<iati-activities version="2.03" generated-datetime="2026-09-30T10:55:35"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P130592</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Pacific Regional Connectivity Program 2:FSM Connectivity Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective of the Project is to reduce the cost and increase the availability of ICT services needed to supportsocial and economic development in the Recipient's territory.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Government of the Federated States of Micronesia (FSM) and the Republic of Palau (Palau) are partnering with the World Bank under the Palau-FSM Connectivity Project (P130592) and the Technical Assistance (TA) Project (P132686).  The two governments have requested the Bank's support in reforming and investing in improved access to Information and Communications Technology (ICT).  The Palau-FSM Connectivity Project, funded by the International Development Association (IDA), comprises the first component of the support program.  It is focused on reducing the cost and increasing the availability of international bandwidth for FSM through catalytic public investments in telecommunications infrastructure.  The Technical Assistance Project, which is financed by the Australian Government under the Pacific Region Infrastructure Facility (PRIF) Trust fund, comprises the second component of the program.  The TA grant, signed in September 2013, will provide advisory support and capacity-building needed to support sector reform and liberalization in FSM and Palau.  Overall, both projects are expected to increase the availability of ICT infrastructure and enable the more widespread application of ICT services towards improvements in economic and social development in these countries.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0009167"><narrative>Federated States of Micronesia</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0009167"><narrative>Federated States of Micronesia</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-0009168"><narrative>Department of Transport, Communication and Infrastructure</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2013-03-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-12-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Toni Kristian Eliasz</narrative></person-name><telephone>+1-202-473-1000</telephone><email>teliasz@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004043988" />
            <name><narrative>Guam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.47861 144.81834</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082282" />
            <name><narrative>State of Chuuk</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.454 151.805</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081324" />
            <name><narrative>Tonachau</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.45679 151.84957</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081175" />
            <name><narrative>State of Yap</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.538 138.097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081114" />
            <name><narrative>Weno Town</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.45154 151.8468</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001559582" />
            <name><narrative>Republic of Palau</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.503 134.621</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007648112" />
            <name><narrative>Colonia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.51638 138.12167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082036" />
            <name><narrative>State of Kosrae</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.325 162.981</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081550" />
            <name><narrative>State of Pohnpei</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.964 158.2056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="22040" percentage="97" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="98.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="3" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="32" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="32" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">2416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">2416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">2416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">796849.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">796849.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">796849.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">47500000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">16200000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="1992-11-30"/><value value-date="1992-11-30">130016</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 1992</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="1992-12-31"/><value value-date="1992-12-31">17730</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 1992</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="1993-01-31"/><value value-date="1993-01-31">16294</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 1993</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="1993-05-31"/><value value-date="1993-05-31">40024</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 1993</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">32598</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">5250000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">75749</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">102707</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">2919000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">108637</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">377635</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">59784</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">39412</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">12556800</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">5726165</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">1585461</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">2340987</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">243798</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">4126985</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">2061869</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">986652</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">637830</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">245306</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">647523</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">331419</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">234899</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">182091</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">97272</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">1835928</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">845997</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">280997</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">863661</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">853514</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">111524</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">196926</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">74097</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">96815</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">255433</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">154708</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">154708</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">243965</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">322515</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">1250000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">359137</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">1554287</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">300000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">1246498</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">1553341</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">150000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">360968</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">56812</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">606877</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">1757682</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-9168"><narrative>Department of Transport, Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9169"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-9170"><narrative>Federated States of Micronesia Telecommunications Cable Corporation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P130592"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P130592?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P130592"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to Internet Services (number of subscribers per 100 people)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="50.00">

</target>
<actual value="39.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="0">
<comment><narrative>
Project does not fund direct end-user connections
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="0">
<comment><narrative>
Project does not fund direct end-user connections
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="1,5000">

</target>
<actual value="14,359">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="1,5000">

</target>
<actual value="1,4250">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="3,5000">

</target>
<actual value="31,173">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="3,5000">

</target>
<actual value="31,173">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Internet bandwidth available (Mbps)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="38.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="400,000.00">
<comment><narrative>
Measure of the transport capacity which has been lit up on the submarine cable plus an estimate for Kosrae satellite capacity comprised: 100,000 Yap based on 1 wavelength, 100,000 Chuuk based on 1 wavelength, 110,000 Pohnpei based on1 wavelength of new system + 1 of old system (FSMTC), 2 Gbps Kosrae based on new Starlink Gateway.
</narrative></comment>
</target>
<actual value="312,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Internet bandwidth available (Mbps)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="38.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="400,000.00">
<comment><narrative>
Measure of the transport capacity which has been lit up on the submarine cable plus an estimate for Kosrae satellite capacity comprised: 100,000 Yap based on 1 wavelength, 100,000 Chuuk based on 1 wavelength, 110,000 Pohnpei based on1 wavelength of new system + 1 of old system (FSMTC), 2 Gbps Kosrae based on new Starlink Gateway.
</narrative></comment>
</target>
<actual value="312,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Impact on Telecom sector of World Bank Technical Assistance (composite score: 1- low impact to 5-high impact)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2022-11-30" />
<target value="5.00">
<comment><narrative>
The World Bank Technical Assistance has enabled the FSM has developed a sophisticated telecommunications market with functioning regulator. Competition (or credible threat of competition) has driven investment in infrastructure which has benefited consumers. The regulator has licensed the new entry of players like Kacific, Starlink and iBoom.
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Impact on Telecom sector of World Bank Technical Assistance (composite score: 1- low impact to 5-high impact)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2022-11-30" />
<target value="5.00">
<comment><narrative>
The World Bank Technical Assistance has enabled the FSM has developed a sophisticated telecommunications market with functioning regulator. Competition (or credible threat of competition) has driven investment in infrastructure which has benefited consumers. The regulator has licensed the new entry of players like Kacific, Starlink and iBoom.
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Retail Price of Internet Services (per Mbit/s per Month, in US$)
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="65.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2026-11-30" />
<target value="20.00">
<comment><narrative>
Starlink is minimum 45 Mbps for US$35 per month (45-130 Mbps speed). Referenced on 25 June 2025
</narrative></comment>
</target>
<actual value="0.77">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Retail Price of Internet Services (per Mbit/s per Month, in US$)
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="65.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2026-11-30" />
<target value="20.00">
<comment><narrative>
Calculated as US$35 per month divided by the minimum quoted speed of 45Mbps - - $0.77777 per Mbps per month.
Starlink is minimum 45 Mbps for US$35 per month (45-130 Mbps speed). Referenced on 25 June 2025
</narrative></comment>
</target>
<actual value="0.77">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to Internet Services (number of subscribers per 100 people)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="50.00">

</target>
<actual value="39.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to Internet Services (number of subscribers per 100 people)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="50.00">

</target>
<actual value="39.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Wholesale International Internet bandwidth price
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="1,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="20.00">
<comment><narrative>
$9.38Mbps/month (including satellite components) based on costs for OAE/Hantru cable/satellite divided by total estimated amount of traffic current at ~30 Gbps. Note that this update is based on capacity upgrades allowing for additional traffic on the same assume cost base.
</narrative></comment>
</target>
<actual value="9.38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Wholesale International Internet bandwidth price
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="1,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="20.00">
<comment><narrative>
$9.38Mbps/month (including satellite components) based on costs for OAE/Hantru cable/satellite divided by total estimated amount of traffic current at ~30 Gbps. Note that this update is based on capacity upgrades allowing for additional traffic on the same assume cost base.
</narrative></comment>
</target>
<actual value="9.38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="57,500.00">
<comment><narrative>
Population minus 5 years old and under.
</narrative></comment>
</target>
<actual value="101,531.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="57,500.00">
<comment><narrative>
Population minus 5 years old and under.
</narrative></comment>
</target>
<actual value="101,531.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to telephone services (mobile phones per 100 people)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="50.00">

</target>
<actual value="32.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to telephone services (mobile phones per 100 people)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="50.00">

</target>
<actual value="32.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to telephone services (mobile phones per 100 people)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="50.00">

</target>
<actual value="32.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="1,5000">

</target>
<actual value="14,359">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Impact on Telecom sector of World Bank Technical Assistance (composite score: 1- low impact to 5-high impact)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2022-11-30" />
<target value="5.00">
<comment><narrative>
The World Bank Technical Assistance has enabled the FSM has developed a sophisticated telecommunications market with functioning regulator. Competition (or credible threat of competition) has driven investment in infrastructure which has benefited consumers. The regulator has licensed the new entry of players like Kacific, Starlink and iBoom.
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Wholesale International Internet bandwidth price
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="1,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="20.00">
<comment><narrative>
$9.38Mbps/month (including satellite components) based on costs for OAE/Hantru cable/satellite divided by total estimated amount of traffic current at ~30 Gbps. Note that this update is based on capacity upgrades allowing for additional traffic on the same assume cost base.
</narrative></comment>
</target>
<actual value="9.38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="3,5000">

</target>
<actual value="31,173">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="0">
<comment><narrative>
Project does not fund direct end-user connections
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
EMC establishment
</narrative></title>
<baseline year="2017" iso-date="2017-03-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-20" />
<period-end iso-date="2019-08-30" />
<target value="Yes">
<comment><narrative>
The C&amp;MA has been signed by the parties establishing the EMC consortium.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to telephone services (mobile phones per 100 people)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="50.00">

</target>
<actual value="32.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulatory capacity strengthened
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2022-11-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Internet bandwidth available (Mbps)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="38.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="400,000.00">
<comment><narrative>
Measure of the transport capacity which has been lit up on the submarine cable plus an estimate for Kosrae satellite capacity comprised: 100,000 Yap based on 1 wavelength, 100,000 Chuuk based on 1 wavelength, 110,000 Pohnpei based on1 wavelength of new system + 1 of old system (FSMTC), 2 Gbps Kosrae based on new Starlink Gateway.
</narrative></comment>
</target>
<actual value="312,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to Internet Services (number of subscribers per 100 people)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="50.00">

</target>
<actual value="39.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="3,5000">

</target>
<actual value="31,173">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Internet bandwidth available (Mbps)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="38.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="400,000.00">
<comment><narrative>
Measure of the transport capacity which has been lit up on the submarine cable plus an estimate for Kosrae satellite capacity comprised: 100,000 Yap based on 1 wavelength, 100,000 Chuuk based on 1 wavelength, 110,000 Pohnpei based on1 wavelength of new system + 1 of old system (FSMTC), 2 Gbps Kosrae based on new Starlink Gateway.
</narrative></comment>
</target>
<actual value="312,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="57,500.00">
<comment><narrative>
Population minus 5 years old and under.
</narrative></comment>
</target>
<actual value="101,531.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="57,500.00">
<comment><narrative>
Population minus 5 years old and under.
</narrative></comment>
</target>
<actual value="101,531.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Retail Price of Internet Services (per Mbit/s per Month, in US$)
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="65.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2026-11-30" />
<target value="20.00">
<comment><narrative>
Calculated as US$35 per month divided by the minimum quoted speed of 45Mbps - - $0.77777 per Mbps per month.
Starlink is minimum 45 Mbps for US$35 per month (45-130 Mbps speed). Referenced on 25 June 2025
</narrative></comment>
</target>
<actual value="0.77">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Wholesale International Internet bandwidth price
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="1,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2026-11-30" />
<target value="20.00">
<comment><narrative>
$9.38Mbps/month (including satellite components) based on costs for OAE/Hantru cable/satellite divided by total estimated amount of traffic current at ~30 Gbps. Note that this update is based on capacity upgrades allowing for additional traffic on the same assume cost base.
</narrative></comment>
</target>
<actual value="9.38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of fiber optic cable access (km)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2022-11-30" />
<target value="1,950.00">

</target>
<actual value="1950">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulatory capacity strengthened
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2022-11-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
EMC establishment
</narrative></title>
<baseline year="2017" iso-date="2017-03-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-20" />
<period-end iso-date="2019-08-30" />
<target value="Yes">
<comment><narrative>
The C&amp;MA has been signed by the parties establishing the EMC consortium.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="1,5000">

</target>
<actual value="1,4250">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2014" iso-date="2014-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-15" />
<period-end iso-date="2026-03-15" />
<target value="0">
<comment><narrative>
Project does not fund direct end-user connections
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of fiber optic cable access (km)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2022-11-30" />
<target value="1,950.00">

</target>
<actual value="1950">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Impact on Telecom sector of World Bank Technical Assistance (composite score: 1- low impact to 5-high impact)
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2022-11-30" />
<target value="5.00">
<comment><narrative>
The World Bank Technical Assistance has enabled the FSM has developed a sophisticated telecommunications market with functioning regulator. Competition (or credible threat of competition) has driven investment in infrastructure which has benefited consumers. The regulator has licensed the new entry of players like Kacific, Starlink and iBoom.
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Retail Price of Internet Services (per Mbit/s per Month, in US$)
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="65.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2026-11-30" />
<target value="20.00">
<comment><narrative>
Starlink is minimum 45 Mbps for US$35 per month (45-130 Mbps speed). Referenced on 25 June 2025
</narrative></comment>
</target>
<actual value="0.77">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P170718</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Digital Federated States of Micronesia Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To expand access to the internet, promote private sector investment in digital services, and establish the critical foundations for digital government services and the digital economy in the Recipient's territory]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Digital Federated States of Micronesia Project for Micronesia is to expand access to the internet, promote private sector investment in digital services, and establish the critical foundations for digital government services and the digital economy in the Recipient's territory. The Project has four components. 1. National Digital Connectivity Infrastructure component will support the development of climate and disaster resilient national digital connectivity infrastructure. The activities are designed to maximize benefits for public institutions, private sector businesses and to leverage the private sector to address bottlenecks within different parts of the digital connectivity value chain which have the largest impact on costs, competitiveness and reliability of internet connectivity, including in remote underserved areas and on outer islands. 2. Digital Government Platform component will support a program of activities designed to develop the Recipient's National and State governments digital capabilities. It will finance a range of interventions and investments beginning with the development and implementation of a nationwide Digital Government Strategic Framework (DGSF). 3. Enabling Environment for Digital Government and Digital Economy component will support the carrying out a program of activities designed to strengthen the Recipient's enabling environment for digital government and the digital economy. It will also provide ongoing support to traditional regulatory priorities for the telecommunications sector, particularly to promote investment, technological innovation and evolution, and the long-term interests of users of digital services. 4. Project Management component will support (a) the Project Implementation Unit (PIU) on management and implementation of the Project, including financing of training and operating costs and (b) the Central Implementation Unit (CIU) with regard to preparatory and implementation activities related to the Project, as well as other projects financed by Bank, including financing of training and operating costs.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0041142"><narrative>Federated States of Micronesia</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0041142"><narrative>Federated States of Micronesia</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-0041143"><narrative>FSM Telecommunications Cable Corporation</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2020-03-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-03-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Toni Kristian Eliasz</narrative></person-name><telephone>+1-202-473-1000</telephone><email>teliasz@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>













<recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001558583" />
            <name><narrative>Yap Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.537 138.097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081155" />
            <name><narrative>Kosrae Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.325 162.982</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081309" />
            <name><narrative>Chuuk Islands</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.454 151.806</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081551" />
            <name><narrative>Pohnpei Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.89132 158.2299</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="22040" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="20.0000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="49.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000434" percentage="42" xml:lang="en"><narrative>Civil Registration and Identification</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="42" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="42" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000434" percentage="42" xml:lang="en"><narrative>Civil Registration and Identification</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="30" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000262" percentage="30" xml:lang="en"><narrative>ICT Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="15" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000434" percentage="42" xml:lang="en"><narrative>Civil Registration and Identification</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="42" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="69" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="100" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="100" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="42" xml:lang="en"><narrative>Public Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">15000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">15000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">15000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">15000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">83333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">208333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">61666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">61666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">61666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">61666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">61666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">61666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">61666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">61666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">61666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">61666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">61666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">61666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">3478305.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">3478305.26</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">30800000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">18400000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">178218</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">86244</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">101361</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">89438</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">54115</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">77184</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">90242</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">222582</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">1023085</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">314928</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">344158</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">1245282</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">1009726</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">1355555</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">1838427</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">1939229</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">2583434</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">1820628</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">1206394</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">1668472</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1761169</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">1925180</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">1171623</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">1558337</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">893927</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">1762757</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-41143"><narrative>FSM Telecommunications Cable Corporation</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41144"><narrative>Department of Transportation Communication and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41145"><narrative>Telecommunication Regulation Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41146"><narrative>Department of Finance and Administration</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-41147"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170718"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P170718?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170718"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulatory framework for digital services adopted
</narrative></title>
<baseline year="2019" iso-date="2019-11-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-29" />
<period-end iso-date="2027-03-11" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2019" iso-date="2019-11-25" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-25" />
<period-end iso-date="2027-03-10" />
<target value="10,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
'Amount of Private Capital Enabled
</narrative></title>
<baseline year="2020" iso-date="2020-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-14" />
<period-end iso-date="2027-03-14" />
<target value="5000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people reached through digital literacy and entrepreneurship programs (disaggregated by gender)
</narrative></title>
<baseline year="2019" iso-date="2019-11-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-23" />
<period-end iso-date="2027-03-05" />
<target value="5,000.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of fixed broadband retail providers in FSM
</narrative></title>
<baseline year="2019" iso-date="2019-11-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-30" />
<period-end iso-date="2027-03-10" />
<target value="4">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Speed (Kbps) of entry level fixed broadband service
</narrative></title>
<baseline year="2020" iso-date="2020-02-28" value="512.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-28" />
<period-end iso-date="2027-03-05" />
<target value="100,000">
<comment><narrative>
Starlink Residential Lite advertised speeds between 50-100Mbps
</narrative></comment>
</target>
<actual value="50,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2019" iso-date="2019-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-29" />
<period-end iso-date="2027-03-10" />
<target value="5,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2019" iso-date="2019-11-25" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-25" />
<period-end iso-date="2027-03-10" />
<target value="3,5000">

</target>
<actual value="31,173">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to the Internet
</narrative></title>
<baseline year="2020" iso-date="2020-03-01" value="35000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-01" />
<period-end iso-date="2027-03-11" />
<target value="60000">
<comment><narrative>
Increase in satellite users was less than the decreased in fixed-wired users, hence overall decrease
</narrative></comment>
</target>
<actual value="45,423">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Expanded access to internet services on outer islands (percentage of outer islands with internet access)
</narrative></title>
<baseline year="2019" iso-date="2019-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-26" />
<period-end iso-date="2027-03-11" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New digital services hosted on private sector operated green data centers.
</narrative></title>
<baseline year="2020" iso-date="2020-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-12" />
<period-end iso-date="2027-03-12" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Passage of harmful digital communications bill
</narrative></title>
<baseline year="2019" iso-date="2019-11-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-12" />
<period-end iso-date="2027-03-12" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Premises with a fiber connection
</narrative></title>
<baseline year="2020" iso-date="2020-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-25" />
<period-end iso-date="2027-03-05" />
<target value="25.00">
<comment><narrative>
4,111 connected premises / 10,014 homes
</narrative></comment>
</target>
<actual value="41.05">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost of entry level fixed broadband service
</narrative></title>
<baseline year="2020" iso-date="2020-02-25" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-25" />
<period-end iso-date="2027-03-05" />
<target value="35">
<comment><narrative>
-Starlink Residential Lite $35/month
-If just measuring fiber - no change, FSMTC Kaboom Bronze = $49/month
</narrative></comment>
</target>
<actual value="35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital services implemented by government
</narrative></title>
<baseline year="2019" iso-date="2019-11-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-24" />
<period-end iso-date="2027-03-05" />
<target value="6">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital government strategy developed
</narrative></title>
<baseline year="2019" iso-date="2019-11-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-24" />
<period-end iso-date="2027-03-05" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Availability of fiber services in the deployment area (homes passed)
</narrative></title>
<baseline year="2019" iso-date="2019-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-26" />
<period-end iso-date="2027-03-05" />
<target value="80.00">

</target>
<actual value="55.62">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances responded and/or resolved within the stipulated service standards
</narrative></title>
<baseline year="2019" iso-date="2019-11-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-21" />
<period-end iso-date="2027-03-05" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of Greenhouse Gas (GHG) emissions achieved under cloud-first policy
</narrative></title>
<baseline year="2020" iso-date="2020-03-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-05" />
<period-end iso-date="2027-03-05" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Government's Cyber Security Program developed
</narrative></title>
<baseline year="2019" iso-date="2019-11-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-23" />
<period-end iso-date="2027-03-05" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2019" iso-date="2019-11-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-24" />
<period-end iso-date="2027-03-10" />
<target value="1,5000">
<comment><narrative>
Slight decrease in overall number of internet users
</narrative></comment>
</target>
<actual value="1,4250">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mobile broadband penetration
</narrative></title>
<baseline year="2020" iso-date="2020-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-27" />
<period-end iso-date="2027-03-05" />
<target value="40.00">
<comment><narrative>
--Updated number is assuming definition of mobile broadband = at least 4G.
--If defining mobile broadband as 3G + 4G, then result is 21.9%
--Results are % of population. FSMTC has updated their reporting methods and started reporting higher mobile and 4G use than before. The Nov-24 update had around 3,500 4G mobile users, the latest data has 19,500 4G users.
</narrative></comment>
</target>
<actual value="18">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital government strategy adopted by National government
</narrative></title>
<baseline year="2019" iso-date="2019-11-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-29" />
<period-end iso-date="2027-03-11" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project beneficiaries reporting satisfaction with improved internet services
</narrative></title>
<baseline year="2020" iso-date="2020-03-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-21" />
<period-end iso-date="2027-03-05" />
<target value="75">
<comment><narrative>
May 2023 TRA online survey. Upcoming survey planned in early 2026.
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of mobile service providers in FSM
</narrative></title>
<baseline year="2020" iso-date="2020-02-28" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-28" />
<period-end iso-date="2027-03-10" />
<target value="2">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2019" iso-date="2019-11-25" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-25" />
<period-end iso-date="2027-03-10" />
<target value="10,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2019" iso-date="2019-11-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-24" />
<period-end iso-date="2027-03-10" />
<target value="1,5000">
<comment><narrative>
Slight decrease in overall number of internet users
</narrative></comment>
</target>
<actual value="1,4250">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2019" iso-date="2019-11-25" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-25" />
<period-end iso-date="2027-03-10" />
<target value="3,5000">

