urban planning documents. 
Furthermore, the final target can only be achieved if the project obtains an extension of FND funding for at least two years.

There is a risk that the target will not be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Local flood management committees (COLIGEP) created in Keur Massar/Mbao catchment and strategy for sustainability designed and implemented
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="6">
<comment><narrative>
The target has been reached halfway through.

The final target will be reached.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Transfer of PROGEP 2 investments to ONAS for the O&amp;M effective
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The target can be achieved by the end of 2025 if works MBS 3.2, 3.3 and 3.5 are accepted. It should be noted that the structures must be transferred as and when they are accepted.
The final target can be achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC manual of procedures is completed
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The final target is achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Planning documents related to urban resilience and sustainability including climate change, validated
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3.00">
<comment><narrative>
The target will not be achieved by the end of 2025 due to considerable delays in the preparation of urban planning documents. 
Furthermore, the final target can only be achieved if the project obtains an extension of FND funding for at least two years.

There is a risk that the target will not be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Primary drainage system in Keur Massar/Mbao catchment put in place
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="88,150.00">
<comment><narrative>
The target will be achieved by the end of 2025 thanks to the work currently underway.
</narrative></comment>
</target>
<actual value="49497">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached by information, education and communication strategy in flood risk management and resilience (of which 50 percent women)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="120,000.00">
<comment><narrative>
Target achieved: Nearly 92,439 people benefited from the IDA-funded social facilitation and civic engagement strategy, including 50,370 women (53.7%)
</narrative></comment>
</target>
<actual value="93636">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutional actors in the project intervention areas who have adopted the planning tools for integrated flood risk management
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="350.00">
<comment><narrative>
The indicator can be achieved by the end of 2025 if a third session is organized before the end of 2025.
The target can be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="136">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The improved planning capacities of integrated flood risk management have allowed to increase the rate of authorized subdivisions to 80% in accordance with validated urban plans in the target areas.
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="80.00">
<comment><narrative>
The target is not be achieved by the end of the year due to delays in the preparation of urban planning documents on the one hand, and on the other hand, due to the suspension of the issuance of subdivision permits by the Government.
Consequently, it is suggested that the indicator be removed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-07-15" />
<target value="0">
<comment><narrative>
The target has been largely achieved thanks to the training sessions organised. Implementing the project's training plan could improve the target.

The final target has already been achieved.
</narrative></comment>
</target>
<actual value="788">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area in peri-urban Dakar protected against recurrent flooding through drainage works
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3,600.00">
<comment><narrative>
Current works on MBS 3-5, will enable the target to be reached by the end of the year.
</narrative></comment>
</target>
<actual value="1330">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The improved planning capacities of integrated flood risk management have allowed to increase the rate of authorized subdivisions to 80% in accordance with validated urban plans in the target areas.
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="80.00">
<comment><narrative>
The target will not be achieved by the end of the year due to delays in the preparation of urban planning documents on the one hand, and on the other hand, due to the suspension of the issuance of subdivision permits by the Government.
Consequently, it is suggested that the indicator be removed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC manual of procedures is completed
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The final target is achieved.
The procedures manual was developed and approved by the World Bank
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated urban flood risks management tools and guidance notes developed
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="9">
<comment><narrative>
The target will not be met by the end of 2025 due to delays in recruiting the consultant responsible for developing the SAPI.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ONAss Remote Management System for PROGEP 1 and 2 is functional
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The company's hiring process is currently being finalized
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A stakeholder digital knowledge sharing platform on data related to integrated flood risk management is designed and operational
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The target can be achieved by the end of the year if the appropriate decisions are taken in a timely manner.

The final target can be achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Transfer of PROGEP 1 investments to ONAS for the O&amp;M effective
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The goal has been achieved. The transfer of PROGEP 1 projects is now complete.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC manual of procedures is completed
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The final target is achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ONAss Remote Management System for PROGEP 1 and 2 is functional
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The target will not be achieved by the end of 2025 because the system is still in the validation phase.

The final target may be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached by information, education and communication strategy in flood risk management and resilience (of which 50 percent women)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="120,000.00">
<comment><narrative>
The final target will be achieved.
</narrative></comment>
</target>
<actual value="82520">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Currage rate of drainage channels in areas covered by PROGEP 1 and 2
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="100.00">
<comment><narrative>
The target is achieved halfway through with the annual winter cleaning of the structures.

The final target will be achieved in 2029.
</narrative></comment>
</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Currage rate of drainage channels in areas covered by PROGEP 1 and 2
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="100.00">
<comment><narrative>
ONAS has contracted the company for dredging and winter maintenance in 2026; as for ADM, the process is currently underway
</narrative></comment>
</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capitalization knowledge document developed and disseminated at local and national levels
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The indicator cannot yet be assessed.
However, as the production of the capitalisation report is part of a contract financed by the FND, it is necessary to obtain an extension of funding from this donor until 2029 in order to be able to carry out the activity in a timely manner.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Eligible flood risk community investment projects completed in Keur Massar/Mbao catchment
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="120.00">
<comment><narrative>
To date, 52 PICs are fully operational in the project's target municipalities, and work on others is currently underway.
</narrative></comment>
</target>
<actual value="52">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of which female (50%)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="189,000.00">
<comment><narrative>
The yearly target has been achieved. The final target will be revised according to the mid-term review guidance.
</narrative></comment>
</target>
<actual value="219000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to delivery of project addressed
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="95.00">
<comment><narrative>
The target can be achieved by the end of 2025 if outstanding complaints are dealt with.

The final target could be achieved by the end of the project if complaints are dealt with diligently.
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="25,0000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2029-07-15" />
<target value="0">
<comment><narrative>
The target has been largely achieved thanks to the training sessions organised. Implementing the project's training plan could improve the target.

The final target has already been achieved.
</narrative></comment>
</target>
<actual value="788">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Transfer of PROGEP 1 investments to ONAS for the O&amp;M effective
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The target has been achieved halfway through, despite significant delays.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Transfer of PROGEP 2 investments to ONAS for the O&amp;M effective
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
Projects MBS 3.2, 3.3, and 3.4 have been completed, and the handover process is currently being finalized.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Policies related to urban resilience and sustainability including climate change validated
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="2">
<comment><narrative>
The target will not be achieved by the end of 2025.
The Urban Planning Code was adopted at the end of 2023. The National Urbanisation Policy (PNU), whose development has been fraught with difficulties, has yet to be finalised.
However, the target could still be achieved by the end of the year if the right decisions are taken in a timely manner.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached by information, education and communication strategy in flood risk management and resilience (of which 50 percent women)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="120,000.00">
<comment><narrative>
The final target will be achieved.
</narrative></comment>
</target>
<actual value="82520">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women participating in/leading management committees for the COLIGEP
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="35.00">
<comment><narrative>
The target has been reached halfway through.

The final target will be reached.
</narrative></comment>
</target>
<actual value="39%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutional actors in the project intervention areas who have adopted the planning tools for integrated flood risk management
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="350.00">
<comment><narrative>
A capacity-building session will be held before the end of the year for institutional stakeholders on topics related to the indicator
</narrative></comment>
</target>
<actual value="136">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ONAss Remote Management System for PROGEP 1 and 2 is functional
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The target will not be achieved by the end of 2025 because the system is still in the validation phase.

The final target may be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated urban flood risks management tools and guidance notes developed
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="9">
<comment><narrative>
The target will not be met by the end of 2025 due to delays in recruiting the consultant responsible for developing the SAPI.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Transfer of PROGEP 1 investments to ONAS for the O&amp;M effective
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The target has been achieved halfway through, despite significant delays.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Transfer of PROGEP 2 investments to ONAS for the O&amp;M effective
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The target can be achieved by the end of 2025 if works MBS 3.2, 3.3 and 3.5 are accepted. It should be noted that the structures must be transferred as and when they are accepted.
The final target can be achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women participating in/leading management committees for the COLIGEP
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="35.00">
<comment><narrative>
The target has been reached halfway through.

The final target will be reached.
</narrative></comment>
</target>
<actual value="39%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Local flood management committees (COLIGEP) created in Keur Massar/Mbao catchment and strategy for sustainability designed and implemented
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="6">
<comment><narrative>
The target has been reached halfway through.

The final target will be reached.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="25,0000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2029-07-15" />
<target value="0">
<comment><narrative>
The target has been largely achieved
</narrative></comment>
</target>
<actual value="25,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of which female (50%)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="189,000.00">
<comment><narrative>
The yearly target has been achieved. The final target will be revised according to the mid-term review guidance.
</narrative></comment>
</target>
<actual value="219000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women are consulted and involved in the development of policies, strategies, and plans in local and national level
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="50.00">
<comment><narrative>
Target achieved
Of the 1,886 people who received training, 56% (1,056) are women
</narrative></comment>
</target>
<actual value="56">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capitalization knowledge document developed and disseminated at local and national levels
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The indicator cannot yet be assessed.
However, as the production of the capitalisation report is part of a contract financed by the FND, it is necessary to obtain an extension of funding from this donor until 2029 in order to be able to carry out the activity in a timely manner.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to delivery of project addressed
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="95.00">
<comment><narrative>
As of April 30, 2026, 498 complaints had been documented and recorded since the start of the project, of which 376 have been closed, 122 are pending, and 120 have been rejected.
The target has not yet been met due to delays in the payment of expenses and in the repair of damage caused by the construction work.
</narrative></comment>
</target>
<actual value="76%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women trained and engaged in flood risk management works at a community level (EWS, Solid waste management, awareness, education system)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="57,500.00">
<comment><narrative>
The target has been reached halfway through.

The final target will be reached.
</narrative></comment>
</target>
<actual value="44090">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to delivery of project addressed
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="95.00">
<comment><narrative>
The target can be achieved by the end of 2025 if outstanding complaints are dealt with.