</target>
<actual value="31,173">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2019" iso-date="2019-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-29" />
<period-end iso-date="2027-03-10" />
<target value="5,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New digital services hosted on private sector operated green data centers.
</narrative></title>
<baseline year="2020" iso-date="2020-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-12" />
<period-end iso-date="2027-03-12" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
'Amount of Private Capital Enabled
</narrative></title>
<baseline year="2020" iso-date="2020-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-14" />
<period-end iso-date="2027-03-14" />
<target value="5000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of fixed broadband retail providers in FSM
</narrative></title>
<baseline year="2019" iso-date="2019-11-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-30" />
<period-end iso-date="2027-03-10" />
<target value="4">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital government strategy adopted by National government
</narrative></title>
<baseline year="2019" iso-date="2019-11-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-29" />
<period-end iso-date="2027-03-11" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of mobile service providers in FSM
</narrative></title>
<baseline year="2020" iso-date="2020-02-28" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-28" />
<period-end iso-date="2027-03-10" />
<target value="2">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulatory framework for digital services adopted
</narrative></title>
<baseline year="2019" iso-date="2019-11-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-29" />
<period-end iso-date="2027-03-11" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Expanded access to internet services on outer islands (percentage of outer islands with internet access)
</narrative></title>
<baseline year="2019" iso-date="2019-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-26" />
<period-end iso-date="2027-03-11" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to the Internet
</narrative></title>
<baseline year="2020" iso-date="2020-03-01" value="35000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-01" />
<period-end iso-date="2027-03-11" />
<target value="60000">
<comment><narrative>
Increase in satellite users was less than the decreased in fixed-wired users, hence overall decrease
</narrative></comment>
</target>
<actual value="45,423">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P172225</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Federated States of Micronesia Prioritized Road Investment and Management Enhancements Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve the climate resilience of FSM's road network.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of Prioritized Road Investment and Management Enhancements Project for Federated States of Micronesia (FSM) is to improve the climate resilience of FSM's road network. This project has three components. 1) The first component, Spatial and Sector Planning Tools, has the following sub-components: (i) Vulnerability Assessment (VA) and Climate Resilient Road Strategy (CRRS); and (ii) Climate-informed road asset management system. 2) The second component, Climate Resilient Infrastructure Solutions, has the following sub-components: (i) Urgent priority works; and (ii) Works informed by the VA and CRRS. 3) The third component, Strengthening the Enabling Environment, has the following sub-components: (i)  Institutional and Governance Review; (ii) Project Management; (iii) Road Safety Program; (iv) Capacity Building Initiatives; (v) Driver Licensing Pilot; and (vi) Emerging Priority Issues.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0043277"><narrative>Department of Finance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-0043276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2020-12-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-05-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-08-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-08-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Naoki Kakuta</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nkakuta@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001558583" />
            <name><narrative>Yap Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.537 138.097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001558881" />
            <name><narrative>Yap International Airport</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.49995 138.08595</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001558887" />
            <name><narrative>Ngoof</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.47738 138.07035</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001559008" />
            <name><narrative>Maap Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.598 138.1665</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001559098" />
            <name><narrative>Gagil-Tamil Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.54362 138.16936</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081114" />
            <name><narrative>Weno</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.44648 151.84135</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081155" />
            <name><narrative>Kosrae Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.325 162.982</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081169" />
            <name><narrative>Kosrae International Airport</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.35698 162.95839</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081175" />
            <name><narrative>State of Yap</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.538 138.097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081240" />
            <name><narrative>Weno Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.44 151.882</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081342" />
            <name><narrative>Tofol</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.32479 163.00781</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081550" />
            <name><narrative>State of Pohnpei</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.964 158.2056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081551" />
            <name><narrative>Pohnpei Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.89132 158.2299</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081918" />
            <name><narrative>Federated States of Micronesia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.924 158.162</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081939" />
            <name><narrative>Mechitiw</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.46139 151.85868</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081986" />
            <name><narrative>Palikir - National Government Center</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.92477 158.16109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082036" />
            <name><narrative>State of Kosrae</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.325 162.981</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082097" />
            <name><narrative>Pohnpei International Airport</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9851 158.20899</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082282" />
            <name><narrative>State of Chuuk</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.44077 151.85431</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004037178" />
            <name><narrative>Magachgil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.44533 138.0641</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004037183" />
            <name><narrative>Malaay</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.46222 138.05781</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004038461" />
            <name><narrative>Iras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.45843 151.84354</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004042091" />
            <name><narrative>Tamwarohi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.93243 158.13558</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004042681" />
            <name><narrative>Mwan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.43675 151.83902</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004042683" />
            <name><narrative>Nepukos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.44369 151.84316</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004043034" />
            <name><narrative>Kolonia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.964 158.2062</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004044250" />
            <name><narrative>Penia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.45335 151.87708</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004044441" />
            <name><narrative>Tunuk</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.45783 151.86429</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007626946" />
            <name><narrative>Kanifay Municipality</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.46735 138.05935</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007626948" />
            <name><narrative>Maap Municipality</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.58975 138.17119</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007626950" />
            <name><narrative>Rull Municipality</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.50773 138.1154</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007648112" />
            <name><narrative>Colonia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.51638 138.12167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007648249" />
            <name><narrative>Lelu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.33359 163.02248</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007648250" />
            <name><narrative>Tafunsak</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.3671 162.98532</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007648440" />
            <name><narrative>Malem</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.28599 163.02609</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007648441" />
            <name><narrative>Utwe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.27486 162.97656</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21011" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="89.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="99" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="15" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="99" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000726" percentage="15" xml:lang="en"><narrative>Geospatial Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="96" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="15" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">83333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">658333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">658333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">658333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">658333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">658333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">658333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">658333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">658333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">658333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">658333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">658333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">658333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">983333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">983333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">983333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">983333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">983333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">983333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">983333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">983333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">983333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">983333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">983333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">983333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">8333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">140000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">140000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">140000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">30909021.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">30909021.45</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">40000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">57008</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">64946</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">214276</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">131087</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">140029</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">46119</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">165005</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">155505</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">206365</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">28390</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">199348</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">287024</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">382546</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">832143</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">328936</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">563856</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">247774</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">328936</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">471684</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">393486</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">220482</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">498805</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">47193</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">529763</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">550273</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-43276"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172225"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P172225?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172225"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="75.00">
<comment><narrative>
While the GRM has been set up and has an assigned person responsible to handle any complaints, none have been received thus far during works design and E&amp;S instrument preparation. The CIU Safeguards Specialist is responsible for receiving the complaints, logging them, referring them to the PIU to be resolved and monitoring their resolution.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?Number of direct and indirect beneficiaries having enhanced access to road transport services
</narrative></title>
<baseline year="2020" iso-date="2020-10-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-30" />
<period-end iso-date="2028-06-30" />
<target value="63,120.00">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified planning tools being used to improve climate resilience of roads
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="2.00">
<comment><narrative>
The Vulnerability Assessment and the Road Asset Management System (RAMS) have been completed and are being used to inform the ongoing road selection by the government.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient design packages completed
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2026-06-30" />
<target value="2.00">
<comment><narrative>
The design packages for urgent priority works and VA-identified roads are ongoing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Vulnerability Assessment and Climate Resilient Road Strategy in use
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
The Vulnerability Assessment has been completed and is being used to inform the ongoing road selection by the Government
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgraded with climate resilience measures
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="7.30">
<comment><narrative>
No civil works have taken place at this time
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of new vegetated coastal scour protection
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="850.00">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road improved with spot slope stabilization
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="500.00">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road with improved drainage
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="3.90">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified planning tools being used to improve climate resilience of roads
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="2.00">
<comment><narrative>
The Vulnerability Assessment has been completed and is being used to inform the ongoing road selection by the Government. 

 The climate-informed Road Asset Management System (CiRAMS) and manuals have been completed, and training was delivered on December 2, 2025. The system is now ready to be used.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified planning tools being used to improve climate resilience of roads
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="2.00">
<comment><narrative>
The Vulnerability Assessment and the Road Asset Management System (RAMS) have been completed and are being used to inform the ongoing road selection by the government.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgraded with climate resilience measures
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="7.30">
<comment><narrative>
No civil works have taken place at this time
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgraded with climate resilience measures
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="7.30">
<comment><narrative>
No civil works have taken place at this time
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified enabling environment solutions implemented
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.00">
<comment><narrative>
This indicator takes stock of completed activities under Component 3, including but not necessarily limited to: 
1. Institutional and Governance Review 
2. PIU establishment
3. Road Safety Audit for Urgent Priority Works
4. Road Safety Audits for VA and CRRS 
5. Capacity Building Activity(ies) 
6. Beneficiary Survey

Based on future TA, this list may increase. 

Until now #1, #2 #3, #4 and #6 have been completed. Capacity Building is ongoing. The Institutional and Governance Review report highlighted key challenges in the FSM road sector and put forward recommendations to help the government develop a more sustainable, efficient, and effective road network. The findings and recommendations from the report are also being considered into other technical assistance, such as motorization management. Similarly, the Beneficiary Survey aimed at informing the Driver Licensing Pilot and design for the VA and CRRS works.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified enabling environment solutions implemented
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.00">
<comment><narrative>
This indicator takes stock of completed activities under Component 3, including: 
1. Institutional and Governance Review 
2. PIU establishment
3. Road Safety Audit for UPW
4. Road Safety Audits for VAIW  
5. Capacity Building Activity(ies) 
6. Beneficiary Survey

Items #1, #2 #3, #4 and #6 have been completed. Capacity Building is ongoing.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water crossings reconstructed or rehabilitated with climate resilience measures
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2026-06-30" />
<target value="5.00">
<comment><narrative>
No civil works have taken place at this time
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water crossings reconstructed or rehabilitated with climate resilience measures
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2026-06-30" />
<target value="5.00">
<comment><narrative>
No civil works have taken place at this time
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Vulnerability Assessment and Climate Resilient Road Strategy in use
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
The Vulnerability Assessment has been completed and is being used to inform the ongoing road selection by the Government
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access audits completed
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.00">
<comment><narrative>
This indicator measures whether baseline, design and post-construction access audits that have been conducted for UPW and VAIW roads. 

Baseline and design audits for UPW have been completed. Baseline and design audits for VAIW have also been completed.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified enabling environment solutions implemented
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.00">
<comment><narrative>
This indicator takes stock of completed activities under Component 3, including but not necessarily limited to: 
1. Institutional and Governance Review 
2. PIU establishment
3. Road Safety Audit for Urgent Priority Works
4. Road Safety Audits for VA and CRRS 
5. Capacity Building Activity(ies) 
6. Beneficiary Survey

Based on future TA, this list may increase. 

Until now #1, #2 #3, #4 and #6 have been completed. Capacity Building is ongoing. The Institutional and Governance Review report highlighted key challenges in the FSM road sector and put forward recommendations to help the government develop a more sustainable, efficient, and effective road network. The findings and recommendations from the report are also being considered into other technical assistance, such as motorization management. Similarly, the Beneficiary Survey aimed at informing the Driver Licensing Pilot and design for the VA and CRRS works.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?Number of direct and indirect beneficiaries having enhanced access to road transport services
</narrative></title>
<baseline year="2020" iso-date="2020-10-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-30" />
<period-end iso-date="2028-06-30" />
<target value="63,120.00">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of new vegetated coastal scour protection
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="850.00">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified planning tools being used to improve climate resilience of roads
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="2.00">
<comment><narrative>
The Vulnerability Assessment has been completed and is being used to inform the ongoing road selection by the Government. 

 The climate-informed Road Asset Management System (CiRAMS) and manuals have been completed, and training was delivered on December 2, 2025. The system is now ready to be used.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional and Governance Review completed
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
The final report has been received.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contractor staff trained on SEA and SH components of the Codes of Conduct
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="100.00">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgraded with climate resilience measures
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="7.30">
<comment><narrative>
No civil works have taken place at this time
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in the gap between percentage of men and women with driver licenses
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Baseline information is still being collected on drivers licenses in the four states to get a baseline as the work on this component is now beginning with the completion of the beneficiary survey. PIU is currently in the process of signing data sharing MoUs with all states to facilitate this process.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety audits completed
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.00">
<comment><narrative>
This indicator measures whether baseline, design and post-construction road safety audits that have been conducted for UPW and VAIW roads. 

Baseline and design audits for UPW have been completed. Baseline and design audits for VAIW have also been completed.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Government staff and local consultants who have achieved improvements in skills/knowledge as a result of capacity building programs compared to pre-training baseline
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="48.00">
<comment><narrative>
A total of 293 participants (of which 236 are female) have achieved improvements in skills/knowledge as a result of capacity building programs under PRIME. These consist of 55 participants for RAMS (of which 4 are female), and 238 participants for Gender Equity Empowerment (of which 232 are female) and reflect the total attendance recorded across the four states. The original target of 48 was established conservatively during preparation based on the anticipated scale and initial implementation assumptions. During implementation, the training outreach was expanded significantly to ensure broader participation across national and state agencies and maximize capacity building opportunities in the transport sector. This contributed to the higher number of participants achieved. In addition, the training conducted in Pohnpei coincided with the International Women's Day activities, which further increased participation and engagement in the Gender Equity Empowerment sessions.
</narrative></comment>
</target>
<actual value="293">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of coastal protection revetment constructed and/or replenished
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="850.00">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water crossings reconstructed or rehabilitated with climate resilience measures
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2026-06-30" />
<target value="5.00">
<comment><narrative>
No civil works have taken place at this time
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Hydraulic designs considering hydrology, catchment area and tidal flows completed, with appropriate climate change-informed design factors applied
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
The design packages for urgent priority works and VA-identified roads are ongoing
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="75.00">
<comment><narrative>
While the GRM has been set up and has an assigned person responsible to handle any complaints, none have been received thus far during works design and E&amp;S instrument preparation. The CIU Safeguards Specialist is responsible for receiving the complaints, logging them, referring them to the PIU to be resolved and monitoring their resolution.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of coastal protection revetment constructed and/or replenished
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="850.00">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road rehabilitated with pavement strengthening
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.50">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Hydraulic designs considering hydrology, catchment area and tidal flows completed, with appropriate climate change-informed design factors applied
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
The design packages for urgent priority works and VA-identified roads are ongoing
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road rehabilitated with pavement strengthening
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.50">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety audits completed
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.00">
<comment><narrative>
This indicator measures whether baseline, design and post construction safety audits have been conducted for UPW (3) and VA CRRS roads (3). 

Baseline and design stage access audits for the Urgent Priority Works have been completed.

Baseline access audits for VA CRRS roads has also been completed.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgraded using participatory design approaches
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.30">
<comment><narrative>
Consultations were undertaken with community members and landowners adjacent to the Urgent Priority Works during design and preparation of E&amp;S instruments.  Consultations with adjacent landowners for VAIW roads are underway and will be reported in the E&amp;S instruments.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient design packages completed
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2026-06-30" />
<target value="2.00">
<comment><narrative>
The design packages for urgent priority works and VA-identified roads are ongoing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgraded using participatory design approaches
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.30">
<comment><narrative>
Consultations were undertaken with community members and landowners adjacent to the Urgent Priority Works during design and preparation of E&amp;S instruments.  Consultations with adjacent landowners for CRRS roads are under way and will be reported in the E&amp;S instruments.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road asset management system that considers climate factors in use
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
The CiRAMS and manuals have been completed, and training was delivered on December 2, 2025. The system is now ready to be used.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contractor staff trained on SEA and SH components of the Codes of Conduct
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="100.00">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Government staff and local consultants who have achieved improvements in skills/knowledge as a result of capacity building programs compared to pre-training baseline
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="48.00">
<comment><narrative>
No additional training has been completed under PRIME between April and October 2025.
</narrative></comment>
</target>
<actual value="41.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in the gap between percentage of men and women employed in technical roles within DoTC&amp;I and State transport agencies
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="15.00">
<comment><narrative>
No updated data was available at the time of the mission
</narrative></comment>
</target>
<actual value="3.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road with improved drainage
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="3.90">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access audits completed
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.00">
<comment><narrative>
This indicator measures whether baseline, design and post construction access audits have been conducted for UPW (3) and VA CRRS roads (3). 

Currently only the baseline and design audits for UPW have been completed, which include recommendations for provisions for those with disabilities, especially access for wheelchair users.

The consultant for the audits of VA CRRS Roads has been identified and his contract is currently being processed
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in the gap between percentage of men and women with driver licenses
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Baseline information is still being collected on drivers licenses in the four states to get a baseline as the work on this component is beginning with the completion of the beneficiary survey. PIU is in the process of signing data sharing MOUs with all states to facilitate this process.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road improved with spot slope stabilization
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="500.00">
<comment><narrative>
No civil works have taken place
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified enabling environment solutions implemented
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="6.00">
<comment><narrative>
This indicator takes stock of completed activities under Component 3, including: 
1. Institutional and Governance Review 
2. PIU establishment
3. Road Safety Audit for UPW
4. Road Safety Audits for VAIW  
5. Capacity Building Activity(ies) 
6. Beneficiary Survey