The final target could be achieved by the end of the project if complaints are dealt with diligently.
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The improved planning capacities of integrated flood risk management have allowed to increase the rate of authorized subdivisions to 80% in accordance with validated urban plans in the target areas.
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="80.00">
<comment><narrative>
The target is not be achieved by the end of the year due to delays in the preparation of urban planning documents on the one hand, and on the other hand, due to the suspension of the issuance of subdivision permits by the Government.
Consequently, it is suggested that the indicator be removed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The improved planning capacities of integrated flood risk management have allowed to increase the rate of authorized subdivisions to 80% in accordance with validated urban plans in the target areas.
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="80.00">
<comment><narrative>
The target will not be achieved by the end of the year due to delays in the preparation of urban planning documents on the one hand, and on the other hand, due to the suspension of the issuance of subdivision permits by the Government.
Consequently, it is suggested that the indicator be removed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The improved planning capacities of integrated flood risk management have allowed to increase the rate of authorized subdivisions to 80% in accordance with validated urban plans in the target areas.
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="80.00">
<comment><narrative>
The target will not be achieved by the end of the year due to delays in the preparation of urban planning documents on the one hand, and on the other hand, due to the suspension of the issuance of subdivision permits by the Government.
Consequently, it is suggested that the indicator be removed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of which female (50%)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="189,000.00">
<comment><narrative>
The 1,500 hectares of flood-protected peri-urban areas have helped lift 250,000 people (50% of whom are women) out of the cycle of flooding, far exceeding the project's final target
</narrative></comment>
</target>
<actual value="250000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of which female (50%)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="189,000.00">
<comment><narrative>
The yearly target has been achieved. The final target will be revised according to the mid-term review guidance.
</narrative></comment>
</target>
<actual value="219000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of which female (50%)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="189,000.00">
<comment><narrative>
The yearly target has been achieved. The final target will be revised according to the mid-term review guidance.
</narrative></comment>
</target>
<actual value="219000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutional actors in the project intervention areas who have adopted the planning tools for integrated flood risk management
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="350.00">
<comment><narrative>
A capacity-building session will be held before the end of the year for institutional stakeholders on topics related to the indicator
</narrative></comment>
</target>
<actual value="136">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutional actors in the project intervention areas who have adopted the planning tools for integrated flood risk management
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="350.00">
<comment><narrative>
The indicator can be achieved by the end of 2025 if a third session is organized before the end of 2025.
The target can be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="136">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Policies related to urban resilience and sustainability including climate change validated
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="2">
<comment><narrative>
The Urban Planning Code was adopted on December 20, 2023, and promulgated on December 29, 2023. As for the PNU, its development has been canceled following the mid-term review.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutional actors in the project intervention areas who have adopted the planning tools for integrated flood risk management
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="350.00">
<comment><narrative>
The indicator can be achieved by the end of 2025 if a third session is organized before the end of 2025.
The target can be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="136">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area in peri-urban Dakar protected against recurrent flooding through drainage works
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3,600.00">
<comment><narrative>
500 hectares of suburban areas are protected from flooding thanks to the BCI, MBS 3.2, 3.4, and 3.3 projects, as well as the MBS 3.5 and upstream U3 projects, which are currently underway.
</narrative></comment>
</target>
<actual value="1500">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area in peri-urban Dakar protected against recurrent flooding through drainage works
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3,600.00">
<comment><narrative>
Current works on MBS 3-5, will enable the target to be reached by the end of the year.
</narrative></comment>
</target>
<actual value="1330">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area in peri-urban Dakar protected against recurrent flooding through drainage works
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3,600.00">
<comment><narrative>
Current works on MBS 3-5, will enable the target to be reached by the end of the year.
</narrative></comment>
</target>
<actual value="1330">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of which female (50%)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="189,000.00">
<comment><narrative>
The 1,500 hectares of flood-protected peri-urban areas have helped lift 250,000 people (50% of whom are women) out of the cycle of flooding, far exceeding the project's final target
</narrative></comment>
</target>
<actual value="250000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Key stakeholders trained in integrated urban flood risk management, climate change resilience and territorial planning
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="750.00">
<comment><narrative>
The target has been largely achieved thanks to the training sessions organised. Implementing the project's training plan could improve the target.

The final target has already been achieved.
</narrative></comment>
</target>
<actual value="788">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated urban flood risks management tools and guidance notes developed
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="9">
<comment><narrative>
The target will not be met by the end of 2025 due to delays in recruiting the consultant responsible for developing the SAPI.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Urban Policies related to urban resilience and sustainability including climate change validated
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="2">
<comment><narrative>
The target will not be achieved by the end of 2025.
The Urban Planning Code was adopted at the end of 2023. The National Urbanisation Policy (PNU), whose development has been fraught with difficulties, has yet to be finalised.
However, the target could still be achieved by the end of the year if the right decisions are taken in a timely manner.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Primary drainage system in Keur Massar/Mbao catchment put in place
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="88,150.00">
<comment><narrative>
Work carried out under the BCI phase and funded by the World Bank has resulted in the construction of 62,793 meters of primary and secondary collectors in the municipalities of Keur Massar Nord, Keur Massar Sud, and Jaxaay-Parcelles. 
The target will be met by the end of the year
</narrative></comment>
</target>
<actual value="67405">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area in peri-urban Dakar protected against recurrent flooding through drainage works
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3,600.00">
<comment><narrative>
500 hectares of suburban areas are protected from flooding thanks to the BCI, MBS 3.2, 3.4, and 3.3 projects, as well as the MBS 3.5 and upstream U3 projects, which are currently underway.
</narrative></comment>
</target>
<actual value="1500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Primary drainage system in Keur Massar/Mbao catchment put in place
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="88,150.00">
<comment><narrative>
The target will be achieved by the end of 2025 thanks to the work currently underway.
</narrative></comment>
</target>
<actual value="49497">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The improved planning capacities of integrated flood risk management have allowed to increase the rate of authorized subdivisions to 80% in accordance with validated urban plans in the target areas.
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="80.00">
<comment><narrative>
The target is not be achieved by the end of the year due to delays in the preparation of urban planning documents on the one hand, and on the other hand, due to the suspension of the issuance of subdivision permits by the Government.
Consequently, it is suggested that the indicator be removed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The improved planning capacities of integrated flood risk management have allowed to increase the rate of authorized subdivisions to 80% in accordance with validated urban plans in the target areas.
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="80.00">
<comment><narrative>
The target will not be achieved by the end of the year due to delays in the preparation of urban planning documents on the one hand, and on the other hand, due to the suspension of the issuance of subdivision permits by the Government.
Consequently, it is suggested that the indicator be removed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The improved planning capacities of integrated flood risk management have allowed to increase the rate of authorized subdivisions to 80% in accordance with validated urban plans in the target areas.
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="80.00">
<comment><narrative>
The target will not be achieved by the end of the year due to delays in the preparation of urban planning documents on the one hand, and on the other hand, due to the suspension of the issuance of subdivision permits by the Government.
Consequently, it is suggested that the indicator be removed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of which female (50%)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="189,000.00">
<comment><narrative>
The 1,500 hectares of flood-protected peri-urban areas have helped lift 250,000 people (50% of whom are women) out of the cycle of flooding, far exceeding the project's final target
</narrative></comment>
</target>
<actual value="250000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of which female (50%)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="189,000.00">
<comment><narrative>
The yearly target has been achieved. The final target will be revised according to the mid-term review guidance.
</narrative></comment>
</target>
<actual value="219000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries of which female (50%)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="189,000.00">
<comment><narrative>
The yearly target has been achieved. The final target will be revised according to the mid-term review guidance.
</narrative></comment>
</target>
<actual value="219000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutional actors in the project intervention areas who have adopted the planning tools for integrated flood risk management
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="350.00">
<comment><narrative>
A capacity-building session will be held before the end of the year for institutional stakeholders on topics related to the indicator
</narrative></comment>
</target>
<actual value="136">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutional actors in the project intervention areas who have adopted the planning tools for integrated flood risk management
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="350.00">
<comment><narrative>
The indicator can be achieved by the end of 2025 if a third session is organized before the end of 2025.
The target can be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="136">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutional actors in the project intervention areas who have adopted the planning tools for integrated flood risk management
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="350.00">
<comment><narrative>
The indicator can be achieved by the end of 2025 if a third session is organized before the end of 2025.
The target can be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="136">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area in peri-urban Dakar protected against recurrent flooding through drainage works
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3,600.00">
<comment><narrative>
500 hectares of suburban areas are protected from flooding thanks to the BCI, MBS 3.2, 3.4, and 3.3 projects, as well as the MBS 3.5 and upstream U3 projects, which are currently underway.
</narrative></comment>
</target>
<actual value="1500">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area in peri-urban Dakar protected against recurrent flooding through drainage works
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3,600.00">
<comment><narrative>
Current works on MBS 3-5, will enable the target to be reached by the end of the year.
</narrative></comment>
</target>
<actual value="1330">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area in peri-urban Dakar protected against recurrent flooding through drainage works
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3,600.00">
<comment><narrative>
Current works on MBS 3-5, will enable the target to be reached by the end of the year.
</narrative></comment>
</target>
<actual value="1330">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The improved planning capacities of integrated flood risk management have allowed to increase the rate of authorized subdivisions to 80% in accordance with validated urban plans in the target areas.
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="80.00">
<comment><narrative>
The target will not be achieved by the end of the year due to delays in the preparation of urban planning documents on the one hand, and on the other hand, due to the suspension of the issuance of subdivision permits by the Government.
Consequently, it is suggested that the indicator be removed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area in peri-urban Dakar protected against recurrent flooding through drainage works
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3,600.00">
<comment><narrative>
Current works on MBS 3-5, will enable the target to be reached by the end of the year.
</narrative></comment>
</target>
<actual value="1330">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Eligible flood risk community investment projects completed in Keur Massar/Mbao catchment
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="120.00">
<comment><narrative>
The target will not be achieved at the halfway point.

The final target may be achieved if appropriate measures are taken, namely greater speed in the design and implementation of PICs.
</narrative></comment>
</target>
<actual value="41">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutional actors in the project intervention areas who have adopted the planning tools for integrated flood risk management
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="350.00">
<comment><narrative>
The indicator can be achieved by the end of 2025 if a third session is organized before the end of 2025.
The target can be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="136">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Eligible flood risk community investment projects completed in Keur Massar/Mbao catchment
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="120.00">
<comment><narrative>
The target will not be achieved at the halfway point.

The final target may be achieved if appropriate measures are taken, namely greater speed in the design and implementation of PICs.
</narrative></comment>
</target>
<actual value="41">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women are consulted and involved in the development of policies, strategies, and plans in local and national level
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="50.00">
<comment><narrative>
The target can be achieved by the end of 2025 if another training session is organized.

The final target can be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="44.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Key stakeholders trained in integrated urban flood risk management, climate change resilience and territorial planning
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="750.00">
<comment><narrative>
The three training sessions organized for municipal government employees reached 1,886 people, including 1,056 women (56%).
The target has been met.
</narrative></comment>
</target>
<actual value="1886">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Key stakeholders trained in integrated urban flood risk management, climate change resilience and territorial planning
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="750.00">
<comment><narrative>
The target has been largely achieved thanks to the training sessions organised. Implementing the project's training plan could improve the target.

The final target has already been achieved.
</narrative></comment>
</target>
<actual value="788">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women trained and engaged in flood risk management works at a community level (EWS, Solid waste management, awareness, education system)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="57,500.00">
<comment><narrative>
The target has been reached halfway through.

The final target will be reached.
</narrative></comment>
</target>
<actual value="44090">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Currage rate of drainage channels in areas covered by PROGEP 1 and 2
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="100.00">
<comment><narrative>
The target is achieved halfway through with the annual winter cleaning of the structures.

The final target will be achieved in 2029.
</narrative></comment>
</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Planning documents related to urban resilience and sustainability including climate change, validated
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="3.00">
<comment><narrative>
The target will not be achieved by the end of 2025 due to considerable delays in the preparation of urban planning documents. 
Furthermore, the final target can only be achieved if the project obtains an extension of FND funding for at least two years.

There is a risk that the target will not be achieved by the end of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A stakeholder digital knowledge sharing platform on data related to integrated flood risk management is designed and operational
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="Yes">
<comment><narrative>
The digital platform is now available and operational
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women trained and engaged in flood risk management works at a community level (EWS, Solid waste management, awareness, education system)
</narrative></title>
<baseline year="2021" iso-date="2021-02-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-26" />
<period-end iso-date="2029-07-31" />
<target value="57,500.00">
<comment><narrative>
The target has been largely achieved
</narrative></comment>
</target>
<actual value="45552">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P164262</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Rural Water Supply and Sanitation Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project's development objective is to increase access to improved water and sanitation services in selected rural areas and strengthen capacity for water resources management.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Rural Water Supply and Sanitation Project  for Senegal is to increase access to improved water and sanitation services in selected rural areas and strengthen capacity for water resources management. This project has four components. 1) The first component, Rural Water Supply, aims to improve water services and expand access through the following sub-components: (i) Upgrading of piped water systems to increase water availability and quality, in selected areas; and (ii) Development of access to water in selected areas. 2) The second component, Sanitation, aims to increase access to improved sanitation and ensure adequate disposal of wastewater and sludge through the following sub-components: (i) Development of access to improved sanitation in selected rural areas; (ii) Development of access to condominial sewerage services and provision of adequate wastewater and sludge disposal in Gandiaye;  (iii) Development of access to sewerage services and provision of adequate wastewater and sludge disposal in selected small towns; (iv) Implementation of a pilot program of the marketing approach to sanitation; and (v) Support to the Recipient. 3) The third component, Water Resources Management, aims to improve the knowledge and planning of the development of water resources through the following sub-components: (i) Strengthening the Recipient's capacity to assess and monitor water resources; and (ii) Supporting the Recipient's capacity in planning the development of water resources. 4) The fourth component, Program Coordination, Institutional Support and Capacity Building, aims to support sector institutions and reforms, and to enable the Project Coordination Unit (PCU) to deliver its responsibilities through the following sub-components: (i) Support to the Recipient in the areas of project coordination, supervision, financial management (FM), communication and outreach, procurement, monitoring and evaluation (M and E), supervision of implementation of the Safeguards Instruments; (ii) Support to the Recipient and sector institution; and (iii) Support to Ministry of Water and Sanitation (MHA) and the Specialized Implementation Agencies (SIAs) by financing expenses related to Training and Operating Costs for the implementation of Project activities.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0033665"><narrative>REpublique du SEnEgal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0033665"><narrative>REpublique du SEnEgal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0033665"><narrative>REpublique du SEnEgal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0033660"><narrative>Direction de l'Hydraulique (DH)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-07-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-06-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Apolline Gaye</narrative></person-name><telephone>+1-202-473-1000</telephone><email>agaye5@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

























<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244990" />
            <name><narrative>Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.91667 -13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246451" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.33333 -15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246452" />
            <name><narrative>Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.01793 -16.48962</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246842" />
            <name><narrative>Palmarin</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.01667 -16.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002247157" />
            <name><narrative>Nioro du Rip</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.75 -15.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248752" />
            <name><narrative>Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.65587 -13.25544</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249395" />
            <name><narrative>Lampsar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.1075 -16.34528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249554" />
            <name><narrative>Koungheul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.98333 -14.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250804" />
            <name><narrative>Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14 -16</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251007" />
            <name><narrative>Kaffrine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.10594 -15.5508</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251230" />
            <name><narrative>GuinguinEo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.26667 -15.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251688" />
            <name><narrative>Gandiaye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.23333 -16.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251910" />
            <name><narrative>Fatick</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.28333 -16.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252308" />
            <name><narrative>Diourbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -16.1</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002252379" />
            <name><narrative>Diosmone</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.4 -16.7</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253350" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -17.28333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253435" />
            <name><narrative>Casamance</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.75 -15.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006759213" />
            <name><narrative>Gorom</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.34381 -16.32847</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010778870" />
            <name><narrative>Birkelane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.0685 -15.69036</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010778871" />
            <name><narrative>Malem Hoddar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.38595 -15.23713</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244112" />
            <name><narrative>Cap Vert</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.7221 -17.50449</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="14022" percentage="56" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="34" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="53.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="16" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="63" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="94" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="15" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="7" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000724" percentage="94" xml:lang="en"><narrative>Rural Water and Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="15" xml:lang="en"><narrative>Water Resource Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">2083333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">2916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">18365220.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">18365220.43</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">130000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-2472615</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">6886427</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">75446</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">70822</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">948031</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">827406</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">1291534</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">426708</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">480960</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">3294020</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">2407081</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">3094094</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">4763999</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">4705895</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">1317459</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">1629326</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">2750760</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">1754979</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">2821460</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">4920161</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">7210448</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">5547098</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">737010</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">1621566</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">2627407</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">495311</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">3492010</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">10538258</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">2995087</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">928595</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">3121812</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">3406527</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">2579698</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">2533319</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">2285290</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">4178417</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">1087549</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">2134773</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">2188220</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">1034463</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">830136</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">964028</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">836206</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">3794984</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-305058</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-348882</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-168678</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-198615</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-192991</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-213565</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-225348</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-276580</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1054763</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-73</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1910382</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-2603908</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-2691511</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-275</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2496426</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2079025</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2001523</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-33662"><narrative>Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Direction de l'Assainissement (DA); Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Office National de l'Assainissement du SEnEgal (ONAS); Project Implementation Unit (PIU); SociEtE Nationale des Eaux du SEnEgal (SONES)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P164262"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P164262?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P164262"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of piezometers, trial boreholes and hydrometric stations installed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2023-06-29" />
<target value="54.00">
<comment><narrative>
Final result: 63% of target achieved.
</narrative></comment>
</target>
<actual value="42.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women provided with access to improved sanitation under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-02" />
<period-end iso-date="2024-06-30" />
<target value="270,500.00">
<comment><narrative>
The number of women beneficiaries provided with access to improved sanitation is 201,385.  Since the final ISR Report (Seq No: 12, archived on June 28, 2024, ISR59690) did not reflect the finalized results at closure, this number is taken from the Senegal Client Completion Report, 2024. 
Final result: 74% of target achieved
</narrative></comment>
</target>
<actual value="201,385">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2018" iso-date="2018-07-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-14" />
<period-end iso-date="2024-06-14" />
<target value="50421">
<comment><narrative>
Final result: 101% of final target achieved.
</narrative></comment>
</target>
<actual value="50421">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operator monitoring system generating regular reports on performance against key indicators
</narrative></title>
<baseline year="2018" iso-date="2018-07-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-02" />
<period-end iso-date="2023-06-30" />
<target value="Yes">
<comment><narrative>
The indicator for monitoring the performance of Public Service Delegations has been documented by ensuring the exhaustiveness and coherence of OFOR's operational control activities thanks to the recruitment of a consultant who has accompanied OFOR.
Final result: Target achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional wastewater treatment capacity installed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2024-06-29" />
<target value="4,850.00">
<comment><narrative>
Final result: 100% of final target achieved.
</narrative></comment>
</target>
<actual value="4,850.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rate of users of WSS services provided
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2023-06-29" />
<target value="80.00">
<comment><narrative>
Final result: 100% of final target achieved.
</narrative></comment>
</target>
<actual value="92.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household sewer connections constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2024-06-29" />
<target value="6,600.00">
<comment><narrative>
Since the final Implementation Status and Results Report (Seq No: 12, archived on June 28, 2024, ISR59690) did not reflect the finalized results at closure, this number is taken from the Senegal Client Completion Report, 2024. 
Final result: 50% of final target achieved.
</narrative></comment>
</target>
<actual value="3,271.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2018" iso-date="2018-07-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-02" />
<period-end iso-date="2024-06-30" />
<target value="541,000.00">
<comment><narrative>
402,770  people benefitted from improved sanitation through additional household latrines and sewerage connections. Since the final ISR Report (Seq No: 12, archived on June 28, 2024, ISR59690) did not reflect the finalized results at closure, this number is taken from the Senegal Client Completion Report, 2024. 
Final result: 79 percent of target achieved.
</narrative></comment>
</target>
<actual value="402,770.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household latrines constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2024-06-29" />
<target value="47,500.00">
<comment><narrative>
Final result: 82% of final target achieved
</narrative></comment>
</target>
<actual value="38,887.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Piped water systems equipped with chlorination devices under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2024-06-29" />
<target value="586.00">
<comment><narrative>
The contractor (SAHE) is implementing this activity.&amp;nbsp; To date 341 piped water systems have been equipped with a&amp;nbsp;chlorination unit.&amp;nbsp;The remaining work is in progress and is expected to be completed before the closing date.
</narrative></comment>
</target>
<actual value="341.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water production facilities rehabilitated under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-14" />
<period-end iso-date="2024-06-14" />
<target value="439">
<comment><narrative>
Final result 103% of final target achieved.
</narrative></comment>
</target>
<actual value="439">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Piped water systems equipped with chlorination devices under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-14" />
<period-end iso-date="2024-06-14" />
<target value="341">
<comment><narrative>
Final result 58% of final target achieved.
</narrative></comment>
</target>
<actual value="341">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2024-06-29" />
<target value="49,900.00">
<comment><narrative>
Household connections have been completed.
</narrative></comment>
</target>
<actual value="50,421.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Water sample tests meeting bacteriological standards
</narrative></title>
<baseline year="2018" iso-date="2018-07-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-14" />
<period-end iso-date="2024-06-14" />
<target value="70">
<comment><narrative>
According to the Senegal Client Completion Report, 2024, this indicator was difficult to track and assess due to lack of data availability.
Final result: 70% of final target achieved.
</narrative></comment>
</target>
<actual value="68">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water resources development master plans completed and approved
</narrative></title>
<baseline year="2018" iso-date="2018-07-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-02" />
<period-end iso-date="2023-06-30" />
<target value="5.00">
<comment><narrative>
All five SDAGEs were completed by March 2023, and approved during a dissemination workshop held on January 18, 2024, attended by the Minster of Water and Sanitation.
Final Result: 100% of target achieved.
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People practicing basic hygiene rules in terms of hand washing in public places.
</narrative></title>
<baseline year="2018" iso-date="2018-07-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-02" />
<period-end iso-date="2023-06-30" />
<target value="50,000.00">
<comment><narrative>
The final target was miscalculated and revised from 50,000 to 25,000 in the June 2024 restructuring.
Final result:  51% of target achieved.
</narrative></comment>
</target>
<actual value="12,750.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water quality mapping system in use
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2023-06-29" />
<target value="Yes">
<comment><narrative>
All deliverables have been submitted by the consultant-firm, and the tracking system tool is in place. A dissemination workshop was held on May 24, 2022. The tool is currently in use.
Final result: Target achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Water sample tests meeting bacteriological standards
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2024-06-29" />
<target value="98.00">
<comment><narrative>
Two&amp;nbsp;&amp;nbsp;tests have been conducted so far???????,&amp;nbsp; the first report &amp;nbsp;showed that only 68% of samples were compliant with the standards
</narrative></comment>
</target>
<actual value="68.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional sludge treatment capacity installed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2024-06-29" />
<target value="100,000.00">
<comment><narrative>
Final result: 100% of final target achieved.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved community water points constructed or rehabilitated under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2024-06-29" />
<target value="216.00">
<comment><narrative>
&amp;nbsp;229&amp;nbsp;stand-posts have been constructed and are operational.&amp;nbsp;
</narrative></comment>
</target>
<actual value="229.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water production facilities rehabilitated under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2024-06-29" />
<target value="428.00">
<comment><narrative>
To date 439 water facilities have been rehabilitated.
</narrative></comment>
</target>
<actual value="439.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2018" iso-date="2018-07-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-02" />
<period-end iso-date="2024-06-30" />
<target value="545,800.00">
<comment><narrative>
The project reached 554,889 people exceeding the indicator target of 545,800 through rehabilitated and new piped connections, social connections, or standpipes programs. 
Final result: 102 percent of target achieved.
</narrative></comment>
</target>
<actual value="554,889.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved community water points constructed or rehabilitated under the project
</narrative></title>
<baseline year="2018" iso-date="2018-07-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-14" />
<period-end iso-date="2024-06-14" />
<target value="229">
<comment><narrative>
229 standposts have been constructed and are operational. 
Final result: 106% of final target achieved.
</narrative></comment>
</target>
<actual value="229">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public toilets constructed under the project for public places like health centers, schools, etc.
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2024-06-29" />
<target value="83.00">
<comment><narrative>
Thanks to Covid-19 emergency response, 45 public toilets have been built in public places (markets, schools and health centers) in the peri-urban areas and 43 more public toilets have been built thanks to latrines contracts in rural areas. Since the final Implementation Status and Results Report (Seq No: 12, archived on June 28, 2024, ISR59690) did not reflect the finalized results at closure, this number is taken from the Senegal Client Completion Report, 2024. 
Final result: 100% of target achieved.
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Satisfaction rate of female users of WSS services provided
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2023-06-29" />
<target value="80.00">
<comment><narrative>
Final result: 100% of final target achieved.
</narrative></comment>
</target>
<actual value="91.50">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" humanitarian="1"  hierarchy="1"><iati-identifier>44000-P125506</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SN:Casamance Development Pole Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives (PDO) are to: (i) enhance the agricultural productivity of youth and female farmers for selectedcrops; and (ii) improve transport linkages in isolated rural communities in targeted areas of the Casamance region.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Casamance Development Pole Project for Senegal are to: (i) enhance the agricultural productivity of youth and female farmers for selected crops; and (ii) improve transport linkages in isolated rural communities in targeted areas of the Casamance region. The project has three components. The first component is support to agricultural production, post-harvest, and marketing for selected value-chains. This component responds to the demand by Casamance agricultural cooperatives, and small-scale private operators for support to production, marketing, and commercialization of agricultural commodities. The component supports activities aimed at restoring the missing links in the rice, horticulture, and oysters value-chains. The second component is rural accessibility. This component will carry out a program aiming at improving accessibility of the most isolated rural communities and improving communities' access to roads leading to local markets and agricultural production zones. The third component is project implementation and capacity building in Disarmament, Demobilization, and Reintegration (DDR). This component includes four sub-components: (i) strengthening the capacity of key stakeholders, including the Agence Nationale pour la Relance des Activites Economiques et Sociales en Casamance (ANRAC) through consolidation of peace building processes and the fundamentals of DDR for ex-combatants; (ii) carrying-out of three strategic studies on: (a) developing a cadastral plan; (b) developing a geo-reference map of interventions in Casamance; and (c) support to the government in the definition and implementation of a strategy on poles development, which integrates a fiscal framework; (iii) support to project management, results monitoring and evaluation (M and E); and (iv) construction of office facilities for the Regional Development Agency (Agence Regionale de Developpement) (ARDs) and provision of related office equipment.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0006033"><narrative>Ministry of Economy and Finance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0006031"><narrative>Project Implementation Unit (PIU)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-03-26"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-09-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nicolas Perrin</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nperrin@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002243939" />
            <name><narrative>Ziguinchor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.8 -16.366671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002249781" />
            <name><narrative>Kolda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13 -14.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007303937" />
            <name><narrative>REgion de SEdhiou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.70683 -15.55801</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31191" percentage="35" xml:lang="en"/><sector vocabulary="1" code="31161" percentage="25" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="24" xml:lang="en"/><sector vocabulary="1" code="31194" percentage="12" xml:lang="en"/><sector vocabulary="1" code="73010" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AH" percentage="32.0000000" xml:lang="en"><narrative>FY17 - Crops</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="32.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="5" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="5" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000532" percentage="2" xml:lang="en"><narrative>Post-conflict reconstruction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="8" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000531" percentage="2" xml:lang="en"><narrative>Conflict Prevention</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="5" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="77" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="8" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="5" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="8" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">3257713.36</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">3257713.36</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">40000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-417451</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">919915</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">1348739</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">43133</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">142223</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">2041661</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">98845</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">1037759</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">249434</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">412173</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">536003</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">325133</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">78706</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">389253</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">139963</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">419345</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">74474</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">58343</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">1665437</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">320925</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">199126</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">1378817</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">1777960</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">468416</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">2121191</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">92682</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">1253298</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">528765</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">2143589</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">1098252</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">1188703</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">685034</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">315824</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">624608</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">1321526</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">372029</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">478899</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">508612</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">702894</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">265551</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">396195</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">672206</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">880538</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">741758</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">484074</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">609918</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">350159</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">371209</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">109160</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">514036</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">364531</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">437513</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">945123</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">307759</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">131546</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">134707</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">216270</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">862950</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">768709</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-383317</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-1604</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-8876</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-20128</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-26344</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-30878</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-46224</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-69974</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-90668</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-94725</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-107686</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-115595</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-119300</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-137415</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-141995</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-138190</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-140126</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-127428</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-133837</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-130958</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-130015</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-130902</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-127773</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-130851</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-122631</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-348280</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-350852</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-6001</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-341608</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-358898</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-5799</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-351601</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-6031"><narrative>Project Implementation Unit (PIU); Steering Committee</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P125506"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P125506?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P125506"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with irrigation and drainage services (ha)
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="126620.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small enterprises created around the platform of Bignona
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of citizen engagement pilots implemented
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="2017-09-19" />
<target value="9.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The platform of Bignona is constructed and functional
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Horticultural perimeters rehabilitated managed and /or developped (hectares)
</narrative></title>
<baseline year="2017" iso-date="2017-08-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-08-30" />
<period-end iso-date="2017-09-19" />
<target value="300.00">