Items #1, #2 #3, #4 and #6 have been completed. Capacity Building is ongoing.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road asset management system that considers climate factors in use
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
The Climate-Informed RAMS has been completed, with a National Deployment Workshop held in Pohnpei on November 14, 2025, followed by the installation of five RAMS servers at Federal and State Government level, and training to TDMU and State Governments in the operation and updating of the system from November 17 to 18, 2025, and acceptance of the following final set of deliverables: (i) Final Report, (ii) Network Summary Report 2025, (iii) Draft Five Year Plans 2026–2030 for Chuuk, Kosrae, Pohnpei, and Yap, and (iv) ten RAMS Manual. The system is being used.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in the gap between percentage of men and women employed in technical roles within DoTC&amp;I and State transport agencies
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="15.00">
<comment><narrative>
Baseline information is still being collected on drivers licenses in the four states to get a baseline as the work on this component is beginning with the completion of the beneficiary survey. PIU is in the process of signing data sharing MOUs with all states to facilitate this process.
</narrative></comment>
</target>
<actual value="3.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional and Governance Review completed
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
The final report has been received.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water crossings reconstructed or rehabilitated with climate resilience measures
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2026-06-30" />
<target value="5.00">
<comment><narrative>
No civil works have taken place at this time
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P181237</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Strengthening Public Financial Management II Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve government capacity to manage public resources efficiently and increase transparency and accountability of service delivery.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development of objective of the Second Strengthening Public Financial Management Project for Micronesia is to improve fiscal management practices and increase fiscal transparency at the national government level. The project comprises of four components. The first component improved fiscal management practices and controls will support the improvement of practices to carry out budgeting, financial reporting, internal audit and procurement within Department of Finance and Administration (DOFA). It consists of following sub-components: (i) strengthening budgeting and reporting practices; and (ii) strengthening procurement practices. The second component expanded core financial management information systems will support increased efficiency and automation of public finance processes through the expanded use of the financial management information system (FMIS) implemented under public financial management (PFM) I to additional government Departments and agencies. It consists of following sub-components: (i) continued rollout of core public finance system; and (ii) expand public finance systems. The third component, enhanced human resource capacity, communications, and change management aims to build on the initiatives to strengthen human resource capacity, foster communications and carry out change management established under PFM I by continuing competency development activities, engaging in continued internal and external communications, and carrying out in citizen engagement activities. It consists of following sub-components: (i) strengthen human resource capacity for public finance; and (ii) change management, communications and citizen engagement. The fourth component, project management objective is to support overall project management and coordination.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–00007122"><narrative>The Federated States of Micronesia</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–00007122"><narrative>The Federated States of Micronesia</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-00006467"><narrative>Department of Finance and Administration</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-03-05"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-03-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-03-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-03-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Patrick Piker Umah Tete</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pumahtete@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2081986" />
                <name><narrative>Palikir - National Government Center</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.92477 158.16109</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15126" percentage="55" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="29" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="100.000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">28571.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">28571.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">28571.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">28571.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">151021.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">151021.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">151021.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">151021.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">151021.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">151021.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">151021.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">151021.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">151021.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">151021.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">151021.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">151021.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">238333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">238333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">238333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">238333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">238333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">238333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">238333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">238333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">238333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">238333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">238333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">238333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">203750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">234666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">234666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">234666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">234666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">234666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">234666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">234666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">234666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">234666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">234666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">234666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">234666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">238895.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">238895.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">238895.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">238895.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">238895.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">238895.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">238895.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">238895.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">238895.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">238895.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">238895.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">238895.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">85714.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-29"/>
<value currency="USD" value-date="2030-03-29">12046531.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-29"/>
<value currency="USD" value-date="2030-03-29">12046531.47</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">13000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-6467"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">700000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-6467"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">116342</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-6467"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">137126</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-6467"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181237"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P181237?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181237"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-2 Number of key fiscal documents made publicly available by DOFA within the timeline specified in PEFA Indicator PI-9.1
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Three documents* used as criteria for PEFA Indicator PI-9.1 are made publicly available within the specified timeframes (one basic and two additional). Note: *The key fiscal documents are those from PEFA Indicator PI-9 that are fully within the control of DoFA.  These are: i) annual executive budget proposal documentation; ii) in-year budget execution reports; iii) annual budget execution reports; iv) prebudget statements; and v) summaries of the budget proposal (or citizens' budgets)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Four additional fiscal documents used as criteria for PI-9.1 made publicly available within the specified timeframes.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-1 Budget classification and documentation is consistent with criteria for a B score for PI-4 and PI-5 of the PEFA Framework
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Economic/functional classification used for budget formulation is not consistent with GFS/COFOG standards, and ii) budget documentation contains three elements (one basic and two additional) as set out in the criteria for PEFA Indicator PI-4."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Budget prepared consistent with criteria for a B score for PI-4 and PI-5 of the PEFA Framework.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-1 Budget classification and documentation is consistent with criteria for a B score for PI-4 and PI-5 of the PEFA Framework
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Economic/functional classification used for budget formulation is not consistent with GFS/COFOG standards, and ii) budget documentation contains three elements (one basic and two additional) as set out in the criteria for PEFA Indicator PI-4."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Budget prepared consistent with criteria for a B score for PI-4 and PI-5 of the PEFA Framework.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-2 Number of key fiscal documents made publicly available by DOFA within the timeline specified in PEFA Indicator PI-9.1
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Three documents* used as criteria for PEFA Indicator PI-9.1 are made publicly available within the specified timeframes (one basic and two additional). Note: *The key fiscal documents are those from PEFA Indicator PI-9 that are fully within the control of DoFA.  These are: i) annual executive budget proposal documentation; ii) in-year budget execution reports; iii) annual budget execution reports; iv) prebudget statements; and v) summaries of the budget proposal (or citizens' budgets)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Four additional fiscal documents used as criteria for PI-9.1 made publicly available within the specified timeframes.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-2 Number of key fiscal documents made publicly available by DOFA within the timeline specified in PEFA Indicator PI-9.1
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Three documents* used as criteria for PEFA Indicator PI-9.1 are made publicly available within the specified timeframes (one basic and two additional). Note: *The key fiscal documents are those from PEFA Indicator PI-9 that are fully within the control of DoFA.  These are: i) annual executive budget proposal documentation; ii) in-year budget execution reports; iii) annual budget execution reports; iv) prebudget statements; and v) summaries of the budget proposal (or citizens' budgets)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Four additional fiscal documents used as criteria for PI-9.1 made publicly available within the specified timeframes.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-7 Increased engagement with citizens on public finances and the role of DoFA
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="No reporting by DOFA summarizing feedback received from citizens (e.g., the main trends, key issues, main types of queries, etc.) and actions being taken based on the feedback received."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-03-09" />
<target value="Five annual reports published summarizing the citizen feedback received and the responses/actions taken.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-4 FMIS rolled out to sectoral Departments
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="FMIS rolled out in DOFA and State Finance Offices"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="At least 90% of national line Departments and targeted embassies and agencies using FMIS">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-4 FMIS rolled out to sectoral Departments
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="FMIS rolled out in DOFA and State Finance Offices"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="At least 90% of national line Departments and targeted embassies and agencies using FMIS">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR-5 Number of active users submitting tenders through the online tendering system
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2030-03-14" />
<target value="1,000">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR-8 Training partnerships for qualification courses in specialized areas. (Procurement, AT, IA, US GASB)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-1 Improved capacity of DoFA to prepare US GASB consolidated financial statements
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Preparation of Annual Financial Statements outsourced, new unified COA captures US GASB reporting requirements"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="US GASB consolidated financial statements prepared in-house with disclosures">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR-6 Number of individuals completing certifications in specialized technical areas and retained within GoFSM (US GASB, AT, Procurement, Internal Audit)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-2 Number of key fiscal documents made publicly available by DOFA within the timeline specified in PEFA Indicator PI-9.1
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Three documents* used as criteria for PEFA Indicator PI-9.1 are made publicly available within the specified timeframes (one basic and two additional). Note: *The key fiscal documents are those from PEFA Indicator PI-9 that are fully within the control of DoFA.  These are: i) annual executive budget proposal documentation; ii) in-year budget execution reports; iii) annual budget execution reports; iv) prebudget statements; and v) summaries of the budget proposal (or citizens' budgets)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Four additional fiscal documents used as criteria for PI-9.1 made publicly available within the specified timeframes.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR-8 Training partnerships for qualification courses in specialized areas. (Procurement, AT, IA, US GASB)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-1 Budget classification and documentation is consistent with criteria for a B score for PI-4 and PI-5 of the PEFA Framework
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Economic/functional classification used for budget formulation is not consistent with GFS/COFOG standards, and ii) budget documentation contains three elements (one basic and two additional) as set out in the criteria for PEFA Indicator PI-4."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Budget prepared consistent with criteria for a B score for PI-4 and PI-5 of the PEFA Framework.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-3 Internal Audit Unit Operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Internal compliance Unit operational."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Y4 target plus follow-up of previously issued audit findings.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-1 Improved capacity of DoFA to prepare US GASB consolidated financial statements
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Preparation of Annual Financial Statements outsourced, new unified COA captures US GASB reporting requirements"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="US GASB consolidated financial statements prepared in-house with disclosures">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-3 Internal Audit Unit Operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Internal compliance Unit operational."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Y4 target plus follow-up of previously issued audit findings.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-2 Improved Procurement Transparency
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Two elements used as a criteria for PEFA Dimension 24.3 are publicly available (Legal and regulatory framework for procurement and bidding opportunities)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Procurement information made publicly available consistent with criteria for a B score for PI-24.3 of the PEFA Framework (at least four elements made publicly available in a timely manner).">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-1 Budget classification and documentation is consistent with criteria for a B score for PI-4 and PI-5 of the PEFA Framework
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Economic/functional classification used for budget formulation is not consistent with GFS/COFOG standards, and ii) budget documentation contains three elements (one basic and two additional) as set out in the criteria for PEFA Indicator PI-4."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Budget prepared consistent with criteria for a B score for PI-4 and PI-5 of the PEFA Framework.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR-6 Number of individuals completing certifications in specialized technical areas and retained within GoFSM (US GASB, AT, Procurement, Internal Audit)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-7 Increased engagement with citizens on public finances and the role of DoFA
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="No reporting by DOFA summarizing feedback received from citizens (e.g., the main trends, key issues, main types of queries, etc.) and actions being taken based on the feedback received."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-03-09" />
<target value="Five annual reports published summarizing the citizen feedback received and the responses/actions taken.">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR-5 Number of active users submitting tenders through the online tendering system
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2030-03-14" />
<target value="1,000">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-2 Improved Procurement Transparency
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="Two elements used as a criteria for PEFA Dimension 24.3 are publicly available (Legal and regulatory framework for procurement and bidding opportunities)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="Procurement information made publicly available consistent with criteria for a B score for PI-24.3 of the PEFA Framework (at least four elements made publicly available in a timely manner).">

</target>
<actual value="Not yet due">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P177073</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Federated States of Micronesia Strategic Climate-Oriented Road Enhancements</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve the climate resilience of the Recipient's secondary road network, and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Strategic Climate-Oriented Road Enhancements Project for Federated States of Micronesia is to improve the climate resilience of the Recipient's secondary road network, and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it. This project has four components. The first component, Spatial and Sector Planning Tools, involves technical assistance (TA) to support FSM in the way that climate change is addressed in the road sector through analytical and sector planning tools that enable policymakers to make informed decisions based on the most accurate and up-to-date sector information available. The second component, Climate Resilient Infrastructure Solutions, involves feasibility studies, design, supervision and construction of identified priority strategic secondary road assets to improve their resilience to climate-related hazards and/or events. The third component, Strengthening the Enabling Environment, will help to strengthen coordination among relevant institutions, will look at ways in which road sector management can be improved, and will address any emerging priority issues that can help support the Government in addressing climate change risks. The fourth component, Contingent Emergency Response Component (CERC), is designed to provide swift response in an event of an Eligible Crisis or Emergency, by enabling GoFSM to request the World Bank to re-allocate project funds to support emergency response and reconstruction.
]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0049766"><narrative>Federated States of Micronesia</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-0049767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-05-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-03-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-08-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-08-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Naoki Kakuta</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nkakuta@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081175" />
            <name><narrative>State of Yap</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.538 138.097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081550" />
            <name><narrative>State of Pohnpei</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.964 158.2056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081918" />
            <name><narrative>Federated States of Micronesia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.425554 150.550812</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082036" />
            <name><narrative>State of Kosrae</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.325 162.981</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082282" />
            <name><narrative>State of Chuuk</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.44077 151.85431</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21011" percentage="95" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="5" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="5" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="5" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="5" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="94" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="99" xml:lang="en"><narrative>Road Safety</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">83333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">135000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">30975804.94</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">30975804.94</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">35250000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">41599</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">2031</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">4384</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">9510</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">360586</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">186371</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">525752</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">514514</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">213893</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">1663</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">232955</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">180937</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49767"><narrative>Department of Transportation, Communications &amp; Infrastructure</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177073"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P177073?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177073"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="75.00">
<comment><narrative>
While the GRM has been set up and has an assigned person responsible to handle any complaints, none have been received thus far during works design and E&amp;S instrument preparation. The CIU Safeguards Specialist is responsible for receiving the complaints, logging them, referring them to the PIU to be resolved and monitoring their resolution

Note: This citizen engagement indicator should be reassigned from Component 4 to Component 3 during future project restructuring.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient design packages completed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="1.00">
<comment><narrative>
The design packages are currently under finalization.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Crash database established and used to inform sector planning
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The Road Crash Database work has been completed.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct and indirect beneficiaries having enhanced access to road transport services
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="57,658.00">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population benefited from climate-resilient road improvements (work and/or technical assistance)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="55.00">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road rehabilitated with pavement strengthening
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="13.50">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Transport Sector Data Management Unit is staffed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The TDMU is staffed and operational. The TDMU staff has begun working on implementation activities. The contract with a new TDMU Manager was signed on March 9, 2026.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety audits completed (Number)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="2.00">
<comment><narrative>
The baseline RSAs for the VA/CRRS roads and East-West Pou Bay Road have been completed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of wage employees in project activities who are female
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="20.00">
<comment><narrative>
In 2020, female staff made up 16.7% of the PMU workforce, with 1 female and 5 male staff. By October 2025, this increased to 36.84%, with 7 female and 12 male staff
</narrative></comment>
</target>
<actual value="36.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgraded using participatory design approaches (Kilometers)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="8.80">
<comment><narrative>
Consultations with adjacent landowners for VAIW roads are underway and will be reported in the E&amp;S instruments.

Note: This citizen engagement indicator should be reassigned from Component 4 to Component 3 during future project restructuring.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Materials Testing Laboratory established and in use
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
This has been incorporated in the civil works packages which will be handed over to DoTC&amp;I at completion of the construction works (included in the BOQs).
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road improved with spot slope stabilization
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="135.00">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient design packages completed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="1.00">
<comment><narrative>
The design packages are currently ongoing.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contractor staff trained on SEA and SH components of the Codes of Conduct
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="100.00">
<comment><narrative>
No civil works have taken place, and contractors have not been mobilized.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enabling environment solutions identified and implemented for enhanced climate resilience
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="5.00">
<comment><narrative>
The PIU and the TDMU have been established. The other activities are currently being implemented.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Materials Testing Laboratory established and in use
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
This has been incorporated in the civil works packages which will be handed over to DoTC&amp;I at completion of the construction works (included in the BOQs).
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access audits completed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="2.00">
<comment><narrative>
The baseline RSAs for the VA/CRRS roads and East-West Pou Bay Road have been completed
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="13.50">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road with improved drainage
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="7.00">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Vulnerable strategic secondary roads made more resilient to climate events
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="40.00">
<comment><narrative>
No civil works have taken place. The VA/CRRS tool is being used to determine the roads that would qualify under this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of secondary road upgraded with climate resilience measures
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="13.50">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="13.50">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved planning process for transport network investment and maintenance toward climate resilience
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The Road Crash Database work is ongoing. In addition, this sub-component will support the software maintenance needs of the climate informed road asset management system, developed under PRIME.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved planning process for transport network investment and maintenance toward climate resilience
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The Climate-Informed Road Crash Database work has been completed, with training provided under the pilot.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of secondary road upgraded with climate resilience measures
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="13.50">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of secondary road upgraded with climate resilience measures
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="13.50">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Vulnerable strategic secondary roads made more resilient to climate events
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="40.00">
<comment><narrative>
No civil works have taken place. The VA/CRRS tool is being used to determine the roads that would qualify under this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Vulnerable strategic secondary roads made more resilient to climate events
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="40.00">
<comment><narrative>
No civil works have taken place. The VA/CRRS tool is being used to determine the roads that would qualify under this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enabling environment solutions identified and implemented for enhanced climate resilience
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="5.00">
<comment><narrative>
The PIU and the TDMU have been established. The other activities are currently being implemented.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enabling environment solutions identified and implemented for enhanced climate resilience
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="5.00">
<comment><narrative>
The PIU and the TDMU have been established. The other activities are currently being implemented.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population benefited from climate-resilient road improvements (work and/or technical assistance)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="55.00">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population benefited from climate-resilient road improvements (work and/or technical assistance)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="55.00">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a CERC manual
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The CERC operation manual was cleared by the World Bank on July 8, 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of wage employees in project activities who are female
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="20.00">
<comment><narrative>
In 2020, female staff made up 16.7% of the PMU workforce, with 1 female and 5 male staff. This has increased to 36.84%, with 7 female and 12 male staff.
</narrative></comment>
</target>
<actual value="36.84">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved planning process for transport network investment and maintenance toward climate resilience
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The Road Crash Database work is ongoing. In addition, this sub-component will support the software maintenance needs of the climate informed road asset management system, developed under PRIME.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road rehabilitated with pavement strengthening
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="13.50">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety audits completed (Number)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="2.00">
<comment><narrative>
The baseline RSAs for the VA/CRRS roads and East-West Pou Bay Road have been completed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road improved with spot slope stabilization
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="135.00">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of secondary road upgraded with climate resilience measures
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="13.50">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="75.00">
<comment><narrative>
While the GRM has been set up and has an assigned person responsible to handle any complaints, none have been received thus far during works design and E&amp;S instrument preparation. The CIU Safeguards Specialist is responsible for receiving the complaints, logging them, referring them to the PIU to be resolved and monitoring their resolution

Note: This citizen engagement indicator should be reassigned from Component 4 to Component 3 through a project restructuring.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road with improved drainage
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="7.00">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Motorization Management Policy Implementation Plan completed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The Motorization Management Improvement Roadmap (upstream work) is complete. The Sustainable End-of-life Vehicle Management (downstream work) is delayed, expected to be completed by the end of April 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enabling environment solutions identified and implemented for enhanced climate resilience
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="5.00">
<comment><narrative>
The PIU and the TDMU have been established. The other activities are currently being implemented.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgraded using participatory design approaches (Kilometers)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="8.80">
<comment><narrative>
Consultations with adjacent landowners for VA/CRRS roads are under way and will be reported in the E&amp;S instruments.