</target>
<actual value="197.39">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rice valleys rehabilitated
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="126620.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of rural population with access to an all-season road
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="71.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women and youth groups provided with equipment and input packages Horticulture
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average revenue per hectare of horticulture
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="250.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="2017-09-19" />
<target value="1350.00">

</target>
<actual value="1650.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People in the project area aware of the project's beneficiary targeting criteria
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="98.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural Roads rehabilitated and/or improved to all weather conditions
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="460.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievance responses within the required timeframe
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="2017-09-19" />
<target value="100.00">

</target>
<actual value="94.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tons of local products passing through the platform of Bignona per Year
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="338.98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women and youth groups provided with equipment and input packages Oyster farms
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="21.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average increase in rainfed rice output
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="1.35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted clients satisfied with agricultural services (percentage)
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="98.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women and youth groups provided with equipment and input packages Rice
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="509.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="120842.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural storage facilities
</narrative></title>
<baseline year="2013" iso-date="2013-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P176620</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Senegal Energy Access Scale Up Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Increase access to electricity services for households, enterprises, and critical public facilities in Senegal.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0049120"><narrative>Republic of Senegal</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0049119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-03-08"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Thomas Flochel</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tflochel@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.497401 -14.452362</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="23631" percentage="55" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="45" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="93.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="10" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="97" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="100" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="10" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="50" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="87" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="84" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="16" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="45" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="128" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="97" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="84" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="10" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="100" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="84" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000726" percentage="84" xml:lang="en"><narrative>Geospatial Services</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">3375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">600000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">87880948.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">87880948.03</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">150000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">5870000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">3106606</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">162521</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">72143</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">152031</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">243700</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">1806103</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">3188059</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">12570572</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">1077202</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">532071</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">429721</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">2825264</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1800055</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">2228923</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">4716473</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">1392131</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">4451771</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">7653570</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">907681</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">2861380</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">6643297</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">492254</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">2112083</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">693441</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-346453</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-59706</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-205093</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-246868</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-268292</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-466641</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-661335</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-633034</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1382</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-787606</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-49119"><narrative>Senegal National Electricity Company (SociEtE Nationale d'ElectricitE du SEnEgal - SENELEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176620"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P176620?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176620"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consumer awareness campaign developed and implemented
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the realization of a consumer awareness campaign aiming to increase the awareness of citizens on (i) the SENELEC application process for requesting a connection to the grid, (ii) the benefits of the project offered to vulnerable househods and MSMEs (sub-component 2.1.) and (iii) the safe and efficient use of electricity
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="1954000">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of a technical assistance promoting productive use of electricity
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="200.00">
<comment><narrative>
The indicator will measure the number of people who took part in the business development program financed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Distribution assets financed under the project are resilient to flooding
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="100.00">
<comment><narrative>
This indicator will verify if the design of constructed lines includes strengthening measures to increase resiliency to flooding
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="800.00">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="600">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Offshore development Concepts validated
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="1">
<comment><narrative>
Covering the continuation of GTA Phase 2 and Sangomar Phase 2 as well as the new development of Yakaar Teranga.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in technical positions at SENELEC
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="7.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="10.00">
<comment><narrative>
This indicator will measure the percentage of women that hold a technical position at Senelec.
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commercialization Agreements concluded (Number)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="1">
<comment><narrative>
Covering production from GTA Phase 2, Yakaar Teranga and Sangomar Phase 2.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gas utilization study concluded
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2029-06-15" />
<target value="YES">
<comment><narrative>
&quot;City of Energies&quot; pre-feasibility study to assess the potential for a gas, gas-to-power and alternative energy and industrial hub.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="1954000">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="200,000.00">
<comment><narrative>
This indicator will measure the number of households connected to the grid under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of a technical assistance promoting productive use of electricity
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="200.00">
<comment><narrative>
The indicator will measure the number of people who took part in the business development program financed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2027-06-15" />
<target value="158,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Aggregate Technical, Commercial, and Collection (ATC&amp;C) losses
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2028-12-15" />
<target value="14.8">
<comment><narrative>
The ATC&amp;C loss rate is calculated as the proportion of electricity generated that does not result in collected revenue, expressed as a percentage
</narrative></comment>
</target>
<actual value="16.38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2028-12-15" />
<target value="1,954,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2029-06-15" />
<target value="1,954,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2029-06-15" />
<target value="1,954,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2028-12-15" />
<target value="1,954,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2027-06-15" />
<target value="158,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2027-06-15" />
<target value="158,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2027-06-15" />
<target value="158,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="1954000">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="1954000">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="1954000">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="243000">
<comment><narrative>
This indicator will measure the number of households connected to the grid under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received and addressed within the project Grievance Mechanism specific timeframe
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="100.00">
<comment><narrative>
This beneficiary feedback indicator will measure the percentage of grievances received that have been addressed within the project Grievance Redress Mechanism specific timeframe.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="1,580,000.00">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2028-12-15" />
<target value="1,954,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional distribution transformer capacity installed
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="45,750.00">
<comment><narrative>
This indicator will calculate the additional distribution transformer capacity installed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lines constructed, reinforced or rehabilitated under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="6,557.00">
<comment><narrative>
This indicator will measure the length of total lines constructed or rehabilitated under the project.
</narrative></comment>
</target>
<actual value="175">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Overall SENELEC recovery rate
</narrative></title>
<baseline year="2021" iso-date="2021-12-26" value="81.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-26" />
<period-end iso-date="2027-06-25" />
<target value="85.20">
<comment><narrative>
It is the total energy billed divided by the total energy dispatched.
</narrative></comment>
</target>
<actual value="83.62">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained in technical, planning, and management areas
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="250.00">
<comment><narrative>
This indicator will measure the number of sector staff benefiting from technical, planning, and management trainings under the project
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lines constructed, reinforced or rehabilitated under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="3,470.00">
<comment><narrative>
This indicator will measure the length of total lines constructed or rehabilitated under the project.
</narrative></comment>
</target>
<actual value="39">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consumer awareness campaign developed and implemented
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the realization of a consumer awareness campaign aiming to increase the awareness of citizens on (i) the SENELEC application process for requesting a connection to the grid, (ii) the benefits of the project offered to vulnerable househods and MSMEs (sub-component 2.1.) and (iii) the safe and efficient use of electricity
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2027-06-15" />
<target value="158,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
NEW: Gas utilization study concluded
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-06-15" />
<target value="YES">
<comment><narrative>
&quot;City of Energies&quot; pre-feasibility study to assess the potential for a gas, gas-to-power and alternative energy and industrial hub.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2028-12-15" />
<target value="1,954,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2029-06-15" />
<target value="1,954,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2029-06-15" />
<target value="1,954,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2028-12-15" />
<target value="1,954,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2027-06-15" />
<target value="158,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2027-06-15" />
<target value="158,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2027-06-15" />
<target value="158,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in technical positions at SENELEC
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="7.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="10.00">
<comment><narrative>
This indicator will measure the percentage of women that hold a technical position at Senelec.
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2028-12-15" />
<target value="1,954,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vulnerable households connected to the grid under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="40,000.00">
<comment><narrative>
The indicator will measure the number of vulnerable people integrated in the National Registry (Registre National Unique -RNU) provided with access to electricity under the project by household connections.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commercialization Agreements concluded (Number)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2029-06-15" />
<target value="1">
<comment><narrative>
Covering production from GTA Phase 2, Yakaar Teranga and Sangomar Phase 2.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NEW: Commercialization Agreements concluded (Number)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-06-15" />
<target value="1">
<comment><narrative>
Covering production from GTA Phase 2, Yakaar Teranga and Sangomar Phase 2.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Approval of farm-out and farm-in agreement
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2029-06-15" />
<target value="1">
<comment><narrative>
To conclude the change of operatorship from BP (previous operator) to the new investor/operator.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NEW: Approval of farm-out and farm-in agreement
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-06-15" />
<target value="1">
<comment><narrative>
To conclude the change of operatorship from BP (previous operator) to the new investor/operator.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Offshore development Concepts validated
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2029-06-15" />
<target value="1">
<comment><narrative>
Covering the continuation of GTA Phase 2 and Sangomar Phase 2 as well as the new development of Yakaar Teranga.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NEW: Offshore development Concepts validated
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-06-15" />
<target value="1">
<comment><narrative>
Covering the continuation of GTA Phase 2 and Sangomar Phase 2 as well as the new development of Yakaar Teranga.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gas utilization study concluded
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2029-06-15" />
<target value="YES">
<comment><narrative>
&quot;City of Energies&quot; pre-feasibility study to assess the potential for a gas, gas-to-power and alternative energy and industrial hub.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Least cost geospatial electrification plan developed and adopted by the Universal Access Program Steering Committee
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a Least cost geospatial electrification plan, as the core document to update and implement the Universal Access Program
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Least cost geospatial electrification plan developed and adopted by the Universal Access Program Steering Committee
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2022-12-25" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a Least cost geospatial electrification plan, as the core document to update and implement the Universal Access Program
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lines constructed, reinforced or rehabilitated under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="6,557.00">
<comment><narrative>
This indicator will measure the length of total lines constructed or rehabilitated under the project.
</narrative></comment>
</target>
<actual value="391.64">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lines constructed, reinforced or rehabilitated under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="3,470.00">
<comment><narrative>
This indicator will measure the length of total lines constructed or rehabilitated under the project.
</narrative></comment>
</target>
<actual value="391.64">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a lifeline connection policy for vulnerable households
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a lifeline connection policy
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a lifeline connection policy for vulnerable households
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a lifeline connection policy
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consumer awareness campaign developed and implemented
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the realization of a consumer awareness campaign aiming to increase the awareness of citizens on (i) the SENELEC application process for requesting a connection to the grid, (ii) the benefits of the project offered to vulnerable househods and MSMEs (sub-component 2.1.) and (iii) the safe and efficient use of electricity
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consumer awareness campaign developed and implemented
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2022-12-25" />
<target value="Yes">
<comment><narrative>
This indicator will verify the realization of a consumer awareness campaign aiming to increase the awareness of citizens on (i) the SENELEC application process for requesting a connection to the grid, (ii) the benefits of the project offered to vulnerable househods and MSMEs (sub-component 2.1.) and (iii) the safe and efficient use of electricity
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vulnerable households connected to the grid under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="40,000.00">
<comment><narrative>
The indicator will measure the number of vulnerable people integrated in the National Registry (Registre National Unique -RNU) provided with access to electricity under the project by household connections.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vulnerable households connected to the grid under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="40,000.00">
<comment><narrative>
The indicator will measure the number of vulnerable people integrated in the National Registry (Registre National Unique -RNU) provided with access to electricity under the project by household connections.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained in technical, planning, and management areas
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="250.00">
<comment><narrative>
This indicator will measure the number of sector staff benefiting from technical, planning, and management trainings under the project
</narrative></comment>
</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Approval of farm-out and farm-in agreement
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2029-06-15" />
<target value="1">
<comment><narrative>
To conclude the change of operatorship from BP (previous operator) to the new investor/operator.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lines constructed, reinforced or rehabilitated under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="6,557.00">
<comment><narrative>
This indicator will measure the length of total lines constructed or rehabilitated under the project.
</narrative></comment>
</target>
<actual value="175">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained in technical, planning, and management areas
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="250.00">
<comment><narrative>
This indicator will measure the number of sector staff benefiting from technical, planning, and management trainings under the project
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Distribution assets financed under the project are resilient to flooding
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="100.00">
<comment><narrative>
This indicator will verify if the design of constructed lines includes strengthening measures to increase resiliency to flooding
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consumer awareness campaign developed and implemented
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the realization of a consumer awareness campaign aiming to increase the awareness of citizens on (i) the SENELEC application process for requesting a connection to the grid, (ii) the benefits of the project offered to vulnerable househods and MSMEs (sub-component 2.1.) and (iii) the safe and efficient use of electricity
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a lifeline connection policy for vulnerable households
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a lifeline connection policy
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commercialization Agreements concluded (Number)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="1">
<comment><narrative>
Covering production from GTA Phase 2, Yakaar Teranga and Sangomar Phase 2.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a lifeline connection policy for vulnerable households
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a lifeline connection policy
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a lifeline connection policy for vulnerable households
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a lifeline connection policy
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional distribution transformer capacity installed
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="106750">
<comment><narrative>
This indicator will calculate the additional distribution transformer capacity installed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional distribution transformer capacity installed
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="106750">
<comment><narrative>
This indicator will calculate the additional distribution transformer capacity installed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of a technical assistance promoting productive use of electricity
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="200.00">
<comment><narrative>
The indicator will measure the number of people who took part in the business development program financed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
NEW: Gas utilization study concluded
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-06-15" />
<target value="YES">
<comment><narrative>
&quot;City of Energies&quot; pre-feasibility study to assess the potential for a gas, gas-to-power and alternative energy and industrial hub.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in technical positions at SENELEC
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="7.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="10.00">
<comment><narrative>
This indicator will measure the percentage of women that hold a technical position at Senelec.
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Distribution assets financed under the project are resilient to flooding
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="100.00">
<comment><narrative>
This indicator will verify if the design of constructed lines includes strengthening measures to increase resiliency to flooding
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vulnerable households connected to the grid under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="40,000.00">
<comment><narrative>
The indicator will measure the number of vulnerable people integrated in the National Registry (Registre National Unique -RNU) provided with access to electricity under the project by household connections.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Aggregate Technical, Commercial, and Collection (ATC&amp;C) losses
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2028-12-15" />
<target value="14.8">
<comment><narrative>
The ATC&amp;C loss rate is calculated as the proportion of electricity generated that does not result in collected revenue, expressed as a percentage
</narrative></comment>
</target>
<actual value="16.38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received and addressed within the project Grievance Mechanism specific timeframe
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="100.00">
<comment><narrative>
This beneficiary feedback indicator will measure the percentage of grievances received that have been addressed within the project Grievance Redress Mechanism specific timeframe.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained in technical, planning, and management areas
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="250.00">
<comment><narrative>
This indicator will measure the number of sector staff benefiting from technical, planning, and management trainings under the project
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NEW: Offshore development Concepts validated
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-06-15" />
<target value="1">
<comment><narrative>
Covering the continuation of GTA Phase 2 and Sangomar Phase 2 as well as the new development of Yakaar Teranga.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Approval of farm-out and farm-in agreement
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="1">
<comment><narrative>
To conclude the change of operatorship from BP (previous operator) to the new investor/operator.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Least cost geospatial electrification plan developed and adopted by the Universal Access Program Steering Committee
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a Least cost geospatial electrification plan, as the core document to update and implement the Universal Access Program
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gas utilization study concluded
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="YES">
<comment><narrative>
&quot;City of Energies&quot; pre-feasibility study to assess the potential for a gas, gas-to-power and alternative energy and industrial hub.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received and addressed within the project Grievance Mechanism specific timeframe
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="100.00">
<comment><narrative>
This beneficiary feedback indicator will measure the percentage of grievances received that have been addressed within the project Grievance Redress Mechanism specific timeframe.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commercialization Agreements concluded (Number)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2029-06-15" />
<target value="1">
<comment><narrative>
Covering production from GTA Phase 2, Yakaar Teranga and Sangomar Phase 2.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NEW: Approval of farm-out and farm-in agreement
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-06-15" />
<target value="1">
<comment><narrative>
To conclude the change of operatorship from BP (previous operator) to the new investor/operator.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional distribution transformer capacity installed
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="45,750.00">
<comment><narrative>
This indicator will calculate the additional distribution transformer capacity installed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained in technical, planning, and management areas
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="250.00">
<comment><narrative>
This indicator will measure the number of sector staff benefiting from technical, planning, and management trainings under the project
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of a technical assistance promoting productive use of electricity
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="200.00">
<comment><narrative>
The indicator will measure the number of people who took part in the business development program financed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Distribution assets financed under the project are resilient to flooding
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="100.00">
<comment><narrative>
This indicator will verify if the design of constructed lines includes strengthening measures to increase resiliency to flooding
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Least cost geospatial electrification plan developed and adopted by the Universal Access Program Steering Committee
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a Least cost geospatial electrification plan, as the core document to update and implement the Universal Access Program
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a lifeline connection policy for vulnerable households
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a lifeline connection policy
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received and addressed within the project Grievance Mechanism specific timeframe
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="100.00">
<comment><narrative>
This beneficiary feedback indicator will measure the percentage of grievances received that have been addressed within the project Grievance Redress Mechanism specific timeframe.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NEW: Commercialization Agreements concluded (Number)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-06-15" />
<target value="1">
<comment><narrative>
Covering production from GTA Phase 2, Yakaar Teranga and Sangomar Phase 2.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in technical positions at SENELEC
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="7.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="10.00">
<comment><narrative>
This indicator will measure the percentage of women that hold a technical position at Senelec.
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lines constructed, reinforced or rehabilitated under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="3,470.00">
<comment><narrative>
This indicator will measure the length of total lines constructed or rehabilitated under the project.
</narrative></comment>
</target>
<actual value="39">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NEW: Approval of farm-out and farm-in agreement
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-06-15" />
<target value="1">
<comment><narrative>
To conclude the change of operatorship from BP (previous operator) to the new investor/operator.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="243000">
<comment><narrative>
This indicator will measure the number of households connected to the grid under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received and addressed within the project Grievance Mechanism specific timeframe
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="100.00">
<comment><narrative>
This beneficiary feedback indicator will measure the percentage of grievances received that have been addressed within the project Grievance Redress Mechanism specific timeframe.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained in technical, planning, and management areas
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="250.00">
<comment><narrative>
This indicator will measure the number of sector staff benefiting from technical, planning, and management trainings under the project
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="200,000.00">
<comment><narrative>
This indicator will measure the number of households connected to the grid under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Offshore development Concepts validated
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="1">
<comment><narrative>
Covering the continuation of GTA Phase 2 and Sangomar Phase 2 as well as the new development of Yakaar Teranga.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Least cost geospatial electrification plan developed and adopted by the Universal Access Program Steering Committee
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2022-12-25" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a Least cost geospatial electrification plan, as the core document to update and implement the Universal Access Program
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Least cost geospatial electrification plan developed and adopted by the Universal Access Program Steering Committee
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a Least cost geospatial electrification plan, as the core document to update and implement the Universal Access Program
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="600">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="600">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of a technical assistance promoting productive use of electricity
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="200.00">
<comment><narrative>
The indicator will measure the number of people who took part in the business development program financed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Aggregate Technical, Commercial, and Collection (ATC&amp;C) losses
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2029-06-15" />
<target value="14.8">
<comment><narrative>
The ATC&amp;C loss rate is calculated as the proportion of electricity generated that does not result in collected revenue, expressed as a percentage
</narrative></comment>
</target>
<actual value="16.38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="800.00">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Overall SENELEC recovery rate
</narrative></title>
<baseline year="2021" iso-date="2021-12-26" value="81.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-26" />
<period-end iso-date="2027-06-25" />
<target value="85.20">
<comment><narrative>
It is the total energy billed divided by the total energy dispatched.
</narrative></comment>
</target>
<actual value="83.62">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional distribution transformer capacity installed
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="106750">
<comment><narrative>
This indicator will calculate the additional distribution transformer capacity installed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="1954000">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Overall SENELEC recovery rate
</narrative></title>
<baseline year="2021" iso-date="2021-12-26" value="81.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-26" />
<period-end iso-date="2027-06-25" />
<target value="85.20">
<comment><narrative>
The ATC&amp;C loss rate is calculated as the proportion of electricity generated that does not result in collected revenue, expressed as a percentage
</narrative></comment>
</target>
<actual value="81.54">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Aggregate Technical, Commercial, and Collection (ATC&amp;C) losses
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2029-06-15" />
<target value="14.8">
<comment><narrative>
The ATC&amp;C loss rate is calculated as the proportion of electricity generated that does not result in collected revenue, expressed as a percentage
</narrative></comment>
</target>
<actual value="81.54">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="200,000.00">
<comment><narrative>
This indicator will measure the number of households connected to the grid under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="243000">
<comment><narrative>
This indicator will measure the number of households connected to the grid under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received and addressed within the project Grievance Mechanism specific timeframe
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="100.00">
<comment><narrative>
This beneficiary feedback indicator will measure the percentage of grievances received that have been addressed within the project Grievance Redress Mechanism specific timeframe.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received and addressed within the project Grievance Mechanism specific timeframe
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="100.00">
<comment><narrative>
This beneficiary feedback indicator will measure the percentage of grievances received that have been addressed within the project Grievance Redress Mechanism specific timeframe.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vulnerable households connected to the grid under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="40,000.00">
<comment><narrative>
The indicator will measure the number of vulnerable people integrated in the National Registry (Registre National Unique -RNU) provided with access to electricity under the project by household connections.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional distribution transformer capacity installed
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="45,750.00">
<comment><narrative>
This indicator will calculate the additional distribution transformer capacity installed under the project.
</narrative></comment>
</target>
<actual value="8.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional distribution transformer capacity installed
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="106750">
<comment><narrative>
This indicator will calculate the additional distribution transformer capacity installed under the project.
</narrative></comment>
</target>
<actual value="8.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of a technical assistance promoting productive use of electricity
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="200.00">
<comment><narrative>
The indicator will measure the number of people who took part in the business development program financed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of a technical assistance promoting productive use of electricity
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="200.00">
<comment><narrative>
The indicator will measure the number of people who took part in the business development program financed under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Distribution assets financed under the project are resilient to flooding
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="100.00">
<comment><narrative>
This indicator will verify if the design of constructed lines includes strengthening measures to increase resiliency to flooding
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Distribution assets financed under the project are resilient to flooding
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="100.00">
<comment><narrative>
This indicator will verify if the design of constructed lines includes strengthening measures to increase resiliency to flooding
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in technical positions at SENELEC
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="7.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="10.00">
<comment><narrative>
This indicator will measure the percentage of women that hold a technical position at Senelec.
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="1,580,000.00">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in technical positions at SENELEC
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="7.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="10.00">
<comment><narrative>
This indicator will measure the percentage of women that hold a technical position at Senelec.