Note: This citizen engagement indicator should be reassigned from Component 4 to Component 3 during future project restructuring.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct and indirect beneficiaries having enhanced access to road transport services
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="57,658.00">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contractor staff trained on SEA and SH components of the Codes of Conduct
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="100.00">
<comment><narrative>
No civil works have taken place, and contractors have not been mobilized.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population benefited from climate-resilient road improvements (work and/or technical assistance)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="55.00">
<comment><narrative>
No civil works have taken place.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Transport Sector Data Management Unit is staffed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The TDMU is staffed and operational. The TDMU staff has begun working on implementation activities. Recruitment of a new TDMU Manager is still in progress.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a CERC manual
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The CERC operation manual was cleared by the World Bank on July 8, 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved planning process for transport network investment and maintenance toward climate resilience
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The Climate-Informed Road Crash Database work has been completed, with training provided under the pilot.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Crash database established and used to inform sector planning
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The Road Crash Database work is ongoing, with the PIU securing data-sharing MoUs with state governments, and system deployment is planned for February 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic 10-year plan for women in STEM established
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
This consultancy is at technical evaluation stage, but PIU proposed to drop this activity. Waiting for DoTC&amp;I's decision.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Motorization Management Policy Implementation Plan completed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The Motorization Management Improvement Roadmap (upstream work) is complete. The Sustainable End-of-life Vehicle Management (downstream work) is delayed, expected to be completed by the end of February 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic 10-year plan for women in STEM established
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="Yes">
<comment><narrative>
The STEM consultancy was cancelled after the third rebid and will not be relaunched. The procurement plan that reflected this received the World Bank's no objection on March 10, 2026. This indicator will be dropped through a project restructuring.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Vulnerable strategic secondary roads made more resilient to climate events
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="40.00">
<comment><narrative>
No civil works have taken place. The VA/CRRS tool is being used to determine the roads that would qualify under this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access audits completed
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-08-31" />
<target value="2.00">
<comment><narrative>
The baseline RSAs for the VA/CRRS roads and East-West Pou Bay Road have been completed
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P161969</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Project for Strengthening Public Financial Management</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the project is to improve tax administration and the completeness, reliability and timeliness of financial reports of the National and State Governments.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Strengthening Public Financial Management Project for Micronesia is to improve tax administration and the completeness, reliability and timeliness of financial reports of the National and State Governments. The project has 5 components. 1. Strengthening the public financial management environment component will strengthen the Public Financial Management (PFM) environment by ensuring that the legal and regulatory framework and the procedural guidance for business processes governing budget formulation, budget execution, and financial reporting for revenues and expenditures are internally consistent, aligned with the applicable accounting guidance, and streamlined for efficiency. The scope will include all five governments, each of which has its own set of regulations and procedures. 2. Financial management information system component will implement a new Financial Management Information System that will support effective management of public resources and improve financial reporting for management and accountability. 3. Revenue Management System (RMS) component will improve the efficiency and effectiveness of revenue management for the National Government of the Federated States of Micronesia (FSM). 4. Change management and human resource development component will successful implementation of the FMIS and the RMS with active stakeholder engagement and development of individual competencies and institutional capacity needed to sustain FMIS and RMS operations and related PFM functions. The project will support capacity building in the Department of Finance and Administration (DoFA) and other agencies with key roles in the PFM cycle such as the Office of the National Public Auditor. 5. Project management component will support overall project management and coordination.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0031384"><narrative>The Federated States of Micronesia</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0031384"><narrative>The Federated States of Micronesia</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-0031385"><narrative>Department of Finance and Administration</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-05-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-05-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-08-25"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-08-25"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Patrick Piker Umah Tete</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pumahtete@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081175" />
            <name><narrative>State of Yap</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.538 138.097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081550" />
            <name><narrative>State of Pohnpei</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.964 158.2056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081986" />
            <name><narrative>Palikir - National Government Center</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.92477 158.16109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082036" />
            <name><narrative>State of Kosrae</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.325 162.981</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082282" />
            <name><narrative>State of Chuuk</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.44077 151.85431</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15129" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="22" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="19" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="9" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="15.0000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="24.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="52.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="28" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="25" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="78" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="78" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="25" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="67" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="67" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="95" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="67" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="82" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="38" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">143333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">143333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">143333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">143333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">143333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">143333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">143333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">143333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">143333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">143333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">143333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">143333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">214583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">214583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">214583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">214583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">214583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">214583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">214583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">214583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">214583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">214583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">214583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">214583.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">234583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">234583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">234583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">234583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">234583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">234583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">234583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">234583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">234583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">234583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">234583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">234583.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">85833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">85833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">85833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">85833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">85833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">85833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">85833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">85833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">85833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">85833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">85833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">85833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">131672.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">493089.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">166952.36</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">218237.89</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">226549.23</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">239466.36</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">680253.92</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">218256.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">167805.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">118263.98</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">104497.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-08-25"/>
<value currency="USD" value-date="2025-08-25">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-08-25"/>
<value currency="USD" value-date="2025-08-25">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">11000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">5000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-2142284</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-335046</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">500000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">131673</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">493089</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">166952</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">218238</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">226549</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">239466</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">680254</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">218256</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">167806</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">118264</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">104498</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">167499</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">148794</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">142392</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">139571</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">496195</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">613389</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">204175</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">407900</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">402253</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">340070</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">802050</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">716774</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">431979</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">416432</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">328589</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">51074</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">47836</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">578083</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">1270748</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">92749</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">609616</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">838825</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">283590</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-45798</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-13485</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-31385"><narrative>Department of Finance and Administration</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P161969"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P161969?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P161969"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-6: External training program partnerships for PFM related certification and degree courses
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="No external training program partnerships in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="Four (4) external training program partnerships for certification and degree courses in PFM related disciplines">
<comment><narrative>
Target has been met.
Partnerships entered into with Alison, Career and Technical Education Center (CTEC), Charles Strurt and Cook Islands Tertiary Training Institute Partnership.
</narrative></comment>
</target>
<actual value="Achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-1: In-year budget reports prepared and published by National and all four State governments
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="In-year budget reports not prepared and not published"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="In-year budget reports prepared and cleared for publication by all five Govts meeting criteria for timing, accuracy, coverage and comparability to meet criteria of “B” score for PI-28 based on PEFA Framework">
<comment><narrative>
Not all States/national have prepared two consecutive quarterly in-year budget reports as yet. An assessment against the criteria for PEFA PI-28 (In-year budget reports) indicates that for 28.1 (Coverage and comparability) the C score is already met, for 28.3 (Accuracy) the B score is already met, and for 28.2 (timing ) the score is currently a C. Several states are still awaiting clearance for publication apart from Yap and National.
</narrative></comment>
</target>
<actual value="Yr 1 target achieved. Yr 3 –Yr 5 is partially achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-6: External training program partnerships for PFM related certification and degree courses
</narrative></title>
<baseline year="2018" iso-date="2018-06-28" value="No external training program partnerships in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-28" />
<period-end iso-date="2025-08-15" />
<target value="Four (4) external training program partnerships for certification and degree courses in PFM related disciplines">
<comment><narrative>
Target has been met.
Partnerships entered into with Alison, Career and Technical Education Center (CTEC), Charles Strurt and Cook Islands Tertiary Training Institute Partnership.
</narrative></comment>
</target>
<actual value="Achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-1: New chart of accounts for all govts for better management, financial and statistical reporting
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="&quot;C&quot; score in 2016 self-assessment. Functional classification lacking."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="“A” score criteria for PI-4 met">
<comment><narrative>
Year 1 and 2 targets met. Year 3 target missed. New CoA is ready for adaptation to new FMIS.
</narrative></comment>
</target>
<actual value="Year 1 and 2 targets met. Yr.5 not yet achieved,">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-5: Competency framework specifying minimum skillsets adopted and used for all PFM related jobs
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="No competencies defined for PFM related roles"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="Competency framework specifying minimum skillsets required adopted for PFM related jobs across National and State governments and used for recruitment and training to build gender-balanced workforce">
<comment><narrative>
Draft DoFA Competency Framework Policy mandates the use of the competency framework for recruitment and training. The policy doesn't apply to State level - therefore partially achieved.  Yr5: If policy is in place as per the above it would be used for recruitment and training for DoFA. Partially achieved as it won't be in place in the states.
</narrative></comment>
</target>
<actual value="Y1 and Yr3 target achieved. Yr. 2,4 and 5 have not yet achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-3: New FMIS used by all five govts for recording and reporting budget, revenue and expenditure
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="FundWare accounting system being phased out"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="New FMIS used for preparation of budget for FY2024 and recording of revenue and expenditure transactions by National and all State governments">
<comment><narrative>
Year 2-5 targets: Testing is ongoing, parallel processing planned, operational acceptance planned mid-August. Significant progress has been made towards the roll-out but these targets will not be achieved before project closure.
</narrative></comment>
</target>
<actual value="Yr.5: Not achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-3: Financial data integrity maintained to meet “B” score for PI-27
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="“B+” score for PI-27 in 2016 self-assessment"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="Criteria for &quot;B&quot; score for PI-27 fully met">
<comment><narrative>
New FMIS system has been procured and includes controls for data integrity, restricted access, recording and audit trail. Assessment against PEFA PI-28 (in-year budget reports) has been completed based on current processes in Fundware given that the new FMIS is not yet live. 27.1 (bank account reconciliation) is assessed as a B, 27.2 (suspense accounts) is N/A (since there are no suspense accounts), 27.3 (advance accounts) as a D and 27.4 (financial data integrity processes) as a B. Therefore year 2 and 4 targets will remain as partially achieved at project closure. The strengthening of travel advance reconciliations will carry forward to PFM II under support provided through Component 1.
</narrative></comment>
</target>
<actual value="Partially achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-8: Gender-sensitive communication conducted for the project for awareness and building ownership
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="No communication strategy; regular updates and information not released for government staff and citizens"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="DoFA website enhanced and regularly updated with information for government staff and citizens with functionality developed for capturing and summarizing feedback">
<comment><narrative>
Yr.3 and Yr.5 target achieved. Yr.1 not yet achieved. Yr2 and Yr.4 partially achieved. The website also includes functionality to capture feedback from citizens through two feedback pages (one for the the FMIS and one for the RMS), although these were not publicized so no feedback has been received.   Further work on two way citizen engagement will be carried forward to PFM II.
</narrative></comment>
</target>
<actual value="Yr.3 and Yr.5 target achieved. Yr.1 not yet achieved. Yr2 and Yr.4 partially achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-8: Gender-sensitive communication conducted for the project for awareness and building ownership
</narrative></title>
<baseline year="2018" iso-date="2018-06-28" value="No communication strategy; regular updates and information not released for government staff and citizens"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-28" />
<period-end iso-date="2025-08-15" />
<target value="DoFA website enhanced and regularly updated with information for government staff and citizens with functionality developed for capturing and summarizing feedback">
<comment><narrative>
Yr.3 and Yr.5 target achieved. Yr.1 not yet achieved. Yr2 and Yr.4 partially achieved. The website also includes functionality to capture feedback from citizens through two feedback pages (one for the the FMIS and one for the RMS), although these were not publicized so no feedback has been received.   Further work on two way citizen engagement will be carried forward to PFM II.
</narrative></comment>
</target>
<actual value="Yr.3 and Yr.5 target achieved. Yr.1 not yet achieved. Yr2 and Yr.4 partially achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-5: Competency framework specifying minimum skillsets adopted and used for all PFM related jobs
</narrative></title>
<baseline year="2018" iso-date="2018-06-28" value="No competencies defined for PFM related roles"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-28" />
<period-end iso-date="2025-08-15" />
<target value="Competency framework specifying minimum skillsets required adopted for PFM related jobs across National and State governments and used for recruitment and training to build gender-balanced workforce">
<comment><narrative>
Draft DoFA Competency Framework Policy mandates the use of the competency framework for recruitment and training. The policy doesn't apply to State level - therefore partially achieved.  Yr5: If policy is in place as per the above it would be used for recruitment and training for DoFA. Partially achieved as it won't be in place in the states.
</narrative></comment>
</target>
<actual value="Y1 and Yr3 target achieved. Yr. 2,4 and 5 have not yet achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-2: Revenue Management System installed and in use by CTA for improved revenue accounting
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="“C” score in 2016 self-assessment for PI-20.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="Criteria for “B” score of PI-20.3 met">
<comment><narrative>
Year 1 and 2 targets achieved. Year 3 target in process.&amp;nbsp;RMS contract was signed in September 2022 and completed inception report. The first-round testing was completed in February 2024. The second-round testing will be completed in June 2024 and requires close monitoring of implementation to avoid further delays.
</narrative></comment>
</target>
<actual value="Year 1 - 4 targets achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR-7: Number of staff completing external training programs in PFM related disciplines
</narrative></title>
<baseline year="2018" iso-date="2018-06-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-28" />
<period-end iso-date="2025-08-15" />
<target value="50.00">
<comment><narrative>
Year 1-3 targets achieved. 
Y4 target in process.
</narrative></comment>
</target>
<actual value="21.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-2: Procedures Manuals updated with detailed guidance for all five governments
</narrative></title>
<baseline year="2018" iso-date="2018-06-28" value="Operations Procedure not covering all required areas"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-28" />
<period-end iso-date="2025-08-15" />
<target value="Procedures Manuals in place with detailed guidance for budget formulation, accounting, internal controls, payroll, fixed assets, liabilities (including debt), cash management and financial reporting">
<comment><narrative>
An Accounting Manual was drafted for national government in 2024 but this is still pending and won't be finalized before project closure.  State Procedures Manuals have not been prepared and will not be completed before project closure.  FreeBalance is working on user guides currently and these are expected to be completed before project closure. Years 2-5 targets will not be achieved and these will be will be pushed forward to Component 1 work of PFM II.
</narrative></comment>
</target>
<actual value="Not yet">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-3: New FMIS used by all five govts for recording and reporting budget, revenue and expenditure
</narrative></title>
<baseline year="2018" iso-date="2018-06-28" value="FundWare accounting system being phased out"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-28" />
<period-end iso-date="2025-08-15" />
<target value="New FMIS used for preparation of budget for FY2024 and recording of revenue and expenditure transactions by National and all State governments">
<comment><narrative>
Year 2-5 targets: Testing is ongoing, parallel processing planned, operational acceptance planned mid-August. Significant progress has been made towards the roll-out but these targets will not be achieved before project closure.
</narrative></comment>
</target>
<actual value="Yr.5: Not achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-3: Financial data integrity maintained to meet “B” score for PI-27
</narrative></title>
<baseline year="2018" iso-date="2018-06-28" value="“B+” score for PI-27 in 2016 self-assessment"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-28" />
<period-end iso-date="2025-08-15" />
<target value="Criteria for &quot;B&quot; score for PI-27 fully met">
<comment><narrative>
New FMIS system has been procured and includes controls for data integrity, restricted access, recording and audit trail. Assessment against PEFA PI-28 (in-year budget reports) has been completed based on current processes in Fundware given that the new FMIS is not yet live. 27.1 (bank account reconciliation) is assessed as a B, 27.2 (suspense accounts) is N/A (since there are no suspense accounts), 27.3 (advance accounts) as a D and 27.4 (financial data integrity processes) as a B. Therefore year 2 and 4 targets will remain as partially achieved at project closure. The strengthening of travel advance reconciliations will carry forward to PFM II under support provided through Component 1.
</narrative></comment>
</target>
<actual value="Partially achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-1: In-year budget reports prepared and published by National and all four State governments
</narrative></title>
<baseline year="2018" iso-date="2018-06-14" value="In-year budget reports not prepared and not published"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-14" />
<period-end iso-date="2025-08-14" />
<target value="In-year budget reports prepared and cleared for publication by all five Govts meeting criteria for timing, accuracy, coverage and comparability to meet criteria of “B” score for PI-28 based on PEFA Framework.">
<comment><narrative>
Not all States/national have prepared two consecutive quarterly in-year budget reports as yet. An assessment against the criteria for PEFA PI-28 (In-year budget reports) indicates that for 28.1 (Coverage and comparability) the C score is already met, for 28.3 (Accuracy) the B score is already met, and for 28.2 (timing ) the score is currently a C. Several states are still awaiting clearance for publication apart from Yap and National.
</narrative></comment>
</target>
<actual value="Yr 1 target achieved. Yr 3 –Yr 5 is partially achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-1: In-year budget reports prepared and published by National and all four State governments
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="In-year budget reports not prepared and not published"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="In-year budget reports prepared and cleared for publication by all five Govts meeting criteria for timing, accuracy, coverage and comparability to meet criteria of “B” score for PI-28 based on PEFA Framework">
<comment><narrative>
Not all States/national have prepared two consecutive quarterly in-year budget reports as yet. An assessment against the criteria for PEFA PI-28 (In-year budget reports) indicates that for 28.1 (Coverage and comparability) the C score is already met, for 28.3 (Accuracy) the B score is already met, and for 28.2 (timing ) the score is currently a C. Several states are still awaiting clearance for publication apart from Yap and National.
</narrative></comment>
</target>
<actual value="Yr 1 target achieved. Yr 3 –Yr 5 is partially achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-2: Revenue Management System installed and in use by CTA for improved revenue accounting
</narrative></title>
<baseline year="2018" iso-date="2018-06-14" value="“C” score in 2016 self-assessment for PI-20.3 (revenue accounts reconciliation)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-14" />
<period-end iso-date="2025-08-14" />
<target value="Criteria for “B” score of PI-20.3 met">

</target>
<actual value="Year 1 - 4 targets achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-2: Revenue Management System installed and in use by CTA for improved revenue accounting
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="“C” score in 2016 self-assessment for PI-20.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="Criteria for “B” score of PI-20.3 met">
<comment><narrative>
Year 1 and 2 targets achieved. Year 3 target in process.&amp;nbsp;RMS contract was signed in September 2022 and completed inception report. The first-round testing was completed in February 2024. The second-round testing will be completed in June 2024 and requires close monitoring of implementation to avoid further delays.
</narrative></comment>
</target>
<actual value="Year 1 - 4 targets achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-3: New FMIS used by all five govts for recording and reporting budget, revenue and expenditure
</narrative></title>
<baseline year="2018" iso-date="2018-06-28" value="FundWare accounting system being phased out"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-28" />
<period-end iso-date="2025-08-15" />
<target value="New FMIS used for preparation of budget for FY2024 and recording of revenue and expenditure transactions by National and all State governments">
<comment><narrative>
Year 2-5 targets: Testing is ongoing, parallel processing planned, operational acceptance planned mid-August. Significant progress has been made towards the roll-out but these targets will not be achieved before project closure.
</narrative></comment>
</target>
<actual value="Yr.5: Not achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-3: New FMIS used by all five govts for recording and reporting budget, revenue and expenditure
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="FundWare accounting system being phased out"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="New FMIS used for preparation of budget for FY2024 and recording of revenue and expenditure transactions by National and all State governments">
<comment><narrative>
Year 2-5 targets: Testing is ongoing, parallel processing planned, operational acceptance planned mid-August. Significant progress has been made towards the roll-out but these targets will not be achieved before project closure.
</narrative></comment>
</target>
<actual value="Yr.5: Not achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-2: Procedures Manuals updated with detailed guidance for all five governments
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="Operations Procedure not covering all required areas"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="Procedures Manuals in place with detailed guidance for budget formulation, accounting, internal controls, payroll, fixed assets, liabilities (including debt), cash management and financial reporting">
<comment><narrative>
An Accounting Manual was drafted for national government in 2024 but this is still pending and won't be finalized before project closure.  State Procedures Manuals have not been prepared and will not be completed before project closure.  FreeBalance is working on user guides currently and these are expected to be completed before project closure. Years 2-5 targets will not be achieved and these will be will be pushed forward to Component 1 work of PFM II.
</narrative></comment>
</target>
<actual value="Not yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-4: Taxpayer accounting in Customs and Tax Administration (CTA) automated
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="No RMS in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="All modules of RMS implemented and in use">
<comment><narrative>
All modules are now in use.  The e-payment platform is not yet live, but this is part of the payment module. The e-tax and RMS portals are now live. Time slippage over course of RMS project has led to rushed implementation at the end of the project.  The handover ceremony of the RMS to government took place on July 18.  Some final functionality testing is still ongoing to ensure integrity of system.   The e-payment function is expected to go live before project closure so will need to be assessed in August.
</narrative></comment>
</target>
<actual value="Achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-2: Revenue Management System installed and in use by CTA for improved revenue accounting
</narrative></title>
<baseline year="2018" iso-date="2018-06-14" value="“C” score in 2016 self-assessment for PI-20.3 (revenue accounts reconciliation)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-14" />
<period-end iso-date="2025-08-14" />
<target value="Criteria for “B” score of PI-20.3 met">

</target>
<actual value="Year 1 - 4 targets achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR-7: Number of staff completing external training programs in PFM related disciplines
</narrative></title>
<baseline year="2018" iso-date="2018-06-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-29" />
<period-end iso-date="2024-09-30" />
<target value="50.00">
<comment><narrative>
Year 1-3 targets achieved. 
Y4 target in process.
</narrative></comment>
</target>
<actual value="21.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-1: New chart of accounts for all govts for better management, financial and statistical reporting
</narrative></title>
<baseline year="2018" iso-date="2018-06-14" value="&quot;C&quot; score in 2016 self-assessment. Functional classification lacking."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-14" />
<period-end iso-date="2025-08-14" />
<target value="“A” score criteria for PI-4 met">

</target>
<actual value="Year 1 and 2 targets met. Yr.5 not yet achieved,">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-4: Taxpayer accounting in Customs and Tax Administration (CTA) automated
</narrative></title>
<baseline year="2018" iso-date="2018-06-28" value="No RMS in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-28" />
<period-end iso-date="2025-08-15" />
<target value="All modules of RMS implemented and in use">
<comment><narrative>
All modules are now in use.  The e-payment platform is not yet live, but this is part of the payment module. The e-tax and RMS portals are now live. Time slippage over course of RMS project has led to rushed implementation at the end of the project.  The handover ceremony of the RMS to government took place on July 18.  Some final functionality testing is still ongoing to ensure integrity of system.   The e-payment function is expected to go live before project closure so will need to be assessed in August.
</narrative></comment>
</target>
<actual value="Achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO-1: In-year budget reports prepared and published by National and all four State governments
</narrative></title>
<baseline year="2018" iso-date="2018-06-14" value="In-year budget reports not prepared and not published"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-14" />
<period-end iso-date="2025-08-14" />
<target value="In-year budget reports prepared and cleared for publication by all five Govts meeting criteria for timing, accuracy, coverage and comparability to meet criteria of “B” score for PI-28 based on PEFA Framework.">
<comment><narrative>
Not all States/national have prepared two consecutive quarterly in-year budget reports as yet. An assessment against the criteria for PEFA PI-28 (In-year budget reports) indicates that for 28.1 (Coverage and comparability) the C score is already met, for 28.3 (Accuracy) the B score is already met, and for 28.2 (timing ) the score is currently a C. Several states are still awaiting clearance for publication apart from Yap and National.
</narrative></comment>
</target>
<actual value="Yr 1 target achieved. Yr 3 –Yr 5 is partially achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-9: Transparency and citizen engagement in budget preparation and execution by National government
</narrative></title>
<baseline year="2018" iso-date="2018-04-29" value="DoFA website exists but does not provide platform for receiving citizen feedback."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-29" />
<period-end iso-date="2025-08-15" />
<target value="DoFA website includes functionality to capture citizen feedback.Information on budget preparation stages, final budget and quarterly updates on budget execution posted regularly including:a) summary presented in a citizen-friendly format understandable by non-technical audience;b) summary of citizen-feedback received and government response.">
<comment><narrative>
Website has been improved to capture feedback.  The citizen-friendly budget FY2024 was published in February 2024  and FY 2025 was published in June 2025.  Currently the DoFA website has no information on budget preparation stages, there are no links to the budget appropriation acts, no quarterly updates on budget execution, and no summary of citizen feedback received and the government's response.   There has been no citizen feedback via the website as this was not publicized at all.  Therefore no report on citizen feedback on the website will be produced.  Y2 and Y3 will remain partially achieved.   
https://dofa.gov.fm/fmis-general-comments/    
https://dofa.gov.fm/rms-general-comments/
</narrative></comment>
</target>
<actual value="Yr.1 target achieved. Yr.2 and Yr.5 partially achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR-9: Transparency and citizen engagement in budget preparation and execution by National government
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="DoFA website exists but does not provide platform for receiving citizen feedback."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-09-30" />
<target value="DoFA website includes functionality to capture citizen feedback.Information on budget preparation stages, final budget and quarterly updates on budget execution posted regularly including:a) summary presented in a citizen-friendly format understandable by non-technical audience;b) summary of citizen-feedback received and government response.">
<comment><narrative>
Website has been improved to capture feedback.  The citizen-friendly budget FY2024 was published in February 2024  and FY 2025 was published in June 2025.  Currently the DoFA website has no information on budget preparation stages, there are no links to the budget appropriation acts, no quarterly updates on budget execution, and no summary of citizen feedback received and the government's response.   There has been no citizen feedback via the website as this was not publicized at all.  Therefore no report on citizen feedback on the website will be produced.  Y2 and Y3 will remain partially achieved.   
https://dofa.gov.fm/fmis-general-comments/    
https://dofa.gov.fm/rms-general-comments/
</narrative></comment>
</target>
<actual value="Yr.1 target achieved. Yr.2 and Yr.5 partially achieved.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P163922</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Federated States of Micronesia Maritime Investment Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve the safety, efficiency and climate resilience of maritime infrastructure and operations in the Recipient's territory, and in the event of an Eligible Crisis or Emergency, to provide an immediate response to the Eligible Crisis or Emergency.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Maritime Investment Project for Micronesia is to improve the safety, efficiency and climate resilience of maritime infrastructure and operations in the Recipient's territory, and in the event of an eligible crisis or emergency, to provide an immediate response to the eligible crisis or emergency. This project consists of four components. 1) The first component, Maritime Infrastructure, aims improve the safety and efficiency of port operations, as well as enhance the resilience of maritime structures to natural disasters and climate change impacts through the integration of planning, design, construction, rehabilitation and operation of facilities. It has the following three subcomponents: (i) Surfacing and Drainage at Kosrae, Pohnpei, Chuuk and Yap Ports; (ii) Rehabilitate Utilities; and (iii) Upgrade Terminal Superstructure. 2) The second component, Maritime Safety and Security, aims to strengthen safety and security of maritime transport and support better climate resilience of maritime facilities and for local communities by improving the reliability of connections between FSM states and outer islands for access to food, water, fuel, and emergency response services. It ahs the following four subcomponents: (i) Upgrade Berthing and Apron Facilities; (ii) Compliance with ISPS Requirements; (iii) Replace or upgrade AtoNs; and (iv) Safety and Security Improvements. 3) The third component, Technical Assistance for Port Planning and Project Management, enhance the capacity of government to manage maritime assets in a more safe, efficient and climate resilient manner through technical assistance designed to strengthen the planning and management of climate resilient port facilities, improve coordination of emergency response systems, elevate awareness of ISPS and SAR requirements, and implement project activities. It has the following nine subcomponents: (i) Maritime Safety and Security Needs Assessment and Maritime Infrastructure Needs Assessment; (ii) Design and Supervision; (iii) Review of Institutional and Governance Structures for Port Management; (iv) Strategic Planning; (v) Capacity Building Initiatives; (vi) Outer Island Services and Chuuk Lagoon; (vii) Project Management; (viii) Employment opportunities for women; and (ix) Emerging Priority Issues. 4) The fourth component, Contingent Emergency Response Component, is designed to provide a swift response in the event of an eligible crisis or emergency by enabling uncommitted funds to be quickly reallocated to address immediate post-crisis and emergency financing needs.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0033250"><narrative>Micronesia, Federated States of</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-0033249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-12-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-05-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-08-01"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-08-01"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Anita Shrestha</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ashrestha@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081551" />
            <name><narrative>Pohnpei Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.89132 158.2299</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081694" />
            <name><narrative>Okat Harbor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.34762 162.95669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001558583" />
            <name><narrative>Yap Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.537 138.097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004042205" />
            <name><narrative>Weno Port</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.44478 151.83952</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="21040" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TP" percentage="73.0000000" xml:lang="en"><narrative>FY17 - Ports/Waterways</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="47" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000836" percentage="100" xml:lang="en"><narrative>Coastal Zone Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="48" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="100" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="1" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="47" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="100" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="100" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="100" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="47" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="100" xml:lang="en"><narrative>Regional Integration</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">95840.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">114969.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">133752.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">151342.68</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">167085.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">183019.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">207846.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">228361.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">239561.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">245604.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">125746.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">258075.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">262540.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">261154.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">254688.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">254919.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">265196.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">284979.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">296373.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">306688.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">160503.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">340405.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">357071.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">374392.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">400449.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">429317.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">441133.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">456799.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">487090.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">521808.93</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">540976.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">280168.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">588011.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">632082.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">671227.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">708947.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">880075.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1180443.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1180443.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1180443.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1180443.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1180443.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1180443.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1180443.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1180443.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1180443.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1180443.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1180443.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1180443.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1735629.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">3000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">74834.07</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">150266.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-01"/>
<value currency="USD" value-date="2024-08-01">29101560.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-01"/>
<value currency="USD" value-date="2024-08-01">29101560.08</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">38490000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">2500000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-24999921</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-1504437</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-2518469</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1088096</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">74834</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">150267</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">2500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">178129</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">157965</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">237846</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">701994</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">350487</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">491503</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">379082</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">421760</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">117856</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">186173</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">232669</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">214666</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">366794</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">338510</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">349714</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-761745</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-300062</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-33249"><narrative>Department of Transportation, Communication &amp; Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33251"><narrative>Department of Justice</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-33252"><narrative>Department of Environment, Climate Change and Emergency Management</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163922"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P163922?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163922"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="100.00">
<comment><narrative>
The GRM was advertised on the DoFA website and accompanied by an online portal for logging inquiries or complaints. While the GRM was established and had an assigned person responsible for handling complaints, none were received because no physical works were implemented.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project ports with safety solutions implemented
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CERC-related procurement packages completed on time as per the procurement plan
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="100.00">
<comment><narrative>
Note: &amp;quot;CERC-related procurement packages completed on time as per procurement plan&amp;quot; has been measured on the basis of when the related contract was&amp;nbsp;signed, not when the contract/activity was closed. A single contract for the entire CERC component balance was signed with UNOPS, and consequently actual progress was measured at 100%.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in cargo vessel turnaround times at project port(s)
</narrative></title>
<baseline year="2019" iso-date="2019-02-22" value="1,620.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-22" />
<period-end iso-date="2024-07-29" />
<target value="1,590.00">
<comment><narrative>
The indicator was based on maritime infrastructure development, which did not occur during the project. By the closing date, the indicator was not achieved.
</narrative></comment>
</target>
<actual value="1,620.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="100.00">
<comment><narrative>
The GRM is advertised on the DoFA&amp;nbsp;website. The GRM is accompanied by an online portal to log enquiries or complaints. The CIU Program Manager is responsible for receiving complaints and referring them&amp;nbsp;to the relevant Safeguards counterpart within the corresponding Implementing Agency&amp;nbsp;to resolve.&amp;nbsp;While the GRM has been set up and has an assigned person responsible to hanle any complaints, none&amp;nbsp;have been received as no physical works are currently underway.&amp;nbsp;

The project has a stakeholder engagement plan that is regularly updated to align with the project&amp;#39;s work plan that sets out consultation and information dissemination requirements and assigned responsibilities for carrying these out.&amp;nbsp;???????

In&amp;nbsp;the next six months,e expect the following stakeholder engagements to take place:


 Comp 1: Maritime Infrastructure. Project specific Needs Assessment consultant teams will&amp;nbsp; individually meet the stakeholder groups as required, including port users and surrounding communities.
 Comp 2: Maritime Safety &amp;amp; Security. Extensive consultations with civilociety organization stakeholders and relevant government agencies in the design and preparation of GBV and anti human trafficking mitigation and awareness raising program.
 Comp 3: Technical Assistance Port Planning &amp;amp; Project Management. Regular consultation with all project stakeholder groups, including communities for port planning. The Chuuk Lagoon study especially will require extensive consultations with communities and land owners.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CERC-related procurement packages completed on time as per the procurement plan
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="100.00">
<comment><narrative>
&quot;CERC-related procurement packages completed on time as per procurement plan&quot; was added by COVID-19 pandemic. 
A single contract for the entire CERC component balance was signed with UNOPS, and consequently actual progress was measured at 100%.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a CERC manual given the risk of natural disaster
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="Yes">
<comment><narrative>
CERC manual for ports were prepared.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ISPS recommendations implemented against identified shortcomings
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="100.00">
<comment><narrative>
The indicator was based on maritime infrastructure development, including rehabilitation and upgrading, which did not occur during the project. By the closing date, the indicator was not achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in cargo vessel turnaround times at project port(s)
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="1,620.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="1,590.00">

</target>
<actual value="1,620.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in container yard productivity at project port(s)
</narrative></title>
<baseline year="2019" iso-date="2019-02-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-22" />
<period-end iso-date="2024-07-29" />
<target value="10.00">
<comment><narrative>
The indicator was based on maritime infrastructure development, which did not occur during the project. By the closing date, the indicator was not achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
FSMIP implementation of SOP on trafficking referral service
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contractor staff trained on GBV &amp; Codes of Conduct
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="100.00">
<comment><narrative>
Needs assessment was completed, but capacity development and trainings were not provided during the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area of cargo yard hardened at Pohnpei and Chuuk Ports
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="11,379.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ports with sectoral and contingency planning tools that address natural disasters and climate change
</narrative></title>
<baseline year="2024" iso-date="2024-02-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-22" />
<period-end iso-date="2024-07-29" />
<target value="4.00">
<comment><narrative>
CERC manual was in place and in use. 
Strategic Plans for four ports were completed, and CERC manual was prepared and in use. By the closing date, the indicator was achieved.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of project ports with drainage measures implemented
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="4.00">
<comment><narrative>
The indicator was based on maritime infrastructure development, which did not occur during the project. By the closing date, the indicator was not achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contractor staff trained on GBV &amp; Codes of Conduct
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project ports rehabilitated with at least one climate resilience measure
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a CERC manual given the risk of natural disaster
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="Yes">
<comment><narrative>
Adoption of a CERC manual.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ISPS recommendations implemented against identified shortcomings
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project ports fully compliant with ISPS requirements
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
FSMIP implementation of SOP on trafficking referral service
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="Yes">
<comment><narrative>
The indicator was based on outputs of technical assistance, and maritime infrastructure development, which did not occur during the project. By the closing date, the indicator was not achieved.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed by FSMIP on Sea Ports
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="15.00">
<comment><narrative>
All activities related to the indicator were not completed. By the closing date, the indicator was not achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project ports rehabilitated with at least one climate resilience measure
</narrative></title>
<baseline year="2019" iso-date="2019-02-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-22" />
<period-end iso-date="2024-07-29" />
<target value="4.00">
<comment><narrative>
The indicator was based on rehabilitating ports, which did not occur during the project. By the closing date, the indicator was not achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ports with sectoral and contingency planning tools that address natural disasters and climate change
</narrative></title>
<baseline year="2024" iso-date="2024-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-25" />
<period-end iso-date="2024-08-01" />
<target value="4.00">
<comment><narrative>
CERC manual in place and in use. Sectoral planning tools (i.e. Strategic Plans for Ports) still to be undertaken.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area of cargo yard hardened at Pohnpei and Chuuk Ports
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="11,379.00">
<comment><narrative>
The indicator was based on maritime infrastructure development, which did not occur during the project. By the closing date, the indicator was not achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="104,832.00">
<comment><narrative>
This indicator is being added to the Results Framework through this ISR. Based on 2021 FSM statistics, a&amp;nbsp;total population of 104,823 is&amp;nbsp;estimated as the end target value.

The standard definition of this indicator is provided below:

Number of direct and indirect beneficiaries that experience improved access to transport infrastructure and services that have been built or rehabilitated through a World Bank-financed project (including highways, rural roads, urban and interurban roads, mass transit systems, ports/waterways, railways and airports). Beneficiaries typically experience reductions in cost and time to travel and/or improvements in safety, as well as increased access to markets, job opportunities, and health and education services. In addition, indirect beneficiaries would typically experience reductions in cost and transit time in the delivery of inbound and outbound cargo.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project ports with safety solutions implemented
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="4.00">
<comment><narrative>
The indicator was based on maritime infrastructure development, including rehabilitation and upgrading, which did not occur during the project. By the closing date, the indicator was not achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project ports fully compliant with ISPS requirements
</narrative></title>
<baseline year="2019" iso-date="2019-02-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-22" />
<period-end iso-date="2024-07-29" />
<target value="4.00">
<comment><narrative>
The indicator was based on compliance with ISPS requirements, including fencing, lighting, CCTV, backup generators, and hardware/software, none of which were implemented during the project. By the closing date, the indicator was not been achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="104,832.00">
<comment><narrative>
The indicator was primarily based on maritime infrastructure development, which did not occur during the project. By the closing date, the indicator was not achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of project ports with drainage measures implemented
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy efficiency recommendations implemented
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in container yard productivity at project port(s)
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy efficiency recommendations implemented
</narrative></title>
<baseline year="2019" iso-date="2019-02-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-20" />
<period-end iso-date="2024-07-27" />
<target value="4.00">
<comment><narrative>
The indicator was based on maritime infrastructure development, such as PV systems, switch to LED lighting systems, which did not occur during the project. By the closing date, the indicator was not achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed by FSMIP on Sea Ports
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2024-08-01" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P181253</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Access and Renewable Increase for Sustainable Energy Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project development objective is (i) to increase access to electricity, (ii) improve the reliability of electricity service, and (iii) increase renewable energy generation in targeted Project areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed Project will contribute to the achievement of the GoFSM's energy sector goals by expanding (providing new or improved) access to electricity service, increasing renewable energy generation, and enhancing capacity of energy related entities in the four states of FSM. The Project will fund construction of mini grids, rehabilitation (including resilience enhancement) of distribution networks, integration of solar PV systems, technical assistance, and capacity strengthening. The Project activities are grouped into three components. The Component 1 - Electricity Service Expansion will (i) increase the electricity access rate in Chuuk; (ii) improve the reliability of power supply while enhancing resilience to climate &amp; natural hazards and reducing technical losses in Pohnpei, Yap and Kosrae; and (iii) facilitate preventive grid maintenance for the four power utilities. The Component comprises four subcomponents. Sub-Component 1.1 (Chuuk Islands Electrification) will fund detailed studies, designs, supply, construction, supervision, and commissioning of solar-powered mini grids and stand-alone solar home systems in selected four unelectrified islands of Chuuk. Sub-Component 1.2 (Pohnpei Grid Upgrade) will fund improve the automation, protection, resilience of the distribution grid in Pohnpei main island, provide trucks for preventive maintenance, and enable completion of the rehabilitation of the Nanpohnmal Power Plant. Sub-component 1.3 (Yap Grid Resilience) will fund detailed designs, supply, supervision, and installation of three underground distribution feeders to provide redundant and more reliable power to critical facilities—such as the Airport, hospital, water plant facilities, radio station, selected Government buildings and the commercial center— in Yap main island. Sub-component 1.4 (Kosrae Grid Rehabilitation) will rehabilitate segments of the distribution network, enable battery energy storage and facilitate preventive maintenance in Kosrae main island. The Component 2 - Renewable Energy Generation will increase solar energy generation with storage and grid stability controls in Chuuk, and Pohnpei to reduce diesel generation costs and help achieve GHG emission reduction targets. The component comprises two sub-components. Subcomponent 2.1 (Pohnpei Solar Energy Generation) will fund detailed studies, designs, supply, installation, commissioning, and supervision of about grid-connected solar PV systems in the Pohnpei main grid. Subcomponent 2.2 (Chuuk Solar Energy Generation) will fund similar detailed designs, supply, installation, commissioning, and supervision of about 1.5 MW of grid-connected solar PV systems with 2 MWh of battery storage in the Chuuk's Weno grid and ensure grid stability. Component 3 - Institutional Strengthening and Implementation Support aims to strengthen the capacity of key energy sector entities such as DoR&amp;D, state power utilities, and the project implementation unit (PIU). It consists of three sub-components. Subcomponent 3.1 (Sector Development Assistance) will help strengthen key energy sector areas such as adoption of cost reflective electricity tariffs, regulatory capacity building, energy efficiency policy, and outer island electrification. Subcomponent 3.2 (State Power Utility Capacity Strengthening) will seek to enhance the capacity of the four state power utilities on operation and maintenance of renewable energy technologies and distribution networks through a combination of an apprenticeship program that promotes women's employment, international technical expertise, and maintenance fund development. Subcomponent 3.3 (Project Implementation Support) will provide adequate resources to the DoR&amp;D's PIU to execute the project with support from the Central Implementation Unit on procurement, financial management, and environmental and social aspects.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–00005923"><narrative>Federated States of Micronesia</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-00005922"><narrative>Department of Resources and Development (DoR&amp;D)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-03-21"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-03-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-02-27"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-02-27"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ximing Peng</narrative></person-name><telephone>+1-202-473-1000</telephone><email>xpeng1@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
PS158, Palikir, Pohnpei State

</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
PS12, Palikir, Pohnpei State

</narrative></mailing-address></contact-info><recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2081986" />
                <name><narrative>Palikir - National Government Center</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.92477 158.16109</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23631" percentage="60" xml:lang="en"/><sector vocabulary="1" code="23231" percentage="40" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLU" percentage="33.0000000" xml:lang="en"><narrative>Energy Generation - Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLP" percentage="13.0000000" xml:lang="en"><narrative>Public Administration - Energy</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="54.0000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">224999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">224999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">224999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">225003.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">208344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">487499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">487499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">487499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">487499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">487499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">487499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">487499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">487499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">487499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">487499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">487499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">487511.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">875011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">770832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">770832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">770832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">770832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">770832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">770832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">770832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">770832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">770832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">770832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">770832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">770844.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-27"/>
<value currency="USD" value-date="2031-02-27">38403482.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-27"/>
<value currency="USD" value-date="2031-02-27">38403482.89</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">42000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-5922"><narrative>Department of Resources and Development (DoR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">2500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-5922"><narrative>Department of Resources and Development (DoR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">274307</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-5922"><narrative>Department of Resources and Development (DoR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">468081</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-5922"><narrative>Department of Resources and Development (DoR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">141747</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-5922"><narrative>Department of Resources and Development (DoR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">212383</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-5922"><narrative>Department of Resources and Development (DoR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181253"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P181253?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181253"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="2.70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Power utilities that adjusted electricity tariffs
</narrative></title>
<baseline year="2025" iso-date="2025-03-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-11" />
<period-end iso-date="2031-03-11" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of Project Beneficiaries who expressed satisfaction on new electricity connections, improved reliability of electricity service, and GRM activities
</narrative></title>
<baseline year="2025" iso-date="2025-03-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-11" />
<period-end iso-date="2031-03-11" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Power utilities that adjusted electricity tariffs
</narrative></title>
<baseline year="2025" iso-date="2025-03-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-11" />
<period-end iso-date="2031-03-11" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed battery energy storage capacity
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="4.6">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed renewable energy capacity in Pohnpei
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="1.5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed renewable energy capacity in Weno
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="0.5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved access to electricity
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="32000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Unplanned Distribution Network SAIDI (System Average Interruption Duration Index) in Pohnpei
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="29.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="13.7">

</target>
<actual value="29.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Projected lifetime net greenhouse gas (GHG) emissions (CO2 equvalent)
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="107000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved access to electricity
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="32000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved access to electricity
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="32000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average reduction of unplanned power outages on the distribution networks in Pohnpei, Yap and Kosrae
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average reduction of unplanned power outages on the distribution networks in Pohnpei, Yap and Kosrae
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="2.70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="2.70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households benefiting from reduction of unplanned distribution SAIDI in Pohnpei, Yap and Kosrae
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="5,350">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed battery energy storage capacity
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="4.6">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased share of women in technical and/or engineering positions
</narrative></title>
<baseline year="2025" iso-date="2025-03-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-11" />
<period-end iso-date="2031-03-11" />
<target value="7">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Unplanned Distribution Network SAIDI (System Average Interruption Duration Index) in Kosrae
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="11.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="6.2">

</target>
<actual value="11.1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average reduction of unplanned power outages on the distribution networks in Pohnpei, Yap and Kosrae
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Projected lifetime net greenhouse gas (GHG) emissions (CO2 equvalent)
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="107000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average reduction of unplanned power outages on the distribution networks in Pohnpei, Yap and Kosrae
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed renewable energy capacity in Weno
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="0.5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="2.70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2025" iso-date="2025-03-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-13" />
<period-end iso-date="2031-03-13" />
<target value="3,700">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed renewable energy capacity in Pohnpei
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="1.5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Unplanned Distribution Network SAIDI (System Average Interruption Duration Index) in Yap
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="7.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="4.9">

</target>
<actual value="7.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households, businesses, institutions, and productive use units with new electricity service in Chuuk
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="600">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Certified utility staff from the apprenticeship program
</narrative></title>
<baseline year="2025" iso-date="2025-03-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-11" />
<period-end iso-date="2031-03-11" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed renewable energy capacity in selected islands of Chuuk to be electrified
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="0.70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Unplanned Distribution Network SAIDI (System Average Interruption Duration Index) in Yap
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="7.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="4.9">

</target>
<actual value="7.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased share of women in technical and/or engineering positions
</narrative></title>
<baseline year="2025" iso-date="2025-03-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-11" />
<period-end iso-date="2031-03-11" />
<target value="7">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households, businesses, institutions, and productive use units with new electricity service in Chuuk
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="600">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved access to electricity
</narrative></title>
<baseline year="2025" iso-date="2025-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-15" />
<period-end iso-date="2031-03-15" />
<target value="32000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed renewable energy capacity in selected islands of Chuuk to be electrified
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="0.70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households benefiting from reduction of unplanned distribution SAIDI in Pohnpei, Yap and Kosrae
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="5,350">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2025" iso-date="2025-03-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-13" />
<period-end iso-date="2031-03-13" />
<target value="3,700">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of Project Beneficiaries who expressed satisfaction on new electricity connections, improved reliability of electricity service, and GRM activities
</narrative></title>
<baseline year="2025" iso-date="2025-03-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-11" />
<period-end iso-date="2031-03-11" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Unplanned Distribution Network SAIDI (System Average Interruption Duration Index) in Kosrae
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="11.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="6.2">

</target>
<actual value="11.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Unplanned Distribution Network SAIDI (System Average Interruption Duration Index) in Pohnpei
</narrative></title>
<baseline year="2025" iso-date="2025-03-12" value="29.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-12" />
<period-end iso-date="2031-03-12" />
<target value="13.7">