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained in technical, planning, and management areas
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="250.00">
<comment><narrative>
This indicator will measure the number of sector staff benefiting from technical, planning, and management trainings under the project
</narrative></comment>
</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Distribution assets financed under the project are resilient to flooding
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="100.00">
<comment><narrative>
This indicator will verify if the design of constructed lines includes strengthening measures to increase resiliency to flooding
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in technical positions at SENELEC
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="7.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="10.00">
<comment><narrative>
This indicator will measure the percentage of women that hold a technical position at Senelec.
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consumer awareness campaign developed and implemented
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2022-12-25" />
<target value="Yes">
<comment><narrative>
This indicator will verify the realization of a consumer awareness campaign aiming to increase the awareness of citizens on (i) the SENELEC application process for requesting a connection to the grid, (ii) the benefits of the project offered to vulnerable househods and MSMEs (sub-component 2.1.) and (iii) the safe and efficient use of electricity
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="800.00">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="800.00">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="800.00">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="600">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="140">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="600">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="600">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Least cost geospatial electrification plan developed and adopted by the Universal Access Program Steering Committee
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2022-12-25" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a Least cost geospatial electrification plan, as the core document to update and implement the Universal Access Program
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="1,580,000.00">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="1,580,000.00">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="1,580,000.00">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="1954000">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="1954000">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="1954000">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="1954000">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a lifeline connection policy for vulnerable households
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will verify the adoption of a lifeline connection policy
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NEW: Commercialization Agreements concluded (Number)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-06-15" />
<target value="1">
<comment><narrative>
Covering production from GTA Phase 2, Yakaar Teranga and Sangomar Phase 2.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NEW: Offshore development Concepts validated
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-06-15" />
<target value="1">
<comment><narrative>
Covering the continuation of GTA Phase 2 and Sangomar Phase 2 as well as the new development of Yakaar Teranga.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vulnerable households connected to the grid under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="40,000.00">
<comment><narrative>
The indicator will measure the number of vulnerable people integrated in the National Registry (Registre National Unique -RNU) provided with access to electricity under the project by household connections.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Approval of farm-out and farm-in agreement
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="1">
<comment><narrative>
To conclude the change of operatorship from BP (previous operator) to the new investor/operator.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2029-06-15" />
<target value="1,954,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Offshore development Concepts validated
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2029-06-15" />
<target value="1">
<comment><narrative>
Covering the continuation of GTA Phase 2 and Sangomar Phase 2 as well as the new development of Yakaar Teranga.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vulnerable households connected to the grid under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2027-06-25" />
<target value="40,000.00">
<comment><narrative>
The indicator will measure the number of vulnerable people integrated in the National Registry (Registre National Unique -RNU) provided with access to electricity under the project by household connections.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gas utilization study concluded
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="YES">
<comment><narrative>
&quot;City of Energies&quot; pre-feasibility study to assess the potential for a gas, gas-to-power and alternative energy and industrial hub.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
NEW: Gas utilization study concluded
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-06-15" />
<target value="YES">
<comment><narrative>
&quot;City of Energies&quot; pre-feasibility study to assess the potential for a gas, gas-to-power and alternative energy and industrial hub.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lines constructed, reinforced or rehabilitated under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="6,557.00">
<comment><narrative>
This indicator will measure the length of total lines constructed or rehabilitated under the project.
</narrative></comment>
</target>
<actual value="175">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="800.00">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="800.00">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="800.00">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="600">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="140">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="600">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public institutions provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="600">
<comment><narrative>
This indicator will measure the number of public institutions (clinics, and/or schools, and/or administrative centers) provided with new or improved electricity service under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2029-06-15" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro, small and medium-sized enterprises provided with new or improved electricity services
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="700.00">
<comment><narrative>
This indicator will measure the number of small and medium enterprises provided with new or improved electricity services under the project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="1,580,000.00">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="1,580,000.00">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-31" />
<period-end iso-date="2027-06-29" />
<target value="1,580,000.00">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="1954000">
<comment><narrative>
The indicator will measure the number of people provided with access to electricity under the project by household connections. Construction work is currently in progress on all the lots as of Q4 2025, with the first connections anticipated by Q2 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consumer awareness campaign developed and implemented
</narrative></title>
<baseline year="2021" iso-date="2021-08-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-27" />
<period-end iso-date="2022-12-25" />
<target value="Yes">
<comment><narrative>
This indicator will verify the realization of a consumer awareness campaign aiming to increase the awareness of citizens on (i) the SENELEC application process for requesting a connection to the grid, (ii) the benefits of the project offered to vulnerable househods and MSMEs (sub-component 2.1.) and (iii) the safe and efficient use of electricity
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-15" />
<period-end iso-date="2028-12-15" />
<target value="243000">
<comment><narrative>
This indicator will measure the number of households connected to the grid under the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P109986</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Water and Sanitation Millennium Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the proposed project is to increase access to sustainable water and sanitation services in selected rural and urban areas.  This will contribute to the achievement of the water and sanitation MDGs.  The proposed project will achieve its objective by (i) facilitating access to services through programs for improving and extending water production and distribution systems and urban sanitation networks, constructing social water and sanitation household connections, public standpipes and on-site sanitation facilities, and (ii) consolidating the achievements of the urban water reform, supporting the rural water subsector reform and strengthening capacities to deliver and manage water and sanitation services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Water and Sanitation Millennium Project for Senegal is to increase access to sustainable water and sanitation services in selected rural and urban areas. There are five components to the project. The first component of the project is rural water supply. The main objective of this component is to ensure and improve sustainable and satisfactory access to drinking water of the population of the Senegal River Basin (regions of Saint-Louis and Matam and the district of Bakel). The second component of the project is urban water supply. The main objective of this component is to increase the connection rate to water services in urban areas. The third component of the project is rural sanitation. The main objective of the component is to increase the access rate to adequate on-site sanitation of the rural populations in the regions of Saint-Louis and Matam and the district of Bakel. The fourth component of the project is urban sanitation. The main objective of the component is to increase access to sewerage and condominial networks in peri-urban areas of Dakar by completing works contemplated under the Long Term Water Sector Project. The fifth component of the project is institutional strengthening and capacity building. The main objective of this component is to consolidate the achievements and pursue actions already engaged within the framework of the sectoral reforms to improve performances and ensure the effectiveness and efficiency of investments.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SN–P0002109"><narrative>PEPAM: Programme Eau Potable et Assainissement pour le Millenaire</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SN-COA-0002110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-11-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-02-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Matar Fall</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002244990" />
            <name><narrative>Region de Tambacounda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.91667 -13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002246451" />
            <name><narrative>Region de Saint-Louis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.33333 -15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002248753" />
            <name><narrative>Region de Matam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.16667 -13.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002250804" />
            <name><narrative>Region de Kaolack</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14 -16</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002251084" />
            <name><narrative>Joal-Fadiout</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.16667 -16.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.444059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002254443" />
            <name><narrative>Bakel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.23612 -12.23961</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595778" />
            <name><narrative>Guediawaye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.77446 -17.402121</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="12261" percentage="20" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="20" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="20" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="20" xml:lang="en"/><sector vocabulary="1" code="14032" percentage="20" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="32.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="56.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="70" xml:lang="en"><narrative>Rural Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">458333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">458333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">458333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">458333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">704727.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">704727.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">704727.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">735818.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">735818.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">735818.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">704727.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">704727.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">704727.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">735818.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">735818.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">735818.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">704727.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">704727.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">704727.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">704727.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">735818.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">735818.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">735818.19</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">458333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">458333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">458333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">458333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">704727.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">704727.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">704727.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">735818.18</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">735818.18</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">735818.19</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">704727.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">704727.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">704727.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">704727.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">735818.18</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">735818.18</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">735818.19</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">3397694.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">3397694.24</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">55000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-375892</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">225066</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">2780189</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">71846</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">709799</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">3590763</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">1511851</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">1723133</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">495185</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">2009842</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">1171301</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">1795738</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">2840191</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">1713535</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">539780</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">2684706</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">700298</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">677983</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">1099704</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">1562709</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">869171</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">2770588</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">1850249</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">2444520</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">1348586</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">3043355</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2338358</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">2022075</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">3313785</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">510354</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">1132128</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">1604248</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">492374</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-41106</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-13596</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-17884</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-35844</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-55809</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-72108</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-105956</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-141054</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-153982</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-154126</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-187107</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-176790</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-177599</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-172633</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-180537</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-183920</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-179426</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-175778</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-174621</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-176807</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-178443</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-172981</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-180992</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-155944</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-166316</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-157465</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-327</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-143908</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-169833</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-157233</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-155172</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-155680</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-153673</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-467599</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-480655</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-484672</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-483830</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-467996</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-437049</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-451679</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-447431</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-451801</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-457807</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-459659</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-465636</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2002</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-463543</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SN-COA-2110"><narrative>Programme Eau Potable et Assainissement pour le Millenaire (PEPAM)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P109986"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P109986?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P109986"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="19100.00">