</target>
<actual value="29.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Certified utility staff from the apprenticeship program
</narrative></title>
<baseline year="2025" iso-date="2025-03-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-11" />
<period-end iso-date="2031-03-11" />
<target value="16">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P165183</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SUSTAINABLE ENERGY DEVELOPMENT AND ACCESS PROJECT</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve reliability of electricity supply, expand access to electricity, and scale up renewable energy generation.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Sustainable Energy Development and Access Project is to improve reliability of electricity supply, expand access to electricity, and scale up renewable energy generation. There are five components to the project, the first component being improving reliability of electricity supply in Pohnpei State. This component will address PUC's challenges with insufficient available generation capacity, which is way below the installed capacity, to cover peak demand in a stable manner and reduce unscheduled shutdowns of power supply and unsecure waste oil storage. The second component is the expanding access to electricity in Chuuk State. This component will support CPUC to expand access to electricity in Chuuk State, where the access rate is the lowest in the country (27 percent) due to the remoteness of several islands. The third component is the scaling up renewable energy generation in Chuuk, Yap, and Kosrae States. This component will support CPUC to install the state's first utility-scale solar power plant to reduce fuel cost of diesel-based power generation and relieve CPUC from the financial burden incurred by access expansion on the outer islands. The component will also support YSPSC and KUA to significantly mitigate the curtailment of the existing RE output and enable the integration of more variable RE through storage capacity and high-speed gensets. The fourth component is the institutional strengthening and capacity building in the energy sector. This component aims at reinforcing the sector's operational and environmental sustainability by improving institutional capacities for governance, identifying strategies to attract private sector investments and exploring access to other efficient energy solutions. This component includes two subcomponents: Sector Governance, and efficient and clean cookstoves. Finally, the fifth component is the technical assistance and project management. This component will finance: (a) contract staffing for the project, including a project manager, consultancies and non-consultancies, office and other equipment, travel, and operational costs; (b) training and workshops; (c) recruitment of a full-time energy adviser to assist and support the Secretary of Resources and Development (SoR&amp;D) on energy sector policy matters and development strategy; (d) support to utilities on respective activities implementation, including support on coordination, monitoring and evaluation, and reporting; and (e) capacity building for local experts through technical transfer and on-the-job training with international consultants.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0034804"><narrative>Federated States of Micronesia</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0034805"><narrative>FEDERATED STATES OF MICRONESIA</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-0034799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-07-02"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-12-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Myoe Myint</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mmyint@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081114" />
            <name><narrative>Weno</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.44648 151.84135</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081175" />
            <name><narrative>State of Yap</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.538 138.097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081550" />
            <name><narrative>State of Pohnpei</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.964 158.2056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082036" />
            <name><narrative>State of Kosrae</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.325 162.981</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082282" />
            <name><narrative>State of Chuuk</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.44077 151.85431</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007645384" />
            <name><narrative>Satowan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.334 153.738</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004044426" />
            <name><narrative>Pohnlangas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83785 158.29904</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007626989" />
            <name><narrative>Udot-Fonuweisom Municipality</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.389 151.708</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="23630" percentage="56" xml:lang="en"/><sector vocabulary="1" code="23230" percentage="31" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="7" xml:lang="en"/><sector vocabulary="1" code="23210" percentage="3" xml:lang="en"/><sector vocabulary="1" code="15170" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="55.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LU" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Renewable Energy Solar</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="100" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="16" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="36" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="8" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="49" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="8" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="100" xml:lang="en"><narrative>Access to Energy</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">74700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">89610.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">104250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">117960.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">130230.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">142650.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">162000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">177990.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">92640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">189270.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">194250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">201150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">204630.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">203550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">198510.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">198690.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">206700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">222120.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">114840.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">234210.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">246090.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">265320.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">278310.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">291810.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">312120.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">334620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">343830.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">356040.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">186240.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">394200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">414720.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">431220.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">458310.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">492660.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">523170.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">552570.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">582750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">613710.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">320910.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">665490.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">692430.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">712680.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">738300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">766590.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">790290.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">813210.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">847920.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">874200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">889890.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">449820.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">904740.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">920340.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">937560.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">949290.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">965310.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">983340.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">999090.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1014030.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1029330.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">520440.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1052700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">824460.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">4739103.06</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">4739103.06</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-2298936</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">445231</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">76759</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">133822</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">101707</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">137539</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">107477</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">132203</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">55026</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">300262</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-300262</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">300262</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">187386</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">336143</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">335471</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">209417</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">184743</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">1196152</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">342672</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">351092</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">1068336</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">117906</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">1572567</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">226383</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">396207</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">315420</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">91295</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">868941</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">253837</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">1292948</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">1266532</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">4588929</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">708855</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">262639</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">316610</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">3504117</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1052995</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">581575</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">641704</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-34799"><narrative>Department of Resources and Development (DR&amp;D)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165183"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P165183?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165183"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women in technical positions employed by power utilities
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2025-09-30" />
<target value="4.00">
<comment><narrative>
There are currently four women in technical positions in the four power utilities (2 PUC, 2 KUA).
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households receiving new connections
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="272.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Generation Output of Renewable Energy (other than hydropower) in Chuuk, Yap and Kosrae
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="1,930.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="3,500.00">
<comment><narrative>
In Chuuk, the construction of the Weno solar PV facility began in October 2025, and commissioning tests are scheduled to take place in June 2026.
</narrative></comment>
</target>
<actual value="1,704">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of GRM briefs published (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2026-06-15" />
<target value="1">
<comment><narrative>
Both a stakeholder sensitization event on the GRM and a citizen engagement activity were organized in Chuuk. The CIU (in collaboration with the PIU) explained the GRM mechanism to all relevant stakeholders. This was also a citizen engagement activity. A brief report on the event was sent to the Bank. The indicator complies with the Bank citizen engagement requirement.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2025-09-30" />
<target value="7.50">
<comment><narrative>
A 830kW diesel generator commenced operations in Yap in May 2024. Following a storm in March 2025, the generator is undergoing a repair and scheduled to be back online in early 2026. The major generation capacity will come from the PUC's Nanpohnmal Power Plant rehabilitation, where 7.5 MW of new diesel generators are expected to be delivered, installed, and commissioned. The 3 new diesel generators are delayed and expected be installed by February 2026, plus additional time for commissioning and acceptance.
</narrative></comment>
</target>
<actual value="0.83">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Generation Output of Renewable Energy (other than hydropower) in Chuuk, Yap and Kosrae
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="1,930.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2025-09-30" />
<target value="3,500.00">
<comment><narrative>
1 MWh of battery energy storage system (BESS) were manufactured and shipping is being coordinated with the delayed solar PV construction in Kosrae and project closing date (as may be extended). In Chuuk, the construction of Weno solar PV facility was initiated (contract became effective in August 2024), and delayed scheduled commissioning test in April 2026. Grid-connected solar &amp; wind power generation had decreased in Chuuk, Kosrae and Yap in recent years.
</narrative></comment>
</target>
<actual value="1,704">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Battery Storage Capacity in Chuuk, Yap and Kosrae States
</narrative></title>
<baseline year="2018" iso-date="2018-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-14" />
<period-end iso-date="2026-06-14" />
<target value="1.00">
<comment><narrative>
The battery energy storage system shipping and installation is being coordinated with solar PV construction in Kosrae.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2026-06-15" />
<target value="1.05">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People newly provided with access to electricity under the project by household connections Grid/Off-grid/mini-grid in Chuuk
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="1,898.00">
<comment><narrative>
The target is expected to be achieved by April 2026. Final designs for the mini grids intended to provide household electricity connections have been completed. Solar PV modules and batteries for the Udot-Eot and Satowan mini grids have been manufactured and delivered to the sites. According to the current schedule, construction of all mini grids is ongoing.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance contract in effect for PUC
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
The performance contract was drafted, being revised, and discussed with the office of the Governor of Pohnpei State. It includes provisions to enable PUC to increase the electricity tariffs without waiting for a prior review with the State Legislature. The Pohnpei State legislature has not yet signed the performance contract. The Bank has recently selected a consultant firm for a tariff study. The study includes support to PUC and the State for the adoption of cost recovery tariffs.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Clean cooking assessment completed
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
East West Center, in collaboration, with the College of Micronesia, was selected for the assessment. The quality enhancement review (QER) of this activity is ongoing with a plan for Decision Review in March 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People newly provided with access to electricity under the project by household connections Grid/Off-grid/mini-grid in Chuuk
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="1,898.00">
<comment><narrative>
The target is expected to be achieved by April 2026. Final designs for the mini grids intended to provide household electricity connections have been completed. Solar PV modules and batteries for the Udot-Eot and Satowan mini grids have been manufactured and delivered to the sites. According to the current schedule, construction of all mini grids is ongoing.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People newly provided with access to electricity under the project by household connections Grid/Off-grid/mini-grid in Chuuk
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2025-09-30" />
<target value="1,898.00">
<comment><narrative>
The target is expected to be achieved in early 2026. The final designs of the mini grids to provide electricity connections to households were completed. Solar PV modules and batteries for Udot-Eot and Satowan mini grids were manufactured and being shipped. The current schedule shows that the construction of all mini grids is delayed until December 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2026-06-15" />
<target value="1898">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Battery Storage Capacity in Kosrae
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2025-09-30" />
<target value="1.00">
<comment><narrative>
The battery energy storage system shipping and installation is being coordinated with solar PV construction in Kosrae.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of GRM briefs published (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2026-06-15" />
<target value="1">
<comment><narrative>
Both a stakeholder sensitization event on the GRM and a citizen engagement activity were organized in Chuuk. The CIU (in collaboration with the PIU) explained the GRM mechanism to all relevant stakeholders. This was also a citizen engagement activity. A brief report on the event was sent to the Bank. The indicator complies with the Bank citizen engagement requirement.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Clean cooking assessment completed
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2025-09-30" />
<target value="Yes">
<comment><narrative>
East West Center, in collaboration, with the College of Micronesia, was selected for the surveys. Questionnaires were prepared and reviewed to undertake the surveys, quantitative and qualitative assessments. This activity has resumed in June 2025, following contract renewal.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PUC System Average Interruption Duration Index (SAIDI)
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="4,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2026-06-15" />
<target value="1,500.00">
<comment><narrative>
Combined planned and unplanned generation and distribution SAIDI fluctuated between 2021 and 2024. The indicator is expected to meet its target upon completion of the NPP rehabilitation.
</narrative></comment>
</target>
<actual value="2,483.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2026-06-15" />
<target value="1898">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated in Chuuk, Yap and Kosrae States
</narrative></title>
<baseline year="2018" iso-date="2018-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-14" />
<period-end iso-date="2026-06-14" />
<target value="1.88">

</target>
<actual value="0.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households receiving new connections
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="272.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="8.33">
<comment><narrative>
An 830 kW diesel generator commenced operations in Yap in May 2024. The major generation capacity increase will result from PUC's NPP rehabilitation project, under which 7.5 MW of new diesel generators are expected to be delivered, installed, and commissioned by June 2026. Three new diesel generators have been shipped to Pohnpei and are expected to be installed by April 2026, with commissioning and acceptance anticipated by June 2026.
</narrative></comment>
</target>
<actual value="0.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="8.33">
<comment><narrative>
An 830 kW diesel generator commenced operations in Yap in May 2024. The major generation capacity increase will result from PUC's NPP rehabilitation project, under which 7.5 MW of new diesel generators are expected to be delivered, installed, and commissioned by June 2026. Three new diesel generators have been shipped to Pohnpei and are expected to be installed by April 2026, with commissioning and acceptance anticipated by June 2026.
</narrative></comment>
</target>
<actual value="0.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of GRM briefs published (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2025-09-30" />
<target value="3.00">
<comment><narrative>
Both a stakeholder sensitization event on the GRM and a citizen engagement activity were organized in Chuuk. The CIU (in collaboration with the PIU) explained the GRM mechanism to all relevant stakeholders. This was also a citizen engagement activity. A brief report on the event was sent to the Bank. The indicator complies with the Bank citizen engagement requirement.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated in Chuuk, Yap and Kosrae States
</narrative></title>
<baseline year="2018" iso-date="2018-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-14" />
<period-end iso-date="2026-06-14" />
<target value="1.88">

</target>
<actual value="0.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Clean cooking assessment completed
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
East West Center, in collaboration, with the College of Micronesia, was selected for the assessment. The quality enhancement review (QER) of this activity is ongoing with a plan for Decision Review in March 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women in technical positions employed by power utilities
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="4.00">
<comment><narrative>
There are currently four women in technical positions in the two power utilities (2 PUC, 2 KUA).
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Generation Output of Renewable Energy (other than hydropower) in Chuuk, Yap and Kosrae
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="1,930.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="3,500.00">
<comment><narrative>
In Chuuk, the construction of the Weno solar PV facility began in October 2025, and commissioning tests are scheduled to take place in June 2026.
</narrative></comment>
</target>
<actual value="1,704">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance contract in effect for PUC
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
The performance contract was drafted, being revised, and discussed with the office of the Governor of Pohnpei State. It includes provisions to enable PUC to increase the electricity tariffs without waiting for a prior review with the State Legislature. The Pohnpei State legislature has not yet signed the performance contract. The Bank has recently selected a consultant firm for a tariff study. The study includes support to PUC and the State for the adoption of cost recovery tariffs.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PUC System Average Interruption Duration Index (SAIDI)
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="4,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2026-06-15" />
<target value="1,500.00">
<comment><narrative>
Combined planned and unplanned generation and distribution SAIDI fluctuated between 2021 and 2024. The indicator is expected to meet its target upon completion of the NPP rehabilitation.
</narrative></comment>
</target>
<actual value="2,483.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PUC System Average Interruption Duration Index (SAIDI)
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="4,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2025-09-30" />
<target value="1,500.00">
<comment><narrative>
Combined planned and unplanned generation and distribution SAIDI had fluctuated over 2021-2024. Unplanned distribution SAIDI had increased to 1,759 minutes/year in 2024.
</narrative></comment>
</target>
<actual value="2,483.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2025-09-30" />
<target value="1.88">

</target>
<actual value="0.83">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People newly provided with access to electricity under the project by household connections Grid/Off-grid/mini-grid in Chuuk
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2025-09-30" />
<target value="1,898.00">
<comment><narrative>
The target is expected to be achieved in early 2026. The final designs of the mini grids to provide electricity connections to households were completed. Solar PV modules and batteries for Udot-Eot and Satowan mini grids were manufactured and being shipped. The current schedule shows that the construction of all mini grids is delayed until December 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2026-06-15" />
<target value="1.05">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People newly provided with access to electricity under the project by household connections Grid/Off-grid/mini-grid in Chuuk
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="1,898.00">
<comment><narrative>
The target is expected to be achieved by April 2026. Final designs for the mini grids intended to provide household electricity connections have been completed. Solar PV modules and batteries for the Udot-Eot and Satowan mini grids have been manufactured and delivered to the sites. According to the current schedule, construction of all mini grids is ongoing.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People newly provided with access to electricity under the project by household connections Grid/Off-grid/mini-grid in Chuuk
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="1,898.00">
<comment><narrative>
The target is expected to be achieved by April 2026. Final designs for the mini grids intended to provide household electricity connections have been completed. Solar PV modules and batteries for the Udot-Eot and Satowan mini grids have been manufactured and delivered to the sites. According to the current schedule, construction of all mini grids is ongoing.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People newly provided with access to electricity under the project by household connections Grid/Off-grid/mini-grid in Chuuk
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="1,898.00">
<comment><narrative>
The target is expected to be achieved by April 2026. Final designs for the mini grids intended to provide household electricity connections have been completed. Solar PV modules and batteries for the Udot-Eot and Satowan mini grids have been manufactured and delivered to the sites. According to the current schedule, construction of all mini grids is ongoing.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PUC System Average Interruption Duration Index (SAIDI)
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="4,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2025-09-30" />
<target value="1,500.00">
<comment><narrative>
Combined planned and unplanned generation and distribution SAIDI had fluctuated over 2021-2024. Unplanned distribution SAIDI had increased to 1,759 minutes/year in 2024.
</narrative></comment>
</target>
<actual value="2,483.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PUC System Average Interruption Duration Index (SAIDI)
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="4,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2026-06-15" />
<target value="1,500.00">
<comment><narrative>
Combined planned and unplanned generation and distribution SAIDI fluctuated between 2021 and 2024. The indicator is expected to meet its target upon completion of the NPP rehabilitation.
</narrative></comment>
</target>
<actual value="2,483.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PUC System Average Interruption Duration Index (SAIDI)
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="4,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2026-06-15" />
<target value="1,500.00">
<comment><narrative>
Combined planned and unplanned generation and distribution SAIDI fluctuated between 2021 and 2024. The indicator is expected to meet its target upon completion of the NPP rehabilitation.
</narrative></comment>
</target>
<actual value="2,483.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PUC System Average Interruption Duration Index (SAIDI)
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="4,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2026-06-15" />
<target value="1,500.00">
<comment><narrative>
Combined planned and unplanned generation and distribution SAIDI fluctuated between 2021 and 2024. The indicator is expected to meet its target upon completion of the NPP rehabilitation.
</narrative></comment>
</target>
<actual value="2,483.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Generation Output of Renewable Energy (other than hydropower) in Chuuk, Yap and Kosrae
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="1,930.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2025-09-30" />
<target value="3,500.00">
<comment><narrative>
1 MWh of battery energy storage system (BESS) were manufactured and shipping is being coordinated with the delayed solar PV construction in Kosrae and project closing date (as may be extended). In Chuuk, the construction of Weno solar PV facility was initiated (contract became effective in August 2024), and delayed scheduled commissioning test in April 2026. Grid-connected solar &amp; wind power generation had decreased in Chuuk, Kosrae and Yap in recent years.
</narrative></comment>
</target>
<actual value="1,704">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Generation Output of Renewable Energy (other than hydropower) in Chuuk, Yap and Kosrae
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="1,930.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="3,500.00">
<comment><narrative>
In Chuuk, the construction of the Weno solar PV facility began in October 2025, and commissioning tests are scheduled to take place in June 2026.
</narrative></comment>
</target>
<actual value="1,704">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Generation Output of Renewable Energy (other than hydropower) in Chuuk, Yap and Kosrae
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="1,930.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="3,500.00">
<comment><narrative>
In Chuuk, the construction of the Weno solar PV facility began in October 2025, and commissioning tests are scheduled to take place in June 2026.
</narrative></comment>
</target>
<actual value="1,704">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Generation Output of Renewable Energy (other than hydropower) in Chuuk, Yap and Kosrae
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="1,930.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="3,500.00">
<comment><narrative>
In Chuuk, the construction of the Weno solar PV facility began in October 2025, and commissioning tests are scheduled to take place in June 2026.
</narrative></comment>
</target>
<actual value="1,704">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2026-06-15" />
<target value="1.05">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2026-06-15" />
<target value="1898">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Clean cooking assessment completed
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
East West Center, in collaboration, with the College of Micronesia, was selected for the assessment. The quality enhancement review (QER) of this activity is ongoing with a plan for Decision Review in March 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women in technical positions employed by power utilities
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="4.00">
<comment><narrative>
There are currently four women in technical positions in the two power utilities (2 PUC, 2 KUA).
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households receiving new connections
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="272.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of GRM briefs published (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-11-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-19" />
<period-end iso-date="2026-06-15" />
<target value="1">
<comment><narrative>
Both a stakeholder sensitization event on the GRM and a citizen engagement activity were organized in Chuuk. The CIU (in collaboration with the PIU) explained the GRM mechanism to all relevant stakeholders. This was also a citizen engagement activity. A brief report on the event was sent to the Bank. The indicator complies with the Bank citizen engagement requirement.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Battery Storage Capacity in Chuuk, Yap and Kosrae States
</narrative></title>
<baseline year="2018" iso-date="2018-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-14" />
<period-end iso-date="2026-06-14" />
<target value="1.00">
<comment><narrative>
The battery energy storage system shipping and installation is being coordinated with solar PV construction in Kosrae.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households receiving new connections
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2025-09-30" />
<target value="272.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance contract in effect for PUC
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
The performance contract was drafted, being revised, and discussed with the office of the Governor of Pohnpei State. It includes provisions to enable PUC to increase the electricity tariffs without waiting for a prior review with the State Legislature. The Pohnpei State legislature has not yet signed the performance contract. The Bank has recently selected a consultant firm for a tariff study. The study includes support to PUC and the State for the adoption of cost recovery tariffs.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated in Chuuk, Yap and Kosrae States
</narrative></title>
<baseline year="2018" iso-date="2018-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-14" />
<period-end iso-date="2026-06-14" />
<target value="1.88">

</target>
<actual value="0.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="8.33">
<comment><narrative>
An 830 kW diesel generator commenced operations in Yap in May 2024. The major generation capacity increase will result from PUC's NPP rehabilitation project, under which 7.5 MW of new diesel generators are expected to be delivered, installed, and commissioned by June 2026. Three new diesel generators have been shipped to Pohnpei and are expected to be installed by April 2026, with commissioning and acceptance anticipated by June 2026.
</narrative></comment>
</target>
<actual value="0.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance contract in effect for PUC
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2025-09-30" />
<target value="Yes">
<comment><narrative>
The performance contract was drafted, being revised, and discussed with the office of the Governor of Pohnpei State. It includes provisions to enable PUC to increase the electricity tariffs without waiting for a prior review with the State Legislature. The Pohnpei State legislature has not yet signed the performance contract. The Bank has recently selected a consultant firm for a tariff study. The study includes support to PUC and the State for the adoption of cost recovery tariffs.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Battery Storage Capacity in Chuuk, Yap and Kosrae States
</narrative></title>
<baseline year="2018" iso-date="2018-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-14" />
<period-end iso-date="2026-06-14" />
<target value="1.00">
<comment><narrative>
The battery energy storage system shipping and installation is being coordinated with solar PV construction in Kosrae.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women in technical positions employed by power utilities
</narrative></title>
<baseline year="2018" iso-date="2018-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-30" />
<period-end iso-date="2026-06-15" />
<target value="4.00">
<comment><narrative>
There are currently four women in technical positions in the two power utilities (2 PUC, 2 KUA).
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P176965</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>FSM Skills and Employability Enhancement Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve the quality of and equitable access to vocational education and skills trainings, to improve access to employment, and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Federated States of Micronesia (FSM) Skills and Employability Enhancement Project for Micronesia, Federated States of is to improve the quality of and equitable access to vocational education and skills trainings, to improve access to employment, and in case of an eligible crisis or emergency, respond promptly and effectively to it. This project has five components. 1) The first component, Improving equitable access to vocational education and training, has the following components: (i) Provision of financial support for students; (ii) Provision of grants to Technical and Vocational Education and Training (TVET) institutions; and (iii) Targeted outreach and information campaigns to vulnerable groups on TVET opportunities. 2) The second component, Improving the relevance and quality of TVET, has the following sub-components: (i) Establishment of the FSM Skills Academy; (ii) Establishment of the FSM Skills Academy; (iii) Designing and implementing high-quality training of TVET master trainers and trainers; and (iv) Making provisions for independent assessment and certification of skills. 3) The third component, : Improving labor market information and employment services, has the following sub-components: (i) Implementation of a comprehensive labor market assessment; and (ii) Supporting job search assistance. 4) The fourth component, Project Management, aims to support project management, including monitoring and evaluation (M&amp;E) of project activities. 5) The fifth component, Contingent Emergency Response Component, is designed to provide swift response in an event of an eligible crisis or emergency, by enabling GFSM to request the World Bank to re-allocate uncommitted project funds to support emergency response and reconstruction.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0049604"><narrative>Federated States of Micronesia</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-0049603"><narrative>FSM National Department of Education</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-05-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-05-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Yuliya Smolyar</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jsmolyar@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081175" />
            <name><narrative>State of Yap</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.538 138.097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081550" />
            <name><narrative>State of Pohnpei</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.964 158.2056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082036" />
            <name><narrative>State of Kosrae</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.325 162.981</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082282" />
            <name><narrative>State of Chuuk</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.44077 151.85431</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11330" percentage="94" xml:lang="en"/><sector vocabulary="1" code="11330" percentage="94" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="3" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="3" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="3" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EW" percentage="84.0000000" xml:lang="en"><narrative>FY17 - Workforce Development and Vocational Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="75" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="16" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="16" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="32" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="20" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="16" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="87" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="65" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="69" xml:lang="en"><narrative>Education Facilities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="14" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="87" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="14" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="81" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="96" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="65" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="14" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="65" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="75" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="71" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000655" percentage="16" xml:lang="en"><narrative>Student Assessment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="14" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000661" percentage="78" xml:lang="en"><narrative>Skills Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="16" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">296666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">296666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">296666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">296666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">296666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">296666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">296666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">296666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">296666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">296666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">296666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">296666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">358333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">8746794.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">8746794.19</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">17700000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">149469</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">4907</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">74996</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">105534</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">167136</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">292530</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">563610</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">421079</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">980205</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">294866</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">953280</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">1786023</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1375930</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">783642</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-49603"><narrative>FSM National Department of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176965"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P176965?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176965"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries of job search assistance (disaggregated by gender)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="1000.00">
<comment><narrative>
This indicator measures the number of jobseekers who received comprehensive job search assistance (i.e. job matching, career counselling, mentoring) to improve their employability offered by TVET institution staff. The disaggregated data by male, female and person with disabilities are collected and reported.
</narrative></comment>
</target>
<actual value="681">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Targeted proportion of participants of TVET programs who passed the skills assessment and received certification
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the quality of the TVET training. YES means the percentage of assessment participants who passed and received certification is within 20 percent of the global average pass rate of the specific trade and / or age cohort. The denominator is the total number of participants of TVET program that took the skills assessment conducted by the skills certification agency (to be established), and the numerator is the total number of TVET program participants who passed the skills tests and received certificaion. This indicator is disaggregated by gender.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants of TVET programs who completed at least one year of market relevant TVET programs (disaggregated by gender and disability status)
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2027-06-15" />
<target value="4000">

</target>
<actual value="1635">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants of TVET programs who completed at least one year of market relevant TVET programs (disaggregated by gender and disability status)
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2027-06-15" />
<target value="4000">

</target>
<actual value="1635">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants of TVET programs who completed at least one year of market relevant TVET programs (disaggregated by gender and disability status)
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2027-06-15" />
<target value="4000">

</target>
<actual value="1664">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants of TVET programs who completed at least one year of market relevant TVET programs (disaggregated by gender and disability status)
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2027-06-15" />
<target value="4000">

</target>
<actual value="1664">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries of job search assistance (disaggregated by gender)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="1000.00">
<comment><narrative>
This indicator measures the number of jobseekers who received comprehensive job search assistance (i.e. job matching, career counselling, mentoring) to improve their employability offered by TVET institution staff. The disaggregated data by male, female and person with disabilities are collected and reported.
</narrative></comment>
</target>
<actual value="681">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries of job search assistance (disaggregated by gender)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="1000.00">
<comment><narrative>
This indicator measures the number of jobseekers who received comprehensive job search assistance (i.e. job matching, career counselling, mentoring) to improve their employability offered by TVET institution staff. The disaggregated data by male, female and person with disabilities are collected and reported.
</narrative></comment>
</target>
<actual value="681">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries who completed TVET courses and / or received employment services that found jobs or enrolled in tertiary education within six months of graduation (disaggregated by gender)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
Based on a very small pilot covering 6 students, 3 appeared employed. This indicates positive progress.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries who completed TVET courses and / or received employment services that found jobs or enrolled in tertiary education within six months of graduation (disaggregated by gender)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
IA will engage beneficiary schools in data collection effort to inform this indicator by May 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of TVET teachers across the country completed ToTs
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="120.00">
<comment><narrative>
This indicator measures the number of TVET teacher across the country who completed the TOTs offered in the project which will focus on equipping TVET teachers with the basic skills, knowledge, tools and techniques to deliver high quality TVET instruction. The TOTs will start in the 2nd year of project implementation.
</narrative></comment>
</target>
<actual value="18">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of TVET institutions successfully implementing performance grants for at least one year, awarded on the basis of equity criteria (socio-economic and / or disability status of students)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="7.00">
<comment><narrative>
This indicator captures the outcome of the performance grant to enhance access and equity for students from socioeconomically disadvantaged families and students with disabilities. The successful implementation means the disbursement took place, expenditures were in compliance, and results were achieved. The performance indicators will be defined in the Performance Grant Operational Manual (t be developed) and included in the grant agreement between the TVET institution and NDOE during the implementation. The TVET institutions will participate in a phased approach: 4 schools in the first 3 years, 5 in the 4th year and 6 in the 5th year.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of TVET institutions successfully implementing performance grants for at least one year, awarded on the basis of equity criteria (socio-economic and / or disability status of students)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="7.00">
<comment><narrative>
4 new schools have joined the PG program this academic year.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Targeted proportion of participants of TVET programs who passed the skills assessment and received certification
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the quality of the TVET training. YES means the percentage of assessment participants who passed and received certification is within 20 percent of the global average pass rate of the specific trade and / or age cohort. The denominator is the total number of participants of TVET program that took the skills assessment conducted by the skills certification agency (to be established), and the numerator is the total number of TVET program participants who passed the skills tests and received certificaion. This indicator is disaggregated by gender.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Targeted proportion of participants of TVET programs who passed the skills assessment and received certification
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the quality of the TVET training. YES means the percentage of assessment participants who passed and received certification is within 20 percent of the global average pass rate of the specific trade and / or age cohort. The denominator is the total number of participants of TVET program that took the skills assessment conducted by the skills certification agency (to be established), and the numerator is the total number of TVET program participants who passed the skills tests and received certificaion. This indicator is disaggregated by gender.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of project beneficiaries of TVET programs under the project in/from communities vulnerable to climate change (i.e. sea-level rise and flooding)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
This indicator measures the number of participants of TVET programs who are from the climate vulnerable communities, especially from the coastal zones, low-lying atoll islets facing the threats of sea-level rise and flooding.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of relevant government officers and TVET institution staff trained to provide job search assistance
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures capacity building provided for government and TVET institution staff on how to engage with jobseekers on effective strategies and practices in job matching, career counseling and mentoring of vulnerable jobseekers.
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results of the beneficiary engagement survey and plans for course-corrections and improvements of services under the project shared publicly
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Beneficiary engagement survey is to begin soon.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of TVET institutions eligible for performance-based grant which received the maximum annual grant amount allocated to them
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="75.00">
<comment><narrative>
This indicator measures the implementation progress of the performance-based grant by monitoring the achievement of the performance indicators (i.e., milestone, condition, output, or result) by the beneficiary institutions as defined in the PGOM.  The numerator i the number of institutions that received the maximum amount of annual performance grant allocated to them, and the denominator is the total number of institutions eligible to receive performance grants that year.
</narrative></comment>
</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Targeted proportion of participants of TVET programs who passed the skills assessment and received certification
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the quality of the TVET training. YES means the percentage of assessment participants who passed and received certification is within 20 percent of the global average pass rate of the specific trade and / or age cohort. The denominator is the total number of participants of TVET program that took the skills assessment conducted by the skills certification agency (to be established), and the numerator is the total number of TVET program participants who passed the skills tests and received certificaion. This indicator is disaggregated by gender.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="False">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of TVET teachers across the country completed ToTs
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="120.00">
<comment><narrative>
This indicator measures the number of TVET teacher across the country who completed the TOTs offered in the project which will focus on equipping TVET teachers with the basic skills, knowledge, tools and techniques to deliver high quality TVET instruction. The TOTs will start in the 2nd year of project implementation.
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results of the beneficiary engagement survey and plans for course-corrections and improvements of services under the project shared publicly
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Beneficiary engagement survey was completed in 2025. The results were published on the project webpage.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries who completed TVET courses and / or received employment services that found jobs or enrolled in tertiary education within six months of graduation (disaggregated by gender)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
Based on a very small pilot covering 6 students, 3 appeared employed. This indicates positive progress.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of outreach and information campaigns carried out targeting vulnerable groups
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures the number of communication campaigns on TVET opportunities carried out under the project targeting the vulnerable groups - low-income families, families residing on outer islands of FSM, families of students with IEPs. The information provision includes (i) the availability and benefits of attending TVET in targeted trades at FSA as well as state schools; and (ii) the provision of financial support for TVET students; (iii) the eligibility and procedures for application, and others as designed in te outreach and communications strategy.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants of TVET programs who completed at least one year of market relevant TVET programs (disaggregated by gender and disability status)
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2027-06-15" />
<target value="4000">

</target>
<actual value="1635">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants of TVET programs who completed at least one year of market relevant TVET programs (disaggregated by gender and disability status)
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2027-06-15" />
<target value="4000">

</target>
<actual value="1635">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants of TVET programs who completed at least one year of market relevant TVET programs (disaggregated by gender and disability status)
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2027-06-15" />
<target value="4000">

</target>
<actual value="1664">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of market relevant curricula developed or upgraded for target occupations in high priority sectors
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="7.00">
<comment><narrative>
This indicator monitors the development of the market relevant curricula in the target occupations in high priority sectors (at least one in each priority sector) based on the updated curriculum standards and the new occupational standards developed under the project. The priority sectors initially identified (to be adjusted based on the market needs): agriculture, business, carpentry, electrical, hospitality, mechanical, and IT. A typical developmental process involves discussions, design, piloting, and validation/finalization.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or better jobs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="1500">
<comment><narrative>
Based on very small pilot, 3 out of 6 students have been employed
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Update of LM assessment completed
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the development of a labor market assessment report accompanying technical analysis, led by NDOE in partnership with FSM Statistics and other stakeholders. The report includes sex-disaggregated employment information. NDOE will regularly (annually) update this analysis to meet the changing needs of the labor market, with findings to be regularly published. While the first report will be based on a comprehensive survey, the subsequent annual updates can utilize qualitative research methods such as focus group discussions and key informant interview to gather relevant information.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of market relevant curricula developed or upgraded for target occupations in high priority sectors
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="7.00">
<comment><narrative>
Development of curricula for 19 occupational CTE programs is underway with expected delivery in March 2026.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants of TVET programs who completed at least one year of market relevant TVET programs (disaggregated by gender and disability status)
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2027-06-15" />
<target value="4000">

</target>
<actual value="1664">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or better jobs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="1500">
<comment><narrative>
This indicator was introduced as CRI to measures the number of beneficiaries who completed TVET courses and / or received employment services that found jobs within six months of graduation. It will be measured along with the outcome indicator that measures the share of the employed graduates.
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of TVET institutions successfully implementing performance grants for at least one year, awarded on the basis of equity criteria (socio-economic and / or disability status of students)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="7.00">
<comment><narrative>
This indicator captures the outcome of the performance grant to enhance access and equity for students from socioeconomically disadvantaged families and students with disabilities. The successful implementation means the disbursement took place, expenditures were in compliance, and results were achieved. The performance indicators will be defined in the Performance Grant Operational Manual (t be developed) and included in the grant agreement between the TVET institution and NDOE during the implementation. The TVET institutions will participate in a phased approach: 4 schools in the first 3 years, 5 in the 4th year and 6 in the 5th year.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of relevant government officers and TVET institution staff trained to provide job search assistance
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures capacity building provided for government and TVET institution staff on how to engage with jobseekers on effective strategies and practices in job matching, career counseling and mentoring of vulnerable jobseekers.
</narrative></comment>
</target>
<actual value="48">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of TVET institutions successfully implementing performance grants for at least one year, awarded on the basis of equity criteria (socio-economic and / or disability status of students)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="7.00">
<comment><narrative>
4 new schools have joined the PG program this academic year.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of outreach and information campaigns carried out targeting vulnerable groups
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures the number of communication campaigns on TVET opportunities carried out under the project targeting the vulnerable groups - low-income families, families residing on outer islands of FSM, families of students with IEPs. The information provision includes (i) the availability and benefits of attending TVET in targeted trades at FSA as well as state schools; and (ii) the provision of financial support for TVET students; (iii) the eligibility and procedures for application, and others as designed in te outreach and communications strategy.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries who completed TVET courses and / or received employment services that found jobs or enrolled in tertiary education within six months of graduation (disaggregated by gender)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
IA will engage beneficiary schools in data collection effort to inform this indicator by May 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of TVET institutions eligible for performance-based grant which received the maximum annual grant amount allocated to them
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="75.00">
<comment><narrative>
This indicator measures the implementation progress of the performance-based grant by monitoring the achievement of the performance indicators (i.e., milestone, condition, output, or result) by the beneficiary institutions as defined in the PGOM.  The numerator i the number of institutions that received the maximum amount of annual performance grant allocated to them, and the denominator is the total number of institutions eligible to receive performance grants that year.
</narrative></comment>
</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries of job search assistance (disaggregated by gender)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="1000.00">
<comment><narrative>
This indicator measures the number of jobseekers who received comprehensive job search assistance (i.e. job matching, career counselling, mentoring) to improve their employability offered by TVET institution staff. The disaggregated data by male, female and person with disabilities are collected and reported.
</narrative></comment>
</target>
<actual value="681">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Update of LM assessment completed
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the development of a labor market assessment report accompanying technical analysis, led by NDOE in partnership with FSM Statistics and other stakeholders. The report includes sex-disaggregated employment information. NDOE will regularly (annually) update this analysis to meet the changing needs of the labor market, with findings to be regularly published. While the first report will be based on a comprehensive survey, the subsequent annual updates can utilize qualitative research methods such as focus group discussions and key informant interview to gather relevant information.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="False">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of project beneficiaries of TVET programs under the project in/from communities vulnerable to climate change (i.e. sea-level rise and flooding)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
This indicator measures the number of participants of TVET programs who are from the climate vulnerable communities, especially from the coastal zones, low-lying atoll islets facing the threats of sea-level rise and flooding.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P148560</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Energy Sector Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is to increase the available generation capacity and efficiency of electricity supply in the state power utilities, and to strengthen the planning and technical capacities of the National Government and the state power utilities in the energy sector.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Energy Sector Development Project for Micronesia is to increase the available generation capacity and efficiency of electricity supply in the state power utilities, and to strengthen the planning and technical capacities of the National Government and the state power utilities in the energy sector. There are three components to the project, the first component being increasing available generation capacity and efficiency of electricity supply in the state power utilities. The second component is the national and state energy planning. Preparation of energy master plans for each of the Federated States of Micronesia, or FSM states, including: (i) identifying and prioritizing infrastructure investments in the energy sector; and (ii) undertaking feasibility studies, and environmental and social impact assessments for the priority investments. Finally, the third component is the technical assistance and project management.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–P0017466"><narrative>Federated States of Micronesia</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-0017467"><narrative>Department of Resources and Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-08-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-05-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Leopold Sedogo</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lsedogo@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081175" />
            <name><narrative>State of Yap</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.5380001 138.097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002081550" />
            <name><narrative>State of Pohnpei</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9640002 158.2056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082036" />
            <name><narrative>State of Kosrae</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.3249998 162.981</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002082282" />
            <name><narrative>State of Chuuk</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.454 151.80499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="23310" percentage="57" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="37" xml:lang="en"/><sector vocabulary="1" code="23210" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LU" percentage="100.000000" xml:lang="en"><narrative>FY17 - Renewable Energy Solar</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="29" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="37" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="60" xml:lang="en"><narrative>Climate change</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">258771.05</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">258771.05</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">258771.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">258771.05</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">258771.05</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">258771.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">258771.05</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">258771.05</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">258771.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">258771.05</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">258771.05</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">258771.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">646927.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">646927.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">646927.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">646927.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">646927.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">646927.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">646927.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">646927.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">646927.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">646927.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">646927.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">646927.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">452849.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">452849.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">452849.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">452849.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">452849.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">452849.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">452849.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">452849.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">452849.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">452849.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">452849.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">452849.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">491664.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">491664.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">491664.97</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">491664.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">491664.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">491664.97</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">491664.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">491664.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">491664.97</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">491664.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">491664.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">491664.97</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">25877.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">25877.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">25877.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">25877.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">25877.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">25877.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1919992.72</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1919992.72</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">14400000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-550893</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-89375</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">1000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">32197</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">52350</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">1600000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">87184</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">1614501</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">196394</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">173093</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1253785</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">39317</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">680829</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">2262663</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">575817</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">265004</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">420786</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">1617257</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">606987</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">1841</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-17467"><narrative>Department of Resources and Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P148560"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P148560?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P148560"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Energy sector master plans completed and accepted
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;fully achieved. See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Commissioning of efficient streetlights
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;fully achieved. The&amp;nbsp;number of efficient streetlights&amp;nbsp;at completion reached 742% of the original target. See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Energy sector information system in place - implementation progress
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved technical capacity in the state utilities for operations and maintenance
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;fully achieved. See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation Capacity of Conventional Generation constructed under the project
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="4.70">

</target>
<actual value="6.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sustainability reform program agreed with each state power utility - implementation progress
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2018-09-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Commissioning of conventional energy generation equipment
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="100.00">

</target>
<actual value="132.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Commissioning of solar generation equipment
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="100.00">

</target>
<actual value="200.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation Capacity of Conventional Generation constructed under the project
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="4.70">

</target>
<actual value="6.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Energy sector information system in place - implementation progress
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Commissioning of solar generation equipment
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="100.00">

</target>
<actual value="200.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Energy sector master plans completed and accepted
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="50,000.00">

</target>
<actual value="62,632.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Commissioning of efficient streetlights
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="100.00">

</target>
<actual value="742.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Energy sector information system in place - implementation progress
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;fully achieved. See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved technical capacity in the state utilities for operations and maintenance
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation Capacity of Renewable Energy (other than hydropower) constructed
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;over achieved. See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sustainability reform program agreed with each state power utility - implementation progress
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2018-09-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Projected lifetime fuel savings
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="124,000,000.00">

</target>
<actual value="124,000,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved planning capacity of the state power utilities and national government
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation Capacity of Renewable Energy (other than hydropower) constructed
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="0.20">

</target>
<actual value="0.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Commissioning of efficient streetlights
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="100.00">

</target>
<actual value="742.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sustainability reform program agreed with each state power utility - implementation progress
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;fully achieved.&amp;nbsp;See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Commissioning of conventional energy generation equipment
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;fully achieved. The generation capacity at completion reached 132% the size of the original target. See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation specialists in place
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Projected lifetime fuel savings
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="124000000.00">

</target>
<actual value="124000000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Projected lifetime fuel savings
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;over achieved. See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="915000000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;over achieved. See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="62632.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved technical capacity in the state utilities for operations and maintenance
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved planning capacity of the state power utilities and national government
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Commissioning of conventional energy generation equipment
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="100.00">