</target>
<actual value="20600.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new household sewerage connections that are resulting from the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="7900.00">

</target>
<actual value="6598.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new household sewerage connections that are resulting from the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="7900.00">

</target>
<actual value="8226.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of other water service providers that the project is supporting
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative>Number of ASUFORs established</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="127.00">

</target>
<actual value="138.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Designation of a private maintenance operator for the Central Zone
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="In progress">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Idenfication of rehabilitation needs of the boreholes to be transferred to a private maintenance operator
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of the access rate to sanitation services in Dakar
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="79.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="83.00">

</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People with access to piped water supply in the project areas (rural areas)
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="73.00">
<comment><narrative>
Indicator moved from project outcome level to intermediate outcome level.
</narrative></comment>
</target>
<actual value="75.20">
<comment><narrative>
Unchanged; data updated every year after end of December
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of other water service providers that the project is supporting
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="127.00">

</target>
<actual value="140.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Idenfication of rehabilitation needs of the boreholes to be transferred to a private maintenance operator
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of the access rate to sanitation services in Dakar
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="79.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="83.00">
<comment><narrative>
Indicator moved from project outcome level to intermediate outcome level.
</narrative></comment>
</target>
<actual value="83.00">
<comment><narrative>
Unchanged; data updated every year after end of dcember
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Idenfication of alternative water resources for Dakar and the Petite Cote by 2012
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="Started"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional number of children in the project rural areas having access to adequate sanitation facilities in their schools
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="7000.00">

</target>
<actual value="7200.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Updating of business plan and drafting of contractual documents
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A new institutional framework that maintains the PPP option for the urban water and sanitation subsector is defined
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="Started"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new household sewerage connections that are resulting from the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="7900.00">

</target>
<actual value="8226.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="191000.00">

</target>
<actual value="206160.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="19100.00">

</target>
<actual value="20600.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Designation of a private maintenance operator for the Central Zone
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="In progress">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Idenfication of alternative water resources for Dakar and the Petite Cote by 2012
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="Started"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Updating of business plan and drafting of contractual documents
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory of rural motorized boreholes
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="Started"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Designation of a private maintenance operator for the Central Zone
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="In progress">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="191000.00">

</target>
<actual value="206160.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory of rural motorized boreholes
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="Started"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Idenfication of rehabilitation needs of the boreholes to be transferred to a private maintenance operator
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved latrines constructed under the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="17500.00">

</target>
<actual value="19370.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="130000.00">

</target>
<actual value="172370.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A new institutional framework that maintains the PPP option for the urban water and sanitation subsector is defined
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="Started"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="130000.00">

</target>
<actual value="172370.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="191000.00">
<comment><narrative>
Core indicator moved from intermediate outcome level to project outcome level.
</narrative></comment>
</target>
<actual value="206160.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional number of children in the project rural areas having access to adequate sanitation facilities in their schools
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="7000.00">
<comment><narrative>
Indicator moved from intermediate outcome level to project outcome level.
</narrative></comment>
</target>
<actual value="4800.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of the access rate to sanitation services in Dakar
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="79.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="83.00">

</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People with access to piped water supply in the project areas (rural areas)
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="73.00">

</target>
<actual value="75.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People with access to sanitation services in the area of intervention (rural areas)
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="27.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="38.50">

</target>
<actual value="38.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People with access to sanitation services in the area of intervention (rural areas)
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="27.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="38.50">

</target>
<actual value="38.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A new institutional framework that maintains the PPP option for the urban water and sanitation subsector is defined
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="Started"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="19100.00">

</target>
<actual value="20600.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Idenfication of alternative water resources for Dakar and the Petite Cote by 2012
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="Started"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People with access to piped water supply in the project areas (rural areas)
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="73.00">

</target>
<actual value="75.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of other water service providers that the project is supporting
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="127.00">

</target>
<actual value="140.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="130000.00">
<comment><narrative>
Core indicator moved from intermediate outcome level to project outcome level.
</narrative></comment>
</target>
<actual value="87971.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of availability of rural water supply facilities in the Northern Zone (rural areas)
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="83.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="87.50">

</target>
<actual value="97.12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of availability of rural water supply facilities in the Northern Zone (rural areas)
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="83.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="87.50">
<comment><narrative>
Indicator moved from project outcome level to intermediate outcome level.
</narrative></comment>
</target>
<actual value="97.12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People with access to sanitation services in the area of intervention (rural areas)
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="27.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="38.50">
<comment><narrative>
Indicator moved from project outcome level to intermediate outcome level.
</narrative></comment>
</target>
<actual value="38.70">
<comment><narrative>
Unchanged; data updated every year after December
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved latrines constructed under the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="17500.00">
<comment><narrative>
Core indicator was not initially included in the PAD. It is therefore being added to capture the number of improved latrinesconstructed under the project.
</narrative></comment>
</target>
<actual value="16657.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of availability of rural water supply facilities in the Northern Zone (rural areas)
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="83.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="87.50">

</target>
<actual value="97.12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory of rural motorized boreholes
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="Started"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Updating of business plan and drafting of contractual documents
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="Completed">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional number of children in the project rural areas having access to adequate sanitation facilities in their schools
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="7000.00">

</target>
<actual value="6100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved latrines constructed under the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-25" />
<period-end iso-date="2015-06-30" />
<target value="17500.00">

</target>
<actual value="18176.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T10:13:00" hierarchy="1"><iati-identifier>44000-P073477</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SN - Electricity Sector Efficiency Enhancement - Phase 1, APL-1</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objectives of the project are to help the Borrower to: (a) assist in maintaining and increasing the electricitysupply and the reliability and cost-effectiveness of electricity services; and (b) enhance the performance of key institutions ofthe energy sector. The Project includes two main parts: Part A focuses on strengthening SENELEC#s power generation through theinvolvement of the private sector and rehabilitating its transmission and distribution systems.  It also supports the governmentand SENELEC in the development of a master plan for electricity generation, transmission and distribution investments. Part Bsupports the government's efforts to strengthen sector institutions, implement public/private partnership arrangements for SENELEC,and monitor and evaluate project implementation.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Senegal Electricity Sector Efficiency Enhancement Project aims to: (1) maintain and increase the electricity supply and the reliability of the services; (2) reduce the costs of the electricity services; and (3) enhance the performance of key energy sector institutions.  The Project includes two components: Part A focuses on priority activities that will allow the commission for Senegal's National Power Utility (SENELEC) new generation facilities through an independent power producer; rehabilitate critical sections of the transmission and distribution systems; and reduce costs. It also supports the government and SENELEC in preparing the next phase of investment in the energy sector.  Part B would provide financial resources to support the government's efforts to strengthen the institutions; implement public/private partnership arrangements for SENELEC; and for communication and monitoring and evaluation of project implementation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2002-04-03"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2005-05-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Stephan Claude Frederic Garnier</narrative></person-name><telephone>+1-202-473-1000</telephone><email>sgarnier@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="SN" percentage="100"><narrative xml:lang="en">SENEGAL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2253354" />
                <name><narrative>Dakar</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.6937 -17.444059</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23310" percentage="50" xml:lang="en"/><sector vocabulary="1" code="23630" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="92.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="17" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="17" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="17" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="17" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="17" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">10288383.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">10288383.70</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P073477"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P073477?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P073477"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the variable cost of energy generated and purchased by SENELEC by 7% by 2007 (based on the 2004 petroleum products price levels).
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="No baseline"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2009-12-31" />
<target value="To be determined">