</target>
<actual value="132.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation specialists in place
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Commissioning of solar generation equipment
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;fully achieved. The generation capacity at completion reached 200% the size of the original target. See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Energy sector master plans completed and accepted
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="2019-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation specialists in place
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved planning capacity of the state power utilities and national government
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;fully achieved. See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation Capacity of Conventional Generation constructed under the project
</narrative></title>
<baseline year="2014" iso-date="2014-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator is&amp;nbsp;over achieved. See additional information in Table 2&amp;nbsp;and&amp;nbsp;3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6.20">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:35:03" hierarchy="1"><iati-identifier>44000-P178237</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience: Federated States of Micronesia (FSM PROPER)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Development Objective of the Series of Projects is to strengthen the shared management of selected Pacific Island oceanic and coastal fisheries, and the critical habitats upon which they depend.The Development Objective of the objective is to strengthen stakeholder capacity for regional collaboration and enhanced sector performance in fisheries, and for improved habitat preservation of the Federated States of Micronesia.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience (PROPER) project in the Federated States of Micronesia (FSM) (The Project, or FSM PROPER). The Project is part of the Pacific Islands Regional Oceanscape Program (PROP), a series of projects, which aims to strengthen the shared management of selected Pacific Island oceanic and coastal fisheries, and the critical habitats upon which they depend. The Program is structured to allow national and regional projects to work in conjunction, and for all national projects to contribute towards regional policy objectives and focus on addressing national priorities. The Project is the second in the series for the country. It aims to strengthen regional collaboration and national capacity for the management and the sustainable development of the oceanic and coastal fisheries sector in the FSM. The National Oceanic Resources Management Authority (NORMA) will be the primary implementing agency (IA) for the Project. NORMA has significant experience with World Bank (WB) procedures as they were implemented in FSM PROP 1st Phase (P151754). The Department of Health and Social Affairs (DHSA), Department of Resources and Development (DRD) and the Department of Environment, Climate Change &amp; Emergency Management (DECEM) will be supporting IAs for specific Components and activities under their respective mandates.  The Project activities are defined in general terms and may not be fully quantified prior to appraisal. The project has three components, aligned with the Program's thematic, and one project management component: Component 1: Strengthening the effective management and harnessing of oceanic fisheries. This component will support improved oceanic fisheries management and maximization of the domestic value added through institutional strengthening of NORMA, consolidating for certification for food safety and legal compliance to enable FSM fish products to enter regional value chains and reach high-end markets.Subcomponent 1.1. Strengthening the enabling environment for oceanic fisheries will strengthen the enabling environment for seafood safety and traceability through; (i) skills and competency training of CA staff in good hygiene practices (GHP), good manufacturing practices (GMP), hazard analysis and critical control points (HACCP); vessel and facility inspections and audits; (ii) institutional strengthening support of the CA through inter alia; drafting of Standard Operating Procedures, CA Regulations, NCP and Industry standards; development of auditing and inspections systems; laboratory protocols, sampling and testing protocols; (iii) pre-feasibility studies for infrastructure and equipment requirements (offices, laboratory, equipment) for sustainable and effective operation of the CA; (iv) improving dockside landing sites for seafood safety; (v) support design, construction, installation and validation of an Integrated Fisheries Information Management System; (vi) support effective detection, deterrence, and elimination IUU fishing through upgrading electronic monitoring and reporting; training and capacity building, etc; (vii) design and construction of a new NORMA office building and a new satellite office for NORMA in Kosrae State.Subcomponent 1.2. Maximizing the value of oceanic resources to the FSM will support inter alia: (i) capacity building and preparation of policy analyses for investment and increasing fisheries revenues, IUU fishing and oceanic fisheries and exports; (ii) reviewing legal frameworks that a relevant to FSM meeting regional compliance particularly related to authorized fishing vessels entering FSM Ports, and (iii) pre-feasibility and cost-benefit studies on priority fisheries infrastructure, and investment in climate proofed fisheries infrastructure where there is evidence for such infrastructures to be economically viable, etc. Component 2: Strengthening the effective management of, and socio-economic benefits from, coastal fisheries. This component aims to sustain and increase benefits from the coastal fisheries by rebuilding the resource base and building value chains through implementation of measures to reduce excessive fishing effort on depleted resources, providing opportunities to re-direct fishing to healthy nearshore pelagics, creating new work opportunities through fishing and development of value-added products, and providing small-scale public infrastructure such as improved landing sites. This is underpinned by improved market data collection as well as monitoring through vessel registration legislation.Activities under subcomponent 2.1. Strengthening coastal fisheries institutional and legal framework include: (i) technical assistance to review of existing coastal legislation in each State and to finalize vessel registration and mandatory sea safety equipment; (ii) workshops and trainings to communicate legislative updates and requirements; (iii) goods and equipment to support vessel registration and sea safety programs; (iv) assessment of existing data and development of new/revised protocols for fisheries and ecological data collection; (v) procurement of goods and equipment for data collection; (vi) refurbishment of the Kosrae Department of Resources and Economic Affairs (DREA) Fisheries Office; (vii) improving inshore MCS capacity through supplies, equipment, training and construction of watch houses in Pohnpei Marine Protected Areas (MPAs).Subcomponent 2.2. Delivering critical marina infrastructure (Chuuk, Pohnpei and Kosrae)will support (i) the development of “marinas” i.e., improved landing sites to serve as a multi-purpose facility as a centralized location for fishers to bring in, process and market catches, for boat servicing, and other economic activities, with consideration for monitoring and enforcement of activities including pollution control and for energy efficiency, emission reduction, and climate-resilient design.Subcomponent 2.3. Fish Processing and Value Chain Addition will support (i) training fishers on value chain addition; (ii) feasibility assessments for value chain addition through fish processing in Kosrae; (iii) investigating and disseminating activities to boost coastal restoration and provide alternative jobs, such as fishing around anchored FADs and supportive measures (e.g., safety at sea), restorative and community aquaculture; and (iv) increasing aquaculture capacity by improving National Aquaculture Center (NAC) capacity and feasibility assessments for commercial aquaculture production. Component 3: Strengthening the sustainable management, protection and resilience of marine habitats addresses impacts of land-based and marine pollution on coastal and marine ecosystems, which affect the health of fisheries, fish stock, and sanitary standards.Subcomponent 3.1. Environmental protection and marine habitat management will support (i) environmental awareness campaigns on environmental pollution with support provided to the Chuuk’ Women's Council to enable expanded environmental outreach; (ii) identifying options for restoring and monitoring dredging sites; (iii) establishment of an ecological baseline through comprehensive ecological assessments in all four States with support to disseminate findings. Subcomponent 3.2. Improvements to waste management activities will include the (i) review waste management strategies, emergency response protocols and pollution laws; (ii) improvements to hazardous waste management in Pohnpei and Yap; (iii) technical assistance on legislative improvements, infrastructure planning including detailed environmental and social impact assessments and detailed design of facilities, cost recovery and waste market creation in Chuuk; and (iv) capacity building for staff in waste management and emergency response.Component 4: Project Management. The Project would finance consultant services for the Project Implementation Unit (PIU), annual financial audits, operating costs, goods]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–00007508"><narrative>Federated States of Micronesia</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM-COA-00006878"><narrative>Department of Environment, Climate Change, and Emergency Management</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-10-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-10-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Aimee Terese Hall</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ahall8@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>






<contact-info type="2">
<mailing-address><narrative>
X686+P69, Kolonia, Pohnpei, Micronesia, (691) 320-2700/5181, info@norma.fm

</narrative></mailing-address></contact-info><recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2081986" />
                <name><narrative>Palikir - National Government Center</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.92477 158.16109</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="31310" percentage="100" xml:lang="en"/><sector vocabulary="1" code="31310" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAK" percentage="8.00000000" xml:lang="en"><narrative>Public Administration - Agriculture, Fishing, and Forestry </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAF" percentage="92.0000000" xml:lang="en"><narrative>Fisheries</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="0" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="0" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="0" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="0" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="0" xml:lang="en"><narrative>Regional Integration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000832" percentage="0" xml:lang="en"><narrative>Fisheries Policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000836" percentage="0" xml:lang="en"><narrative>Coastal Zone Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="0" xml:lang="en"><narrative>Regional Integration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="0" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="0" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="0" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="0" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="0" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000833" percentage="0" xml:lang="en"><narrative>Oceans</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="0" xml:lang="en"><narrative>Gender</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">631241.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">631241.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">631241.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">631241.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">631241.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">631241.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">631241.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">631241.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">631251.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1265789.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1265789.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1265789.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1265789.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1265789.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1265789.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1265789.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1265789.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1265789.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1265789.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1265789.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1265801.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1487013.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1487013.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1487013.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1487013.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1487013.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1487013.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1487013.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1487013.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1487013.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1487013.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1487013.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1487025.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">797463.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">797463.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">797463.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">797463.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">797463.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">797463.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">797463.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">797463.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">797463.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">797463.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">797463.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">797475.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">563261.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">563261.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">563261.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">563261.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">563261.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">563261.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">563261.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">563261.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">563261.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">563261.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">563261.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">563273.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">27098.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">27098.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">27098.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">27098.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">27098.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">27098.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">27098.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">27098.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">27098.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">27098.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">27098.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">27110.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">52062016.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">52062016.49</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">56000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-51330"><narrative>Department of Resource &amp; Development</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-51331"><narrative>National Oceanic Resource Management Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-6878"><narrative>Department of Environment, Climate Change, and Emergency Management</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-7698"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">993725</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-51330"><narrative>Department of Resource &amp; Development</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-51331"><narrative>National Oceanic Resource Management Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-6878"><narrative>Department of Environment, Climate Change, and Emergency Management</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-7698"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">2500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-51330"><narrative>Department of Resource &amp; Development</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-51331"><narrative>National Oceanic Resource Management Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-6878"><narrative>Department of Environment, Climate Change, and Emergency Management</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-7698"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">47409</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-51330"><narrative>Department of Resource &amp; Development</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-51331"><narrative>National Oceanic Resource Management Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-6878"><narrative>Department of Environment, Climate Change, and Emergency Management</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-7698"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">136160</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-51330"><narrative>Department of Resource &amp; Development</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-51331"><narrative>National Oceanic Resource Management Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-6878"><narrative>Department of Environment, Climate Change, and Emergency Management</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-7698"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">146091</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-51330"><narrative>Department of Resource &amp; Development</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-51331"><narrative>National Oceanic Resource Management Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-6878"><narrative>Department of Environment, Climate Change, and Emergency Management</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-7698"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">114599</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FM-COA-51330"><narrative>Department of Resource &amp; Development</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-51331"><narrative>National Oceanic Resource Management Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-6878"><narrative>Department of Environment, Climate Change, and Emergency Management</narrative></receiver-org><receiver-org xml:lang="en" ref="FM-COA-7698"><narrative>Department of Health and Social Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178237"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178237?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178237"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries receiving project support
</narrative></title>
<baseline year="2024" iso-date="2024-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-11" />
<period-end iso-date="2030-09-11" />
<target value="11704">
<comment><narrative>
Implementation of Component 1 to 3 activities is commencing and these will feed into numbers of beneficiaries.  Some activities planned for early 2026 that can deliver benefit to population.  Data gathering tool (kobo toolbox) established and being populated.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of digitalized datasets on marine health with updated baseline for all four states
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of digitalized datasets on marine health with updated baseline for all four states
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="4">
<comment><narrative>
TOR for assessment of data/research and scope of ecological assessment in development with assistance by SPC. Selection of dive instructors completed and negotiations are ongoing for Kosrae and Yap. Direct selection for Pohnpei and Chuuk submitted. Dependent on hiring of data collection protocol development consultant. Data activities aggregation agreed to by States. TOR developed with assistance of SPC.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Infrastructure Design, Environment &amp; Social Assessment and Procurement Packages completed
</narrative></title>
<baseline year="2024" iso-date="2024-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-03" />
<period-end iso-date="2030-09-08" />
<target value="3">
<comment><narrative>
Procurement of Design/Supervision and ESIA for coastal infrastructure marinas are under evaluation.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of establishments meeting the requirements for export to the EU market
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="6">
<comment><narrative>
DHSA has lodged request to EU to be certified CA and received questions to address. Existing CA staff participated in certification training with partners in RMI. Additional inspector for Pohnpei contracted. Process and regulations for audits already in place and audits are ongoing.  M&amp;E Officer collecting CA Inspection Reports.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Infrastructure Design, Environment &amp; Social Assessment and Procurement Packages completed
</narrative></title>
<baseline year="2024" iso-date="2024-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-03" />
<period-end iso-date="2030-09-08" />
<target value="3">
<comment><narrative>
Procurement of Design/Supervision and ESIA for coastal infrastructure marinas at RFP stage.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries receiving project support
</narrative></title>
<baseline year="2024" iso-date="2024-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-11" />
<period-end iso-date="2030-09-11" />
<target value="11704">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Infrastructure Design, Environment &amp; Social Assessment and Procurement Packages completed
</narrative></title>
<baseline year="2024" iso-date="2024-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-03" />
<period-end iso-date="2030-09-08" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female fishers and fish workers benefiting from value chain addition activities
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="350">
<comment><narrative>
System for collecting beneficiaries set up in kobo toolbox. Value chain activities looking at starting next reporting period.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries receiving project support
</narrative></title>
<baseline year="2024" iso-date="2024-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-11" />
<period-end iso-date="2030-09-11" />
<target value="11704">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of digitalized datasets on marine health with updated baseline for all four states
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An operational fisheries monitoring and information management system facilitates dissemination of updated timely data to national and regional stakeholders
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An operational fisheries monitoring and information management system facilitates dissemination of updated timely data to national and regional stakeholders
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="Yes">
<comment><narrative>
TOR being developed for Coastal Fisheries data/research assessments, assistance of SPC. Aggregation for data activities agreed to by all States.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An operational fisheries monitoring and information management system facilitates dissemination of updated timely data to national and regional stakeholders
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="Yes">
<comment><narrative>
TOR being developed for Coastal Fisheries data/research assessments, assistance of SPC. Aggregation for data activities agreed to by all States.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of establishments meeting the requirements for export to the EU market
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="6">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of establishments meeting the requirements for export to the EU market
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="6">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of establishments meeting the requirements for export to the EU market
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="6">
<comment><narrative>
DHSA has lodged request to EU to be certified CA and received questions to address. Existing CA staff participated in certification training with partners in RMI. Additional inspector for Pohnpei contracted. Process and regulations for audits already in place and audits are ongoing.  M&amp;E Officer collecting CA Inspection Reports.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of digitalized datasets on marine health with updated baseline for all four states
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of digitalized datasets on marine health with updated baseline for all four states
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of digitalized datasets on marine health with updated baseline for all four states
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="4">
<comment><narrative>
TOR for assessment of data/research and scope of ecological assessment in development with assistance by SPC. Selection of dive instructors completed and negotiations are ongoing for Kosrae and Yap. Direct selection for Pohnpei and Chuuk submitted. Dependent on hiring of data collection protocol development consultant. Data activities aggregation agreed to by States. TOR developed with assistance of SPC.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities engaged with findings from ecological surveys in each State.
</narrative></title>
<baseline year="2024" iso-date="2024-09-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-07" />
<period-end iso-date="2030-09-07" />
<target value="80">
<comment><narrative>
Preparatory activities (dive certifications) are underway and assessments to identify gaps for ecological assessments being planned next reporting period.  Instructors for Kosrae and Yap Dive certification being negotiated.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities engaged with findings from ecological surveys in each State.
</narrative></title>
<baseline year="2024" iso-date="2024-09-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-07" />
<period-end iso-date="2030-09-07" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
EM data reviews and program cost recovery designed
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="Yes">
<comment><narrative>
Example TOR shared with NORMA. NORMA has designated EM Officer after losing its first EM Officer.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2024" iso-date="2024-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-11" />
<period-end iso-date="2030-09-11" />
<target value="0.83">
<comment><narrative>
Kosrae DREA building design included solar power system. RFPs for Marina ESIA and D&amp;S includes solar power expertise requirement.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female fishers and fish workers benefiting from value chain addition activities
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="350">
<comment><narrative>
System for collecting beneficiaries set up in kobo toolbox. Value chain activities looking at starting next reporting period.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal framework for authorization of fishing vessels requesting to enter FSM ports reviewed
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-08-31" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of establishments meeting the requirements for export to the EU market
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="6">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time for registered project-related grievances to be addressed through the Grievance Redress Mechanisms
</narrative></title>
<baseline year="2024" iso-date="2024-09-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-06" />
<period-end iso-date="2030-09-10" />
<target value="21">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
EM data reviews and program cost recovery designed
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="Yes">
<comment><narrative>
Example TOR shared with NORMA. NORMA has designated EM Officer after losing its first EM Officer.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal framework for authorization of fishing vessels requesting to enter FSM ports reviewed
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-08-31" />
<target value="Yes">
<comment><narrative>
NORMA considering how to align with existing support from other donors to meet its needs. TOR elements discussed with NORMA Division of Fisheries Compliance.
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2024" iso-date="2024-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-11" />
<period-end iso-date="2030-09-11" />
<target value="0.83">
<comment><narrative>
Kosrae DREA building design included solar power system. RFPs for Marina ESIA and D&amp;S includes solar power expertise requirement.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities engaged with findings from ecological surveys in each State.
</narrative></title>
<baseline year="2024" iso-date="2024-09-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-07" />
<period-end iso-date="2030-09-07" />
<target value="80">
<comment><narrative>
Preparatory activities (dive certifications) are underway and assessments to identify gaps for ecological assessments being planned next reporting period
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female fishers and fish workers benefiting from value chain addition activities
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="350">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
EM data reviews and program cost recovery designed
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of establishments meeting the requirements for export to the EU market
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-09-12" />
<target value="6">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An operational fisheries monitoring and information management system facilitates dissemination of updated timely data to national and regional stakeholders
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="Yes">
<comment><narrative>
TOR being developed for Coastal Fisheries data/research assessments, assistance of SPC. Aggregation for data activities agreed to by all States.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An operational fisheries monitoring and information management system facilitates dissemination of updated timely data to national and regional stakeholders
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2024" iso-date="2024-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-11" />
<period-end iso-date="2030-09-11" />
<target value="0.83">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal framework for authorization of fishing vessels requesting to enter FSM ports reviewed
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-08-31" />
<target value="Yes">
<comment><narrative>
Flagged for restructure as completed but not under PROPER.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time for registered project-related grievances to be addressed through the Grievance Redress Mechanisms
</narrative></title>
<baseline year="2024" iso-date="2024-09-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-06" />
<period-end iso-date="2030-09-10" />
<target value="21">
<comment><narrative>
GRM established and monitored by Project ES Officer. Zero submissions received.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time for registered project-related grievances to be addressed through the Grievance Redress Mechanisms
</narrative></title>
<baseline year="2024" iso-date="2024-09-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-06" />
<period-end iso-date="2030-09-10" />
<target value="21">
<comment><narrative>
GRM established and monitored by Project ES Officer. Zero submissions received.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An operational fisheries monitoring and information management system facilitates dissemination of updated timely data to national and regional stakeholders
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="Yes">
<comment><narrative>
TOR being developed for Coastal Fisheries data/research assessments, assistance of SPC. Aggregation for data activities agreed to by all States.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-29T23:32:58" hierarchy="1"><iati-identifier>44000-P151754</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Pacific Islands Regional Oceanscape Program - Federated States of Micronesia</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The project development objective is to strengthen the shared management of selected Pacific Island oceanic and coastal fisheries, and the critical habitats upon which they depend.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The objective of the Pacific Islands Regional Oceanscape Program Project for the Federated States of Micronesia is to strengthen the shared management of selected Pacific Island oceanic and coastal fisheries, and the critical habitats upon which they depend. The project has four components. (1) Sustainable management of oceanic fisheries component will help participating Pacific Island countries strengthen the management of the region's purse seine and long-line tuna fisheries. The component includes activities to: (i) strengthen the capacity of national and regional institutions to sustainably manage Pacific Island tuna fisheries; and (ii) ensure an equitable distribution within Pacific Island countries of the benefits of sustainably managed tuna fisheries. (2) Sustainable management of coastal fisheries component aims to support participating countries to sustainably manage defined coastal fisheries and the habitats that support them, focusing on those with the greatest potential for increased benefits, i.e. coastal fisheries such as beche-de-mer (BDM) that (i) can generate export earnings for the country, and/or (ii) support livelihoods, food security and dietary health. Towards this objective, this component includes activities to: (i) empower stakeholders to sustainably manage targeted coastal fisheries in participating countries; and (ii) link sustainable coastal fish products to regional markets. This component will provide climate change co-benefits by supporting adaptation in the form of better management of coastal fisheries and natural defenses. (3) Sustainable financing of the conservation of critical fishery habitats component will help identify revenue streams to sustainably finance the conservation of critical habitats that underpin oceanic and coastal fisheries in the region. This component also provides climate change co-benefits by supporting mitigation, in the form of conservation of vegetated coastal habitats that sequester significant amounts of carbon. (4) Regional coordination, implementation support, national program management and monitoring and evaluation component will provide regional coordination, implementation support and project management, to ensure a coherent approach to program implementation and wide dissemination of results and lessons learned; as well as implementation support and training as needed for the program to achieve its objectives.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FM–ORP0020946"><narrative>Federated States of Micronesia</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FM–ORP0020945"><narrative>National Oceanic Resource Management Authority</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="FM–ORP0020947"><narrative>Department of Resources and Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-12-22">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2014-12-22">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2021-09-30"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2021-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Iretomiwa Olatunji</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>iolatunji@worldbankgroup.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>




<recipient-country code="FM" percentage="100"><narrative xml:lang="en">MICRONESIA, FEDERATED STATES OF</narrative></recipient-country><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002082282" />
						<name><narrative>State of Chuuk</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>7.454 151.805</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002082036" />
						<name><narrative>State of Kosrae</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>5.325 162.981</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002081918" />
						<name><narrative>Federated States of Micronesia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>6.924 158.162</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002081550" />
						<name><narrative>State of Pohnpei</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>6.964 158.2056</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002081175" />
						<name><narrative>State of Yap</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>9.538 138.097</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><sector vocabulary="1" code="31320" percentage="58" xml:lang="en"/><sector vocabulary="1" code="31310" percentage="42" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AF" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Fisheries</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AL" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Livestock</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="33" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="11" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="2" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="2" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="11" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="2" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="33" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="33" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="32" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="2" xml:lang="en"><narrative>Biodiversity</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">33576.0800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">68395.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">68395.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">68395.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">68395.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">68395.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">68395.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">68395.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">68395.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">68395.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">68395.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">68395.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">68395.7600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">67152.1500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">59690.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">34819.6300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">34819.6300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">34819.6300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">23333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">23333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">23333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">23333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">23333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">23333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">23333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">23333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">23333.3700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.0000</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">5500000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-939357</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">500000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">19165</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">47454</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-47454</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">47454</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">159290</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">217702</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">434223</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">803351</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">218400</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">118213</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">514364</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">85595</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">160801</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">493915</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">57890</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">134134</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">146494</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">451024</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-184824</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151754"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P151754?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151754"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity></iati-activities>