</target>
<actual value="Cost of energy generated increased in 2006 as expensive units were leased (contrat AGREKKO) or run by SENELEC to meet demand. This Agrekko contract stopped in 2007.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Award of contracts and completion of works relating to the transmission and distribution networks
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="No contract awarded"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2010-06-30" />
<target value="Rehabilitation completed by June 2010">

</target>
<actual value="Procurement under process for Generation rehabilitation. (Cap de Biches steam generation plant)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity consumption increased from 1,538 GWH in 2004 to 1,875 GWH in 2008.
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="1,538 GWh electricity consumption"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2008-12-31" />
<target value="1,875 GWh electricity consumption">

</target>
<actual value="2005 sales: 1,710 GWh; increase of 11% from 2004. 2006 sales 1741 GWh; increase of 2%. Sales in 2007: 1925 Gwh i.e +8.%; Sales estimates for 2008 : 2,069 GWh">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beginning of construction by selected Sponsors and commercial commissioning of the Kounoune I IPP.
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="Kounoune I generating capacity not available."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2007-12-31" />
<target value="67.5 MW additional generating capacity available">

</target>
<actual value="Plant construction was completed by end 2006; Plant fully commisioned by end 2007.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Monitoring and Evaluation (M&amp;E) system for the energy sector set-up
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="No M&amp;E system for the energy sector in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2010-12-31" />
<target value="Monitoring and Evaluation (M&amp;E) system for the energy sector set-up">

</target>
<actual value="Significant progress in setting-up an M&amp;E have been made in the last 6 months. It is expected that a state-of-the art M&amp;E will be set-up as part of improving SENELEC's governance by Dec 2008.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Implementation of the public/private partnership arrangements decided by GOS for SENELEC.
</narrative></title>
<baseline year="2005" iso-date="2005-06-30" value="No PPP arrangements exist."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-06-30" />
<period-end iso-date="2007-12-31" />
<target value="PPP arrangements implemented.">

</target>
<actual value="Kounoune I IPP completed.  IDA and IFC have initiated work with SENELEC on a new 70 MW IPP at Tobene under similar arrangements as for Kounoune I. On going process.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Undelivered energy reduced from 14 GWh in 2004 to 8 GWh in 2007
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="Undelivered energy 14 GWh"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2009-12-31" />
<target value="Undelivered energy under 8 GWh">

</target>
<actual value="Undelivered energy increased in 2006 to 87 GWh  because of financial problems tand delays in commissioning the Kounoune I IPP. In 2007 and 2008 due to Senelec's financial problems, undelivered energy">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Monitoring and Evaluation (M&amp;E) system for the energy sector set-up
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="No M&amp;E system for the energy sector in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2007-12-31" />
<target value="Monitoring and Evaluation (M&amp;E) system for the energy sector set-up">

</target>
<actual value="Significant progress in setting-up an M&amp;E have been made in the last 6 months. It is expected that a state-of-the art M&amp;E will be set-up as part of improving SENELEC's governance by Dec 2008.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beginning of construction by selected Sponsors and commercial commissioning of the Kounoune I IPP.
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="Kounoune I generating capacity not available."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2007-12-31" />
<target value="67.5 MW additional generating capacity available">

</target>
<actual value="Plant construction was completed by end 2006; Plant fully commisioned by end 2007.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Undelivered energy reduced from 14 GWh in 2004 to 8 GWh in 2007
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="Undelivered energy 14 GWh"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2010-12-31" />
<target value="Undelivered energy under 8 GWh.
Expected to be reached in 2010">

</target>
<actual value="Undelivered energy increased in the last years and reach a peak in 2008 at 105 GWh due to SENELEC's financial problems">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparation of Phase II investment plans.
</narrative></title>
<baseline year="2005" iso-date="2005-06-30" value="No plans developed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-06-30" />
<period-end iso-date="2007-12-31" />
<target value="Phase II investment plans agreed; financing lined up.">

</target>
<actual value="No second phase planned.
Replaced by the DPC">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completion of Communication Plan. Compiling/Setting up of Monitoring and Evaluation Data Base
</narrative></title>
<baseline year="2005" iso-date="2005-06-30" value="No communication plan in place.  
No M&amp;E database."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-06-30" />
<period-end iso-date="2009-06-30" />
<target value="Communication Plan implemented.
M&amp;E database operational.">

</target>
<actual value="Strategy under preparation. Communication plan closely managed with the Minister of Energy.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Implementation of the action plan for the public/private partnership arrangements selected by GOS.
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="Action Plan not yet under implementation."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2009-12-31" />
<target value="Action plan fully implemented.">

</target>
<actual value="The Government has confirmed its choice in term of reform and PPP in October 2007. PPP expected to be in place by end 2009. Task Force always in place and operational with WB participation">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Award of contracts and completion of works relating to the transmission and distribution networks
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="No contract awarded"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2009-12-31" />
<target value="Rehabilitation completed by december 2009">

</target>
<actual value="Procurement under process for Generation rehabilitation. (Cap de Biches steam generation plant)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Implementation of the action plan for the public/private partnership arrangements selected by GOS.
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="Action Plan not yet under implementation."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2010-12-31" />
<target value="Action plan fully implemented.">

</target>
<actual value="The Government has confirmed its choice in term of reform and PPP in October 2007. PPP expected to be in place by end 2009. Task Force always in place and operational with WB participation">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adoption of a training program for the public energy sector staff.
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="No training program in place."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2007-12-31" />
<target value="Adoption of a training program for the public energy sector staff.">

</target>
<actual value="Staff from the Ministry of Energy, the Rural Electrification Agency (ASER) and from the unit in charge of biomass management have been trained.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completion of Communication Plan. Compiling/Setting up of Monitoring and Evaluation Data Base
</narrative></title>
<baseline year="2005" iso-date="2005-06-30" value="No communication plan in place.  
No M&amp;E database."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-06-30" />
<period-end iso-date="2007-12-31" />
<target value="Communication Plan implemented.
M&amp;E database operational.">

</target>
<actual value="Strategy under preparation. Communication plan closely managed with the Minister of Energy.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in technical and non-technical transmission and distribution losses (T/D) as a % of net generation from 17.5% in 2004 to 15.5% in 2007.
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="Decrease in technical and non-technical transmission and distribution losses (T/D) as a % of net generation - 17.5%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2009-12-31" />
<target value="Decrease in technical and non-technical transmission and distribution losses (T/D) as a % of net generation reduced to 15.5%">

</target>
<actual value="SENELEC technical and non technical losses have increased to about 22,5% in September 2008 as investments have not been carried out and due to huge shortages.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the variable cost of energy generated and purchased by SENELEC by 7% by 2007 (based on the 2004 petroleum products price levels).
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="No baseline"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2010-12-31" />
<target value="Reduction by 7% by 2008.
Target reached in 2008.">

</target>
<actual value="Cost of energy generated increased in 2006 as expensive units were leased (contrat AGREKKO). This Agrekko contract stopped in 2007. With 3 new generation facilities, target has been met in 2008.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New electricity tariff mechanism set up
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="Existing tariff setting mechanism needs adjustments."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2010-12-31" />
<target value="A new tariff adjustment mechanism will be designed and should be enacted by January 2010 for a period of 5 years.">

</target>
<actual value="New electricity tariffs' structure have and new adjustment formula have been prepared by CRSE. Tariff increase of 17% took place on August 1st 2008. Tariff decrease of 12% on January 2009.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity consumption increased from 1,538 GWH in 2004 to 1,875 GWH in 2008.
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="1,538 GWh electricity consumption"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2010-12-31" />
<target value="1,875 GWh electricity consumption by end 2008
The target has been reached.">

</target>
<actual value="2005 sales: 1710 GWh increase of 11%. 
2006 sales 1741 GWh; increase of 2%. 
2007: 1786 Gwh; +2.3.%; 
2008 : 1868 GWh; +4.6%
2009 estimates : 1997GWh +7%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparation of Phase II investment plans.
</narrative></title>
<baseline year="2005" iso-date="2005-06-30" value="No plans developed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-06-30" />
<period-end iso-date="2007-12-31" />
<target value="Phase II investment plans agreed; financing lined up.">

</target>
<actual value="No second phase planned.
Replaced by the DPC">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New generation facility of 67.5 MW commissioned in 2006 (the Kounoune Project)
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="No plant"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2007-12-31" />
<target value="Facility commissioned">

</target>
<actual value="The 67.5 MW Kounoune I IPP plant is completed. As of end January 2008, 9 of the 9 units are producing.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adoption of a training program for the public energy sector staff.
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="No training program in place."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2010-12-31" />
<target value="Adoption of a yearly training program for the public energy sector staff.">

</target>
<actual value="Staff from the Ministry of Energy, the Rural Electrification Agency (ASER) and from the unit in charge of biomass management have been trained.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in technical and non-technical transmission and distribution losses (T/D) as a % of net generation from 17.5% in 2004 to 15.5% in 2007.
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="Decrease in technical and non-technical transmission and distribution losses (T/D) as a % of net generation - 17.5%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2010-12-31" />
<target value="Decrease in technical and non-technical transmission and distribution losses (T/D) as a % of net generation reduced to 15.5%. 
Should be difficult to reach.">

</target>
<actual value="SENELEC technical and non technical losses have increased to about 22,4% in 2008 as investments have not been carried out and due to huge shortages.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Award of master plans studies for generation, transmission and distribution.  Selection of advisors for Tobene 70MW IPP.
</narrative></title>
<baseline year="2005" iso-date="2005-06-30" value="No updated Master Plans. Advisors selected to review bid documentation."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-06-30" />
<period-end iso-date="2007-12-31" />
<target value="Two master plans should be completed during the second part of 2007.">

</target>
<actual value="Contracts signed for 1) generation-transmission master plan, and 2) distribution master plan. 
Master plans completed by June 2009">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New electricity tariff mechanism set up
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="Existing tariff setting mechanism needs adjustments."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2005-12-30" />
<target value="New tariff adjustment mechanism enacted.">

</target>
<actual value="New electricity tariffs' structure have and new adjustment formula have been prepared by CRSE. Tariff increase of 17% took place on August 1st 2008.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Implementation of the public/private partnership arrangements decided by GOS for SENELEC.
</narrative></title>
<baseline year="2005" iso-date="2005-06-30" value="No PPP arrangements exist."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-06-30" />
<period-end iso-date="2010-12-31" />
<target value="PPP arrangements implemented.">

</target>
<actual value="Kounoune I IPP completed.  
New coal IPP under development (commissioning expected by end 2011)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Award of master plans studies for generation, transmission and distribution.
</narrative></title>
<baseline year="2005" iso-date="2005-06-30" value="No updated Master Plans. Advisors selected to review bid documentation."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-06-30" />
<period-end iso-date="2009-10-01" />
<target value="Two master plans should be completed during the second part of 2009.">

</target>
<actual value="Contracts signed for 1) generation-transmission master plan, and 2) distribution master plan. 
Master plans completed by September 2009">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New generation facility of 67.5 MW commissioned in 2006 (the Kounoune Project)
</narrative></title>
<baseline year="2004" iso-date="2004-12-31" value="No plant"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-31" />
<period-end iso-date="2007-12-31" />
<target value="Facility commissioned">

</target>
<actual value="The 67.5 MW Kounoune I IPP plant is completed. As of end January 2008, 9 of the 9 units are producing.">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>